UPS_and_Battery_Replacement_Q_ _A.docx
DOCX document 16 KB Posted
- Attached to
- USMMA UPS Systems & Battery Replacement Federal contract opportunity
- Solicitation number
- MMAPR5207140103
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| UPS_Systems_and_Battery_Replacement_Q_ _A_Part_3_.docx | DOCX document | |
| UPS_Systems_and_Battery_Replacement_Q_ _A_Part_2_.docx | DOCX document | |
| Site_Visit.docx | DOCX document | |
| UPS_Systems_ _Battery_Replacement_Specifications.docx | DOCX document | |
| USMMA_Barrack_UPS_Systems_SOW_ _Evaluation_Criteria.pdf | ||
| UPS_Systems_ _Battery_Replacement_Specifications.docx | DOCX document | |
| USMMA_Barrack_UPS_Systems_SOW_ _Evaluation_Criteria.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USMMA Uninterruptable Power System (UPS) and Battery Replacement Questions & Answers
Question 1: What is the exact kVA of each UPS?
Answer 1: The kVA is incorporated into the information which is provided in the specification document (Ex. Model # and Serial #) and attached in the solicitation.
Question 2: What is the exact make, model, and quantity of the batteries in each UPS?
Answer 2: The batteries are Mitsubishi. The exact make, model, and quantity of the batteries are spelled out in the specification document and attached in the solicitation.
Question 3: What are the pre-existing conditions and or alarms for Barry Hall “0” Deck?
Answer 3: The pre- existing conditions will need to be assessed by a qualified and certified contractor capable of repairing the equipment in question.
Question 4: Please define additional trouble shooting and service?
Answer 4: This is alarm condition; the Academy will require servicing of equipment in alarm mode. This will need to be performed by a contractor certified to troubleshoot the equipment in question.
Question 5: Can a trailer or city truck access your facility (i.e. height restrictions)?
Answer 5: Trucks of all kinds can access the facility. Routes are up to the discretion of the contractor.
Question 6: Do you have a loading/receiving dock? If yes, is your dock standard 48"?
Answer 6: There is a loading or receiving (area) ground access.
Question 7: Does your facility have a freight elevator? If No, how many flights of stairs or number of stairs are there to final delivery point?
Answer 7: The facility does not have an elevator. All equipment is on the ground level or first floor.
Question 8: Are there any obstruction such as doorways, narrow passageways, carpets, stairs, etc. that would necessitate special handling equipment?
Answer 8: The equipment is located in secured rooms as per code. Stairs could be a minor factor; hallways standard, no carpet.