MPI SOW.pdf
PDF 1 MB Posted
- Solicitation number
- PANRSA23P0000008938
About this file
This sources sought notice requests information from potential offerors for a magnetic particle inspection (MPI) system. Responses are due by 3:00 p.m. Central Standard Time on May 25, 2023 and should be electronically submitted to the contract specialist Harold "Jay" Russell Jr. at the listed email address. Responses should include organization name, address, CAGE code, points of contact and their contact information, and website address. Any data marked proprietary will be protected from release outside the government.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DCRF NDT MPI SOW 1 2023-06-09 1:08 PM
DCRF NDT MPI ONLY SOW
NDT MPI ONLY
1.1. General information: the mission of the Corpus Christi Army Depot is to perform overhaul, repair, modification, retrofit, and modernization of aircraft systems.
1.2. Background: the Corpus Christi Army Depot is currently having DCRF constructed via a military construction/Army authority project. All equipment for shops in DCRF will be obtained by purchase from local sites at CCAD.
1.3. Objective: the contractor shall purchase and provide a turnkey installation of equipment and process shops in DCRF within the stated period of performance.
1.4. Period of performance: the contractor’s period of performance shall be 36 months from contract award.
1.5. Contractor considerations:
1.5.1. Beneficial occupancy date: the targeted beneficial occupancy date is in April 2020. This date represents the day that non-construction personnel, to include Government and contractor personnel, can enter the building and begin work related activities. Corpus Christi Army Depot does not have any control or authority on the beneficial occupancy date.
1.5.2. DCRF facilities: it is expected that building utilities (air, water and electricity) will be provided when the building is released for occupancy and will be available continuously. In the event of extended power outages due to continued building construction efforts and upgrades, the contractor shall be prepared to provide air and electricity to continue uninterrupted installation efforts. The contractor shall not connect any power source to building facilities infrastructure for distribution under any circumstance.
1.6. Quality assurance: the contractor shall develop and implement procedures to identify, prevent and ensure non-recurrence of defective services. The contractor shall develop a proactive quality program plan for measuring and attaining quality of performance, in accordance with DI-QCIC-81722 Quality Program Plan (QPP), CDRL A001. The contractor shall submit this plan to the Government within 20 days of contract award for acceptance. The Government will review this document and provide comments within 10 days. The contractor shall have 10 days to resubmit and address Government comments. The time duration shall apply for every iteration of submissions.
1.7. Operational procedures:
1.7.1. Recognized federal holidays: the following table is a list of federal holidays. The contractor shall not perform services on these days unless required by the contracting officer’s representative (COR) or the contracting officer
(KO).
New year’s Day Labor Day Juneteenth Day
Martin Luther King Jr’s Birthday
Columbus Day
President’s Day Veteran’s Day
Memorial Day Thanksgiving Day
Independence Day Christmas Day
DCRF NDT MPI SOW 2 2023-06-09 1:08 PM
1.7.2. Depot closure: CCAD may schedule a shutdown period of approximately 40 working hours between Thanksgiving Day and New Year’s Day holiday. CCAD may schedule a shutdown period at other times. The contractor shall comply with administrative closing procedures for the depot. Announcements of depot closures will be made through the KO and COR.
1.7.3. Non-personnel services statement: contractor employees performing services under this contract shall be controlled, directed, and supervised at all times by management personnel of the contractor. Contractor employees shall perform their duties independent of, and without the supervision of, any Government official.
1.7.4. Place of performance: Corpus Christi Army Depot, Corpus Christi, TX
1.7.5. Trash and debris removal: the contractor shall keep the work area free of waste materials and rubbish accumulations at all times. The contractor shall leave the work area and premises in a clean, neat and organized condition and provide a dumpster for all metallic materials, shipping containers, or other materials generated during the equipment installation phase. The contractor shall place dumpsters in an area designated by the Government.
1.7.6. Contractor provided equipment requirements: the contractor shall use only propane, electric, hydraulic or pneumatic equipment inside Government buildings. Gasoline driven equipment is not permitted inside any Government building under any circumstance. All forklifts shall have an on board portable fire extinguisher. The contractor shall be required to obtain all cutting and welding permits required by the Corpus Christi Naval Air Station fire protection inspector: 361-961-3491/3492. The contractor shall notify the Navy Fire Department to obtain necessary permits for each working day. If gasoline generators are required, the contractor shall place them in an area designated by the Government.
1.7.7. On and off loading equipment: the contractor shall be responsible for offloading all equipment in DCRF. The contractor shall be responsible for on and off loading of all tools and equipment required for new equipment machines from CCAD sites to DCRF.
