MQR.pdf
PDF 139 KB Posted
- Attached to
- Pin, Utility
- Solicitation number
- SPRHA2-22-Q-0547
- Issued by
-
Defense Logistics Agency Aviation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPRHA222Q0547_______0001.pdf | ||
| SPRHA222Q0547.pdf | ||
| CDRLFATR.pdf | ||
| EDL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MANUFACTURING QUALIFICATION REQUIREMENTS
NSN: 1730-01-043-6145
P/N: 66D48940P1 Noun: Pin & Marker Assy (A&D Safing Pin) Application: Reentry System
14 Jul 2017 Section C 1/4
Qualification Requirement Cost Estimate Estimate the likely cost for testing and evaluation which will be incurred by the potential offeror to become qualified. This is a requirement of FAR 9.202(a)(1)(ii) and 10USC2319(b)(3) (The following categories may not apply in all cases. The product engineer should identify the costs applicable to the project and indicate N/A on all sections that do not apply.)
Total cost is $ , 0 Section A. Shipping, if required, use DD Form 1654, Evaluation of Transportation Cost Factors to develop the information. Refer any questions to the Procurement Contracting Officer for cost estimation.
N/A
Section B. Dimensional/Electronic Verification. Contact the science/engineering laboratory to obtain cost estimates (bids) for tests such as:
$ , 00
a. Chemical N/A
b. Metallurgical
(1) Destructive
(2) Non-Destructive 500
c. Dimensional $1500
d. Electronic N/A
e. Mechanical 200
f. Non-Destructive Inspection N/A Section C. Nuclear Hardness [This includes cost of shock, vibration, and Electro-Magnetic Pulse (EMP)]. Contact Systems Engineering Integration and Test Division for hourly rate.
N/A
Section D. Form, Fit, Function and Interface. Contact your organizational Production Management Specialist (PMS) to obtain information on the same or similar item where work has been accomplished in the past using AFMC Form 206, Temporary Work Request.
Section E. Original Equipment Manufacturer (OEM) Qualification Testing (If required) 1500
a. Laboratory Costs (Costs are directly dependent on the type of testing to be accomplished and the location and duration of the testing. For example, landing gear laboratory testing is normally accomplished on a dynamometer and costs vary from $25,000 to $500,000 depending on the depth of testing. Aircraft and missile testing will vary as the requirement dictates and the cost will have to be identified by the source of testing).
N/A
b. Flight/Data Reduction & Analysis Costs. N/A Section F. Travel by Contractor to Test Site (if required) $ 0
a. Lodging
b. Per Diem
c. Rental Cars
d. Incidentals (Verified) Section G. SAR Package Development/Evaluation Cost: A potential new source’s development of a Source Approval (SAR) package may cost as much as:
In addition, the cost incurred for Government evaluation of their SAR may be as much as: N/A Evaluation cost may be born by the government if it is in the best interest of the Government to qualify alternate sources.
P/N: 66D48940P1 Noun: Pin & Marker Assy (A&D Safing Pin) Application: Reentry System
14 Jul 2017 Section C 2/4
SECTION C:
QUALIFICATION REQUIREMENTS THAT MUST BE SATISFIED TO BECOME A QUALIFIED SOURCE
Prequalification Notice/Sources Sought: The offeror shall notify the appropriate government Small Business Office or, if responding to a solicitation, the contracting officer in the appropriate government contracting office, of intent to qualify as a source for this Pin & Marker Assy (A&D Safing Pin).
Facilities, Testing, and Inspection Capabilities: The offeror must certify to the government that they have, or have access to, the required facilities and equipment to manufacture, inspect, package, and store the item. The offeror shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.
Data Verification: The offeror must verify that he has a complete data package. This verification must include a complete list of all procedures, drawings, and specifications, including change notices, in the offeror’s possession. The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.
Manufacture/Process Verification: The offeror must manufacture this item to conform to the government requirements as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the government requirements as prescribed by , OO-ALC/414 SCMS/GUEA,. The offeror shall also identify its sources for materials and its standards for internally used processes.
Test and Evaluation and/or Verification: The offeror, at their own expense, shall prepare and submit to, OO-ALC/414 SCMS/GUEA, for their prior approval, a qualification plan/procedure detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by drawing 66D48940 and sub tier documents. After completion of the approved qualification plan, the offeror shall be required to submit a complete report of the results to, OO-ALC/414 SCMS/GUEA, for their review and approval. The government retains the right to exercise the option to inspect the manufacturing and verification processes on-site. To facilitate this, the offeror shall notify the government at least 30 days in advance of manufacturing and/ or verification processes that will be used as a basis for qualification. The offeror’s facilities shall be made available for government inspection.
Qualification Article Verification: The offeror must provide, at their own expense, three (3) pre-contract award qualification articles for evaluation by the government. These articles must comply with all of the requirements of drawing 66D48940 and sub tier documents. These articles shall be subjected to a form, fit, and function evaluation to demonstrate compatibility with the weapon system and to evaluate the manufacturing capability of the offeror. Offerors will be notified whether or not their qualification articles passed or failed the required qualification testing within 1 0 days of submitting a product for qualification evaluation.
P/N: 66D48940P1 Noun: Pin & Marker Assy (A&D Safing Pin) Application: Reentry System
14 Jul 2017 Section C 3/4
Note that successful completion of the qualification evaluation does not guarantee contract award. If the offeror is deemed qualified and awarded the contract, a post-contract award first article exhibit may be required to verify production capability.
Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified: $ , 50.
Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 0 days. This is based on complexity of the Pin & Marker Assy (A&D Safing Pin) and other factors.
Qualification Time Limitation: An offeror may not be denied the opportunity to submit and have considered an offer for a contract if the offeror can demonstrate to the satisfaction of the contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed to provide the vendor with an opportunity to demonstrate its ability to meet the standards specified in this qualification requirement.
Evaluation of Proposals Not Previously Qualified: The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in the qualification requirement before the date specified for award of the contract.
Once all qualification requirements are met, the offeror will be added as an approved source for this part on drawing 66D48940. Approval, however, does not guarantee subsequent contract award.
P/N: 66D48940P1 Noun: Pin & Marker Assy (A&D Safing Pin) Application: Reentry System
14 Jul 2017 Section C 4/4
2. SOURCE QUALIFICATION WAIVER REQUIREMENTS
Sources who meet any of the following source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify production capability:
a. QWC1: The potential source submits written certification that the articles have been previously supplied to and accepted by the government or original equipment manufacturer (e.g., DD Form 250, Material Inspection and Receiving Report, Purchase Order invoice, etc).
b. QWC2: The potential source is qualified on the right-hand article and requests to be qualified on the left-hand article. If the right-and left-hand articles are mirror images of each other, then approval can generally be given.
c. QWC3: A source qualified to provide an assembly is usually qualified to provide subassemblies, major components, and items of that assembly.
d. QWC4: A source qualified to provide earlier dash numbers of a basic P/N may be qualified to provide other dash numbers of that same basic P/N, provided there is no increase in complexity, criticality, or other relevant requirements.
e. QWC5: A source qualified to provide a similar or like item can be qualified to provide the required item. However, for approval, the engineering authority must verify that there is no increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written proof, such as purchase orders, shipping documents, etc., to show that the similar item was provided to the original equipment manufacturer or DoD.
f. QWC6: A source previously qualified to provide an item, but which has been purchased, sold, merged, absorbed, reformed, split, etc., may qualify if it can be established that the qualification is currently with the requester and that the requester has the same or equivalent facilities, tooling, equipment, personnel, and utilizes the original forging, castings, etc., in the manufacturing process.
File details come from the government source that posted it. Updated .