N00024-15-R-2309 RFP
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N00024-15-R-2309_0004.pdf | ||
| N00024-15-R-2309_0003.pdf | ||
| Enclosure_1_S-1_Bidders_Questions_7-15.pdf | ||
| Enclosure_2_J-3_Work_Spec_Matrix_2015_05_21_(Rev_3).pdf | ||
| Enclosure_2_Updated_Attachment_J-3_and_J-4.pdf | ||
| Enclosure_1.pdf | ||
| N00024-15-R-2309_0001.pdf | ||
| N0002415R2309_4.6.15.doc | DOC document | |
| N0002415R2309_Attachments.zip | ZIP file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002414NR71469
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to: 1) Provide question responses in Enclosure 1 to this amendment, 2) Extend the proposal and bidder's questions due dates, 3) Update the not to exceed cost for material CLINS 0008, 0108, 0208, 0308, 0408, 0508, 0608, 0708, 0808, 0908, and
4) Provide updates to Attachments J-3 and J-4 in Enclosure 2 to this amendment. Additionally, updated w ork specifications w ill be emailed to potential offerors. See Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
1 24
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-May-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00024-15-R-2309
X 9B. DATED (SEE ITEM 11)
06-Apr-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-May-2015
CODE
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2020
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00024-15-R-2309
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0008
The CLIN extended description has changed from Provide material designated in PSA Work items as Contractor Furnished (CFM) to perform specified PSA work items inclusive of tests and post-repair sea trials for FREEDOM Variant (Hull 1) (See Note C) to Provide material designated in PSA Work items as Contractor Furnished (CFM) to perform specified PSA work items inclusive of tests and post-repair sea trials for FREEDOM Variant (Hull 1) (See Note C)Not to Exceed $1,000,000.00.
CLIN 0108
Contractor Furnished (CFM) to perform specified PSA work items inclusive of tests and post-repair sea trials for INDEPENDENCE Variant (Hull 1) (See Note C) to Provide material designated in PSA Work items as Contractor Furnished (CFM) to perform specified PSA work items inclusive of tests and post-repair sea trials for INDEPENDENCE Variant (Hull 1) (See Note C)Not to Exceed $1,000,000.00.
CLIN 0208
Contractor Furnished (CFM) to perform specified PSA work items inclusive of tests and post-repair sea trials for FREEDOM Variant (Hull 2) (See Notes C and D) to Provide material designated in PSA Work items as Contractor Furnished (CFM) to perform specified PSA work items inclusive of tests and post-repair sea trials for FREEDOM Variant (Hull 2) (See Notes C and D)Not to Exceed $1,000,000.00.
CLIN 0308
Contractor Furnished (CFM) to perform specified PSA work items inclusive of tests and post-repair sea trials for INDEPENDENCE Variant (Hull 2) (See Notes C and D) to Provide material designated in PSA Work items as Contractor Furnished (CFM) to perform specified PSA work items inclusive of tests and post-repair sea trials for INDEPENDENCE Variant (Hull 2) (See Notes C and D)Not to Exceed $1,000,000.00.
CLIN 0408
Contractor Furnished (CFM) to perform specified PSA work items inclusive of tests and post-repair sea trials for INDEPENDENCE Variant (Hull 3) (See Notes C and D) to Provide material designated in PSA Work items as Contractor Furnished (CFM) to perform specified PSA work items inclusive of tests and post-repair sea trials for INDEPENDENCE Variant (Hull 3) (See Notes C and D)Not to Exceed $1,000,000.00.
CLIN 0508
Contractor Furnished (CFM) to perform specified PSA work items inclusive of tests and post-repair sea trials for INDEPENDENCE Variant (Hull 4) (See Notes C and D) to Provide material designated in PSA Work items as Contractor Furnished (CFM) to perform specified PSA work items inclusive of tests and post-repair sea trials for INDEPENDENCE Variant (Hull 4) (See Notes C and D)Not to Exceed $1,000,000.00.
CLIN 0608
Contractor Furnished (CFM) to perform specified PSA work items inclusive of tests and post-repair sea trials for INDEPENDENCE Variant (Hull 5) (See Notes C and D) to Provide material designated in PSA Work items as Contractor Furnished (CFM) to perform specified PSA work items inclusive of tests and post-repair sea trials for INDEPENDENCE Variant (Hull 5) (See Notes C and D)Not to Exceed $1,000,000.00.
CLIN 0708
Contractor Furnished (CFM) to perform specified PSA work items inclusive of tests and post-repair sea trials for INDEPENDENCE Variant (Hull 6) (See Notes C and D) to Provide material designated in PSA Work items as Contractor Furnished (CFM) to perform specified PSA work items inclusive of tests and post-repair sea trials for INDEPENDENCE Variant (Hull 6) (See Notes C and D)Not to Exceed $1,000,000.00.
CLIN 0808
Contractor Furnished (CFM) to perform specified PSA work items inclusive of tests and post-repair sea trials for INDEPENDENCE Variant (Hull 7) (See Notes C and D) to Provide material designated in PSA Work items as Contractor Furnished (CFM) to perform specified PSA work items inclusive of tests and post-repair sea trials for INDEPENDENCE Variant (Hull 7) (See Notes C and D)Not to Exceed $1,000,000.00.