1.7.7.1. The contractor shall be responsible for preservation, packing, shipping, un-packing, on-site placement at CCAD and storage in accordance with the manufacturer’s commercial practices. The contractor shall provide an on-site, fully authorized representative for all receipt of goods. The Government will not provide storage for shipped equipment and materials. The contractor shall be responsible for the storage and handling of equipment and materials.
1.7.8. Travel expenses: the contractor shall be responsible for all travel expenses to and from CCAD. These expenses shall be calculated into the contractor’s final price proposal.
1.7.9. Applicable building, safety, construction, federal and process standards and procedures are listed in Appendix E.
1.7.9.1. Government approvals for any product, design, specification or document does not negate the contractor’s ultimate responsibility for meeting standards, codes and regulatory agency requirements.
1.7.9.2. Standard by reference: when a reference in this document is made to an industry specification, a manufacture, trade or trade association, an industry, or other generally recognized source, such are hereby made a part of the specification and shall have the same force and effect as though referenced in this document.
1.7.9.3. In the event of competing regulations and requirements for this installation, the strictest shall be enforced.
1.8. Intentionally left blank.
1.9. Safety program: the contractor shall conduct all tasks in a safe manner and in compliance with Occupational Safety and Health Association (OSHA), Environmental Protection Agency (EPA), state, Army, and CCAD Safety, Environmental Office regulations, section 1.7.9and Appendix H. The contractor is solely responsible for compliance with all safety regulations by employees while working on Government owned facilities. The contractor bears sole responsibility for
DCRF NDT MPI SOW 3 2023-06-09 1:08 PM
compliance at all times with federal, state, and municipal safety and health laws, regulations, and standards that apply to the work performed under this contract, including the occupational safety and health act. The contractor shall take all reasonable steps and precautions to maintain compliance with applicable regulations/requirements, prevent accidents, and preserve the health and safety of contractor and Government personnel performing or in any way coming in contact with the performance of the work required by this contract. The contractor shall take additional immediate actions or precautions as requested by the KO when the KO determines that such measures are necessary for safety and health purposes. Contractor or subcontractor supervisors shall monitor worksites and operations daily to ensure safe working conditions and continuing compliance. Hazardous or noncompliant conditions identified by the KO shall be promptly corrected, and corrective actions taken shall be reported in writing to the KO, in accordance with DI-SAFT-80106C Health Hazard Assessment Report (HHAR), CDRL A004, within 5 days of the KO’s notification to the contractor. In cases of serious and/or recurring hazards or noncompliance, the KO may stop the work in question pending correction of the hazardous or noncompliant condition, and/or order the removal of the involved contractor or subcontractor employees from the Government installation or facility. In such cases, the contractor will not be granted a cost adjustment nor an extension of time due to the work stoppage or employee removal action. Failure of the contractor to effectively resolve serious and/or recurring hazards or noncompliance may result in termination of the contract.
1.9.1. Activity hazard analysis: the contractor shall provide an activity hazard analysis, in accordance with DI-SAFT- 80106C Health Hazard Assessment Report (HHAR), CDRL A004, and guidelines identified in Appendix H. The analysis shall fully comply with the guidelines and standards stated in section 1.7.9and Appendix H. The contractor shall use the more stringent standard when standards are different. The names of the competent and qualified person required for a particular activity (e.g. excavation, scaffolding, fall protection, or other activities as specified by OSHA) shall be identified and included in the activity hazard analysis, as well as proof of their competency and qualification. The plan shall be reviewed and deemed acceptable by the CCAD safety and occupational health division before beginning any on-site activities. The contractor shall provide the activity hazard analysis within 20 days of contract award. The Government will review and provide a response within 20 days. The contractor shall have 10 days to resubmit with corrections. The time duration shall apply for every iteration of submissions.
1.9.2. Contractor safety brief: prior to beginning any on-site installation work, the contractor shall meet with the Government, on-site, to discuss the administration and understanding of the overall safety program, in accordance with AR 385-10 section 4-4. At a minimum, the meeting shall be attended by the following:
KO or COR Contractor’s project manager Contractor’s safety representative CCAD safety and occupational health division representative Government project lead
1.9.3. The contractor shall be responsible for implementing and enforcing the guidelines and standards stated in section 1.7.9and Appendix H for all aspects of this document.
1.10. All documents, drawings, tabulations, manuals, software and software documentation -turned over to the Government in any phase of this project shall become the property of the Government with unlimited data rights and be delivered in an editable format.
1.11. Security Requirements: The following information is provided on security related matters.
1.12. Installation Access: Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized. Failure to submit required information/data and obtain required documentation or background investigations will be grounds for denying access to U.S. installations, buildings and controlled areas.
The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.
The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control processing requirements.
The Contractor shall return installation and CCAD passes to the issuing Security office when the contract is completed or when a Contractor employee no longer requires access.
