DMSMS Quarterly Report

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1 - Solution Guide

Attachment (8) DMSMS Quarterly Report Formats
Table 1

Report Guide per Solution

Solution / ResolutionTable to fill outOCL EntryCase SheetSolution CostSolution Cost Avoidance
1. Solution Not RequiredTable 3N/AN/A
2. Original component
2a. - Continue to Manufacture (Extend Production)Table 3YESYESN/AN/A
2b. - Life of Type Buy (LOT Buy) or Bridge BuyTable 3YESYESTBDTBD
2c. - Existing StockTable 3YESYES$0.00$0.00
2d. - Broker MarketTable 3YESYES$0.00$0.00
2e. - ReclamationTable 3YESYES$0.00$0.00
3. AlternateTable 3YESYES$0.00$0.00
4. SubstituteTable 3YESYES$0.00$0.00
4a. - Substitute due to ROHSTable 3YESYES$0.00$0.00
5. AftermarketTable 3YESYES$0.00$0.00
6. EmulationTable 3YESYES$0.00$0.00
7. Reverse Engineering (Hybrids)Table 3YESYES$0.00$0.00
8. Redesign – Minor (ASIC) (Footprint of the board stays the same)Table 3YESYES$0.00$0.00
9. Redesign – Major (Footprint of the board changes)Table 3YESYES$0.00N/A
10. Tech Insert/RefreshTable 3YESYESTBDN/A
11. Need More ResearchTable 3YESYESTBDTBD
12. COTS / Subcontracted Assemblies
12a. – No Action RequiredTable 3YESYESN/AN/A
12b. - Design Longevity (DMSMS Support for Vendor)Table 3YESYESTBDTBD
12c. - Extend OEM Maintenance AgreementTable 3YESYESTBDTBD
12d. - Purchase 3rd Party Maintenance AgreementTable 3YESYESTBDTBD
12e. – Life of Type Buy (LOT Buy) or Bridge BuyTable 3YESYESTBDTBD
12f. – AlternateTable 3YESYES$0.00$0.00
12g. - Tech Insert/RefreshTable 3YESYESTBDN/A
12h. – Redesign/Integrated ChangeTable 3YESYES$0.00N/A
12i. – Purchase Data RightsTable 3YESYESTBDN/A
12j. – Reclamation SalvageTable 3YESYES$0.00$0.00
ASIC (Application Specific Integrated Circuit )

ECP (Engineering Change Proposal) ROHS (Restriction of Hazardous Substances)

&A Page &P of &N

Table 2 -Obsolescence Summary Table 2 Obsolescence Summary by Platform (MH-60R, MH-60S, HH-60H, SH-60B, SH-60F), System, WRA, and SRA

