- RFP FOR MIDDLE SCHOOL FREEZER
- Solicitation number
- RFP-BRP-250000002432-1
- Issued by
- Monroe County, Michigan
About this file
This Notice to Bidders is issued by Kingscott Associates, Inc. for Big Rapids Public Schools, located in Big Rapids, Michigan, for the Middle School Freezer Project. The project involves a comprehensive remodeling of the middle school cafeteria, with sealed bids to be received on May 29, 2025, at 2:00 p.m. at the Central Office. The scope of work includes selective site and interior demolition, installation of a new walk-in freezer unit with associated concrete slab and ramp, new guardrails and handrails, ceiling replacement, epoxy flooring, wall painting, electrical power and lighting upgrades, and integration of the freezer unit with the existing Building Management System.
Bidders are required to submit a prime bid including all subcontractor costs, with a mandatory 5% bid bond or certified check. No prevailing wage requirement exists for this project. Bidding and contract documents will be available electronically via Kingscott ShareFile starting May 15, 2025, with interested parties contacting Lisa Dailey for access. The Owner reserves the right to accept or reject any bids and to make a final decision within 30 days of the bid opening. The successful bidder will be awarded using the AIA A101-2017 Standard Form of Agreement, with project facilities access arranged through Brian Akey.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Middle School Freezer Project Adendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2806-40 NOTICE TO BIDDERS NTB-1
Kingscott Associates, Inc. Middle School Freezer
Architects/Engineers Big Rapids Public Schools
Portage, Michigan Big Rapids, Michigan
NOTICE TO BIDDERS
Sealed Bids for the Middle School Freezer Project will be received by Big Rapids Public
Schools, at the Central Office, 21034 15 Mile Road, Big Rapids, Michigan 49307 on May 29, 2025 until 2:00 p.m., local time.
Bids will be opened publicly and read aloud at the Big Rapids High School (21175 15 Mile
Road, Big Rapids, MI) in Room #115.
Bids received after 2:00pm will be returned unopened. Each bid shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the owner or any employee of the firm submitting the bid and the Superintendent of Big Rapids School or any member of the Board of Education.
Bids shall be executed on the Bid Form provided. Each proposal must be accompanied by a satisfactory certified check, money order, or bid bond payable to Big Rapids Public Schools for not less than five (5%) percent of the amount of the bid and delivered in a sealed envelope bearing the bidder’s name, address, and project identification.
All bids submitted shall be from a prime bidder only and shall include all subcontractor costs for scopes identified in the contract documents. This project does not require prevailing wages.
Successful bidder(s) will be awarded by AIA A101-2017, Standard Form of Agreement Between
Owner and Contractor, issued by the Owner following direction by Big Rapids Public Schools.
Bidding and Contract Documents will be available from Kingscott Associates, Inc. on May 15, 2025 on the Kingscott ShareFile site. For access to the Kingscott ShareFile site, please contact
Lisa Dailey ldailey@kingscott.com. No printed sets of contract documents will be issued;
however, the electronic files may be reproduced for bidding purposes by the bidder and at the bidder’s expense.
The Owner reserves the right to accept or reject any or all bids, to waive any irregularities in biding and to refrain from accepting or rejecting any bids for a period of thirty (30) days after the bid opening.
Access to the Owner’s facilities may be arranged through contacting Brian Akey at (616)
329-3845.
The project scope of work includes Middle School Remodeling including (but not limited to) the following:
1. Selective site demolition.
2. Selective interior demolition including removal of existing 2’x4’ lay-in ceilings in the
Cafeteria.
3. New walk-in freezer unit, concrete slab, concrete ramp, and foundation.
4. New guardrails and handrails at new exterior concrete ramp.
5. New lay-in ceiling in the Cafeteria.
2806-40 NOTICE TO BIDDERS NTB-2
6. New epoxy flooring in the Cafeteria and (2) Storage rooms.
7. New wall paint in the existing Cafeteria.
8. Electrical power for the new freezer unit and new light fixtures in the Cafeteria.
9. Controls work to integrate the new freezer unit with the existing Building Management
System