This is a bid solicitation document issued by the Santa Maria-Bonita School District for the design and installation of modular classroom buildings to serve a new middle school and new elementary school on a shared campus under Bid No. 5441. The project requires the contractor to furnish all labor, equipment, materials, tools, and implements necessary to perform all work in strict compliance with plans and specifications prepared by PBK Architects. The contractor must deliver the project free from liens and claims in a good and workmanlike manner. The electronic proposal submission deadline is July 20, 2026, at 2:00 p.m. through the PlanetBids portal. Attendance at a mandatory pre-bid conference on June 15, 2026, at 2:00 p.m. at the Souza Support Center in Santa Maria is required for all prime contractors; failure to attend results in bid disqualification. The contract time is 365 calendar days from the date established in the Owner's Notice to Proceed or from the contractor's actual commencement of work. Full-size drawings are available for purchase at Local Copies Etc. in Santa Maria, California. The contract will be awarded to the lowest responsive and responsible bidder as determined by the District.

Prequalification is required for prime contractors holding Class A or B licenses and all first-tier mechanical, electrical, and plumbing subcontractors; prequalification applications must be submitted by July 6, 2026, at 5:00 p.m. Bidders must submit a 10-percent bid bond, cashier's check, or certified check with their proposal. The successful bidder will be required to furnish performance and payment bonds each in the amount of 100 percent of the contract sum. Liquidated damages accrue at $5,000 per calendar day for failure to complete work within the contract time or milestone deadlines. The District will withhold 5-percent retention from all progress payments, though contractors may substitute securities or establish an escrow account in lieu of retention pursuant to Public Contract Code Section 22300. The project is subject to prevailing wage requirements under California Labor Code Section 1770 et seq., and all contractors and subcontractors must be registered under Labor Code Section 1725.5 for projects exceeding $25,000. Federal funds are being used for this contract, making it subject to CFR Title 2, Part 200, and all applicable federal regulations. The project is also subject to 3-percent Disabled Veteran Business Enterprise (DVBE) participation goals as required by State Allocation Board regulations.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid No. 5441 Modular Classroom Buildings for a New Middle School and

New Elementary School on a Shared Campus e-Proposal Due Date/Closing Time: July 20, 2026 at 2:00:00 P.M.

BID DOCUMENTS AND SPECIFICATIONS ARE AVAILABLE FOR

DOWNLOAD AT THE FOLLOWING LINK:

https://www.planetbids.com/portal/portal.cfm?CompanyID=29044

FULL-SIZE DRAWINGS AVAILABLE FOR PURCHASE AT:

Local Copies Etc.

1500 S Broadway, Santa Maria, CA 93454

(805) 928-5776

PREQUALIFICATION REQUIRED

Pursuant to Public Contract Code 20111.5, only General Contractors prequalified by the District will be eligible to submit a bid for this Project. All first-tier Mechanical, Electrical, and Plumbing Subcontractors must also be on the District’s prequalified Contractors list.

Revised 6-1-2026 https://www.planetbids.com/portal/portal.cfm?CompanyID=29044 https://www.google.com/search?gs_ssp=eJzj4tZP1zcsKyksTylPM2C0UjWosDBITTZLtkw1sjA3TQNiK4MKc0PDJGPjVBMjSyPDVBMLYy-enPzkxByF5PyCzNRiAH_NE1A&q=local+copies&rlz=1C1GCEB_enUS886US886&oq=local+cop&aqs=chrome.1.0i355i512j46i175i199i512j0i512j0i457i512j69i57j69i60l3.3927j0j7&sourceid=chrome&ie=UTF-8&safe=active&ssui=on

NOTICE TO BIDDERS

Notice is hereby given that the governing board of the Santa Maria-Bonita School District (hereinafter referred to as “Owner”) will receive electronically sealed ebids prior to the date and time stated in PlanetBids for the bid opening for the award of a contract to construct Modular Classroom Buildings for a New Middle School and New Elementary School on a Shared Campus (the “Contract”), as per the Contract Documents, including the drawings and specifications, which may now be obtained electronically at:

https://www.PlanetBids.com/portal/portal.cfm?CompanyID=29044

This Contract is subject to prequalification of the Prime Contractor and all Mechanical, Electrical, and Plumbing Subcontractors.

The Director of Industrial Relations of the State of California, in the manner provided by law, has ascertained the general prevailing rate of per diem wages and rate for legal holidays and overtime work. The Contractor must pay for any labor therein described or classified in an amount not less than the rates specified. Rates are available from the California Department of Industrial Relations (DIR) website at:

https://www.dir.ca.gov/oprl/dprewagedetermination.htm

Public works projects shall be subject to compliance monitoring and enforcement by the Department of Industrial Relations. For all projects over Twenty-Five Thousand Dollars ($25,000), a contractor or subcontractor shall not be qualified to submit a bid or to be listed in a bid proposal subject to the requirements of Public Contract Code section 4104 unless currently registered and qualified under Labor Code section 1725.5 to perform public work as defined by Division 2, Part 7, Chapter 1 (§§1720 et seq.) of the Labor Code. For all projects over Twenty-Five Thousand Dollars ($25,000), a contractor or subcontractor shall not be qualified to enter into, or engage in the performance of, any contract of public work (as defined by Division 2, Part 7, Chapter 1 (§§1720 et seq.) of the Labor Code) unless currently registered and qualified under Labor Code section 1725.5 to perform public work and proof of registration is provided.