CLIN 0908
Contractor Furnished (CFM) to perform specified PSA work items inclusive of tests and post-repair sea trials for INDEPENDENCE Variant (Hull 8) (See Notes C and D) to Provide material designated in PSA Work items as Contractor Furnished (CFM) to perform specified PSA work items inclusive of tests and post-repair sea trials for INDEPENDENCE Variant (Hull 8) (See Notes C and D)Not to Exceed $1,000,000.00.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
ADDITIONAL INSTRUCTIONS TO OFFERORS
Comprehensive responses to the requirements of this Request for Proposals (RFP) are required to enable the Government to evaluate the Offeror’s understanding of the stated requirements and the Offeror’s capability and approaches to accomplish them. Proposals shall be submitted in accordance with the instructions herein, and non-conformance with the specified required content may be cause for rejection of the proposal. Offerors are advised that material submitted in excess of that required herein will not be evaluated. The proposal shall be valid for no less than 180 days from the date of RFP closing. The proposal shall provide comprehensive responses to the areas provided for in this section.
A. PHYSICAL FORMAT
The Offeror’s proposal shall be detailed, specific, and complete to enable a thorough evaluation of the proposal and a sound determination that the proposal will meet or exceed the requirements and objectives set forth in the RFP.
Each Offeror shall submit a proposal in response to this solicitation subject to the following requirements. The proposal submitted in response to the solicitation must consist of the two (2) volumes listed below. Page limitations and the number of copies to be provided are shown below. Material submitted in excess of the page limits stated below will not be evaluated. If there are any discrepancies between hardcopy and the CD, the hardcopy will govern.
VOLUME
TITLE
PAGE LIMIT
ORIGINALS
PAPER
COPIES
CDs
I Non-Cost 80* 1 4 2 II Cost N/A 1 4 2
* The 80 page limit for Volume I does not include the Executive Summary, cover pages, title pages, tables of contents, lists of illustrations, tab pages, resumes, or glossaries of abbreviations and acronym, Section II facility utilization loading schedules, man-power loading charts, or the craft/trade staffing plan.
Volumes I and II shall be separately bound, and Volume I shall not include any cost or pricing data/information.
The CDs shall follow the same format as the paper copy with major sections in separate and labeled directories, and must contain identical information as the paper copy. The Non-Cost proposal (Volume I) shall not contain more than five foldouts. There is no limitation on foldouts in Volume II (Cost). A foldout is defined as any document larger than a standard 8 ½ by 11 inch sized page. Each foldout shall count as one page. The narrative material in the proposal shall be single spaced, typed on one side of the page only with type no smaller than 12 point characters and 1 inch margins. A page is defined as one side of a sheet 8 1/2 inches by 11 inches. The page count shall not include cover pages, title pages, tables of contents, lists of illustrations, tab pages, resumes, or glossaries of abbreviations and acronyms, Section II facility utilization loading schedules, man-power loading charts, or the craft/trade staffing plan. Documents, spreadsheet or other data submitted on CD must be compatible with Microsoft Office products and in an editable format. All spreadsheets shall contain the formulas used to derive each value, including links to other spreadsheets, as appropriate. The first page of each volume shall be in accordance with FAR 52.215-1 paragraph (c)(2) Instructions to Offerors – Competitive Acquisition.
NOTE: Each page of the Offeror’s proposal shall be labeled with the Offeror’s name and the solicitation number.
However, the Offeror’s executed copy of the solicitation shall be printed on plain paper only. The cover page of each proposal shall contain the document number and title, solicitation number, and address of Offeror.
Restriction on Disclosure and Use of Data
Offerors, who include in their proposal data they do not want disclosed to the public, or to be used by the Government for evaluation purposes only, shall mark such data in accordance with FAR 52.215-1(e). Page(s), paragraph(s), and sentence(s) shall specifically identify such data.
All volumes must be received prior to 2:00 PM EDT on 26 June 2015.
NOTE: OFFERORS ARE REQUIRED TO SUBMIT, IN THE REQUIRED NUMBER OF HARD COPIES AND
CD, VOLUME II (COST PROPOSAL) IN A SEALED ENVELOPE, SEPARATE FROM THE NON-COST
VOLUME.
All copies required shall be submitted by the time and date specified in Block 9 of Standard Form 33 and make special note of Section L Clause “SPECIAL PROPOSAL RECEIPT REQUIREMENTS” above.
All Offerors shall mark submitted items for mailing and/or delivery as shown below:
Department of the Navy Naval Sea Systems Command SEA 02232, Stop 2020 1333 Isaac Hull Avenue, SE Washington Navy Yard DC 20376-2020
RFP N00024-15-R-2309 (UNCLASSIFIED)
Attn: Cristina Covalt, SEA 02232 Phone: (202) 781-1759
DO NOT OPEN IN MAIL ROOM
Telegraphic offers, facsimile offers, or offers submitted by electronic communications will not be considered.
Furthermore, telegraphic, facsimile, or electronic communications modifications of offers, or withdrawals of offers, will not be considered.
Due to recent USPS mail problems in the Washington, D.C. area, the preferred method of response is by overnight delivery service, such as FedEx, UPS, etc. Do not use U.S. Mail.
B. GENERAL CONTENT REQUIREMENTS
The Offeror's proposal is the primary basis for evaluating the merits of what is being offered, the degree to which the Offeror's claims of performance capability and capacity are supported and the ability of the Offeror to perform in accordance with the requirements. Past performance information, in addition to the proposal, may also be considered during evaluations. Proposals submitted shall be sufficiently detailed to enable Government personnel to make a thorough evaluation of the proposal, and to arrive at a sound determination as to whether the prospective Offeror will be able to perform in accordance with the requirements of the RFP.
