J-1_RSC_08.doc
DOC document 38 KB Posted
- Attached to
- Utility Floats 25 & 28 Federal contract opportunity
- Solicitation number
- N00024-17-R-4437
About this file
RSC #8
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| J-1_RSC_10.doc | DOC document | |
| J-1_RSC_07.doc | DOC document | |
| J-1_RSC_04.doc | DOC document | |
| J-1_RSC_09.doc | DOC document | |
| J-1_RSC_06.doc | DOC document | |
| J-1_RSC_05.doc | DOC document | |
| J-1_RSC_03.doc | DOC document | |
| J-1_RSC_01.doc | DOC document | |
| J-1_RSC_02.doc | DOC document | |
| J-1_RSC_form.doc | DOC document | |
| J-2_Five-Way_Breakdown_UF25.xls | XLS spreadsheet | |
| J-8_CDRLs.pdf | ||
| J-5_Past_Performance_Questionnaire.docx | DOCX document | |
| N00024-17-R-4437_SOLICITATION.docx | DOCX document | |
| J-4_Past_Performance_Data_Sheet.docx | DOCX document | |
| J-7_SOW_UF_28.docx | DOCX document | |
| J-3_Five-Way_Breakdown_UF28.xls | XLS spreadsheet | |
| J-6_SOW_UF_25.docx | DOCX document | |
| UF_25&28_FBO_Synopsis.docx | DOCX document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00024-17-R-4437, Attachment J-1
REQUEST FOR SPECIFICATION CLARIFICATION
| DATE OF REQUEST: 6-1-17 |
| QUESTION NO: |
REQUIREMENT:
RFP NUMBER.: N00024-17-R-4437
ITEM NO: 3.4
TITLE: Tanks / Voids
ISSUING OFFICE POC (CODE 446):
John Musante: (360) 476-4065 john.musante@navy.mil
| PARA. NO: |
| PAGE NO: |
| CONTRACTOR: |
| PLANNER’S NAME: |
| ATTACH. NO: |
| CONTRACTOR POC & PHONE: |
CONTRACTOR QUESTION: In the specs for UF 25 3.4 Tanks and Voids are we to close the voids with new gasket and fasteners?
DO NOT WRITE BELOW THIS LINE
| SPEC CHG: Y/N |
| DWG/REF CHG. Y/N |
| RQMTS CHG: Y/N |
| MAT'L CHG: Y/N |
| TECHNICAL REVIEW: Carney, S |
| SERIAL NO: |
The contractor is to retain upon removal and reuse existing gaskets and fasteners.
ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING OFFICE POINT OF CONTACT (POC) NO LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST FOR PROPOSAL.