For all projects over Twenty-Five Thousand Dollars ($25,000), the bidder shall state the public works contractor registration number on the Designation of Subcontractors form for each subcontractor performing more than one-half of one percent (0.5%) of the bidder’s total bid.

The Contract Time shall be Three Hundred and Sixty-Five (365) calendar days, and liquidated damages for delay shall accrue.

All Bids must be electronically submitted through PlanetBids. The submission window will promptly close on the closing date and time identified in the PlanetBids portal. No bid will be accepted by the Owner after this time. Paper or Facsimile (FAX) copies of the bid will not be accepted.

Bids will be electronically opened immediately following the deadline for submittal.

Opened bids may be reviewed for responsiveness at a later time, at the Owner’s discretion.

Attendance at the Mandatory pre-bid conference by a representative of the interested bidder’s firm is a requirement for submitting a bid on this project. There will be a mandatory pre-bid conference on June 15, 2026, at 2:00 p.m. sharp for the purpose of acquainting all prospective Bidders with the work. Meet at the Souza Support Center - District Office located at 708 S. Miller Street, Santa Maria, CA 93454.

Late arrivals will be disqualified from submitting a Bid as a Prime Contractor. All attendees must sign-in when arriving at the location. Prime Contractors wishing to submit a Bid to the District for this project are required to attend. Any Bidder failing to attend the pre-bid conference will be deemed a non-responsive Bidder and their bid will be disqualified. The District at its sole discretion reserves the right to conduct an additional pre-bid conference if deemed necessary. If a second pre-bid conference is scheduled, a contractor must have attended one of the two mandatory pre-bids in order to participate in the Bid process.

Bids must be accompanied by a bidder’s bond, cashier’s check, or certified check for at least ten percent (10%) of the amount of the base bid and made payable to the Owner, as detailed in the Contract Documents.

Pursuant to the Contract Documents, the successful bidder will be required to furnish a Payment (Labor and Material) Bond in the amount of one hundred percent (100%) of the Contract Sum, and a Faithful Performance Bond in the amount of one hundred percent (100%) of the Contract Sum.

The successful bidder will be allowed to substitute securities or establish an escrow in lieu of retainage, pursuant to Public Contract Code Section 22300, and as described in the Agreement Between Owner and Contractor and General Conditions.

The Owner will not consider or accept any Bid from a contractor that is not properly licensed to do business in the State of California. Pursuant to California Public Contract Code section 3300, the Bidder shall possess a valid and active Class “B”, or other applicable contractor's license at the time of Bid submission. Any Bid submitted by a Bidder that does not possess the required license at the time of Bid submission shall be deemed nonresponsive and rejected.

The successful Bidder shall maintain the required license in good standing throughout the procurement process, the term of the Contract, and all applicable warranty periods.

Disabled Veteran Business Enterprises (DVBE) Participation Requirement

State law and regulations adopted by the State Allocation Board (SAB) require that State-funded contracts have participation goals of 3% for Disabled Veteran Business Enterprises as defined in Public Contract Code Section 10115.1. Bidder is required to meet the participation goals or make a good-faith effort to meet the DVBE participation goals as outlined in the regulations. In awarding the contract, the District shall consider the firm's compliance with SAB statutes and regulations related to DVBE participation.

Unless otherwise required by law, no bidder may withdraw its bid for a period of ninety

(90) days after date set for the opening thereof.

End of Section

INSTRUCTIONS TO BIDDERS

Modular Classroom Buildings for a New Middle School and New Elementary School on a Shared Campus Contract for the Santa Maria-Bonita School District

SECURING DOCUMENTS:

The Contract Documents, including the Drawings and Specifications, may now be obtained electronically at:

https://www.PlanetBids.com/portal/portal.cfm?CompanyID=29044

PREQUALIFICATION:

This Contract is subject to prequalification, which applies to contractors with the following licenses: Prime contractors with either an A or B license; and Contractors with a C-4, C- 7, C-10, C- 16, C-20, C-34, C-36, C-38, C-42, C-43, or C-46 license, regardless of whether they are a prime contractor or subcontractor. If a bidder is not prequalified to bid on the Contract at least five (5) business days before the bid deadline and at the bid deadline, Owner will not accept the bid. Any subcontractors listed by a bidder for Work requiring one of the above “C” licenses must be prequalified at least five (5) business days before the bid deadline and at the bid deadline, or Owner will not accept the bid. The application for prequalification must be submitted to the Owner by July 6, 2026 at 5:00 p.m. The prequalification application may be obtained from the Owner. If a contractor is currently prequalified by the District in an amount sufficient for this contract, and such prequalification will not expire prior the bid deadline for this contract, then the contractor will not have to submit a new prequalification application.

RETENTION:

The Owner will withhold retention of 5% from all progress payments.

REGISTRATION:

For all projects over Twenty-Five Thousand Dollars ($25,000), the Owner shall not accept any bid or enter into any contract without proof of the bidder’s current registration to perform public work under Labor Code section 1725.5. The bidder may meet this requirement by submitting a printout of its registration information from the DIR website.

For all projects over Twenty-Five Thousand Dollars ($25,000), the bidder shall not accept any sub bid or enter into any subcontract without proof of the subcontractor’s current registration to perform public work under Labor Code section 1725.5.

PRE-BID CONFERENCES, SITE VISITS, OR MEETINGS:

Mandatory pre-bid conferences, site visits, or meetings will be held as described in the Notice to Bidders.

