2016-02-11_CDRL_Specs_MH-60S_FMV_Sys_V2.pdf
PDF 262 KB Posted
- Attached to
- Draft FMV Pre-Solicitation Federal contract opportunity
- Solicitation number
- N00019-16-R-3000
About this file
Draft Contract Date Requirement List (CDRL) for FMV
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED.
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0008, 1008, 2008, 3008, 4008
B. EXHIBIT
CM
C. CATEGORY
SESS
D. SYSTEM/ITEM
Full Motion Video (FMV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
CM01
2. TITLE OF DATA ITEM
Contractor's Configuration Management Plan
3. SUBTITLE
Configuration Management Plan
(CMP)
4. AUTHORITY (Data Acquisition Document No.)
DI-CMAN-80858B (See Block 16)
5. CONTRACT REFERENCE
SOW Para 3.1.6.1
6. REQUIRING OFFICE
AIR-1.3.2.J
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST
SUBMISSION
90DAC
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 14-P1-PMA-299-0786
BLOCK 4: Contractors format is acceptable in accordance with Contractor Configuration Management Plan.
BLOCK 9: Distribution statements shall be in accordance with Attachment 4 of the Contract.
BLOCK 8: & 13: For each submission, the Government has forty-five
(45) calendar days for review and acceptance (with or without comments) or rejection. Contractor has thirty (30) calendar days for resubmittal if accepted with comments or if rejected.
BLOCK 14: Deliverable shall be submitted in digital format compatible with Microsoft Office. The deliverable shall be placed on the PMA-299 server at https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract #}/CMXX/{in dated subfolder}
An e-mail notification of the CDRL posting shall be delivered to PMA -299OPS@navy.mil.
See Block 16
15. TOTAL
G. PREPARED BY
Ken Kratz, AIR-1.3.2.J
H. DATE
12/11/2015
I. APPROVED BY
John Woodward, In-Service IPTL
J. DATE
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0008, 1008, 2008, 3008, 4008
B. EXHIBIT
CM
C. CATEGORY
SESS
D. SYSTEM/ITEM
Full Motion Video (FMV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
CM02
2. TITLE OF DATA ITEM
Configuration Status Accounting Information
3. SUBTITLE
Configuration Status Accounting Report
4. AUTHORITY (Data Acquisition Document No.)
DI-CMAN-81253A
5. CONTRACT REFERENCE
SOW Para 3.1.6.2
6. REQUIRING OFFICE
AIR-1.3.2.J
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
QTRLY
12. DATE OF FIRST
SUBMISSION
90DAC
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 14-P1-PMA-299-0786
BLOCK 4: Contractor format is acceptable.
BLOCKS 8: & 13: For each submission, the Government has thirty
(30) calendar days for review and acceptance (with or without comments) or rejection. Contractor has thirty (30) calendar days for resubmittal if accepted with comments or if rejected.
BLOCK 9: Distribution statements shall be in accordance with Attachment 4 of the Contract.
BLOCK 14: The deliverable shall be in digital format using Microsoft Office. The deliverable shall be placed on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract #}/CMXX/{in dated subfolder}
An e-mail notification of the CDRL posting shall be delivered to PMA -299OPS@navy.mil.
See Block 16
15. TOTAL
G. PREPARED BY
Ken Kratz, AIR-1.3.2.J
H. DATE
12/11/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0008, 1008, 2008, 3008, 4008
B. EXHIBIT
CM
C. CATEGORY
SESS
D. SYSTEM/ITEM
Full Motion Video (FMV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
CM03
2. TITLE OF DATA ITEM
Specification Change Notice (SCN)
3. SUBTITLE
Proposed Specification Change Notice (PSCN)
4. AUTHORITY (Data Acquisition Document No.)
DI-CMAN-80643C (See Block 16)
5. CONTRACT REFERENCE
SOW Para 3.1.6.3
6. REQUIRING OFFICE
AIR-1.3.2.J
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
ASREQ
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 14-P1-PMA-299-0786
BLOCK 4: Contractor format is acceptable in accordance with Contractor's Configuration Management Plan.
BLOCK 9: Distribution statements shall be in accordance with Attachment 4 of the Contract.
BLOCKS 8: & 13: For each submission, the Government has sixty
(60) calendar days for review and acceptance (with or without comments) or rejection. Contractor has thirty (30) calendar days for resubmittal if accepted with comments or if rejected.