DCRF NDT MPI SOW 4 2023-06-09 1:08 PM
The contractor shall obtain a Defense Biometric Identification System (DBIDS) Card through Navy Pass & Tag not to exceed contract expiration. The government Contracting Officer Representative (COR) will coordinate CCAD badging and briefing with CCAD Security. Contractors are not authorized to escort anyone on the installation or CCAD.
1.13. Installation Pass Log: (Deliverable #1 DCRF) (Reference Section 13.1). In addition, the Contractor shall provide the
Contracting Officer, via the COR, an Initial Installation Pass Log within three (3) calendar days after contract award.
The log must at a minimum contain the following information Full Legal Name, type of access (e.g. CAC, DBIDS, base pass) and working hours. The log shall be updated as employees are added or removed. The Updated Installation Pass Log shall be current and available at any time upon request by the Government and submitted to the COR within five (5) days after any changes to the log.
1.14. Individual Termination or Expiration of Employment: (Deliverable DCRF) The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated and shall return them to the issuing office within three (3) working days.
1.15. Contract Termination or Cancellation: (Deliverable DCRF) Upon termination or cancellation of this contract, the
Contractor shall collect all outstanding installation access passes and return them to the issuing office within three
(3) working days.
1.16. Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for
Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW the Army Physical Security Program (AR 190-13).
1.17. Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel. Government issued access badges shall not be worn outside designated facilities where visible to the general public.
1.18. Safeguarding Covered Defense Information: Contractors and subcontractors are required to safeguard covered defense information that resides in or transits through covered contractor information systems by applying specified network security requirements and reporting of cyber incidents in accordance with 48 CFR 204.73.
1.19. Key Control: (Deliverable DCRF)The Contractor shall establish and implement methods of making sure all keys issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Contractor’s Security Plan (If applicable), and the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any incidents of lost or duplicate keys to the Contracting Officer. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from payment due to the Contractor. Keys not returned at the end of the contract or in the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the payment due to the Contractor. The Contractor shall prohibit the use of Government issued keys by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Quality Control Plan.
1.20. Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
DCRF NDT MPI SOW 5 2023-06-09 1:08 PM
1.21. Contractor workspace (Deliverable DCRF) (staging site, on-site office, desk or work area, etc.) shall contain a sign signifying the space is occupied by Contractor employee(s) to ensure that Government employees and the public know that they are not Government employees. The proposed sign shall be submitted to the Contracting Officer via the COR for review and acceptance within (10) calendar days after contract award. Workspace sign location shall be coordinated with the COR. Contractor employees shall identify themselves by name and company affiliation when answering the telephone, presenting briefings, conducting or attending meetings, and seminars. All Contractor correspondence (written, facsimile, and email display) shall include their company name. Requirements for Contractor vehicles is addressed under Part 4 paragraph 4.4.
1.22. Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.23. Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by Defense imagery
Management operations Center and contained at www.dimoc.mil/resources/limitations/, the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.
1.24. Required Training: The following provides information on training requirements.
1.25. Anti-Terrorism (AT) Level I Training: (Deliverable DCRF) All Contractor employees, including subcontractor employees, who are employed under the contract, shall complete AT Level I Training within thirty (30) calendar days as required on the AT/OPSEC Cover Sheet after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or thirty (30) calendar days after employment of new personnel.
Contractor personnel travelling overseas shall complete area of responsibility (AOR) specific AT awareness training for U.S. based Contractor employees and associated subcontractor employees. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR (or to the Contracting Officer, if a COR is not assigned) within five (5) business days after completion of this training by all employees and subcontractor personnel. AT Level I awareness training is available at https://jkodirect.jten.mil, (course JS-US007). Contractor personnel shall complete refresher training every twelve (12) months except AOR specific AT Level I training which shall be completed as required by local AT policies
If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR within five (5) business days after completion of the training.
1.26. OPSEC Training: (Deliverable DCRF) All Contractor employees, including subcontractors, shall complete Level I OPSEC training within thirty (30) calendar days of employment under this contract. Verification of the training shall be provided to the COR within five business days after completion of the training.
OPSEC Level I training is available at https://securityawareness.usalearning.gov. Contractor personnel must complete refresher training every 12 months. Verification of the training shall be provided to the COR within five (5) business days after completion of the training.
1.27. iWATCH Training: (Deliverable DCRF) The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within thirty (30) calendar days after the contract is awarded and within five (5) business days after new employees commence contract performance, with the results reported to the COR within five (5) business days after the contract is awarded and within thirty (30) calendar days} after new employees commence contract performance. Verification of the training shall be provided to the COR within five (5) businessdays after completion of the training.