The proposal shall be so specific, detailed, and complete as to clearly demonstrate that the Offeror has a thorough comprehension of all technical, fabrication and delivery requirements, including all special contract requirements of the RFP.
General statements that the Offeror understands the requirements and can or will comply with the requirements of the RFP will be considered to be inadequate. The proposal shall be sufficiently complete to demonstrate the manner in which the Offeror will comply with the applicable requirements of the solicitation.
The Offeror need not repeat information within the same volume required in the response to two or more proposal requirements. Such information should be presented in detail in the one area of the volume where it contributes most critically to the discussion. In other areas where discussion of the same information is necessary, the Offeror shall refer to the initial discussion and identify its location within the proposal volume.
In the event that any portion of the proposal is written by someone who is not a bona fide employee of the Offeror, a certificate to this effect shall be signed by a responsible officer of the Offeror and shall show the person's name, employment capacity, the name of his firm, the relationship of that firm to the Offeror's, and the portion of the proposal written by that person.
The format and content of the proposal shall contain a response to the factors noted below. Information presented shall appear in the same order as outlined below. A master index identifying major subsections by number, title, page number and volume shall be provided in each volume.
Submission to the Government of the Offeror's proposal, including the entire RFP [minus Sections L and M] and all of its attachments (completed as necessary) -- will constitute an offer and will indicate the Offeror's unconditional assent to the terms and conditions in this RFP and its attachments. Any objection to any of the terms and conditions may constitute a deficiency and make the offer unacceptable. An Offeror may correct a deficiency only through discussions (see FAR 15.306 (c), (d), and (e)) if discussions are held. However, the Government intends to award a contract without discussions.
The Government reserves the right to conduct discussions and to permit Offerors to revise their offers. If discussions are conducted, the Government reserves the right to use considerations of procurement evaluation efficiency in establishing and reducing the size of the competitive range in accordance with FAR 15.306(c).
CROSS REFERENCING
Each volume shall be written to the greatest extent possible on a stand-alone basis so that its content may be evaluated with a minimum of cross-referencing to other volumes of the proposal. Cross-referencing within a proposal volume is permitted where its use would conserve space without impairing clarity. If the Offeror includes a cross-reference in the proposal, the lowest practicable section reference shall be used.
GLOSSARY OF ABBREVIATIONS AND ACRONYMS
Each volume of the proposals shall contain a glossary of all abbreviations and acronyms used, with an explanation for each. Glossaries do not count against page limitations for their respective volumes.
COMMUNICATION WITH NAVSEA
Solicitation and Amendments
Solicitation information and amendments will be made available through the internet through FEDBIZOPPS (www.fbo.gov).
The solicitation, which will include related files (i.e., RFP, CDRLs) listed under the solicitation number, can then be downloaded directly to your workstation. Offerors are required to periodically check the FEDBIZOPPS page for responses to Offeror questions and any issued amendments.
Questions Concerning the Solicitation
Offerors may submit questions requesting clarification of RFP requirements by electronic mail to Felisha Morsell (Felisha.Morsell@navy.mil) and Cristina Covalt (cristina.covalt@navy.mil) using Attachment S-1.
Only questions submitted by electronic mail will receive a response. Questions and responses will be distributed electronically via FEDBIZOPPS to all potential Offerors. Information provided with each question shall include the document name, document date, specific page, paragraph, clause, or other definitive citation requiring clarification.
Although the Navy may continue to accept questions up to the closing date and time set for receipt of proposals, time may not be sufficient to permit responses to questions received after 12 June 2015 to be prepared and issued prior to the receipt of proposals.
C. PROPOSAL OUTLINE
The proposal shall be organized in accordance with the following outline.
Each of Volumes I and II shall contain the following items in addition to the Offeror’s proposal data required by this
RFP:
1. Title Page in accordance with FAR 52.215-1 paragraph (c)(2).
2. Table of Contents. The table of contents shall provide sufficient detail so that factors can be easily located.
3. Glossary of Abbreviations and Acronyms
Volume I – Non-Cost Proposal
NO COST OR PRICE INFORMATION SHALL BE PRESENTED IN VOLUME I –NON-COST
PROPOSAL. ANY PAGE WITH COST OR PRICE INFORMATION WILL BE REMOVED IN ITS
ENTIRETY AND MAY NOT BE EVALUATED
Volume I will include: Executive Summary of no more than 5 pages; Section I – Management; Section II - Facilities/Production Capability Factor; Section III – Past Performance, and Section IV – PSA Execution. Volume I will be limited to no more than 80 pages. The 80 page limit for Volume I does not include the Executive Summary, cover pages, title pages, tables of contents, lists of illustrations, tab pages, resumes, or glossaries of abbreviations and acronyms, Section II facility utilization loading schedules, man-power loading charts, or the craft/trade staffing plan.
Note: For the purpose of Volume I – Non-Cost Proposal, a “Major subcontractor” is defined as any subcontractor that provides 20% or more of the proposed labor (except for in past performance, where major subcontractor is defined as 33% or more of proposed effort).
Executive Summary
Provide an overview and summary of the Offeror’s proposal. The Executive Summary shall not contain new or additional material that is not otherwise included within the proposal. No cost information shall be contained in the executive summary. The executive summary shall also contain a statement that the Offeror’s proposal is valid for at least 180 calendar days from the date of receipt of proposals. Offerors should organize the Executive Summary according to the Offeror’s own judgment so as to best present its case to the Government in support of selection for contract award. The Executive Summary shall demonstrate the Offeror’s understanding of the Navy’s requirements and may summarize the Offeror’s proposed solution. The Executive Summary, in accordance with Section M of this solicitation, will not be evaluated.