CDRL NO.Delivery Due DateReview Due DateCompany NameTechnical POC NameTechnical POC Phone #Technical POC E-MailNOTES
System Obsolescence Summary
Part TypeNext Higher AssemblyREFDESP/NNomenclatureBOM Delivered to PMA299Monitored PartsRed PartsList Red PartsYellow PartsList Yellow PartsOrange PartsList Orange PartsGreen PartsGray PartsList Gray PartsCOTS PartsCurrent Health Status2 Year Health Status5 Year Health StatusComments
System
WRA/SRA/COTS Obsolescence Summary
Part Type (WRA/SRA/COTS)Next Higher AssemblyREFDESP/NNomenclatureBOM Delivered to PMA299Monitored PartsRed PartsList Red PartsYellow PartsList Yellow PartsOrange PartsList Orange PartsGreen PartsGray PartsList Gray PartsCOTS PartsCurrent Health Status2 Year Health Status5 Year Health StatusComments
Note: If the system is comprised of multiple WRA(s) list the first WRA followed by the SRA(s) in that WRA and then list the next WRA followed by it's SRA(s) etc.
Red (R): A part that is not in production by the original manufacturer. No FFF (Form Fit and Function) part is available that’s in production. High cost and high risk resolution due to redesign and requalification.
Yellow (Y): A part that is not in production by the original manufacturer. A FFF (Form Fit and Function) part is available that's in production. Qualification Issues, requires in circuit testing, minimal cost, minimal risk resolution.
ORANGE (O): A part that is still in production by the original manufacturer but a Life-of-Type buy date has been issued by the original manufacturer on the part. LTB cost, no risk resolution.
Green (G): A part that is still in production by the original manufacturer or an authorized aftermarket source i.e. Rochester Electronics, Lansdale, E2V/QP Semiconductor, etc. No cost, no risk resolution.
Gray (G): A part that is currently under research to determine its obsolesce status.
COTS (Commercial off-the-shelf): By definition are software or hardware products/parts used in commercial applications and environments that are ready-made and available for sale to the general public. COTS products/parts require a manual survey of the manufacturer to determine the obsolescence status.
Current Health Status: Based on current obsolescence and current availability of parts can the OEM supply the required Quantities, as specified by PMA299, that currently are needed to support new production, spares and repairs of the specified Part Type (WRA/SRA/COTS) P/N. (Green if YES and Red if NO)
2 Year Health Status: Based on current obsolescence and current availability of parts can the OEM supply the required Quantities, as specified by PMA299, that are needed to support new production, spares and repairs of the specified Part Type (WRA/SRA/COTS) P/N for the next 2 years. (Green if YES and Red if NO)
5 Year Health Status: Based on current obsolescence and current availability of parts can the OEM supply the required Quantities, as specified by PMA299, that are needed to support new production, spares and repairs of the specified Part Type (WRA/SRA/COTS) P/N for the next 5 years. (Green if YES and Red if NO)
CDRL/OMIS BOM STATUS: If a BOM has been delivered to PMA 299 list the CDRL Number if not List "NO".

&A Page &P of &N

Table 3 - Obsolescence Issues

#Table 3A
Parts / Components / COTS / Subcontracted Assemblies Obsolescence IssuesTable 3B
Parts / Components / COTS / Subcontracted Assemblies Obsolescence IssuesTable 3C

Parts / Components / COTS / Subcontracted Assemblies Obsolescence Issues Red (R): A part that is not in production by the original manufacturer. No FFF (Form Fit and Function) part is available that’s in production. High cost and high risk resolution due to redesign and requalification.

Yellow (Y): A part that is not in production by the original manufacturer. A FFF (Form Fit and Function) part is available that's in production. Qualification Issues, requires in circuit testing, minimal cost, minimal risk resolution.

ORANGE (O): A part that is still in production by the original manufacturer but a Life-of-Type buy date has been issued by the original manufacturer on the part.

Green (G): A part that is still in production by the original manufacturer or an authorized aftermarket source i.e. Rochester Electronics, Lansdale, E2V/QP Semiconductor, etc. No cost, no risk resolution.

Gray: A part that is currently under research to determine its obsolesce status. Red (R): A part that is not in production by the original manufacturer. No FFF (Form Fit and Function) part is available that’s in production. High cost and high risk resolution due to redesign and requalification.

Yellow (Y): A part that is not in production by the original manufacturer. A FFF (Form Fit and Function) part is available that's in production. Qualification Issues, requires in circuit testing, minimal cost, minimal risk resolution.

ORANGE (O): A part that is still in production by the original manufacturer but a Life-of-Type buy date has been issued by the original manufacturer on the part.

Green (G): A part that is still in production by the original manufacturer or an authorized aftermarket source i.e. Rochester Electronics, Lansdale, E2V/QP Semiconductor, etc. No cost, no risk resolution.

Gray: A part that is currently under research to determine its obsolesce status. Red (R): A part that is not in production by the original manufacturer. No FFF (Form Fit and Function) part is available that’s in production. High cost and high risk resolution due to redesign and requalification.

Yellow (Y): A part that is not in production by the original manufacturer. A FFF (Form Fit and Function) part is available that's in production. Qualification Issues, requires in circuit testing, minimal cost, minimal risk resolution.

ORANGE (O): A part that is still in production by the original manufacturer but a Life-of-Type buy date has been issued by the original manufacturer on the part.

Green (G): A part that is still in production by the original manufacturer or an authorized aftermarket source i.e. Rochester Electronics, Lansdale, E2V/QP Semiconductor, etc. No cost, no risk resolution.