1.28. Controlled Unclassified Information (CUI): Contractor employees, including subcontractors, performing services
DCRF NDT MPI SOW 6 2023-06-09 1:08 PM
under this contract with access to CUI shall complete DOD Mandatory Controlled Unclassified Information (CUI) Training within 30 calendar days of employment and annual refresher training in accordance with DoDI 5200.48.The Contractor shall provide the COR a copy of the training certificates for its employees no later than five (5) days after completion (Deliverable DCRF). Training is available at https://securityawareness.usalearning.gov.
1.29. Vehicles and Equipment: The Contractor shall provide all necessary vehicles (no GSA vehicles provided to Contractor for use on this contract) and equipment to perform the work described in this SOW. All Contractor provided vehicles and equipment shall have the company name prominently displayed on both sides of the vehicle or equipment and present a neat, professional appearance. Contractor's vehicles and equipment used in the performance of this contract shall meet all local traffic, safety, and environmental requirements. Vehicles and equipment found to be unsafe shall be removed from the installation and replaced. The Contractor shall not use any Government-owned tools, materials, or parts to maintain Contractor vehicles and equipment without prior written approval of the Contracting Officer. The COR may inspect the Contractor’s vehicles and equipment at any time.
2. Government furnished items, services and technical data:
2.1. Office space: the Government will provide an office, or similar, with a desk and chair. The contractor shall maintain the assigned office space in a neat and orderly manner. The contractor shall provide all office equipment and services (printers, computers, internet access) required to fulfill the requirements of this document.
2.2. Access to Dynamic Component Repair Facility (DCRF): the Government will provide the contractor with all necessary access to DCRF and its infrastructure when required to complete the efforts of this contract. The contractor shall fill out necessary forms provided by the Government required for access to DCRF.
2.3. Intentionally left blank.
2.4. Utilities and equipment: the Government will provide building power and utilities, air and electricity available in the facility for the contractor’s use in the performance of this contract. In the event of extended power outages due to continued building construction efforts and upgrades, the contractor shall be prepared to provide air and electricity to continue uninterrupted installation efforts. The contractor shall not connect any external power source to building facilities infrastructure for distribution under any circumstance. The contractor shall instruct employees in utility conservation practices.
2.5. Technical data: the Government will make available to the contractor with the solicitation:
2.5.1. DCRF architecture and facility drawings: drawings will show column locations, electrical taps and locations, water taps and locations, phone hubs and locations, IT cabinets and hub locations, compressed air taps and locations.
These drawings are available to CCAD through a third party contractor from a current MCA project. Preliminary drawings will be provided with the solicitation, however the as-built, final drawings of the building will not be available until a later date.
2.5.2. Concrete slab ratings and drawings: drawings show slab thickness and load capacities of the building floor. The load capacities of the slab dictate the paths for large material handling equipment with heavy loads. The contractor shall observe and not exceed the load limits during transport of any material through the building.
Equipment with large weights will have a designated location with the proper concrete slab rating.
2.5.3. DCRF shop floor equipment layout drawing: this drawing set is the build-to layout that shows all equipment that will be procured new. This drawing set is generated and supported locally by CCAD. contractor shall use this file to maintain the ‘as-built’ drawings. The contractor shall use this document to determine quantities of equipment to be procured if the quantity specifically is not stated in this document.
2.5.4. Related documents:
J.01: CCAD Process Standard for Magnetic Particle Inspection J.02: CCAD Process Standard for Fluorescent Penetrant Inspection CCAD Industrial IT Requirements
DCRF NDT MPI SOW 7 2023-06-09 1:08 PM
IT Installation: Standing Operating Procedure 25-10-IT-004 Hazardous Substance Fact Sheet: Strontium Chromate 7789-06-2
TM-1-1500-335-23
D0.05 In Process Preservation of Ferrous and Non-Ferrous Parts
DCRF Paint Plan MPI Tech Sheet: 201107768 MPI Tech Sheet: 201206022
2.6. Fluids for equipment: the Government will only furnish the following fluids and material:
Solvent cleaner for solvent booths Cutting fluids for machining equipment Bearing shop cleaning line tank fluids Vapor degreaser tank fluids Preservation vat fluids MPI substation tank fluids MPI machine material and fluids Blast media for shoot peen booths
The contractor shall provide the Government at least a 30 day notice prior to utilizing the Government furnished material to give ample time to deliver the product. The contractor shall provide all other fluids required for the installation of equipment.
3. Contractor furnished items and responsibilities: except for the items and services identified in 2The contractor shall provide all staffing, equipment, supplies, fluids and software required to execute the tasks contained in this contract.