Section I: Factor #1 – Management
Note: Section I, Management, major subcontractors shall be defined as any subcontractor that provides 20% or more of the proposed labor.
Element 1: Program Management
Provide an integrated comprehensive description of the Offeror’s program management organization depicting authority, functions and responsibilities for quality assurance, material procurement and conduct of test and trials.
For the prime and major subcontractors, provide resumes of prospective key personnel and other individuals who will comprise the program management team that include name, education and work experience. For the prime and major subcontractors, provide plans to integrate subcontractor support with clear and concise statements of defined roles and responsibilities. For the prime contractor, provide details on the cost and Earned Value Management systems that will be in place to support CDRL requirements. For the prime and major subcontractors, provide a master program schedule integrating the key design, material ordering, production, test, trials and completion events for FREEDOM Variant (Hull 1 and Hull 2) and INDEPENDENCE Variant (Hull 1 and Hull 2). Identify any labor agreements that expire during the stated PSA period(s) of performance, and contingency plans for labor strikes.
Describe the process in which other prime Contractors with the Government and their subcontractors shall obtain admission to the plant and access to the vessel in order to perform and fulfill their respective obligations to the Government. Further, describe the process for these personnel to obtain the following services: Temporary services, crane and rigging support, material delivery, storage, and transportation, and any other services the offeror considers necessary. Provide the ratio of journeymen to apprentices.
Element 2: Quality Assurance
Describe the proposed quality assurance organization including personnel qualifications and relevant DoD repair/overhaul and/or PSA QA experience. Describe the same for all major subcontractors and integration of subcontractors’ quality assurance programs; describe the approach that will be used to verify completion of all PSA work in each compartment and the turnover of each compartment to ship’s force during the PSA.
Element 3: Subcontracts
Provide a comprehensive description of the roles and responsibilities for each major subcontractor, including whether subcontractors will be required to increase personnel to support the effort and in what areas or trades; and what level of training will be required for the increased workforce. Provide the ratio of journeymen to apprentices for each major subcontractor. Provide the plan to integrate and familiarize all subcontractors to the prime Contractor’s PSA execution philosophy and strategy. Lastly, describe the extent of participation of small business concerns and historically black colleges or universities and minority institutions.
Element 4: Material Procurement
Describe the approach (for prime and all major subcontractors) to procure material in support of the PSA and how emergent Contractor furnished material requirements will be handled during the PSA. Describe the processes the prime and major subcontractors will use to identify and report outstanding Government and Contractor furnished material that will not support the Integrated Master Schedule (IMS). Describe the process and facilities to manage, store and issue GFE. Lastly, describe the plan to manage Provisioning Technical Documentation requirements.
Element 5: Test and Trials
Discuss the plan to prepare for and execute a post repair sea trial event, including the assistance to be provided to the Government for key milestones that are precursors to Sea Trials such as Combat Systems Testing, Light Off Assessment, Dock Trials, and Fast Cruise. This description shall also provide a process for the correction of all Post Repair Sea Trial deficiencies prior to the completion of PSA.
Section II: Factor #2 – Facilities/Production Capabilities
Facilities/Production Capabilities
The Contractor shall provide the following to support the execution of the LCS PSAs. Describe the facility plan for accomplishing the FREEDOM Variant (Hull 1) and INDEPENDENCE Variant (Hull 1) PSAs and option ship PSAs at an availability pier in San Diego homeport. In addition, the Contractor shall identify alternate location facilities if adequate space is not available on the assigned pier. When Contractor capacity is not available, identify subcontracting effort for facilities. The facility plan shall address, at a minimum, the following:
Office space for Government PSA support groups as specified in AWI 0016 of Attachment J-3.
Offices for the Contractor’s Program Management Organization.
Production Shops.
Dry dock facilities, including certification and availability Pier/berthing location, capabilities and characteristics Warehouse/storage facilities to accommodate pre-positioning and long lead time material.
Crane and transportation services.
Power, compressed air, water, and sewage for PSA industrial effort and for Government and Contractor office facilities.
Internet and phone services for Government and Contractor offices.
Identify secure, controlled environment facilities available for combat systems and electronics equipment.
Identify anti-terror/force protection measures that are defined, approved and employed at the Contractor’s facilities.
Identify qualified aluminum welder capability.
Develop and provide manpower loading charts (for prime and subcontractors) to execute the LCS PSAs for Items 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0101, 0102, 0103, 0104, 0105, 0106, 0107, 0201, 0202, 0203, 0204, 0205, 0206, 0207, 0301, 0302, 0303, 0304, 0305, 0306, 0307, 0401, 0402, 0403, 0404, 0405, 0406, 0407, 0501, 0502, 0503, 0504, 0505, 0506, 0507, 0601, 0602, 0603, 0604, 0605, 0606, 0607, 0701, 0702, 0703, 0704, 0705, 0706, 0707, 0801, 0802, 0803, 0804, 0805, 0806, 0807, 0901, 0902, 0903, 0904, 0905, 0906 and 0907 and all other firm and anticipated work (by hull for Navy work and by major category for other work) depicting proposed manning from start of availability to completion with consideration given to all other firm and anticipated work.
Provide a manning plan with a brief explanatory narrative to describe the ability to handle the PSAs.
