USS MICHAEL MURPHY (DDG 112) Selected Restricted Availability (SRA)
Solicitation number
N00024-19-R-4404
Issued by

About this file

Sources Sought Q&A #1 Attachment

View the file

Other files

File Type Posted
USS_MICHAEL_MURPHY_DDG_112_Sources_Sourght_QA_1_(1.31).xlsx XLSX spreadsheet
Sources_Sought__for_USS_Michael_Murphy.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MPH 0C1 WI LISTING

DRAFT DDG112 SRA Work Spec Index as of 1.31. Actual Work Specs may be different at time of solicitation.
Work SpecTitle
042-00-001Work Completion Certification; accomplish
042-11-001Accountability of Manhour and Material Reservation; accomplish
077-01-001Hazardous Waste Produced on Naval Vessels; control
120-11-002Transverse Stiffener; repair
123-00-001JP-5 Tanks and Voids Open, Pump, Clean, Gas Free, and Inspect; accomplish
123-00-002Potable Water Tanks; Open, Pump, Clean, Gas Free and inspect; accomplish
123-00-003VCHT Tank No. One, Open, Pump, Clean and Gas Free; accomplish
123-00-004VCHT Tank No. 2 Open, Pump, Clean and Gas Free; accomplish
123-00-005Plumbing Waste Drain Tank, Open, Pump, Clean and Gas Free; accomplish
123-00-006Plumbing Waste Drain Tank, Open, Pump, Clean and Gas Free; accomplish
123-00-007Tank, Void Cleaning and Pumping; accomplish
123-00-008Tank, Void Cleaning and Pumping; accomplish
123-12-001JP-5 Tank; preserve
123-12-002JP-5 Tank; repair
123-14-001Potable Water Tank; repair and preserve
123-17-001Contaminated Oil Tank; preserve
123-17-002Contaminated Oil Tank; repair
123-19-003Vacuum, Collection, Holding and Transfer (VCHT) Tank; repair
123-19-004Vacuum Collection, Holding and Transfer (VCHT) Tank; preserve
123-19-005Vacuum Collection, Holding and Transfer (VCHT) Tank; repair
123-19-006Vacuum Collection, Holding and Transfer (VCHT) Tank; preserve
123-19-007Waste Water Tank; preserve
123-19-008Waste Water Tank; preserve
123-19-009Waste Water Tank; repair
123-19-010Waste Water Tank; repair
130-11-001Aircraft Securing Fitting; replace
150-11-00205 Level Deck; repair
150-11-00302 Level Deck; repair
167-11-001Bolted Equipment Removal Plate (BERP) Repair; accomplish
167-11-002Cross Flooding Door; repair
167-80-001ShipAlt DDG51-77228D, Install Corrosion Resistant Steel (CRES) Individually Dogged Watertight Door (Partial); accomplish
251-31-001Air Intake and Exhaust Louver; clean and preserve
251-32-001Gas Turbine Intake Number One Touch-Up Repair; accomplish
251-32-0022A and 2B Gas Turbine Intake Touch-Up Repair; accomplish
256-80-001ShipAlt DDG51-64250D, Ship Service Gas Turbine Generator (SSGTG) Emergency Seawater Cooling System Modification; accomplish
259-10-001Uptake Engine Room Number 2 Touch Up; accomplish
259-10-002Uptake Engine Room Number One Touch Up; accomplish
259-11-001Gas Turbine (GTRB) Exhaust Duct Collector; repair
259-11-002Ship Service Gas Turbine Generator (SSGTG) Exhaust Duct Water Tight Seal Cover; replace
259-80-001DDG51 Class AER 66051 D, Main Gas Turbine (MGT) and Gas Turbine Generator (GTG) Louver Foreign Object Damage (FOD) Screen Removal; accomplish
303-80-001ShipAlt DDG51-64207, Transient Voltage Surge Suppressor (TVSS) Installation; accomplish
313-80-001ShipAlt DDG51-86517D, Material Handling Equipment (MHE) Battery Charger Replacement; accomplish
320-80-001ShipAlt DDG51-64231D, Automatic Bus Transfer (ABT) Relocation; accomplish
321-80-001DDG51 Class AER 66085, Generator Cable Chafing Repair; accomplish
332-90-001ShipAlt DDG-51-80330 K Solid State Lighting (LED); accomplish
432-80-001DDG51 Class AER 64057, Net 85 Jackbox (IIEC); accomplish
437-21-001Fuel Oil Storage Tank Level Indicator (TLI); replace