3.1. Safety equipment: the contractor shall provide personal protective equipment required to execute this contract in a safe manner (i.e. earplugs, earmuffs, foot protection, respiratory equipment, and eye protective safety goggles/shields, arc shields). In the event that the contractor will require any of its personnel or subcontractors to use respiratory equipment, the contractor shall establish and implement a written respiratory protection program with worksite specific procedures that meets and exceeds requirements established by 29 CFR 1910.134. The contractor shall have personnel and subcontractors utilize fall protection equipment for required work at elevated levels from the ground floor in excess of 6 feet. The contractor shall establish and implement a written fall protection program that meets or exceeds all requirements of 29 CFR 1926 Subpart M: Fall Protection.
4. Specific tasks:
4.1. Key personnel and responsibilities:
4.1.1. Project manager (PM): the contractor shall provide a project manager. The name of this person shall be designated in writing, in accordance with DI-MGMT-81834A Contractor’s Personnel Roster, CDRL A009, and initially submitted no later than 20 days after contract award.
4.1.1.1. PM tasks: the PM shall be responsible for the overall performance of contractor personnel and ensure successful completion of all aspects of this contract. The PM shall be the central POC with the Government for performance of all work under this contract. The PM communicates frequently with the COR via email or in writing and provides updates, perform project coordination, creates and maintains schedules and reports statuses. The PM ensures satisfactory job performance is compliant with all safety standards and CCAD regulations.
4.1.2. Site safety and health officer (SSHO): the contractor shall provide an on-site safety specialist. The name of this person shall be designated in writing, in accordance with DI-MGMT-81834A Contractor’s Personnel Roster, CDRL A009, and initially submitted no later than 20 days after contract award. This individual can have alternate duties, however the primary duty is to provide safety oversight for all contractor personnel.
4.1.2.1. The SSHO shall:
DCRF NDT MPI SOW 8 2023-06-09 1:08 PM
4.1.2.1.1. Physically be present on-site during normal working hours when work is being done by the contractor. The SSHO shall prepare, train and oversee the contractor employees in the execution of duties of the contract requirements in a safe manner.
4.1.2.1.2. Conduct investigations into any accidents or near miss incidents and shall report in writing to the COR via the PM, in accordance with DI-SAFT-81563 Accident/Incident Report, CDRL A019, within twenty-four hours of such occurrence.
4.1.2.1.3. Develop and manage safety work practices including policies and procedures, job hazard analysis, safety meetings, incident reporting and investigations, safety training and emergency response.
Also ensure that safety data sheets have been reviewed and proper procedures for handling have been identified and followed.
4.1.2.1.4. Inspect contractor work areas, tools, construction equipment, task processing, job hazard analysis, and work activities/methods for hazardous conditions.
4.1.2.1.5. Provide guidance and recommendations for corrective action on any unsafe or potentially unsafe issues pertaining to contractor’s actions.
4.1.2.1.6. Review contractor accident and injury data, identify any requirement for new or modified occupational safety procedures, and report all accident, injury data, and corrective actions to the Government.
4.1.2.1.7. Ensure that proper lock-out/tag-out procedures and devices are implemented for machines being serviced.
4.2. Administrative document maintenance and support: the contractor shall submit and maintain the following administrative documents:
4.2.1. DI-MGMT-81834A, Contractor’s Personnel Roster, CDRL A009: the contractor shall identify, at a minimum, the PM and SSHO assigned to this project. The contractor shall submit this roster within 15 days of contract award for Government review. The contractor shall state assigned alternates if any will be provided.
4.2.2. DI-MGMT-80507C, Project Planning Chart, CDRL A008: the contractor shall submit an initial project plan within 30 days of contract award which outlines all tasks and durations related to the implementation of this contract.
The contractor shall provide an updated project plan every month along with the monthly status reports, DI- MGMT-80368A, Status Report, CDRL A015. The Government will review, provide feedback and accept the project plan monthly. The Government will use this plan for planning Government activities such as scheduling release for productions, preparing for shop equipment, machine fluid procurements, personnel preparations, etc. The project plan shall be compatible with Microsoft Office Project 2013.
4.2.2.1. Project plan tasks for new equipment: the contractor shall include in the project plan – preliminary design reviews, equipment and utility design documents delivery, individual equipment installations listed in section 4.4and expected implementation of test plans.
4.2.2.1.1. The contractor shall include tracking of all areas listed in section 4.4and the installed equipment within the area.