BLOCK 14: The deliverable shall be in digital format using Microsoft Office. The deliverable shall be placed on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract #}/CMXX/{in dated subfolder}
An e-mail notification of the CDRL posting shall be delivered to PMA -299OPS@navy.mil.
See Block 16
15. TOTAL
G. PREPARED BY
Ken Kratz, AIR-1.3.2.J
H. DATE
12/11/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0008, 1008, 2008, 3008, 4008
B. EXHIBIT
CM
C. CATEGORY
SESS
D. SYSTEM/ITEM
Full Motion Video (FMV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
CM04
2. TITLE OF DATA ITEM
Request for Deviation (RFD)
3. SUBTITLE
Request for Deviation (RFD)
4. AUTHORITY (Data Acquisition Document No.)
DI-CMAN-80640C (See Block 16)
5. CONTRACT REFERENCE
SOW Para 3.1.6.4
6. REQUIRING OFFICE
AIR-1.3.2.J
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
ASREQ (See block 16)
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 14-P1-PMA-299-0786
BLOCK 4: Contractor format is acceptable in accordance with Contractor's Configuration Management Plan.
BLOCKS 8: & 13: For each submission, the Government has sixty
(60) calendar days for review and acceptance (with or without comments) or rejection. Contractor has thirty (30) calendar days for resubmittal if accepted with comments or if rejected.
BLOCK 9: Distribution statements shall be in accordance with Attachment 4 of the Contract.
BLOCK 12: Request for Deviations shall be generated as needed in the production program.
BLOCK 14: The deliverable shall be in digital format using Microsoft Office. The deliverable shall be placed on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract #}/CMXX/{in dated subfolder}
An e-mail notification of the CDRL posting shall be delivered to PMA -299OPS@navy.mil.
See Block 16
15. TOTAL
G. PREPARED BY
Ken Kratz, AIR-1.3.2.J
H. DATE
12/11/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0008, 1008, 2008, 3008, 4008
B. EXHIBIT
CM
C. CATEGORY
SESS
D. SYSTEM/ITEM
Full Motion Video (FMV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
CM05
2. TITLE OF DATA ITEM
Engineering Change Proposal (ECP)
3. SUBTITLE
Engineering Change Proposal
(ECP)
4. AUTHORITY (Data Acquisition Document No.)
DI-CMAN-80639C [see block 16]
5. CONTRACT REFERENCE
SOW Para 3.1.6.5
6. REQUIRING OFFICE
AIR-1.3.2.J
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
ASREQ [See Block 16]
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
[See Block 16]
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 14-P1-PMA-299-0786
BLOCK 4: Contractor format is acceptable in accordance with Contractor's Configuration Management Plan.
BLOCKS 8: & 13: For each submission, the Government has ninety
(90) calendar days for review and acceptance (with or without comments) or rejection. Contractor has thirty (30) calendar days for resubmittal if accepted with comments or if rejected.
BLOCK 9: Distribution statements shall be in accordance with Attachment 4 of the Contract.
BLOCK 12: The Contractor shall submit ECPs as necessary during the production program. The ECP inspection and approval are dependent on the NAVAIR Configuration Control Board (CCB) schedule and review.
BLOCK 14: The deliverable shall be in digital format using Microsoft Office. The deliverable shall be placed on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract #}/CMXX/{in dated subfolder}
An e-mail notification of the CDRL posting shall be delivered to PMA-299OPS@navy.mil.
See Block 16
15. TOTAL
G. PREPARED BY
Ken Kratz AIR 1.3.2.J
H. DATE
12/11/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0008, 1008, 2008, 3008, 4008
B. EXHIBIT
CM
C. CATEGORY
SESS
D. SYSTEM/ITEM
Full Motion Video (FMV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
CM06
2. TITLE OF DATA ITEM
Configuration Audit Plan
3. SUBTITLE
Configuration Audit Plan
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81646 (See Block 16)
5. CONTRACT REFERENCE
SOW Para 3.1.6.6
6. REQUIRING OFFICE
AIR-1.3.2.J
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST
SUBMISSION
120DAC
8. APP CODE
N/A D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 14-P1-PMA-299-0786
BLOCK 4: DID is for guidance only. Contractor digital format IAW their Configuration Management Plan is acceptable.
BLOCKS 8: 10: & 13: Allow 30 days for Government approval/disapproval. Contractor has thirty (30) calendar days for resubmittal if accepted with comments or if rejected.