451-67-001AN/SPS-67(V)5 Surface Search Radar Waveguide; repair
472-90-001ShipAlt DDG51-80156K AN/SLQ (V)6 Hardware; ShipAlt DDG51-81382 AN/SLQ-32(V)6 Data Adaptation Processor (DAP); accomplish
511-11-001Ventilation Heater; replace
512-00-001Ventilation Duct Cleaning; accomplish
512-11-001Fan Coil Assembly; replace
512-80-001ShipAlt DDG51-64216D, Fan Room Condensation Drainage Modifications; accomplish
512-80-002ShipAlt DDG51-64238D, Collective Protection System Supply/Exhaust Hoods; replace
526-80-001ShipAlt DDG51-64244D, Weather Deck Drain; install
526-80-002DDG51 AER 64270, 02 Level Aft Port Weather Deck Drain; accomplish
526-80-003ShipAlt DDG51-77691D, Weather Deck Drain and Trough Modifications; accomplish
526-80-004ShipAlt DDG51-64085D, 02 Level Weather Deck Drain; install
528-11-001Plumbing Waste Drain Piping System; hydroblast and clean
528-80-001ShipAlt DDG51-64240D, Uptake Drain Piping Overboard Routing Correction; accomplish
528-80-002ShipAlt DDG51-77690D, 02 Level Intake And Uptake Drains; accomplish
551-61-001Masker Air Cooler Piping Flange; repair
551-61-002Masker Air System; test
582-11-001Retractable Chock and Retractable Chock Cover; repair
583-11-001Boat Handling System; overhaul
588-21-002Recovery Assist, Securing and Traversing (RAST) System Track and Plate; preserve
593-11-001Vacuum, Collection, Holding and Transfer (VCHT) Piping System Chemical Cleaning; accomplish
593-80-001DDG51 Class AER 64257, Primary and Secondary OCM to Drain; accomplish
611-80-001ShipAlt DDG51-64185D, Anchor Chain Chafing Plate Installation; accomplish
623-80-001DDG51 Class AER 66048, Accommodation Ladder Feathering Bar Securing Pin; accomplish
624-11-001Balanced Joiner Door; remove, store and install
634-11-001Chemical - Resistant Flooring; replace
634-11-002Terrazzo Deck Covering; replace
634-11-003Chemical - Resistant Floor Covering; repair, resurface and reseal
634-21-001Nonskid; replace
634-21-002Flight Deck, Hangar One and 2 Nonskid; replace
634-21-003Aft Missile Deck Nonskid; replace
644-80-001ShipAlt DDG51-64170D, Crew 3 Shower Stall Modification; accomplish
651-11-001Cold Food Counter and Skittle; replace
651-80-001DDG51 Class AER 85629 Replace Combination Oven; accomplish
672-80-001ShipAlt DDG51-64241D, Security Force Issue Room Stowage Space Modification; accomplish
721-21-002Vertical Launch System (VLS), MK 41 Launcher Top and Uptake Hatch; preserve
980-11-001Ship's Force Work Autorization Form (WAF) and Tag Out Office; provide
980-11-002Light-Off Discrepancy Correction Assistance; provide
980-11-003ORDALT 70227, 70921, 83489, Alteration Installation Team

(AIT) support service; provide

980-11-004ShipAlt DDG51-81961K/85114K, Tactical Tomahawk Weapons Control System (TTWCS)V 5.4.0.2, Upgrade Alteration Installation Team (AIT)Support; provide
980-90-304ShipAlt DDG51-86304, AN/SQQ-89A(V)15, ShipAlt DDG51-86222, AN/UQN-10 Next Gen Fathometer Alteration Installation Team (AIT) Support Service; provide
991-11-002Mast Staging for Ship's Force Use; provide
992-11-001Temporary Refrigerated Storage Facilities; provide
992-11-002Temporary Air Conditioning; provide
992-11-003Temporary Flammable Liquid Storage and Hazardous Material Storage Unit; provide
992-11-004Temporary Dry Provision Stowage, 1280 Cubic Feet; provide
992-12-001Temporary Service; provide
992-31-001Cleaning and Pumping; accomplish
993-11-001Rigging, Crane and Transportation Service; provide
993-31-002Temporary Deck Covering; install
993-31-003AN/SPY-1D Antenna Protective Cover; install

File details come from the government source that posted it.