Provide a detailed resource management plan to perform the LCS PSAs for 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0101, 0102, 0103, 0104, 0105, 0106, 0107, 0201, 0202, 0203, 0204, 0205, 0206, 0207, 0301, 0302, 0303, 0304, 0305, 0306, 0307, 0401, 0402, 0403, 0404, 0405, 0406, 0407, 0501, 0502, 0503, 0504, 0505, 0506, 0507, 0601, 0602, 0603, 0604, 0605, 0606, 0607, 0701, 0702, 0703, 0704, 0705, 0706, 0707, 0801, 0802, 0803, 0804, 0805, 0806, 0807, 0901, 0902, 0903, 0904, 0905, 0906 and 0907 including actual and projected workload; shifts;
staffing levels and manhours.
Provide a craft/trade staffing plan in accordance with Attachment J-9 to accomplish the Attachment J-3 and J-4 work items and LOE CLINS.
Section III: Factor #3– PSA Execution
Work Specifications: For work item specifications provided in Section J, Attachments J-3 and J-4, provide manhours for each work item in accordance with the format in Section J, Attachment J-9. The format in J-9 may be expanded upon (i.e. to add columns for the addition of craft/trade categories) provided that adequate explanation and backup are provided for each additional column. However, Attachment J-9 shall be followed as closely as possible.
For each work item identified with an asterisk under Attachments J-3 and J-4, provide a brief (1 page maximum) risk mitigation and deck plate execution plan.
Work Certification: The FREEDOM Variant and INDEPENDENCE Variant PSAs under this contract will be conducted in accordance with Supervisor of Shipbuilding, Conversion and Repair, U.S. Navy, Gulf Coast (SUPSHIP Gulf Coast) Instruction 4700.1 (Standard Operating Procedure For Execution Of Post Shakedown Availabilities). The Offeror shall provide a comprehensive description of the program management organization that will be utilized to implement the requirements of the SUPSHIP Instruction. In addition, the Offeror shall provide examples of previous availabilities where the requirements of the SUPSHIP Instruction were implemented.
Section IV: Factor #4 - Past Performance
The Government intends to evaluate the following elements as part of past performance: management, schedule, technical (quality of product) and cost. As part of this evaluation, the Government intends to review Contractor Performance Assessment Reporting System (CPARS) reports and information (within PPIRS), and may review any other past performance information available (through past performance questionnaires, etc.) on relevant contracts.
Furthermore, the Government intends to evaluate two aspects for past performance evaluation. The first is to evaluate the offeror’s past performance to determine how relevant a recent effort accomplished by the offeror is to the effort to be acquired through the source selection. For purposes of this evaluation, the Government shall consider as somewhat relevant any work on CMAVs, SRAs, DSRAs, DPMAs, and EDSRAs on LCS, DDG, and CG class ship availabilities performed within the three (3) years prior to RFP release. For purposes of this evaluation, the Government shall consider as more relevant any PSAs on DDG and LPD class ships performed within the three
(3) years prior to RFP release. For the purposes of this evaluation, the Government will consider LCS Class Post Shakedown Availability execution experience within the three (3) years prior to RFP release, if applicable, as most relevant. Emphasis shall be placed on industrial efforts with significant work package growth that demonstrates the Offeror's ability to successfully accomplish large, dynamic, intense availabilities within the ships’ homeport, while demonstrating schedule flexibility and the ability to manage complex issues. The second aspect of the past performance evaluation the Government intends to evaluate is how well the contractor performed on the contracts.
Each Offeror has the opportunity to provide in its proposal any information regarding its past performance on previous efforts that it would like the Government to consider. Such information may be in the nature of:
Information which the Offeror considers essential to the Government’s evaluation.
Explanatory information of substandard or poor performance and the corrective actions taken to prevent a recurrence.
Examples of availabilities the Offeror has led as a prime contractor where subcontractors comprised 30% or greater of the work force.
The Government reserves the right to determine the relevancy of past performance information and to verify statements and representation made in an Offeror’s proposal. Any information provided must be in sufficient detail with points of contact to enable the Government to contact persons with knowledge of the Offeror’s Past Performance and do an evaluation in accordance with the Past Performance in Section M.
The Offeror must provide the same past performance information requested above for each subcontractor performing 33% or more of the effort under this requirement.
Volume II – Cost Proposal
The Offeror’s proposal is presumed to represent its best effort to respond to the solicitation. The Navy will analyze the Offeror’s proposal using (but not limited to) cost realism analysis techniques, in accordance with FAR 15.404.
Any inconsistency, whether real or apparent, between proposed performance and cost, shall be explained in the proposal. For example, if the intended use of new and innovative production techniques is the basis for an abnormally low estimate, the nature of these techniques and the impact on cost shall be explained. Any significant inconsistency, if unexplained, may be grounds for rejection or a less favorable evaluation, or higher projected costs to the Government. The burden of proof as to cost credibility rests with the Offeror.
The required content of the Cost Volume is identified below. The order of presentation in the Offeror’s proposal volume shall correspond to the ordering of the appropriate subparagraph discussed below.
Offerors must eliminate rounding errors from their proposals.
A. COST PROPOSAL
The Cost Proposal shall be organized as follows. Each section shall be titled and tabbed for easy identification.
Title Page in accordance with FAR 52.215-1 paragraph (c)(2) Table of Contents Glossary of Abbreviations and Acronyms
Section 1.0 Cost Data
1.1 Prime Contractor Cost Exhibits
1.2 Prime Contractor Estimating Rationale/Cost Proposal Narrative
1.3 Subcontractor Cost Data
1.4 Other Data
Subsection 1.1 Prime Contractor Cost Exhibits
The Offeror shall submit the following cost exhibits, utilizing the Excel file templates included as part of Section J, Attachment J-6 of the Solicitation. The instructions for each of the required cost exhibits are provided below. The Offeror shall identify each cost exhibit, follow the prescribed format, including all the information requested, and sequentially number the pages as appropriate.
Table L-1 - Summary of Cost Exhibits
Attachment J-6 - Exhibit L001
Total Proposal Contract Value Summary
Attachment J-6 - Exhibit L002
CLIN Pricing Summary
Attachment J-6 - Exhibit L003
CLIN Cost Element Breakdown
Attachment J-6 - Exhibit L004
Work Items Specification Hour and Material Summary , by CLIN
Attachment J-6– Exhibit L005 Historical/Proposed Rates Summary Schedule AttachmentJ-6 - Exhibit L006 Indirect Expense Schedules
(a) Instructions for Attachment J-6 - Exhibit L001 – Total Proposal Contract Value Summary
(1) This cost exhibit displays the Offeror’s proposed price by specified elements of cost over the life of the contract for all priced CLINs (Items 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0101, 0102, 0103, 0104, 0105, 0106, 0107, 0108, 0201, 0202, 0203, 0204, 0205, 0206, 0207, 0208, 0301, 0302, 0303, 0304, 0305, 0306, 0307, 0308, 0401, 0402, 0403, 0404, 0405, 0406, 0407, 0408, 0501, 0502, 0503, 0504, 0505, 0506, 0507, 0508, 0601, 0602, 0603, 0604, 0605, 0606, 0607, 0608, 0701, 0702, 0703, 0704, 0705, 0706, 0707, 0708, 0801, 0802, 0803, 0804, 0805, 0806, 0807, 0808, 0901, 0902, 0903, 0904, 0905, 0906, 0907, 0908), by Government Fiscal Year (GFY), and cumulative proposed contract value. Each Offeror must provide this cost exhibit for their total contract/proposal value. All Subcontractor costs must also be included in the Offeror’s (prime contractor) cost exhibit. Each Subcontractor must be separately listed, regardless of subcontract value. The total price amount for the prime contractor (including their Subcontractor prices) must equal the cumulative total price proposed for the Section B CLINs that require Offeror pricing (Items 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0101, 0102, 0103, 0104, 0105, 0106, 0107, 0108, 0201, 0202, 0203, 0204, 0205, 0206, 0207, 0208, 0301, 0302, 0303, 0304, 0305, 0306, 0307, 0308, 0401, 0402, 0403, 0404, 0405, 0406, 0407, 0408, 0501, 0502, 0503, 0504, 0505, 0506, 0507, 0508, 0601, 0602, 0603, 0604, 0605, 0606, 0607, 0608, 0701, 0702, 0703, 0704, 0705, 0706, 0707, 0708, 0801, 0802, 0803, 0804, 0805, 0806, 0807, 0808, 0901, 0902, 0903, 0904, 0905, 0906, 0907, 0908) The specific cost elements shall be adjusted to reflect the Offeror’s accounting system and proposed costs. If Facilities Capital Cost of Money (FCCOM) is not proposed, it shall not be an allowable cost under the contract, and FAR 52.215-17, Waiver of Facilities Capital Cost of Money, will be inserted by the Navy at contract award.
(2) The element identified as “Direct Labor” should show only the proposing Offeror’s direct labor cost
(not labor for Subcontractors). All Subcontractor costs shall be included in the “Subcontractors” section of this exhibit.
(3) The elements identified as Subcontractor costs must exactly equal the cumulative bottom lines from Attachment J-6-Exhibit L001 submitted by the Subcontractor(s).
(b) Instructions for Attachment J-6-Exhibit L002 – CLIN Pricing Summary
This cost exhibit displays the Offeror’s proposed labor hours and total price (cost plus fee) for each Section B CLIN requiring proposed pricing (Items 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0101, 0102, 0103, 0104, 0105, 0106, 0107, 0108, 0201, 0202, 0203, 0204, 0205, 0206, 0207, 0208, 0301, 0302, 0303, 0304, 0305, 0306, 0307, 0308, 0401, 0402, 0403, 0404, 0405, 0406, 0407, 0408, 0501, 0502, 0503, 0504, 0505, 0506, 0507, 0508, 0601, 0602, 0603, 0604, 0605, 0606, 0607, 0608, 0701, 0702, 0703, 0704, 0705, 0706, 0707, 0708, 0801, 0802, 0803, 0804, 0805, 0806, 0807, 0808, 0901, 0902, 0903, 0904, 0905, 0906, 0907 and 0908). Subcontractor labor hours and pricing must be included in the Offeror’s (prime contractor) pricing included in this cost exhibit. The total labor hour and total dollar price amounts shown in this exhibit must equal the cumulative total shown in Exhibit L001. The total hours for Items 0003, 0004, 0006, 0007, 0103, 0104, 0106, 0107, 0203, 0204, 0206, 0207, 0303, 0304, 0306, 0307, 0403, 0404, 0406, 0407, 0503, 0504, 0506, 0507, 0603, 0604, 0606, 0607, 0703, 0704, 0706, 0707, 0803, 0804, 0806, 0807, 0903, 0904, 0906, 0907, must be consistent with Exhibit L004.
(c) Instructions for Attachment J-6-Exhibit L003 – CLIN Cost Element Breakdowns
(1) The Offeror must provide a separate Exhibit L003 for each Section B CLIN that requires Offeror pricing (Items 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0101, 0102, 0103, 0104, 0105, 0106, 0107, 0108, 0201, 0202, 0203, 0204, 0205, 0206, 0207, 0208, 0301, 0302, 0303, 0304, 0305, 0306, 0307, 0308, 0401, 0402, 0403, 0404, 0405, 0406, 0407, 0408, 0501, 0502, 0503, 0504, 0505, 0506, 0507, 0508, 0601, 0602, 0603, 0604, 0605, 0606, 0607, 0608, 0701, 0702, 0703, 0704, 0705, 0706, 0707, 0708, 0801, 0802, 0803, 0804, 0805, 0806, 0807, 0808, 0901, 0902, 0903, 0904, 0905, 0906, 0907 and 0908).
(2) This cost exhibit displays the Offeror’s proposed price by specified element of cost for each CLIN.
The Offeror is required to complete this cost exhibit for each priced CLIN and shall NOT refer to any other portion of the cost proposal to meet this solicitation requirement. The total value for each CLIN must equal the CLIN value provided in Exhibit L002, as well as the Section B pricing proposed in the model contract. The Offeror shall clearly label the specific CLIN number with applicable GFY for each L003 cost exhibit submitted. Subcontractor costs must also be included in the Offeror’s (prime contractor) cost exhibit. Each Subcontractor must be separately listed, regardless of subcontract value.
If Facilities Capital Cost of Money (FCCOM) is not proposed, it shall not be an allowable cost under the contract.
(3) The element identified as “Direct Labor” shall show only the proposing Offeror’s direct labor cost (not labor for Subcontractors). All Subcontractor costs shall be included in the ‘Subcontractors’ section of this exhibit.
(4) The elements identified as Subcontractor costs must exactly equal the cumulative bottom line totals from Attachment J-6-Exhibit L003 submitted by the Subcontractor(s).
(d) Instructions for Attachment J-6 - Exhibit L004 – Work Item Specification Hour and Material Summary, by
CLIN
(1) The Offeror must provide a separate Exhibit L004 for each of the following CLINs: Items 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0101, 0102, 0103, 0104, 0105, 0106, 0107, 0108, 0201, 0202, 0203, 0204, 0205, 0206, 0207, 0208, 0301, 0302, 0303, 0304, 0305, 0306, 0307, 0308, 0401, 0402, 0403, 0404, 0405, 0406, 0407, 0408, 0501, 0502, 0503, 0504, 0505, 0506, 0507, 0508, 0601, 0602, 0603, 0604, 0605, 0606, 0607, 0608, 0701, 0702, 0703, 0704, 0705, 0706, 0707, 0708, 0801, 0802, 0803, 0804, 0805, 0806, 0807, 0808, 0901, 0902, 0903, 0904, 0905, 0906, 0907 and 0908. The cumulative labor hours and material values for each CLIN must be utilized for pricing of the corresponding CLIN pricing provided in Exhibit L003 (for example, the total CLIN 0002 Exhibit L004 labor hours and material values must equal the cumulative proposed CLIN 0002 labor hours and material [excluding material escalation, if any] values proposed by the prime and the prime’s subcontractors shown in Exhibit L003). Each subcontractor proposed to provide labor hour and material for any work item must be separately listed in this exhibit.
(e) Instructions for Attachment J-6-Exhibit L005 – Historical/Proposed Rates Summary Schedule.
This cost exhibit shall display a summary of both historical and proposed direct rates, indirect rates, and escalation rates utilized in the proposal. Historical rates must be provided for all Contractor Fiscal Years (CFY) from 2009 thru 2014 (where the Offeror provides CFY rates for a CFY that is not complete, the Offeror shall indicate what time period this CFY data represents). Proposed rates must be provided for each Government Fiscal Year (GFY) covered by the proposed pricing. At a minimum, the rates included shall include: each individual direct labor rate proposed; direct labor escalation rates; each fringe rate proposed; each labor overhead rate proposed; G&A rate proposed; material and/or subcontract burden proposed, each FCCOM rate proposed; and material escalation rate proposed. The specific rates in this exhibit should be adjusted to reflect the Offeror’s accounting system and cost proposal pricing methodology. The rates provided in this exhibit for each GFY proposed must be the exact rates utilized in pricing Section B CLINs and as displayed within Exhibits L001 and L003.
(f) Instructions for Attachment J-6-Exhibit L006 – Indirect Expense Schedules
The Offeror must include a separate set of indirect expense schedules for each proposed indirect rate included in the proposal (for example: labor overhead; G&A; fringe; material overhead; etc.) along with the distribution base amount for indirect expense allocation. The Offeror shall provide historical indirect expense schedules for all Contractor Fiscal Years (CFY) from 2009 thru 2014 (where the Offeror provides CFY rates for a CFY that is not complete, the Offeror shall indicate what time period this CFY data represents), and the projected indirect expense schedule for each Government Fiscal Year (GFY) covered by the proposed pricing. These schedules must be consistent with the historical indirect rates provided within Exhibit L005.
Subsection 1.2 Prime Contractor Estimating Rationale/Cost Proposal Narrative
The Offeror shall fully explain the estimating rationale on which its proposal is based, including full supporting rationale. Full supporting rationale includes both numeric projections and a complete and clearly written explanation. The burden of proof for cost credibility rests with the Offeror.
The basis for the Offeror’s cost proposal, regardless of the contracting approach, shall be thoroughly explained, including bases, rates, and methodology used to generate the proposal, and such information on any subcontracts.
Offerors are required to provide all data necessary for complete analysis of proposed cost estimates. The data elements below represent a minimum list of such data elements, and are not exclusive. The Offeror shall submit any additional data, supporting schedules or substantiation that will facilitate the Government's evaluation of the proposal.