BLOCK 9: Distribution statements shall be in accordance with Attachment 4 of the Contract.
BLOCK 14: The deliverable shall be in digital format as a .pdf document. The deliverable shall be placed on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract #}/CMXX/{in dated subfolder}
An e-mail notification of the CDRL posting shall be delivered to:
PMA-299OPS@navy.mil.
See Block 16
15. TOTAL
G. PREPARED BY
Ken Kratz, AIR-1.3.2.J
H. DATE
12/11/2015
I. APPROVED BY
John Woodward, In-Service IPTL
10/6/2014
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0008, 1008, 2008, 3008, 4008
B. EXHIBIT
CM
C. CATEGORY
SESS
D. SYSTEM/ITEM
Full Motion Video (FMV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
CM07
2. TITLE OF DATA ITEM
Configuration Audit Report
3. SUBTITLE
Configuration Audit Report
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81646 (See Block 16)
5. CONTRACT REFERENCE
SOW Para 3.1.6.6
6. REQUIRING OFFICE
AIR-1.3.2.J
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ (See Block 16)
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 14-P1-PMA-299-0786
BLOCK 4: DID is for guidance only. Contractor digital format IAW their Configuration Management Plan is acceptable.
BLOCKS 8: & 13: Allow thirty (30) days for Government approval/disapproval. Contractor has thirty (30) calendar days for resubmittal if accepted with comments or if rejected.
BLOCK 9: Distribution statements shall be in accordance with Attachment 4 of the Contract.
BLOCK 10: & 12: A report shall be submitted NLT thirty (30) days after completion of each Configuration Audit Meeting
BLOCK 14: The deliverable shall be in digital format as a .pdf document. The deliverable shall be placed on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract #}/CMXX/{in dated subfolder}
An e-mail notification of the CDRL posting shall be delivered to:
PMA-299OPS@navy.mil.
See Block 16
15. TOTAL
G. PREPARED BY
Ken Kratz, AIR-1.3.2.J
H. DATE
12/11/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0008, 1008, 2008, 3008, 4008
B. EXHIBIT
LS
C. CATEGORY
ILSS
D. SYSTEM/ITEM
Full Motion Video (FMV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
LS01
2. TITLE OF DATA ITEM
Provisioning Parts List (PPLs)
3. SUBTITLE
Provisioning Parts List (PPL)
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81715 (See Block 16)
5. CONTRACT REFERENCE
SOW Para 3.3.1.1
6. REQUIRING OFFICE
AIR 6.6.1.10
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R (See Block 16)
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 14-P1-PMA-299-0786
BLOCK 4: DID is for guidance only. Content for this data item shall be provided in accordance with the PPL Worksheet (Attachment
XX).
BLOCKS 8:, 10:, 12: and 13: Approval is for content and format. The Contractor shall provide the PPL 90 days after receipt. Government will review the PPL and provide comments within 30 days after delivery. The Contractor shall incorporate Government comments and resubmit within 30 days of receipt of Government comments.
BLOCK 9: Distribution statements shall be in accordance with Attachment 4 of the Contract.
BLOCK 14: For reports, the Contractor shall provide this product in digital format using Microsoft Office format and shall submit the deliverable on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract #}/LSXX/{in dated subfolder}
An e-mail notification of the CDRL shall be delivered to: PMA- 299OPS@navy.mil.
Additionally, one copy shall be delivered on CD-ROM to the following address:
Commander Naval Inventory Control Point 700 Robbins Avenue Philadelphia, PA 19111 Attn: Code 03621.17
See Block 16
NAVICP
15. TOTAL
G. PREPARED BY
Stuart Holladay, AIR-6.6.1
H. DATE
12/11/2015
I. APPROVED BY
John Woodward, In-Service IPTL
12/25/2015
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0008, 1008, 2008, 3008, 4008
B. EXHIBIT
LS
C. CATEGORY
SESS
D. SYSTEM/ITEM
Full Motion Video (FMV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
LS02
2. TITLE OF DATA ITEM
Engineering Data for Provisioning (EDFP)
3. SUBTITLE
Engineering Data For Provisioning
(EDFP)
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81874 (See Block 16)
5. CONTRACT REFERENCE
SOW Para 3.3.1.2
6. REQUIRING OFFICE
AIR 6.6.1.10
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R (See Block 16)
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 14-P1-PMA-299-0786
BLOCK 4: DID is for guidance only. Content for this data item shall be provided in accordance with the EDFP Worksheet, Attachment
XX.
