UPS_and_Battery_Replacement_Q_ _A.docx

DOCX document 16 KB Posted

Attached to
USMMA UPS Systems & Battery Replacement Federal contract opportunity
Solicitation number
MMAPR5207140103
Issued by
Department of Transportation Maritime Administration

View the file

Other files for this federal contract opportunity

Other files attached to USMMA UPS Systems & Battery Replacement, newest first.
File Type Posted
UPS_Systems_and_Battery_Replacement_Q_ _A_Part_3_.docx DOCX document
UPS_Systems_and_Battery_Replacement_Q_ _A_Part_2_.docx DOCX document
Site_Visit.docx DOCX document
UPS_Systems_ _Battery_Replacement_Specifications.docx DOCX document
USMMA_Barrack_UPS_Systems_SOW_ _Evaluation_Criteria.pdf PDF
UPS_Systems_ _Battery_Replacement_Specifications.docx DOCX document
USMMA_Barrack_UPS_Systems_SOW_ _Evaluation_Criteria.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USMMA Uninterruptable Power System (UPS) and Battery Replacement Questions & Answers

Question 1: What is the exact kVA of each UPS?

Answer 1: The kVA is incorporated into the information which is provided in the specification document (Ex. Model # and Serial #) and attached in the solicitation.

Question 2: What is the exact make, model, and quantity of the batteries in each UPS?

Answer 2: The batteries are Mitsubishi. The exact make, model, and quantity of the batteries are spelled out in the specification document and attached in the solicitation.

Question 3: What are the pre-existing conditions and or alarms for Barry Hall “0” Deck?

Answer 3: The pre- existing conditions will need to be assessed by a qualified and certified contractor capable of repairing the equipment in question.

Question 4: Please define additional trouble shooting and service?

Answer 4: This is alarm condition; the Academy will require servicing of equipment in alarm mode. This will need to be performed by a contractor certified to troubleshoot the equipment in question.

Question 5: Can a trailer or city truck access your facility (i.e. height restrictions)?

Answer 5: Trucks of all kinds can access the facility. Routes are up to the discretion of the contractor.

Question 6: Do you have a loading/receiving dock? If yes, is your dock standard 48"?

Answer 6: There is a loading or receiving (area) ground access.

Question 7: Does your facility have a freight elevator? If No, how many flights of stairs or number of stairs are there to final delivery point?

Answer 7: The facility does not have an elevator. All equipment is on the ground level or first floor.

Question 8: Are there any obstruction such as doorways, narrow passageways, carpets, stairs, etc. that would necessitate special handling equipment?

Answer 8: The equipment is located in secured rooms as per code. Stairs could be a minor factor; hallways standard, no carpet.