BUILDER’S RISK COVERAGE:

For the purpose of builder’s risk coverage (see General Conditions Article 11).

PROJECT LABOR AGREEMENT:

No project labor agreement applies to this contract.

USE OF FEDERAL FUNDS: ☐ Applicable ☒ Non-Applicable

Federal funds are being used by Owner for this Contract, either in whole or in part, and thus the Contract is subject to, and Contractor shall comply with, all applicable federal laws, rules, regulations, and other requirements, including but not limited to the federal regulations set forth in CFR Title 2, Part 200, and the requirements set forth in Article 3 of the General Conditions.

BIDS:

Bids to receive consideration shall be made in accordance with the following instructions:

1. Facsimile, e-mail, or any other bid submission format will not be accepted; only electronic bid submitted through PlanetBids will be accepted. Bids shall be made on the Bid Form obtained from the PlanetBids portal. Bids not made on the proper Bid Form shall be deemed non-responsive.

2. No bid will be considered which makes exceptions, changes, or in any manner makes reservations to the terms of the drawings or specifications. If prequalification is required for this Contract, no bid will be accepted from a contractor that has not been prequalified.

3. Any questions concerning the Contract Documents, including discrepancies, omissions, ambiguities, or interpretation of the documents, shall be submitted promptly through the Q&A tab in the PlanetBids portal. The Owner will issue written responses and clarifications through the PlanetBids portal to all prospective bidders. Only written responses issued through the PlanetBids portal shall be considered official and binding. Oral statements or interpretations by the Owner, Architect, or Construction Manager shall have no force or effect.

4. Signatures:

A. Each bid must give the full business address of the bidder and be signed by bidder. Bids by partnerships must furnish the full name of all partners and must be signed in the partnership name by a general partner with authority to bind the partnership in such matters, followed by the signature and designation of the person signing. The name of the person signing shall also be typed or printed below the signature. Bids by corporations must be signed with the legal name of the corporation, followed by the name of the state of incorporation and by the signature and designation of the chairman of the board, president or any vice president, and then followed by a second signature by the secretary, assistant secretary, the chief financial officer or assistant treasurer. All persons signing must be authorized to bind the corporation in the matter. The name of each person signing shall also be typed or printed below the signature. Satisfactory evidence of the authority of the officers signing on behalf of a corporation shall be furnished with the bid.

B. The signatures on the Bid Form and other bid documents must be either (1) original longhand signatures in permanent ink, or (2) electronic signatures (including but not limited to digital signatures). In the event that the bidder submits the bid with an electronic signature, the bidder, by submission of the bid, shall be acknowledging and agreeing that the electronic signature shall have the same legal effect as an original longhand signature, and that District agrees that the electronic signature shall have the same legal effect as an original signature.

5. Pursuant to the provisions of Sections 4100 to 4114, inclusive, of the Public

Contract Code of the State of California, which are hereby incorporated and made a part hereof and these Instructions to Bidders, every bidder shall set forth in its bid (using the Owner’s form for Designation of Subcontractors):

A. The name and location of the place of business, the California contractor license number, and (for all projects over Twenty-Five Thousand Dollars ($25,000)) the public works contractor registration number, of each subcontractor who will perform work or labor or render service to the bidder in or about the construction of the work or improvement, or a subcontractor licensed by the State of California who, under subcontract to the bidder, specially fabricates and installs a portion of the Work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half (½) of one percent (1%) of the bidder's total bid. An inadvertent error in listing a California contractor’s license number shall not be grounds for filing a bid protest or for considering the bid nonresponsive if the bidder submits the corrected contractor’s license number to the Owner within 24 hours after the bid opening, or any continuation thereof, so long as the corrected contractor’s license number corresponds to the submitted name and location for that subcontractor.

B. The portion of the Work which will be done by each such subcontractor. If the bidder fails to specify a subcontractor for any portion of the Work to be performed under the Contract in excess of one-half (½) of one percent (1%) of the bidder's total bid, the bidder agrees to perform that portion itself. The successful bidder shall not, without the consent of the Owner:

1) Substitute any person as subcontractor in place of the subcontractor designated in the original bid.

2) Permit any subcontract to be assigned or transferred or allow it to be performed by anyone other than the original subcontractor listed in the bid.

3) Sublet or subcontract any portion of the Work in excess of one-half

(½) of one percent (1%) of the total bid as to which the original bid did not designate a subcontractor.

6. The Director of Industrial Relations of the State of California, in the manner provided by law, has ascertained the general prevailing rate of per diem wages and the rate for legal holidays and overtime work. The Contractor must pay for any labor therein described or classified in an amount not less than the rates specified.

Copies of the required rates are on file at the Owner's business office and are available to any interested party on request.

7. Bidders shall submit with their bids all required certifications and forms, including the Non-Collusion Declaration, Sufficient Funds Declaration (Labor Code section 2810), Fingerprinting Notice and Acknowledgment, Iran Contracting Act Certification, Workers’ Compensation Certification, and Contractor Questionnaire responses if applicable. Failure to include any required document with the bid may render the bid non-responsive; however, the District reserves the right, in its sole discretion and to the extent permitted by law, to request and accept the correction of minor or immaterial defects, omissions, or informalities after bid opening.

8. Electronic Bids must be accompanied by a bidder’s bond for ten percent (10%) of the amount of the base bid and made payable to the Owner. The bid bond shall be uploaded into PlanetBids at the time of bid submission. If a bid bond is used, it must be issued by an Admitted Surety (an insurance organization authorized by the Insurance Commissioner to transact surety insurance in the State of California during this calendar year). The surety insurer must, unless otherwise agreed to by Owner in writing, at the time of issuance of the bond, have a rating not lower than “A-” as rated by A.M. Best Company, Inc. or other independent rating companies.

Owner reserves the right to approve or reject the surety insurer selected by Contractor and to require Contractor to obtain a bond from a surety insurer satisfactory to the Owner. Bid security in the form of a cashier’s check, certified check or cash is accepted when submitted to the District Office prior to the bid opening date and time. This form of bid security may only be submitted in a sealed envelope, clearly marked with the bid number and project title. Said check or bond shall be given as a guarantee that the bidder will enter into the Contract if awarded the Work, and in case of refusal or failure to enter into said Contract, the check or bond, as the case may be, shall be payable to the Owner and retained as liquidated damages.

9. Bids shall be submitted as indicated in the Notice to Bidders. The bidder is responsible for ensuring that the bid and other documents are uploaded and validated in PlanetBids prior to the time for the bid opening. Bids and other documents for any reason not electronically received prior to the time for the bid opening shall not be considered.

10. DVBE ☒ Applicable ☐ Non-Applicable

This Contract is subject to the DVBE requirements of Education Code Section

17076.11. If this contract is subject to these requirements, then (a) the DVBE Certification must be submitted with the bid, and (b) the DVBE Worksheet must be submitted with the bid if Box D is checked on the first page of the DVBE Certification.

11. Contractors shall maintain their licenses in good standing through Completion of the Work and all applicable warranty periods. Owner shall reject any bid as nonresponsive if bidder or any subcontractor is not licensed in good standing from the time the bid is submitted to Owner up to award of the Contract, whether or not the bidder listed the subcontractor inadvertently, or if a listed subcontractor’s license is suspended or expires prior to award of the Contract. Owner also reserves the right to reject any bid as nonresponsive if a listed subcontractor’s license is not in good standing to perform the work for which it is listed from the time of submission of the bidder’s bid to award of the Contract.

12. The Owner reserves the right to waive any irregularity or failure to comply with the

Contract Documents, and to reject any or all bids.

13. CONTRACTOR QUESTIONNAIRE ☐ Applicable ☒ Non-Applicable

Each bidder must submit complete responses to the Contractor Questionnaire included in the bid documents.

14. Bidders are to include the documents listed ont eh Checklist for Bid Documents

Form with their bid submission for the Contract. Failure to include one or more of these documents may result at the owner’s discretion in the bid being deemed non-responsive.

WITHDRAWAL OF BIDS:

Bids may be withdrawn by bidders prior to the time fixed for the submittal of bids or any authorized postponement thereof.

A successful bidder shall not be relieved of the bid unless by consent of the Owner or bidder's recourse to Public Contract Code §5100 et seq.

Unless otherwise required by law, no bidder may withdraw its bid for a period of ninety

(90) days after the date set for the opening thereof or any extension thereof. The Owner reserves the right to take more than ninety (90) days to make a decision regarding the rejection of the bid or the award of the Contract.

OPENING OF BIDS:

All Bids must be electronically submitted through PlanetBids. The submission window will promptly close on the closing date and time identified in the PlanetBids portal.

EXAMINATION OF CONTRACT DOCUMENTS AND SITE:

Before submitting a bid, bidders shall examine the drawings, read the specifications, the form of Agreement between Contractor and Owner, and the other Contract Documents.

Bidders shall visit the site of the proposed Work, examine the building, or buildings, if any, and any work that may have been done thereon. Bidders shall fully inform themselves of all conditions, in, at, and about the site, the building or buildings, if any, and any work that may have been done thereon.

Pursuant to Public Contract Code section 1104, (1) bidders shall not be required to assume responsibility for the completeness and accuracy of architectural or engineering plans and specifications, except on clearly designated design build projects; (2) however, bidders shall be required to review architectural or engineering plans and specifications prior to submission of their bids and to report any errors and omissions to the Architect and Owner;

and (3) the review shall be confined to the bidder’s capacity as a bidder and not as a licensed design professional.

BID PROTESTS:

Any Bid Appeal by any Bidder regarding any other Bid must be submitted in writing to the District, before 4:00 p.m. of the FIFTH (5th) business day following the date of the Notification of the Intent to Award. Bid Appeals shall be submitted via email to mbeecher@smbsd.net and shall meet all of the requirements listed below.

a. Once District staff has evaluated the Bid proposals received and has determined the lowest responsive and responsible Bidder for award, a Notification of the Intent to Award will be issued and sent to all Bidders.

b. Only a Bidder who has actually submitted a Bid, and who could be awarded the Contract if the Bid Appeal is upheld, is eligible to submit a Bid Appeal.

Subcontractors are not eligible to submit Bid Appeal. A Bidder may not rely on the Bid Appeal submitted by another Bidder.

c. Bidder may appeal the District staff determination if the Bidder believes that the recommendation of intent to award is inconsistent with Board policy, the Bid’s specifications, or was not in compliance. All Bid Appeal requests must be filed in writing with the Superintendent or designee within FIVE (5) calendar days after the date of the notification of the intent to award.

d. The Bidder shall submit a complete statement, including all documents, of any and all bases supporting or justifying the Bid Appeal request. The Bid Appeal must refer to the specific portions of all documents that form the basis mailto:mbeecher@smbsd.net for the Bid Appeal. A Bidder’s failure to file the Bid Appeal documents prior to the Bid Appeal deadline shall constitute a waiver of the Bidder’s right to file a Bid Appeal of the award of the contract.

e. The Deputy Superintendent or designee shall review the documents submitted with the Bidder’s claim and render a decision in writing. The Deputy Superintendent or designee may convene a meeting with the Bidder to attempt to resolve the Bid Appeal. Bidder shall attend the meeting when requested and may not delay the meeting.

f. The Bidder may appeal in person the Deputy Superintendent or designee’s decision to the Board. The Deputy Superintendent or designee will provide twenty-four (24) hour notice via email to the Bidder of the time for Board consideration of the Bid Appeal. The Board’s decision shall be final.

g. The Bid Appeal must include the name, address, email address, and telephone number of the protesting party or the person representing the protesting party.

h. The procedure and time limits set forth in this paragraph are mandatory and are each Bidder’s sole and exclusive remedy in the event of a Bid Appeal.

Failure to comply with these procedures shall constitute a waiver of any right to further pursue the Bid Appeal, including filing a Government Code Claim or instituting legal proceedings.

FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR:

The form of Agreement between Owner and Contractor which the successful bidder will be required to execute, if awarded the Work, is a part of this Bid Package.

ADDENDA OR BULLETINS:

Any addenda or bulletins, issued during the time of bidding, shall form a part of the drawings and specifications loaned to the bidder for the preparation of its bid, shall be covered in the bid, and shall be made a part of the Contract Documents. All addendums will be posted in PlanetBids.

EVIDENCE OF RESPONSIBILITY:

Upon the request of Owner, a bidder shall submit promptly to the Owner or its designee satisfactory evidence showing the bidder's financial resources, the bidder's experience in the type of work required by the Owner, the bidder's organization available for the performance of the Contract, and any other required evidence of the bidder's or its subcontractor's qualifications to perform the proposed Contract. The Owner may consider such evidence before making its decision awarding the proposed Contract. Failure to submit evidence of the bidder's or its subcontractors' responsibility to perform the proposed Contract may result in rejection of the bid.

AWARD OF CONTRACT:

Rejection of any or all bids, contracting work with whomever and in whatever manner, abandoning work entirely, and/or waiving any informality in receiving of bids are reserved as the rights of the Owner.

Before the Contract is awarded, the Contractor receiving the award shall submit the CARB Compliance Declaration, including all certificates, to the Owner.

Before the Contract is awarded, the Owner may, at its sole discretion, require from a potential Contractor on the Contract further evidence of the reasonable qualifications of such contractor to faithfully, capably, and reasonably perform the Contract and may consider such evidence before making its decision on the award of the Contract.

If awarded, the Contract shall be awarded to the lowest responsible and responsive bidder as indicated in the Notice to Bidders and as interpreted by the Owner under California law and as specified herein. Owner reserves the right, without any liability, to cancel the award of the Contract for any reason at any time before the full execution of the Agreement between Owner and Contractor.

EXECUTION OF AGREEMENT BETWEEN OWNER AND CONTRACTOR:

Contractor shall sign and return the Agreement within ten (10) days after mailing, faxing or delivery of the Notice of Award of Contract, or prior to the commencement of the Work, whichever is earlier. The Contractor shall sign the Agreement in as many originals as the Owner deems necessary. Within ten (10) days after mailing, faxing, or delivery of the Notice of Award of Contract, or prior to the commencement of the Work, whichever is earlier, the Contractor shall also submit to Owner the Contract payment and performance bonds; insurance certificates, additional insured endorsement, and declarations page; a Public Contract Code section 3006(a) Roof Project Certification, if required; the Drug-Free Workplace Certification; the Student Contact Form (see Attachment B to the Fingerprinting Notice and Acknowledgement); a schedule of values (see General Conditions §9.2.1.A); a schedule of cash flow (see General Conditions §9.2.1.B); and subcontractor information (see General Conditions §9.2.1.D). Within two (2) weeks after award the Work, or prior to commencement of the Work, whichever is earlier, the Contractor shall also submit to Owner the certified baseline schedule (see General Conditions §3.9.1). If the Contractor does not comply with this paragraph, Owner may revoke and/or cancel the award to the Contractor, award the Contract to the next lowest bidder, and pursue the low bidder and bid bond for damages, or may otherwise proceed as allowed by law. A Roof Project Certification is not required if (1) the Owner has ADA (average daily attendance) of 2,500 or less, or (2) the Work involves repair of 25% or less of the roof, or costs $21,000 or less.

CONTRACT BONDS:

As required by the Contract Documents, two bonds, as itemized below and in the forms presented in these Contract Documents, shall be furnished by the Contractor. The surety insurers must, unless otherwise agreed to by Owner in writing, at the time of issuance of the bond, have a rating not lower than “A-” as rated by A.M. Best Company, Inc. or other independent rating companies. Owner reserves the right to approve or reject the surety insurers selected by Contractor and to require Contractor to obtain bonds from surety insurers satisfactory to the Owner.

Performance Bond in the amount of one hundred percent (100%) of the Contract Sum to insure Owner during construction, and for one year after Completion and during any warranty or guaranty period, against faulty or improper materials or workmanship and to assure Owner of full and prompt performance of the Contract.

Payment Bond (Labor and Material) in the amount of one hundred percent (100%) of the Contract Sum in accordance with the laws of the State of California to secure payment of any and all claims for labor and materials used or consumed in performance of this Contract.

REQUESTS FOR SUBSTITUTION OF MATERIALS PRIOR TO BIDDING:

Bidders may submit products for consideration as an 'approved equal' to the brand(s) specified. To be considered, proposed equal products must meet or exceed all performance, functional, and dimensional requirements of the specified product. Documentation supporting equivalency, including technical specifications, performance data, and any relevant certifications, must be submitted during the bidding process in accordance with the submission timeline outlined in Pre-Proposal Material Substitution Request Form. The District reserves the sole right to determine if a proposed product(s) is approved as an equal. An addendum will be issued containing a list of products the District has approved as equivalent.

PAYMENTS:

Payments to the Contractor on account of the Contract shall be made in accordance with the terms of the Contract Documents.

TAXES:

Contract Price is to include any and all applicable sales taxes or other taxes that may be due in accordance with the Revenue and Taxation Code, Regulation 1521 of the State Board of Equalization, and/or any other tax code that may be applicable.

EARLY TERMINATION:

Notwithstanding any provision herein to the contrary, if for any fiscal year of this Contract the governing body of the Owner fails to appropriate or allocate funds for future periodic payments under the Contract after exercising reasonable efforts to do so, the Owner may upon thirty (30) days' notice, order Work on the Contract to cease. The Owner will remain obligated to pay for the Work already performed but shall not be obligated to pay the balance remaining unpaid beyond the fiscal period for which funds have been appropriated or allocated and for which the Work has not been done.

TIME OF COMPLETION AND LIQUIDATED DAMAGES:

The Contract Time shall be Three Hundred and Sixty-Five (365) calendar days.

Liquidated damages for delay in Completion of the Work within the Contract Time, or for delay in completion of a specified portion of the Work by a milestone deadline, will accrue liquidated damages in the amount of Five Thousand Dollars ($5,000) per calendar day.

COMPLIANCE WITH GOVERMENTAL ORDERS:

During the Work, if a legislative or governmental order imposing a shutdown is issued, the Contractor shall ensure that all Work, including, without limitation, Work performed by Subcontractors, is performed in compliance with all applicable laws, regulations, contractual requirements, and directives of state and local authorities, including any mandated social distancing, masking, hygiene, or similar health and safety requirements, as may be required by applicable governmental authorities or the Contract Documents.

If additional requirements are imposed after bid submission and the Contractor believes it is entitled to additional compensation or time, the Contractor shall timely submit a request in accordance with the Contract Documents.

SANCTIONS IN RESPONSE TO RUSSIAN AGGRESSION:

The Owner is using State of California funds for this Contract, and therefore Contractor must comply with the Governor’s March 4, 2022, Executive Order N-6-22 (“Order”) relating to any existing sanctions imposed by the United States government and the State of California in response to Russia’s actions in Ukraine, including additional requirements for contracts of $5 million or more. Failure to comply may result in the termination of the Contract The Owner requires Contractor to comply with the Governor’s March 4, 2022, Executive Order N-6-22 (“Order”) relating to any existing sanctions imposed by the United States government and the State of California in response to Russia’s actions in Ukraine, including additional requirements for contracts of $5 million or more. Failure to comply may result in the termination of the Contract.

New Elementary School on a Shared Campus

CHECKLIST FOR BID SUBMISSION DOCUMENTS

Name of Document Submitted

Submit with Bid:

Bid Form, including proof of signers’ authority

Bid Security

Designation of Subcontractors

Non-Collusion Declaration

Sufficient Funds Declaration

Fingerprinting Notice and Acknowledgement

Workers’ Compensation Certification

Iran Contracting Act Certification

DVBE Certification

DVBE Good Faith Effort Worksheet – (submit if not meeting DVBE 3% requirement)

Mandatory Pre-Bid Conference Site-Visit Certification

Guarantee Form

Prevailing Wage and Related labor Requirements Certification

Lead-Based Materials Certification

Non-Discriminatory Employment Practices Certification

Russia Sanction Certification

New Elementary School on a Shared Campus

BEFORE AWARD BID DOCUMENTS CHECKLIST

Submit Before Award of Contract:

CARB Compliance Declaration

BEFORE COMMENCEMENT OF WORK BID DOCUMENT CHECKLIST

Required Before Commencement of Work:

Drug-Free Workplace Certification

Independent Contractor Student Contact Form

Performance Bond

Payment Bond

Insurance Certificates

Additional Insured Endorsements

Insurance Declaration Pages

Roof Project Certification (if required for contract)

Submit with Bid

BID FORM

To: The Governing Board of the Santa Maria-Bonita School District (“District” or

“Owner”)

From: (Proper Name of

Bidder)

DBA: ________________________________________________________________

The undersigned Bidder declares that the Contract Documents including, without limitation, the Notice to Bidders and the Instructions to Bidders, have been read, and agrees and proposes to furnish all necessary labor, materials, and equipment to perform and furnish all work in accordance with the terms and conditions of the Contract Documents, including, without limitation, the Drawings and Specifications of

Modular Classroom Buildings for a New Middle School and New Elementary

School on a Shared Campus

1. The undersigned has reviewed the Work outlined in the Contract Documents and fully understands the scope of Work required in this Proposal, understands the construction and project management function(s) as described in the Contract Documents, and understands that each Bidder who is awarded a contract shall be in fact a prime contractor, not a subcontractor, to the District, and agrees that its Proposal, if accepted by the District, will be the basis for the Bidder to enter into a contract with the District in accordance with the intent of the Contract Documents.

2. The Contract will be awarded to a single Bidder who is determined by the District to be the lowest responsive responsible Bidder.

3. The undersigned has notified the District through the PlanetBids Bidder’s Portal of any discrepancies or omissions or of any doubt, questions, or ambiguities about the meaning of any of the Contract Documents.

4. The undersigned agrees to commence work under this Contract on the date established in the Contract Documents and to complete all work within the time specified in the Contract Documents.

BID ITEM BID AMOUNT

Middle School Modular Classroom Buildings

Enter the Bid amount above and into the Line Items tab in PlanetBids

Elementary School Modular Classroom Buildings

Enter the Bid amount above and into the Line Items tab in PlanetBids

5. The liquidated damages clause of the General Conditions and Agreement is hereby acknowledged. Bidder specifically acknowledges that liquidated damages in this project are Five Thousand Dollars ($5,000) per calendar day.

6. The undersigned acknowledges that five percent (5%) retention is required for this

Project and agrees thereto.

7. It is understood that the District reserves the right to reject this Bid and that the

Bid shall remain open to acceptance and is irrevocable for a period of ninety (90) days.

8. Bidder acknowledges receipt and acceptance of all addenda posted in PlanetBids

9. Bidder acknowledges that the Bidder possesses a valid contractor license as required to performance of the Work for this project and if required is Certified by the Manufacture of the material being installed by the Bidder.

10. The undersigned hereby certifies that Bidder is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the Work.

11. The Bidder represents that it is competent, knowledgeable, and has special skills with respect to the nature, extent, and inherent conditions of the Work to be performed. Bidder further acknowledges that there are certain peculiar and inherent conditions existent in the construction of the Work that may create, during the Work, unusual or peculiar unsafe conditions hazardous to persons and property.

12. Bidder expressly acknowledges that it is aware of such peculiar risks and that it has the skill and experience to foresee and to adopt protective measures to adequately and safely perform the Work with respect to such hazards.

13. Bidder expressly acknowledges that it is aware that if a false claim is knowingly submitted (as the terms “claim” and “knowingly” are defined in the California False Claims Act, Cal. Gov. Code, §12650 et seq.), the District will be entitled to civil remedies set forth in the California False Claim Act. It may also be considered fraud and the Contractor may be subject to criminal prosecution.

14. The undersigned Bidder certifies that it is, at the time of Bidding, and shall be throughout the period of the contract, licensed by the State of California to do the type of work required under the terms of the Contract Documents. Bidder further certifies that it is regularly engaged in the general class and type of work called for in the Contract Documents.

Bidder confirms that the required Bid security in the amount of at least ten percent (10%) of the total Bid is submitted with Bidder’s proposal.

Furthermore, Bidder hereby certifies to the District that all representations, certifications, and statements made by Bidder, as set forth in this Bid form, are true and correct and are made under penalty of perjury.

NOTE: This Bid Form shall state the full business address of the bidder and shall be signed using the bidder’s customary signature. Partnerships shall provide the full names of all partners and shall sign in the partnership name by a general partner authorized to bind the partnership in such matters, followed by the signature and title of the person signing. Corporations shall sign using the legal name of the corporation, followed by the state of incorporation, and by the signature and title of an authorized officer. California limited liability companies (“LLCs”) shall sign using the legal name of the LLC. A member-managed LLC shall be signed by a member, and a manager-managed LLC shall be signed by a manager.

All persons signing the Bid shall be authorized to bind the entity in the matter. The name and title of each person signing shall be typed or printed below the signature. Bidders shall furnish satisfactory evidence of the authority of the person or persons signing the Bid to bind the entity. Failure to provide such evidence with the Bid may, at the Owner’s discretion, result in the Bid being deemed non-responsive. The Owner reserves the right to request additional or supplemental documentation after bid opening.

The undersigned declares under penalty of perjury under the laws of the State of California that the information and representations in the undersigned’s bid documents (including this Bid Form and all other documents provided with the bid) are true and correct.

Dated this __________ day of [month], 2026

Name of Bidder:

Type of Organization: ________________________________________________

Signed by: _________________________________________________________

Title of Signer: ______________________________________________________

Address of Bidder: ___________________________________________________

Taxpayer's Identification No. of Bidder:___________________________________

Telephone Number: _________________ Bidder e-mail: ____________________

CSLB No(s): No.: Class: Expiration Date:__________________

No.: Class: Expiration Date: __________________

No.: Class: Expiration Date:

Dir Registration Number: ______________________ Expiration Date: __________

If Bidder is a corporation, affix corporate seal.

Name of Corporation: _____________________________________________________

President: _______________________________________________________________

Secretary:_______________________________________________________________

Treasurer:_______________________________________________________________

Manager: _______________________________________________________________

BID BOND

Bond Number: ________________

KNOW ALL MEN BY THESE PRESENTS that we the undersigned ______________________________________________________ as Principal and ____________________________________ as Surety, are hereby held and firmly bound unto the Santa Maria-Bonita School District (“Owner”) in the sum of _______________________ Dollars ($____________) for payment of which sum, well and truly to be made, we hereby jointly and severally bind ourselves, our heirs, executors, administrators, successors and assigns.

The condition of the above obligation is such that whereas the Principal has submitted to the Owner a certain bid, attached hereto and hereby made a part hereof, to enter into a Contract in writing for the construction of Bid No. 5441 Modular Classroom Buildings for a New Middle School and New Elementary School on a Shared Campus in strict accordance with Contract Documents.