BLOCKS 8:, 10:, 12: and 13: Approval is for content and format. The Contractor shall provide EDFP 90 days of receipt. Government will review and provide comments within 30 days after receipt. The Contractor shall incorporate Government comments and resubmit within 30 days after receipt.
BLOCK 9: Distribution statements shall be in accordance with Attachment 4 of the Contract.
BLOCK 14: The Contractor shall provide the product in PDF file format with the part number and/or PLISN in the file name. The Contractor shall submit deliverable on the PMA299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract #}/LSXX/{in dated subfolder}
An e-mail notification of the CDRL Posting shall be delivered to:
PMA-299OPS@navy.mil.
EDFP shall be delivered to NAVSUP 03622.27 or designated representative. Provide a CD-ROM of the deliverable to the following address:
Commander NAVSUP Weapons Systems Support Code N98422.29 700 Robbins Avenue Philadelphia, PA 19111
See Block 16
NAVICP
15. TOTAL
G. PREPARED BY
Stuart Holladay, AIR-6.6.1
H. DATE
12/11/2015
I. APPROVED BY
John Woodward, In-Service IPTL
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0008, 1008, 2008, 3008, 4008
B. EXHIBIT
LS
C. CATEGORY
SESS
D. SYSTEM/ITEM
Full Motion Video (FMV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
LS03
2. TITLE OF DATA ITEM
Maintenance, Test and Support Equipment Requirements List
3. SUBTITLE
Support Equipment Recommendation Data (SERD)
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80294B (See Block 16)
5. CONTRACT REFERENCE
SOW Para 3.3.2
6. REQUIRING OFFICE
AIR 6.6.1.10
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ (See Block 16)
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 14-P1-PMA-299-0786
BLOCK 4: The DID is cited for content guidance. Use LSAR-070 for format.
BLOCKS 8:, 10:, 12: and 13: Approval is for content and format. The Contractor shall deliver the SERD within 90 days of receipt. The Government will review the submittal and provide comments within 30 days after receipt. The Contractor shall incorporate Government comments and resubmit within 30 days after receipt of Government comments. The Government will provide approval/rejection letter within 30 days after final submittal.
BLOCK 9: Distribution statements shall be in accordance with Attachment 4 of the Contract.
BLOCK 14: The deliverable shall be in digital format using Microsoft Office. The deliverable shall be placed on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract #}/LSXX/{in dated subfolder}
An e-mail notification of the CDRL Posting shall be delivered to:
PMA-299OPS@navy.mil
See Block 16
15. TOTAL
G. PREPARED BY
Stuart Holladay, AIR-6.6.1
H. DATE
12/11/2015
I. APPROVED BY
John Woodward, In-Service IPTL
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0008, 1008, 2008, 3008, 4008
B. EXHIBIT
LS
C. CATEGORY
PACK
D. SYSTEM/ITEM
Full Motion Video (FMV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
LS04
2. TITLE OF DATA ITEM
Packaging Plan
3. SUBTITLE
Packaging, Handling, Storage, and Transportation (PHS&T)
4. AUTHORITY (Data Acquisition Document No.)
DI-PACK-80455 (See Block 16)
5. CONTRACT REFERENCE
SOW Para 3.3.3
6. REQUIRING OFFICE
AIR 6.6.1.10
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R (See Block 16)
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 14-P1-PMA-299-0786
BLOCK 4: All items considered candidates for accommodation by specially designed reusable containers shall be identified and data in accordance with MIL-PRF-49506 shall be furnished. Data shall be sufficient detail to allow the design of a specialized container and dummy load without having to obtain additional data. The Contractor shall provide the following for all items:
Unit dimensions:
Unit weight Special shipping requirements Drawings showing envelope dimensions Detailed drawings showing mounting points Item material and surface finishes Item fragility
For large items greater than sixty inches long or over one hundred and fifty pounds in weight, the following additional information shall be provided:
Center of gravity Radii of Gyration Moment of inertia
Items requiring special marking requirements for shelf life items, constant power source needs, special attitude, controlled storage, hazardous materials and classified items shall be identified.
Submittal shall include Packaging Requirement Codes (PRC) for all new particular procurable source code items.