4.2.2.1.2. Project plan implementation surveillance for new equipment: The equipment installation task start and end dates for base year items, months 1 through 12, shall be fixed within 3 months of contract award. The installation task start and end dates for the 2nd year, months 13 to 24, shall be fixed 10 months after contract award. The installation task start and end dates for the 3rd year, months 25 to 36, shall be fixed 15 months after award. In accordance with Appendix J, once dates are fixed, the contractor shall not change increase start and end installation task dates by more than 40 business days. This performance requirement shall only apply to new equipment installations. In the case of Building Occupancy Dates (BOD) shifts, the contractor shall be allowed to change start and end dates by the same amount the BOD shifts for base year tasks only. The contractor shall comply with section 4.6
DCRF NDT MPI SOW 9 2023-06-09 1:08 PM
4.2.3. DI-MGMT-80368A, Status Report, CDRL A015: the contractor shall submit the status report to account for all contract activities to include an executive summary highlighting significant completions, technical challenges, obstacles, failures and issues of concern. Status reports shall be due by the 5th day of each month.
4.2.4. DI-MISC-81489A, Real Property Facilities As-Built Drawings, CDRL A016: the contractor shall maintain an as-built drawing of the shop floor layout. The format of the shop floor layout shall be compatible with AutoCAD 2016 or newer. The contents of the initial shop floor layout provided as GFI shall be used and edited. The contractor shall update the drawing and include any changes in equipment information such as equipment location, facility drops, IT drops, power requirements, etc. The contractor shall add the fire sprinkler and RO/DI water main trunk piping routes in this drawing. If the contractor requires new locations for equipment or deviations from the shop layout are needed, the Government will review the new criteria and either reject or accept the new requirements. The contractor shall submit the first as-built drawing after contract award when installation of the equipment begins. The contractor shall provide updated layouts semi-annually (starting either January 1 or July 1: whichever day comes first after installation commences) attached to the status report due that month, DI-MGMT-80368A, Status Report, CDRL A015.
4.2.4.1. The contractor shall provide individual CAD 3D files of the following new equipment: CNC machines (grinders, lathes and mills), manual machines (grinders, lathes, mills), bearing enclosure, paint enclosure, roller systems, ovens, tumblers.
4.2.5. DI-MGMT-81836, Facilities Requirements Document (FRD), CDRL A007: the contractor shall maintain a spreadsheet that contains a list of new equipment and the utility installation requirements the equipment requires. The spreadsheet shall contain: voltage, current, power, water (RO, chilled, hot), air pressure and CFM, and any other utility requirement. If the equipment has multiple sub-systems that require separate utilities, the contractor shall provide separate line items for each sub-system. The contractor shall exclude the following items: paint guns, worktables and any item that does not require facilities. For multiple identical machines, the contractor shall have one entry per machine. The contractor shall submit this list quarterly (starting January 1, April 1, July 1 or October 1: whichever day comes first after contract award) attached to the status report due that month.
4.2.5.1. Facilities requirements document surveillance: in accordance with Appendix J, the contractor shall not be allowed more than 5% of the total quantity of listed items to contain incorrect data. The document will be reviewed by Government personnel for accuracy of data captured. The Government will randomly check information in the listing using the following methods:
Review of documented machine specifications for new equipment
Using measurement instrumentation
Review of utility requirements at original site for equipment
4.3. Utility distribution and equipment installation for new equipment:
4.3.1. Utility distribution for new and equipment: the contractor shall distribute building facility services to all equipment purchased new equipment. The contractor shall design and implement the shop electrical system, shop air system, water system, bearing shop steam piping, bearing enclosure systems, paint enclosure system, oven exhaust systems and systems required in section 4and 2.5The contractor shall be responsible for tapping into designated building hubs (electrical, air, water, fire protection, IT, etc.) as identified in the drawings provided in section 2.5Utility distribution designs and construction drawings shall be created and stamped by a practicing, licensed professional engineer. All designs shall be in accordance with section 1.7.9and UFC codes and shall be submitted to the Government for review in an electronic and hard copy format. The Government will review and provide comments within 30 working days of submittal. The contractor shall resubmit the reviewed drawings, with Government comments addressed, within 30 working days. On-site installation shall begin only after Government review. Utility distribution shall also extend to the utility room. The contractor shall provide labeling of contractor installed city water, chilled water, hot water, DI/RO water, air, vacuum, steam, and fire suppression
DCRF NDT MPI SOW 10 2023-06-09 1:08 PM
service pipes that indicate service provided and direction of flow of material within the pipe. The labels shall be clearly visible from the floor.
Overhead cranes and crane coverage: the contractor shall provide the utility design drawings with all cranes/bridges/rails and crane coverage represented in the utility drawings. Cranes and crane coverage is provided in section 2.5For utility distribution equipment (to include IT equipment), the contractor shall:
Maximize overhead crane coverage in the installation
Not install any equipment crossing easements, walkways or aisle ways
Utilize non-crane coverage areas to the maximum extent possible (between columns, between crane rails)
Provide horizontal unistrut heights of a minimum of 15 feet except where stated in this document
Integration of shop floor layout with utility drawing: the contractor shall provide the utility drawing with all equipment and shop floor areas represented in the drawing. The utility drawing also shall demonstrate all utility connections for all equipment listed.
