J-3_Five-Way_Breakdown_UF28.xls

XLS spreadsheet 41 KB Posted

Attached to
Utility Floats 25 & 28 Federal contract opportunity
Solicitation number
N00024-17-R-4437
Issued by
Department of the Navy Naval Sea Systems Command

About this file

J-3 Five-Way Breakdown UF28

View the file

Other files for this federal contract opportunity

Other files attached to Utility Floats 25 & 28, newest first.
File Type Posted
J-1_RSC_10.doc DOC document
J-1_RSC_08.doc DOC document
J-1_RSC_07.doc DOC document
J-1_RSC_04.doc DOC document
J-1_RSC_09.doc DOC document
J-1_RSC_06.doc DOC document
J-1_RSC_05.doc DOC document
J-1_RSC_03.doc DOC document
J-1_RSC_01.doc DOC document
J-1_RSC_02.doc DOC document
J-1_RSC_form.doc DOC document
J-2_Five-Way_Breakdown_UF25.xls XLS spreadsheet
J-8_CDRLs.pdf PDF
J-5_Past_Performance_Questionnaire.docx DOCX document
N00024-17-R-4437_SOLICITATION.docx DOCX document
J-4_Past_Performance_Data_Sheet.docx DOCX document
J-7_SOW_UF_28.docx DOCX document
J-6_SOW_UF_25.docx DOCX document
UF_25&28_FBO_Synopsis.docx DOCX document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

INSERT CONTRACTOR/COMPANY NAME HERE
Project =Utility Float 28DATE: =
PRIMESUBCONTRACTORPRIMEPRIME
PARAGRAPH No.TITLEM/HLABOR PRICEMATERIAL PRICEM/HLABOR PRICEMATERIAL PRICEOther Direct Cost (ODC)*G&APROFITLine Item Total
1.4Arrival Conference$0
1.5Required Documents$0
1.6Progress Meetings$0
1.7Availability Requirements$0
1.11CFR Reports$0
1.16.1Maintain Preservation OQE$0
1.17Environmental/Hazwaste Managemment$0
1.21Gas Free$0
1.22.1Develop & Maintain Test Plan$0
3.1Docking & Undocking$0
3.2.1Identify Distinguishing Figures & Markings$0
3.2.2Rubber Fender$0
3.2.2.5Replace D-Rubber Cut and Drill holes
3.2.3Zinc Anodes$0
3.2.4Hull Blasting & Preservation$0
3.2.5Hull Visual Inspection$0
3.2.6Hull and Freeboard UT Inspection$0
3.3.1Repair Fender Brackets$0
3.4.1Open, Pump, Clean, Vent, Gas free$0
3.4.2Tanks/Void Visual Inspection$0
3.4.3Identify Color schemes and markings$0
3.4.4Power Tool Clean$0
3.4.5Preliminary Air Tests$0
3.4.6Tank/Void bolting ring broken stud replacement$0
3.4.7Tank/Void Touch up Preservation$0
3.4.8Final Air Test
3.4.9Closeout Inspection
3.5.1Main Deck Non-skid repair$0
3.5.2Main Deck Visual Inspection$0
3.5.3Main Deck UT inspection$0
Column Totals0$0$00$0$0$0$0$0$0

&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the proposed G&A and proposed Profit rates.