BLOCKS 8:,10:, 12: and 13: Approval will be for content and format, mandatory use of the DID is required. Submission of PHS&T requirements shall be 60 days of receipt. The Government will review and provide acceptance, rejection, and/or comments within
(30) days after receipt. All Government comments shall be incorporated into the final submittal within (30) days after receipt of Government comments.
BLOCK 9: Distribution statements shall be in accordance with Attachment 4 of the Contract.
BLOCK 14: For reports, the Contractor shall provide this product in
See Block 16
15. TOTAL
G. PREPARED BY
Stuart Holladay, AIR-6.6.1
H. DATE
12/11/2015
I. APPROVED BY
John Woodward, In-Service IPTL
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0008, 1008, 2008, 3008, 4008
B. EXHIBIT
LS
C. CATEGORY
PACK
D. SYSTEM/ITEM
Full Motion Video (FMV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
LS04
2. TITLE OF DATA ITEM
Packaging Plan
3. SUBTITLE
Packaging, Handling, Storage, and Transportation (PHS&T)
4. AUTHORITY (Data Acquisition Document No.)
DI-PACK-80455 (See Block 16)
5. CONTRACT REFERENCE
SOW Para 3.3.3
6. REQUIRING OFFICE
AIR 6.6.1.10
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R (See Block 16)
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro digital format using Microsoft Office format and shall submit the deliverable to the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract #}/LSXX/{in dated subfolder}
An e-mail notification of the CDRL Posting shall be delivered to:
PMA-299OPS@navy.mil
G. PREPARED BY
Stuart Holladay, AIR-6.6.1
H. DATE
12/11/2015
I. APPROVED BY
John Woodward, In-Service IPTL
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0008, 1008, 2008, 3008, 4008
B. EXHIBIT
LS
C. CATEGORY
SESS
D. SYSTEM/ITEM
Full Motion Video (FMV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
LS05
2. TITLE OF DATA ITEM
Logistics Product Data
3. SUBTITLE
Interim Support Items List (ISIL)
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81758A (See Block 16)
5. CONTRACT REFERENCE
SOW Para 3.3.4
6. REQUIRING OFFICE
AIR 6.6.1.10
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R (See Block 16)
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 14-P1-PMA-299-0786
BLOCK 4: DID is for format only.
BLOCKS 8:, 10:, 12: and 13: Approval is for content and format. The Contractor shall deliver the ISIL 90 days of receipt. The Government will review draft submittal and provide comments within 30 days of receipt. The Contractor shall incorporate Government comments and resubmit within 30 days of receipt.
BLOCK 9: Distribution statements shall be in accordance with Attachment 4 of the Contract.
BLOCK 14: This report shall be prepared in a digital format using Microsoft Office and CD-ROM, ASCII file or Electronic Data Transfer(EDT) The deliverable shall be placed on the PMA 299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract #}/LSXX/{in dated subfolder}
An e-mail notification of the CDRL Posting shall be delivered to:
PMA-299OPS@navy.mil.
Deliver NAVSUP copy of ISIL in one (1) CD-ROM to the following address:
Commander Naval Inventory Control Point 700 Robbins Avenue Philadelphia, PA 19111 Attn: Code 03622.17
See Block 16
NAVSUP WSS
15. TOTAL
G. PREPARED BY
Stuart Holladay, AIR-6.6.1
H. DATE
12/11/2015
I. APPROVED BY
John Woodward, In-Service IPTL
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0008, 1008, 2008, 3008, 4008
B. EXHIBIT
LS
C. CATEGORY
MGMT
D. SYSTEM/ITEM
Full Motion Video (FMV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
LS06
2. TITLE OF DATA ITEM
DMSMS Parts Management Plan
3. SUBTITLE
DMSMS Management Plan
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81948 (See Block 16)
5. CONTRACT REFERENCE
SOW Para 3.3.5.1
6. REQUIRING OFFICE
AIR 6.6.1.10
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R (See Block 16)
12. DATE OF FIRST
SUBMISSION
90DAC
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 14-P1-PMA-299-0786
BLOCK 4: Contractor format is acceptable. Prepare and submit in digital format compatible with Microsoft Office.
BLOCKS 8:, 10: & 13: For each submission, the Government has 45 calendar days for review and acceptance (with or without comments) or rejection. Contractor has thirty (30) calendar days for resubmittal if accepted with comments or if rejected. Only one delivery is required although if a change to the Contractor's DMSMS process occurs, then an update to the plan is required and the updated plan shall be re-delivered under this CDRL.