4.3.1.1. Electrical service: the contractor shall be responsible for installing all electrical equipment (transformers, conduit, unistrut, wire, circuit breaker panels, disconnects, etc.) for a turn-key installation of equipment to be installed in DCRF.
4.3.1.1.1. Electrical service requirements overview:
4.3.1.1.1.1. Under no circumstances shall the contractor use extension cords or power strips to provide power to any equipment listed in this document. All equipment listed in this document shall have its electrical power provided for as set out in the CCAD reviewed electrical design.
4.3.1.1.1.2. Electrical enclosures must meet National Electrical Manufactures Association (NEMA) ratings for their location.
4.3.1.1.1.3. All electrical components and wiring shall be labeled in such a way that they can be easily found in their schematic i.e. transformer to circuit breaker box to disconnect to machine.
4.3.1.1.1.4. Each circuit shall have a dedicated neutral/grounded conductor. No multi-wire circuits are allowed.
4.3.1.1.1.5. CCAD minimum sized conduit is 3/4'’ and shall be used.
4.3.1.1.1.6. Do not use electrical non-metallic tubing or flexible non-metallic tubing and associated fittings.
4.3.1.1.1.7. Specify galvanized rigid steel conduit where exposed to weather, where subject to physical damage, and where exposed on exterior of buildings.
4.3.1.1.1.8. Intermediate metal conduit may be used in lieu of galvanized rigid steel as allowed by NFPA 70.
4.3.1.1.1.9. Specify electrical metallic tubing for branch circuits and feeders above suspended ceilings or where not subject to physical damage.
4.3.1.1.1.10. Shall not use electrical metallic tubing for underground applications or when the tubing will be encased in concrete, mortar or grout. The contractor shall not use metallic tubing in hazardous locations, where exposed to physical damage, outdoors or in fire pump rooms.
The contractor shall use die-cast compression connectors.
DCRF NDT MPI SOW 11 2023-06-09 1:08 PM
4.3.1.1.1.11. Flexible metal conduit can be used, however limited to 3 feet total length, for the following:
recessed and semi recessed lighting fixtures, for equipment subject to vibration and for motors other than pumps. Use liquid tight flexible metal conduit in damp and wet locations and for pumps.
4.3.1.1.1.12. An electrical disconnect shall not be placed underneath any process water feeder lines. The disconnect shall be placed at a minimum of 3 feet from the vertical projection of water feeder lines to the floor. If a disconnect is absolutely required below a water feeder line, the contractor shall obtain CCAD approval prior to installing a NEMA rated disconnect for wet conditions.
4.3.1.1.1.13. Branch circuit conductors, including power and lighting applications, shall not be thinner than 12 AWG.
4.3.1.1.1.14. All workbenches shall have power to all its power outlet strips and overhead lights.
Additional power shall be supplied to locations designated in section 2.5
4.3.1.1.1.15. Power shall be provided to every visual board annotated in section 2.5The contractor shall provide 120 VAC receptacles at each point near the area indicated approximately 10 feet high. The contractor shall not run unistrut specifically for the visual board and shall utilize existing unistrut at the closest proximity to the desired location.
4.3.1.1.1.16. All circuit panels and breakers shall be labeled for the equipment it supports.
4.3.1.2. Compressed air service: the contractor shall be responsible for the design of the shop air system to supply air to all equipment in section 2.5and equipment listed in this document that requires air.
4.3.1.2.1. Compressed air service requirements overview:
4.3.1.2.1.1. An air purge shall be installed at each I beam drop.
4.3.1.2.1.2. A shut off valve shall be placed prior to each air regulator.
4.3.1.2.1.3. Air regulators with pressure indicators shall be installed within 5 feet of termination of each drop and be easily accessible to the employee to monitor and adjust as needed. Each regulator shall have a 5 micron filter with a polycarbonate bowl with a guard.
4.3.1.2.1.4. The contractor shall terminate piping at all workbenches and non-machine locations with a 3/8” quick disconnect coupling. The contractor shall provide an additional ½” quick disconnect coupling placed near the termination point.
4.3.1.2.1.5. Certain types of equipment (such as MPI machines, CMM’s, etc.) require special air requirements (such as water and oil mist separators, micro-particle air filters, etc.), therefore the contractor shall provide air filtration that meet OEM specifications of that equipment. This requirements shall apply for new equipment.