Gray: A part that is currently under research to determine its obsolesce status.

Obsolescence Initial Issue Data (Fill in When first reporting an Obsolescence Issue)Obsolescence Interim Solution Data (Fill in current status of an obsolescence issue that has not been resolved)Obsolescence Final Solution Data (Fill in when an obsolescence issue has been resolved)
STATUS (Pick One of the following: New / Unresolved / Resolved)Case Sheet NumberOMIS OCL #Open DateLTB DateImpact DateSCD P/N (Original)Vendor P/N (Original)Vendor P/N Cage Code (Original)P/N DescriptionNHA P/NWRA P/NSYSTEM P/NVendor P/N Status (R,Y,O,G)LOT BUY QUANTITYLOT BUY UNIT PRICELOT BUY TOTAL COSTWHO IS FUNDING LOT BUYHAS LOT BUY BEEN FUNDEDHAS LOT BUY BEEN EXECUTEDSpan of Coverage Part Buy is Good forAlternate P/NAlternate P/N Cage CodeIs Alternate P/N Under Engineering Evaluation (Yes/No)Has Alternate P/N Been Approved (Yes/No)Has Final Resolution Been Implemented (Yes/No) and provide details for either Yes or NoSolution Type (Table 1)Solution Cost (Actual or from Table 1)Solution Cost Avoidance (Actual or from Table 1)Solution SCD P/N (Replacement)Solution Vendor P/N (Replacement)Solution Vendor P/N Cage Code (Replacement)Closed DateNOTES:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

&A Page &P of &N

Table 4 - Monitored Part List Table 4 Monitored Parts List

NHA P/NSCD P/NVendor P/NVendor P/N Cage CodeVendor P/N QTYVendor P/N DescriptionStatus (R,Y,O,G Gray)Sourcing Issues and Recommended Resolutions
Red (R): A part that is not in production by the original manufacturer. No FFF (Form Fit and Function) part is available that’s in production. High cost and high risk resolution due to redesign and requalification.
Yellow (Y): A part that is not in production by the original manufacturer. A FFF (Form Fit and Function) part is available that's in production. Qualification Issues, requires in circuit testing, minimal cost, minimal risk resolution.
ORANGE (O): A part that is still in production by the original manufacturer but a Life-of-Type buy date has been issued by the original manufacturer on the part. LTB cost, no risk resolution.
Green (G): A part that is still in production by the original manufacturer or an authorized aftermarket source i.e. Rochester Electronics, Lansdale, E2V/QP Semiconductor, etc. No cost, no risk resolution.
Gray (Gray): A part that is currently under research to determine its obsolesce status.

&A Page &P of &N

Other DMSMS Issues

5.1 Planned Upgrades Due to DMSMS Issues
Provide a description and solution for planned ECP upgrades to CCAs due to obsolescence, part number changes, and redesigns.
Example: No planned ECP upgrades to any CCAs at this time
5.2 Proposed Upgrades Due to DMSMS Issues
Provide a description and solution for proposed ECP upgrades to CCAs due to obsolescence, part number changes, and redesigns.
Example: No proposed ECP upgrades to any CCAs at this time
5.3 COTS DMSMS Issues
Provide a description and solution for COTS DMSMS issues due to obsolescence, part number changes, and redesigns.
Example: No COTs DMSMS issue at this time
5.4 Passive DMSMS Issues
Provide a description and solution for passive component DMSMS issues due to obsolescence, part number changes, and redesigns.
Example: No passive DMSMS issue at this time
5.5 Electro-Mechanical DMSMS Issues
Provide a description and solution for electro-mechanical component DMSMS issues due to obsolescence, part number changes, and redesigns.
Example: No electro-mechanical DMSMS issues at this time
5.6 Mechanical DMSMS Issue
Provide a description and solution for mechanical component DMSMS issues due to obsolescence, part number changes, and redesigns.
Example: No Mechanical DMSMS issues at this time
5.7 Software DMSMS Impact Issues
Provide a description and solution for software DMSMS issues due to software obsolescence, part number changes, and redesigns
Example: No software DMSMS issues at this time