NOW, THEREFORE,

a. If said bid shall be rejected, or, in the alternative;

b. If said bid shall be accepted and the Principal shall execute and deliver a contract in the form of agreement attached hereto and shall execute and deliver Performance and Payment Bonds in the forms attached hereto (all properly completed in accordance with said bid), and shall in all other respects perform the agreement created by the acceptance of said bid;

Then this obligation shall be void, otherwise the same shall remain in full force and effect, it being expressly understood and agreed that the liability of the Surety for any and all default of the Principal hereunder shall be the amount of this obligation as herein stated.

Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract on the call for bids, or to the Work to be performed hereunder, or the specifications accompanying the same, shall in any way affect its obligation under this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of said Contract or the call for bids, or to the Work, or to the specifications.

IN WITNESS WHEREOF, the above-bounden parties have executed this instrument under several seals this ____ day of __________________, _____, the name and corporate party being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body. In the presence of:

(Notary Seal)

(Principal)

(Business Address)

(Corporate Surety)

Business Address)

By:_______________________________

The rate or premium of this bond is _______________________ per thousand, the total amount of premium charged, $_______________.

(The above must be filled in by Corporate Surety).

DESIGNATION OF SUBCONTRACTORS

Bid No. 5441 Modular Classroom Buildings for a New Middle School and New Elementary

School on a Shared Campus

Each bidder shall set forth below the name and the location of the place of business of each subcontractor, and the California contractor license number and (for all projects over Twenty-Five Thousand Dollars ($25,000)) public works contractor registration number of each subcontractor who will perform work or labor or render service to the Contractor in or about the construction of the Work or improvement, or to a subcontractor licensed by the State of California who, under subcontract to the Contractor, specially fabricates and installs a portion of the Work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent (0.5%) of the bidder's total bid, and the portion of the Work which will be done by each subcontractor.

An inadvertent error in listing a California contractor’s license number shall not be grounds for filing a bid protest or for considering the bid nonresponsive if the bidder submits the corrected contractor’s license number to the Owner within 24 hours after the bid opening, or any continuation thereof, so long as the corrected contractor’s license number corresponds to the submitted name and location for that subcontractor.

If the Contractor fails to specify a subcontractor for any portion of the Work to be performed under the Contract in excess of one-half of 1 percent (0.5%) of the Contractor’s total bid, the Contractor shall be deemed to have agreed to perform such portion itself, and shall not be permitted to subcontract that portion of the Work except under the conditions hereinafter set forth.

Subletting or subcontracting of any portion of the Work as to which no subcontractor was designated in the original bid shall only be permitted in cases of public emergency or necessity, and then only after a finding reduced to writing as a public record of the legislative body of the Owner.

For all projects over Twenty-Five Thousand Dollars ($25,000): For any bid proposal submitted, and for any contract for public work entered into, an inadvertent error in listing a subcontractor who is not registered under Labor Code section 1725.5 shall not be grounds for filing a bid protest or grounds for considering the bid nonresponsive, provided that either: the subcontractor is registered prior to the bid opening; or the subcontractor is registered and has paid the penalty registration fee specified in Labor Code section 1725.5(a)(2)(E), if applicable, within 24 hours after the bid opening; or the subcontractor is replaced by another registered subcontractor under Public Contract Code section 4107. Failure of a listed subcontractor to be registered shall be grounds under Public Contract Code section 4107 for the Contractor, with the Owner’s consent, to substitute a registered subcontractor for the unregistered subcontractor.

DESIGNATION OF SUBCONTRACTORS

Bid No. 5441 -Modular Classroom Buildings for a New Middle School and New Elementary School on a Shared Campus. Failure to provide this information in a legible manner may result in the rejection of an otherwise acceptable bid.

NOTE: Duplicate this template as needed - Attach a Completed CARB Form for each Sub-Contractor (if not provided, will be required to be submitted before Award)

I am the authorized representative of the Bidder submitting this Designation of Subcontractors and I declare that each subcontractor listed holds a valid and current contractor license in good standing in California to perform the portion of work for which the subcontractor is listed.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on _________, 20___, at __________ [city],___________[state].

Signature: Print Name: Title:

Trade Dollar Amount of Work

Subcontractor Name Subcontractor City & Telephone Number

License No. & DIR No.

Trade: ___________

CSLB#: __________

Classification: _____

CSLB No.

DIR No.

Classification: _____

CSLB No.

Classification: _____

CSLB No.

Classification: _____

CSLB No.

Submit in PlanetBids Q&A tab if Applicable

PRE-PROPOSAL MATERIAL SUBSTITUTION REQUEST

Project: Bid No. 5441 -Modular Classroom Buildings for a New Middle School and New

Elementary School on a Shared Campus

Owner: Santa Maria-Bonita School District

Request for Approved Product Submittal Process:

All requests for consideration as an equal product must include the product information for the proposed product, including, technical specification data and warranty information.

All supporting documentation including this form must be submitted through PlanetBids Q&A Tab no later than the last day for questions established in PlanetBids.

In the Q&A tab title the question “Request for Approved Product Consideration” and attach all supporting documentation to the request.

An Addendum will be issued stating which products the District has deemed as an approved equal.

LIST SMBSD-SPECIFIED PRODUCT LIST PROPOSER PROPOSED EQUAL

For technical assistance, contact PlanetBids directly at: 818-992-1771

PROPOSER: ____________________________ PHONE NUMBER: _________________

CONTACT NAME & TITLE:…