BLOCK 9: Distribution statements shall be in accordance with Attachment 4 of the Contract.
BLOCK 14: The deliverable shall be in digital format using Microsoft Office. The deliverable shall be placed on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract #}/LSXX/{in dated subfolder}
An e-mail notification of the CDRL Posting shall be delivered to:
PMA-299OPS@navy.mil
Revisions if necessary should use letters as follow:
First Submittal: LS06-001 Second Submittal, first revision: LS06-001R1 Etc.
See Block 16
15. TOTAL
G. PREPARED BY
Stuart Holladay, AIR-6.6.1
H. DATE
12/11/2015
I. APPROVED BY
John Woodward, In-Service IPTL
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0008, 1008, 2008, 3008, 4008
B. EXHIBIT
LS
C. CATEGORY
PSSS
D. SYSTEM/ITEM
Full Motion Video (FMV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
LS07
2. TITLE OF DATA ITEM
Source Data for forcasting Diminishing Manufacturing Sources and Material Shortages
(DMSMS)
3. SUBTITLE
Bill of Materials (BOM)
4. AUTHORITY (Data Acquisition Document No.)
DI-PSSS-81656A (See Block 16)
5. CONTRACT REFERENCE
SOW Para 3.3.5.2
6. REQUIRING OFFICE
AIR 6.6.1.10
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
QTRLY (See Block 16)
12. DATE OF FIRST
SUBMISSION
90DAC
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 14-P1-PMA-299-0786
BLOCK 4: and 8: Contractor shall provide all data required by DI- PSSS-81656A. Approval shall be for technical content and format.
Contractor shall deliver BOM in accordance with Attachment XX using E-BOM format (XML Data STD). All information shall be filled out in the template and include an indentured format from the main Weapons Replaceable Assembly (WRA) down to the piece-part level. All Original Equipment Manufacturer's (OEM) and Vendor part numbers shall be included.
BLOCKS 8:, 10: and 13: The first submittal is considered the baseline document. If no change and/or revision of the BOM occur in the quarter delivery period then no delivery of the BOM is necessary. The CDRL Delivery letter that notifies the Government of no change is sufficient. If a change and/or revision occurs then re -submission of the BOM shall show the updated/change area highlighted to enhance the Government entry/change/update process. For each submission, the Government has forty-five (45) calendar days for review and acceptance (with or without comments) or rejection. Contractor has thirty (30) calendar days for resubmittal if accepted with comments or if rejected.
BLOCK 9: Distribution statements shall be in accordance with Attachment 4 of the Contract.
BLOCK 14: This report shall be prepared in an editable electronic format using XML data standards and IAW Attachment XX for content and format. The deliverable shall be placed on the PMA299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract #}/LSXX/{in dated subfolder}
An e-mail notification of the CDRL Posting shall be delivered to:
PMA-299OPS@navy.mil
Revisions if necessary should use letters as follow:
First Submittal: LS07-001 Second Submittal, first revision: LS07-001R1 Etc.
See Block 16
15. TOTAL
G. PREPARED BY
Stuart Holladay, AIR-6.6.1
H. DATE
12/11/2015
I. APPROVED BY
John Woodward, In-Service IPTL
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0008, 1008, 2008, 3008, 4008
B. EXHIBIT
LS
C. CATEGORY
MGMT
D. SYSTEM/ITEM
Full Motion Video (FMV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
LS08
2. TITLE OF DATA ITEM
Source Data for Forecasting Diminishing Manufacturing Source and Material Shortages
(DMSMS)
3. SUBTITLE
DMSMS Quarterly Status Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81941 (See Block 16)
5. CONTRACT REFERENCE
SOW PARA 3.3.5.3
6. REQUIRING OFFICE
AIR 6.6.1.10
7. DD 250
REQ
XX (See Block 16)
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
QTRLY (See Block 16)
12. DATE OF FIRST
SUBMISSION
90DAC
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
QTRLY (See Block 16)
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 14-P1-PMA-299-0786
BLOCK 4: DI-MGMT-81941, DoD SD-22 and NAVAIR Instruction
4790.35 shall be used for guidance for quarterly report development only. The Contractor shall deliver the reports in accordance with Attachment XX using XML Data STD.