4.3.1.2.1.6. The contractor shall provide a blow off clean air gun with air for all new machining equipment. The length of the coil type hose used shall be long enough to reach the work envelope of the machine plus 3 feet. The nozzle shall be designed to deliver air and provide chip guarding that meet standards in section 1.7.9Incoming air to the clean air blow gun shall not exceed 110 PSI. The contractor shall provide documentation that the nozzle meets standard. The material of the coil type hose shall be compatible with machine fluids and coolant.
4.3.1.2.1.7. The contractor shall only use flex tubing for connecting a machine to a drop. The flex tubing shall be limited to 3 feet in length.
DCRF NDT MPI SOW 12 2023-06-09 1:08 PM
4.3.1.2.1.8. All connections shall be leak free. If leaks develop during the contractor’s period of performance, it shall be the responsibility of the contractor to perform necessary repairs or replacements.
4.3.1.3. Water service:
4.3.1.3.1. Potable hot and cold water: the contractor shall provide potable hot and cold water service to locations as required in section 2.5and for equipment listed in this document as needed.
4.3.1.3.2. The contractor shall be limited to 3 feet of flex tubing if required for connecting a machine to a drop.
4.3.1.3.3. Reverse osmosis/de-ionized (RO/DI) water service: the contractor shall provide plumbing from the contractor provided DI water system in the utility room, provide drops for equipment as required in section 2.5and for equipment listed in this document. The contractor shall provide a suitable connection between the drop and the machine tank. The contractor shall provide a manual valve before this connection point at an appropriate height. The plumbing and valve material shall be suitable for DI/RO water systems.
4.3.1.4. Communications (IT/data) installation: the contractor shall be responsible for the installation of data drops to locations as required in section 2.5and to equipment listed in this document.
Telecommunications cables must be installed in cable trays and/or conduit. If no conduit or cable trays exist, contractor shall furnish and install cable tray or conduit to route to terminated ends. The contractor shall submit:
Telecommunications system installation plan, in accordance with DI-GDRQ-80150 Telecommunications System Installation Plan, CDRL A017, for Government review prior to starting work.
4.3.1.4.1. Contractor shall install/run 2 drops of category 6 cables for data via 2 port gang plates for each IT point:
1 IT point for each workbench smaller than 96”, each computer workstation, each mini computer workstation, each desk, each VLM, each tool dispenser, each VLC, each CMM. This requirement shall exist for all stainless steel workstations.
1 IT point for every machine that has IT capability of new equipment.
2 IT points for every 96” wide workstations 1 IT point for every visual board. The contractor shall provide the IT point near the area indicated in section 2.5The contractor shall not run unistrut specifically for the visual board.
For each additional IT point annotated in section 2.5
4.3.1.4.2. The contractor shall install IT cables through workbenches, desks or raceway/panduit to the nearest communications wall plate/plate termination in a clean and orderly fashion.
4.3.1.4.3. A limited quantity of patch panels shall be provided and installed by the Government in each of the floor IT cabinets indicated in the GFI, therefore the contractor shall supply enough patch panels to support the area designated to the cabinet. Patch panels shall be identical in model and make as currently used in DCRF. The contractor shall provide:
IT patch panel product drawings and associated lists, in accordance with DI-SESS-81000E Product Drawings/Models and Associated Lists, CDRL A010
4.3.1.4.4. Cables shall be run in compliance with CCAD Standing Operating Procedure 25-10-IT-004.
4.3.1.4.5. The contractor shall provide an IT communication’s test plan, in accordance with DI-NDTI-80566A Test Plan, CDRL A014. The test plan shall verify connectivity and the installation of IT equipment and cabling is in accordance with CCAD Standing Operating Procedure 25-10-IT-004 and industry standards. The length of each drop to the IT cabinet shall also be provided in the test plan results.
4.3.1.4.6. The contractor shall label each terminated end of the data line using appropriate nomenclature determined by the Government.
DCRF NDT MPI SOW 13 2023-06-09 1:08 PM
4.3.1.5. All pipe runs shall be properly supported as per industry standards and practice.
4.3.1.6. All valves shall conform to industry standards for service and be compatible with piping material. Pipe fittings shall conform to industry standards for industrial service application and match pipe material of construction utilized in the service.
4.3.1.7. Pipe method of joining shall be threaded. Pipe dope may be used as sealant for threaded connections except where otherwise specified. Teflon tape shall be sealant utilized for RO piping.
4.3.1.8. Pipe MOC and pipe schedules shall conform to industry standards for the industrial service application.
4.3.1.9. All welds shall conform to the AWS standards.
4.3.1.10. All ventilation hoods, exhausts, facility supply line, utility supply lines, fire sprinkler lines or any other contractor installed equipment shall be located to not interfere with any mechanical operation of any device to include existing overhead cranes.
4.3.1.11. All electrical, plumbing and mechanical work shall be subject to frequent walk…
This is the start of the file's text. The full file is on GovTribe.