The Offeror shall provide a narrative that addresses the following areas:
Direct Labor Hour Narrative
Direct Labor Rate Narrative
Material Cost Narrative
Indirect Rates and Business Base
Contractor Systems Approvals and Issues; and
Assumptions
(a) Direct Labor Hour Narrative
For each CLIN where the Navy is not directing the proposal of a specific level of effort (Items 0001, 0002, 0005, 0008, 0101, 0102, 0105, 0108, 0201, 0202, 0205, 0208, 0301, 0302, 0305, 0308, 0401, 0402, 0405, 0408, 0501, 0502, 0505, 0508, 0601, 0602, 0605, 0608, 0701, 0702, 0705, 0708, 0801, 0802, 0805, 0808, 0901, 0902, 0905, 0908), the Offeror shall provide the basis for the number of labor hours proposed. Explain the labor hour estimate for each CLIN. Provide rationale for estimate. Provide explanation of how historical hours for identical or similar tasks relate to the estimates, including explanation of differences.
For each CLIN, briefly explain the function(s) to be performed, and the type of labor to be utilized. To the extent various functions are to be performed within each CLIN, explain the mix of labor categories proposed for the effort.
(b) Direct Labor Rate Narrative
The Offeror shall provide the rationale, including all relevant calculation (to include apportionment method used to generate GFY rates using CFY-based rates) and/or weightings, used for development of each proposed direct labor rate provided in Cost Exhibits L001, L003, and L005. If proposing a composite rate, provide rationale and support for the composite rate.
The Offeror shall address the extent that FPRA rates were utilized, and explain any differences between FPRA rates and proposed rates. The Offeror shall address consistency between proposed direct labor rates and the historical direct rates for same or similar efforts.
The Offeror shall address the rationale of the proposed direct labor escalation rate(s), by GFY.
Overtime - If the price/cost estimate includes overtime premium, Offerors shall furnish the information required by FAR 52.222-2 and the following information:
(i) The dollar amount of overtime premium included in the proposed price/estimate;
(ii) The reason why the use of overtime is necessary;
(iii) The specific operations and categories of personnel which will have to work overtime;
(iv) The estimated number of hours of overtime to be required for each operation;
(v) The estimated period of contract performance during which the overtime will be required; and
(vi) Historical data supporting use of overtime on identical or similar efforts;
(vii) Whether the overtime, if performed, will adversely affect the performance of other Department of Defense contracts and if so, the contract numbers and the contracting activities involved.
(vii) A detailed explanation of how overtime premiums are accounted for in the Contractor’s rate structure.
(viii) Information required by the clause “REQUIREMENTS CONCERNING WORK WEEK.”
(ix) An explanation of how overtime proposed will be used only to perform work pursuant to the reasons stipulated in FAR 52.222-2(a)(1)-(4).
Overtime pursuant to FAR 52.222-2(b) shall not be included in the proposal. Procedures for requesting overtime after award pursuant to FAR 52.222-2(b) are included in the clause.
(c) Material Cost Narrative
For each CLIN where the Navy is not directing the proposal of a specific material amount (Items 0008, 0108, 0208, 0308, 0408, 0508, 0608, 0708, 0808, 0908 and 1000), the Offeror shall provide the rationale, including all relevant calculations, for the proposed material costs. Explain the calculation of material costs and the rationale for any estimates. Provide rationale for each estimate. Provide explanation of how historical material costs for identical or similar tasks relate to the estimates, including explanation of differences, if any.
The Offeror shall address the rationale of proposed material escalation, if any, by GFY.
For Items 0008, 0108, 0208, 0308, 0408, 0508, 0608, 0708, 0808 and 0908 Offerors shall include the Estimated Cost including Facilities Capital Cost of Money (FCCM). For Items 0008, 0108, 0208, 0308, 0408, 0508, 0608, 0708, 0808 and 0908, Offerors shall insert in Section B the following values:
Item Estimated Value 0008 $1,000,000.00 0108 $1,000,000.00 0208 $1,000,000.00 0308 $1,000,000.00 0408 $1,000,000.00 0508 $1,000,000.00 0608 $1,000,000.00 0708 $1,000,000.00 0808 $1,000,000.00 0908 $1,000,000.00
(d) Indirect Rates and Business Base
The Offeror shall provide the rationale used for development of each proposed indirect rate, including facilities capital cost of money, for each GFY. All Offerors shall clearly state their accounting-system defined Contractor Fiscal Year (CFY) (e.g., starts on DD-MM and concludes on DD-MM) and apportionment method used to generate GFY rates using CFY-based rates (for example, if an Offeror’s CFY 2011 runs from September 1, 2010 thru August 31, 2011, in order to convert rates from CFY 2011 to GFY 2011, the Offeror would apportion 11/12 from CFY 2011 and 1/12 from CFY 2012). The Offeror shall address the extent that FPRA indirect rates were utilized, and explain any differences between FPRA rates and proposed rates.
The Offeror shall clearly explain the application of each indirect rate (i.e., the proposed G&A rate is applied to direct labor costs and labor overhead costs).
The Offeror shall provide clear and complete rationale for all business base calculations and assumptions utilized for the proposed indirect rates. The rationale shall include basis, including calculations, for the Offeror’s total business base projections.
(e) Contractor Systems Approvals and Issues
The Offeror shall address whether or not the following contractor systems have been approved by the ACO:
accounting system and purchasing system. Provide the date of most recent ACO determination that stated that the applicable system was approved.