BLOCK 7: The contractor shall submit a DD-250/Receiving Report to the on-site DCMA ACO representative with a copy of the PMA- 299 deliverable approval letter.
BLOCKS 7: and 8: The Government has 45 days to review and determine acceptance or rejection. The Contractor has until the next quarterly submittal to incorporate the Government comments.
BLOCK 9: Distribution statements shall be in accordance with Attachment 4 of the Contract.
BLOCK 10: and 13: Government has 45 days to review and accept (with or without comments) or rejection. Contractor has until the next quarterly submittal to incorporate changes. The Contractor deliveries shall be made on the last business day of JAN, APR, JUL, and OCT.
BLOCK 14: The deliverable shall be in digital format using Microsoft Office. The deliverable shall be placed on the PMA299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract #}/LSXX/{in dated subfolder}
An E-mail notification of the CDRL posting shall be delivered to:
299OPS@navy.mil
Revisions, if necessary, should use letters as follows:
First submittal: LS08-001 First submittal (first revision): LS08-001R1 Etc.
See Block 16
15. TOTAL
G. PREPARED BY
Stuart Holladay, AIR-6.6.1
H. DATE
12/11/2015
I. APPROVED BY
John Woodward, In-Service IPTL
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0008, 1008, 2008, 3008, 4008
B. EXHIBIT
LS
C. CATEGORY
MGMT
D. SYSTEM/ITEM
Full Motion Video (FMV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
LS09
2. TITLE OF DATA ITEM
Life Cycle Cost and Independent Schedule Assessment Report
3. SUBTITLE
Analysis of Alternatives/Case Sheet
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81949 (See Block 16)
5. CONTRACT REFERENCE
SOW Para 3.3.5.4
6. REQUIRING OFFICE
AIR 6.6.1.10
7. DD 250
REQ
XX (See Block 16)
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
QTRLY (See Block 16)
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 14-P1-PMA-299-0786
BLOCK 4: MIL-STD-3018, DOD SD-22 and NAVAIR Instruction
4790.35 are to be used as general guidance for development. The Contractor shall deliver this CDRL in accordance with the Attachment XX for content and format in an editable Microsoft Office format and in a XML Data Standard.
BLOCKS 7:, 8: & 13: For each submission, the Government has forty-five (45) calendar days for review and acceptance (with or without comments) or rejection. Contractor has thirty (30) calendar days for resubmittal if accepted with comments or rejected.
BLOCKS 9: Distribution statements shall be in accordance with Attachment 4 of the Contract.
BLOCK 10:, 11: 12: & 13: When a notification is received for an end -of-life (EOL) component, the contractor shall prepare an AoA/Case sheet and submit it to the Government not more than thirty (30) days after the notification from the subcontractor, part vendor, part supplier, NAVSUP, DLA Maritime, NAVSEA Keyport, GIDEP or the result of notification from the parts monitoring tool. One AoA/case sheet will be submitted for each individual obsolescence issue identified and documented in the delivered quarterly DMSMS reports.
BLOCK 14: The deliverable shall be in digital format using Microsoft Office. The deliverable shall be placed on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract #}/LSXX/{in dated subfolder}
An e-mail notification of the CDRL posting shall be delivered to PMA -299OPS@navy.mil
Revisions, if necessary, should use letters as follows:
First submittal: LS09-001 First Submittal (first revision): LS09-001R1 Etc.
See Block 16
15. TOTAL
G. PREPARED BY
Stuart Holladay, AIR-6.6.1
H. DATE
12/11/2015
I. APPROVED BY
John Woodward, In-Service IPTL
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0008, 1008, 2008, 3008, 4008
B. EXHIBIT
LS
C. CATEGORY
TMSS
D. SYSTEM/ITEM
Full Motion Video (FMV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
LS0A
2. TITLE OF DATA ITEM
Technical Manual
3. SUBTITLE
Maintenance Technical Manual
4. AUTHORITY (Data Acquisition Document No.)
See Block 16
5. CONTRACT REFERENCE
SOW Para 3.3.6.1
6. REQUIRING OFFICE
AIR 6.6.1.10
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
3TIMES/R (See Block 16)
12. DATE OF FIRST
SUBMISSION
180 ARO
8. APP CODE
A (See Block 16)
C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 14-P1-PMA-299-0786
BLOCK 4: Contractor format acceptable.
BLOCK 9: Distribution…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .