2020 BFO MIDDLE PRONG RECLAMATION
STATEMENT OF WORK & SITE LOCATION
DESIGN AND SPECIFICATIONS
BLM BUFFALO FIELD OFFICE
HIGH PLAINS DISTRICT
AUGUST 2020
2020 BFO MIDDLE PRONG RECLAMATION
TABLE OF CONTENTS
1. CONTRACT SPECIFICATIONS
SECTION 01009, GENERAL INFORMATION AND REQUIREMENTS (10 Pages) DATA SUMMARY SCOPE OF WORK (4 Pages) SECTION 01505, MOBILIZATION / DEMOBILIZATION (1 Page) SECTION 02050, REMOVAL AND DISPOSAL OF STRUCTURES AND OBSTRUCTIONS (2 Page) SECTION 02051, ROCK REMOVAL AND STOCKPILE (2Pages) SECTION 02310, SITE GRADING (6 Pages) SECTION 02311, ROAD GRADING (3 Pages) SECTION 02315, EXCAVATION AND FILL (3 Pages) SECTION 02316, VALVE REMOVAL (2 Pages) SECTION 02317, SURFACE ITEM REMOVAL (4 Pages) SECTION 02834, WIRE FENCES AND GATES (5 Pages) SECTION 02933, SEEDING (4 Pages) SECTION 02950, EROSION CONTROL (1 Pages) SECTION 02998 PLUG MONITORING WELL (1 Pages) SECTION 02999, WELL PLUGGING (3 Pages)
2. CONTRACT DRAWINGS AND EXHIBITS AND FIGURES
a. PROJECT LOCATION ACCESS MAP (MIDDLE PRONG SCOPE OF WORK MAP) AND
COORDINATE TABLE (2 Pages)
b. PROJECT FIGURES - MIDDLE PRONG INFRASTRUCTURE REMOVAL (4 Pages)
c. PROJECT DRAWINGS – MESA #3 RESERVOIR (3 Pages 11x17)
d. STANDARD BLM FENCE DETAILS (4 Pages)
3. BID SCHEDULE (3 Pages)
DIVISION 1 SECTION 01009
GENERAL REQUIREMENTS GENERAL INFORMATION AND REQUIREMENTS
BFO 2020 MIDDLE PRONG RECLAMATION 01009 - 1 of 10
SECTION 01009
GENERAL INFORMATION AND REQUIREMENTS
PART 1: GENERAL
1.1 SUMMARY
A. Description of Work: Furnishing labor, equipment, supplies, and materials to grade, and reclaim one (1) reservoir (Mesa #3 Reservoir), restore/grade portions of existing dirt roads, remove and dispose of 22 valves, dispose of miscellaneous debris, Plug MPU Middleprong Spellman 15-29ACY Well/Reclaim 1,200 LF Pipeline/Primitive Area, and Plug Monitoring Well with Bentonite Chips/Restore Disturbed Area.
The reservoir reclamation work (Mesa #3 Reservoir) consists of approximately .78 acres of topsoil removal and redistribution, installing five 30-foot long rock check dams, approximately 5,800 CY of unclassified excavation (soil) to match existing contours, drainages with a slope of high walls to at least a 3:1 slope grade, grade site to provide for positive drainage, reseed disturbed area of 0.78 acres with an approved pure live seed mixture, install erosion control, and 150 linear feet 3-wire barbed wire fencing. Fencing shall be located outside the reclaimed disturbed area. Additional description is provided in the Middle Prong Reclamation Data Summary Sheet provided at the end of this specification.
Provide all supervision, personnel, labor, materials, tools, equipment, maintenance and repairs, services, and all other facilities and incidentals required for the execution and completion of the Work as specified herein. Provide all topsoil stripping and stockpiling, excavating, hauling, backfilling, grading, seeding, surface restoration, fencing, disposal, and associated work as shown on the Drawings, as specified herein, and as required to complete all components of the Work, complete, in place, and accepted by the Contracting Officer.
B. Location: Work under this Contract is located in Campbell County, WY. The location of the Mesa #3 Reservoir and other work sites are shown on attached Middle Prong Statement of Work Map. The reservoir work has the following township, range and section. The latitude and Longitude are in decimal degrees.
Mesa #3 Reservoir is at T54N R75W Sec 17 Latitude 44.659075, -105.907996
C. Middle Prong Reclamation Data Summary Sheet: Summarizes the type of work for each schedule in this project.
BFO 2020 MIDDLE PRONG RECLAMATION 01009 - 2 of 10
1.2 DEFINITIONS AND REFERENCES
A. Approvals: Approval of the submittals is an indication the Contractor's submittals have been reviewed and there are no objections, except as noted. Approval of deviations shall apply only to those deviations or omissions from the requirements of the drawings and specifications brought to the Contracting Officer's attention in writing. After approval of an item, submit a substitute for approval when the approved item cannot be purchased or delivered in time to avoid delay in completion of the project.
B. Referenced Specifications/Standards with Abbreviations and/or Acronyms: Wherever the following acronyms are used in these specifications or on the drawings, they are to be construed the same as the respective expressions represented. Copies of the referenced specifications/standards referred to herein may be procured by the Contractor, from the following:
WYDOT - Wyoming Department of Transportation 5300 Bishop Boulevard Cheyenne, Wyoming 82009
WYDEQ - Wyoming Department Environmental Quality (Water Quality) 200 West 17th Street Cheyenne, Wyoming 82002 307-777-7937
WYSEO - Wyoming State Engineers Office, 122 West 25th Street Herschler Building, 2nd Floor West Cheyenne, Wyoming 82002 Administration 307-777-6150 Board of Control 307-777-6178 Ground Water Division 307-777-6163 Surface Water Division 307-777-6475
U.S.C.O.E. - U.S. Army Corps of Engineers (COE).
Cheyenne Army Corps of Engineers 2232 Dell Range Boulevard, 210 Cheyenne, Wyoming, 82009 307-772-2300
OSHA - Occupational Safety and Health Administration's Standards U.S. Department of Labor Occupational Safety and Health Administration Denver Area Office 333 West Colfax Avenue Denver, CO 80204
BFO 2020 MIDDLE PRONG RECLAMATION 01009 - 3 of 10
1.3 SUBMITTALS
A. Scope: Submittals include but are not limited to seed mixture, construction schedule, equipment, work plans, key personnel, design computations, shop drawings, manufacturers' literature, materials, as-built drawings, samples, safety plan, and maintenance manuals.
B. Requirements: Refer to specifications for submittals required. Allow at least 5 working days for review. If Work proceeds without submittal acceptance, the Contractor is proceeding at its own risk and any work performed may be subject to re-work at no cost to the Government. Submittals shall be delivered to the Contracting Officer (CO) with a copy to the Contracting Officer’s Representative (COR).
C. Identification of Submittals: Completely identify each submittal by showing at least the following information:
1. Name and address of submitter, plus name and telephone number of the individual to contact for further information.
2. Name of project as it appears in these specifications.
3. Contract number, drawing number, and specification section number to which the submittal applies.
4. Whether this is an original submittal or resubmittal.
5. Each item shall clearly note the manufacturer's name and address, trade name, product, lot, style, color, catalog designation or model number, and locations of use.
1.4 CERTIFICATES OF CONFORMANCE
A. Requirements: The Contracting Officer may permit use, prior to sampling and testing, of materials when accompanied by Certificates of Conformance. Materials used on the basis of a Certificate of Conformance may be sampled and tested. Installation of materials on the basis of Certificates of Conformance shall not relieve the Contractor of responsibility for incorporating materials which conform to the requirements of the drawings and specifications. Material not conforming to those requirements will be subject to rejection, whether in place or not.
B. Format: The Certificate of Conformance provided by the supplier shall:
1. State the named product conforms to the Contract requirements.
2. Either be accompanied with a certified copy of the test results or certify that such test results are on file with the manufacturer and will be furnished to the Contracting Officer upon request.
3. Provide the name and address of the manufacturer, the testing agency, and the date of tests.
BFO 2020 MIDDLE PRONG RECLAMATION 01009 - 4 of 10
4. Set forth the means of identification which will permit field determination of the product delivered as being the product covered by the certification.
1.5 QUALITY ASSURANCE
A. Codes and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This Contract incorporates materials, applications, and tests by reference, with the same force and effect as when they were given in full text.
B. Conflict: Where a conflict occurs between reference documents and project specifications, the project specifications shall govern.
1.6 PROJECT SAFETY MANAGEMENT PLAN
A. Before starting any on-site work, the Contractor shall submit a site specific Project Safety Management Plan that complies with and meets applicable Federal, State, and local laws, rules, regulations and guidelines governing safety, health and sanitation, including but not limited to the Occupational Safety and Health Act, 29 CFR 1910, 29 CFR 1926, 23 CFR 634, Mine Safety and Health Administration (MSHA), Title 30 CFR, CFR 49, and the Drug-Free Workplace Act (Public Law 100-690 Title V, subtitle D, 41 USC 701 et seq.). All operations and work practices of the Contractor will comply with this Plan.
The Contractor shall require all subcontractors, suppliers to comply with this Plan.
B. Specific elements to consider, but not limited to, include hazard assessment/abatement for the specific project site, competent persons, emergency communication plan, personnel charged with enforcing site safety, identify significant or high-risk activities, measures implemented, safety meetings, drug and alcohol impairment, project safety inspections, and corrective actions.
1.7 PROJECT/SITE CONDITIONS
A. Access to the Work: Access is via Campbell County roads, two track roads, and trails.
1.8 SEQUENCING AND SCHEDULING
A. Work Schedule: The schedule shall be submitted at the pre-work conference. When requested, submit an updated schedule within 3 calendar days. As a minimum, the estimated start and completion dates shall be shown in the estimate.
B. The site work is not authorized between AA and BB each year without a written exception from the BLM. Not applicable this contract.
C. The site work may be prohibited AA through BB for wintering sage grouse. Not applicable this contract.
BFO 2020 MIDDLE PRONG RECLAMATION 01009 - 5 of 10
D. Work shall not occur during wet, muddy or frozen conditions. Off road travel is prohibited.
1.9 CONSTRUCTION SITE RESTRICTIONS
A. Do not trespass in any way to impact property outside the construction area without written permission from the Owner(s) of such lands.
1.10 ADDITIONAL PROVISION
A. The Contractor shall apply for, obtain, and pay for licenses and permits required to perform the Work.
B. Comply with applicable codes and regulations of authorities having jurisdiction, including but not limited to:
1. Wyoming Department of Environmental Quality (WDEQ),
2. Wyoming State Engineers Office, and
3. U.S. Army Corps of Engineers (COE).
C. Contractor shall field verify dimensions shown on the Drawings before fabricating or ordering any materials.
D. Notify the Contracting Officer of existing conditions that differ from those shown on the Drawings.
E. Portions of the contract documents are written in the imperative mode.
1. Except where specifically intended otherwise, the subject of all imperative statements is the Contractor.
2. Examples of imperative statements include but are not limited to:
3. "Provide . . . " means "Contractor shall provide . . ." and
4. "Install . . . " means "Contractor shall install . . . ".
PART 2: PRODUCTS (No applicable requirements.)
BFO 2020 MIDDLE PRONG RECLAMATION 01009 - 6 of 10
PART 3: EXECUTION
3.1 PROJECT MEETINGS
A. Pre-Work Conference:
1. Will be held prior to the start of work. The Contractor will be notified in advance of meeting time, date and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, administrative provisions of the Contract, and anticipated site safety concerns.
2. The Contractor, subcontractors and the persons responsible for coordination of the work shall be present at the meeting.
3. The Contractor shall be prepared to summarize and explain procedures planned for the project and present the submittals requested in the specifications.
4. Submit at this pre-construction conference a complete list of individual equipment and labor rates which will be used to perform miscellaneous projects as required during the course of the Work.
5. The Contractor shall submit at this pre-construction conference proposed locations for the staging/storage area.
6. Provide BLM with necessary information in case of emergency.
B. Progress Meetings:
1. To be held at the project site, or as determined by the Contracting Officer.
2. May be called by either the Contracting Officer or the Contractor. Request shall state who should attend and include an agenda.
C. Final Inspection:
1. To be held at the project site, or as determined by the Contracting Officer.
2. Notify the Contracting Officer in writing at least ten (10) working days before the completion date so the Government can schedule final inspection.
3. The superintendent shall be present during this inspection.
3.2 PREPARATION
A. Work Limits: The Contractor is responsible for staking the construction based on the design drawings and specifications. The Contractor, at a minimum, shall stake the expected disturbance limits with either 10-foot or 20-foot offsets outside the disturbed area. The BLM will approve the staking in the field prior to surface disturbance. The Contractor shall notify the BLM at least five (5) working days before any site disturbance begins and after the proposed disturbance limits are staked to allow for field inspection, review, and acceptance.
BFO 2020 MIDDLE PRONG RECLAMATION 01009 - 7 of 10
B. Work Layout: The Contractor will set construction stakes to give the measurements, lines and grades necessary for the work executed under the Contract. Baseline monuments or benchmarks disturbed or removed during construction shall be reset by the Contractor at the Contractor's expense.
C. Stormwater Pollutant Protection Plan (SWPPP): Contractor shall be responsible to submit and implement Stormwater Pollutant Protection Plan (SWPPP) in accordance with WDEQ regulations (http://deq.wyoming.gov/wqd/storm-water-permitting/).
D. Environmental Considerations: The project sites shall be left in a clean and orderly condition. All trash shall be removed from site and placed in an authorized landfill at contractor expense.
3.3 PERSONNEL SUPPORT AND SANITATION FACILITIES
A. Provide and maintain, in a neat and sanitary condition, such accommodations for use by the Contractor’s and subcontractors' employees, the Engineer, and the Owner as required by regulations of the General Safety and Health Regulations of the Wyoming Occupational Health and Safety Commission and by State and locals Boards of Health as enforced by the Campbell County Health Officer.
B. Provide personnel support facilities including but not limited to:
1. Drinking water,
2. First aid facilities,
3. Sanitary facilities including washing and disinfection,
4. Trash removal, and
5. Coordination with emergency medical services.
C. Prevent personnel support facilities and sanitation facilities from becoming a nuisance to the public or to the Owner.
3.4 UTILITIES
A. The Contractor shall have full responsibility for locating all utilities before commencement of construction.
B. Omission of an existing utility location on the Drawings does not indicate or imply that a utility(ies) does not exist within the work site.
C. Inclusion of an existing utility(ies) location on the Drawings does not necessarily indicate the definite location(s) of the utility(ies).
D. Obtain written permission from the Contracting Officer before altering or removing any existing utility.
E. Protect all existing public or private utilities and improvements that are located on the work site.
BFO 2020 MIDDLE PRONG RECLAMATION 01009 - 8 of 10
F. Pay for any unplanned breakage or damage to existing utilities and improvements that may occur during construction and that is caused by the Contractor.
3.5 WATER
A. Contractor will be responsible for transporting water from source to project site. No separate measurement of payment will be made for water.
3.6 ROADS
A. Use existing roads during construction as directed by the Contracting Officer and as identified on the plans, specifications, exhibits, and maps.
B. Do not modify or alter existing roads nor construct additional temporary roads.
C. Obtain written approval from the Contracting Officer before modifying or altering any existing road.
D. Obtain written approval from the property owner and provide approval to the Contracting Officer before constructing any temporary construction road(s).
3.7 ENVIRONMENTAL
A. Guard against contamination of topsoil, any earthen material, groundwater, surface water, and air from oil, fuel and other fluid spills; from vehicle emissions; from garbage, waste and other debris; and from any other spills, leaks, discharges or releases of hazardous materials, hazardous wastes or other wastes.
1. Remediate and correct all environmental damage resulting from any such release, discharge, spill or leak occurring during the course of the Work, in accordance with applicable laws and with requirements of agencies having jurisdiction over such matters including, without limitations, Wyoming Department of Environmental Quality (WDEQ).
B. Service all equipment in areas designated and previously accepted by the Contracting Officer or the Contracting Officer’s Representative.
C. Maintain all equipment to prevent leakage of oil, fuel or other fluids and to prevent unacceptable levels of emissions.
D. Collect, remove and properly dispose of all trash, garbage, debris, used oil, contaminated soil, and other waste materials off site at an approved disposal area, in a manner which complies with all applicable state and federal regulations.
BFO 2020 MIDDLE PRONG RECLAMATION 01009 - 9 of 10
E. Comply with all applicable federal and state laws and regulations during the Work, including, but not limited to WDEQ Rules and Regulations, including, but not limited to, those pertaining to the handling and storage of fuel, oil, other liquids, and all other hazardous materials, hazardous wastes and other wastes used, stored, released, discharged, spilled or leaked in, on, or near the property of the Owner.
1. This includes, but is not limited to, the acquisition of and compliance with any permits required by applicable law with respect to the Work, such as permits for releases under the Resource Recovery and Reclamation Act (RCRA) or the Clean Water Act or the Clean Air Act.
F. Establish and maintain dust control and erosion control during the contract time as directed by the Contracting Officer’s Representative as specified herein, and as required by regulatory agencies.
G. Provide all equipment and personnel necessary to meet the contract requirements.
H. Prior to bringing any potentially hazardous material onto the site, provide the Safety Data Sheet (SDS) for that product to the Contracting officer and obtain approval for its use.
1. The Contractor is strongly encouraged to use only products that do not generate hazardous materials in their waste form.
2. Comply with all manufacturer's directions and all of the applicable rules and regulations pertaining to the handling and disposing of such material.
I. Maintain a file of SDS information on site which shall be available to the Contracting Officer and its Representative and available for inspection by proper authorities at any time.
J. At the completion of the project, provide the SDS information, including quantities used, to the Contracting Officer and a copy to its representative for record retention.
K. Be responsible for providing training of those employees meeting the definition of a "hazmat employee" in 49 CFR Part 171.
L. Report to the Contracting Officer and its Representative any product, chemical, or waste releases which occur during the course of the contract which are not large enough to require government reporting under CERCLA or SARA.
M. Report all releases required to be reported under applicable laws.
N. Maintain all sediment control structures in good repair and free of debris to perform their designed function.
O. Berm all fuel, antifreeze, and lubricant storage areas to contain spills and prevent soil and water contamination in accordance with WDEQ regulations.
P. Do not construct any underground storage tanks for storage of oils, fuels, or other chemicals.
1. Any above-ground storage tanks must meet the requirements specified by
WDEQ or any other authorities having jurisdiction.
BFO 2020 MIDDLE PRONG RECLAMATION 01009 - 10 of 10
Q. Report cultural resource or archaeological sites discovered during the course of the Work immediately to the Contracting Officer and its Representative before any further disturbance of such sites.
R. Work stoppage may be required or Work may be redirected to protect these discoveries until appropriate agency clearance can be obtained.
S. Perform and document job site inspections.
T. Report immediately any occurrences of slides, faults, or unstable soil to the Contracting Officer and its Representative immediately upon discovery.
3.8 SECURITY
A. Provide continuous security from intrusion at the site at all times during construction.
1. No unauthorized personnel are allowed onsite.
B. Contractor will be responsible for restricting access to the project site as necessary. Any signage will be removed by the Contractor upon completion.
C. Barricade, cover, or fence as required all hazardous areas to prevent entry of people, wildlife and livestock.
D. No camping, no firearms, no alcohol, nor illegal drugs
3.9 WARRANTY
A. Requirements: Materials and equipment furnished under this Contract shall be covered by the most favorable commercial warranties given to customers for such materials or equipment. The rights or remedies provided herein are in addition to and do not limit rights afforded to the Government by other clauses of this Contract. With respect to warranties, expressed or implied, from manufacturers or suppliers for materials or equipment furnished under the Contract the Contractor shall:
1. Obtain warranties that would be given in normal commercial practices.
2. Require warranties to be executed, in writing, for the benefit of the Government.
3. Submit warranties to the Contracting Officer prior to the final inspection.
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
Units: The work described in this section will not be measured for payment.
4.2 BASIS OF PAYMENT
Payment: No direct payment for the work described under this section will be made. The Contractor shall include consideration for this item in the bid price for other items.
END OF SECTION
2020 BFO MIDDLE PRONG RECLAMATION DATA SUMMARY SHEET Page 1 of 3
2020 BFO MIDDLE PRONG RECLAMATION DATA SUMMARY SHEET
1. Schedule A (Mesa # 3 Reservoir)
a. The reservoir reclamation work (Mesa #3 Reservoir) consists of approximately .78 acres of topsoil removal and redistribution, installing five 30-foot long rock check dams, approximately 5,800 CY of unclassified excavation (soil) to match existing contours, drainages with a slope of high walls to at least a 3:1 slope grade, grade site to provide for positive drainage, reseed site with an approved pure live seed mixture, and install erosion control. Approximate disturbed area is 0.78 acres. Fencing is described below.
Provide all topsoil stripping and stockpiling, excavating, hauling, backfilling, grading, seeding, surface restoration, fencing, and associated work as shown on the Drawings, as specified herein, and as required to complete all components of the Work with all associated structures, complete, in place, and accepted by the Contracting Officer.
b. Provide 3-strand barbed wire fence to connect to the existing barbed wire fence on both ends to enclose area. Fence shall connect to each side of the existing barbed wire boundary on both sides. Fencing shall be located outside the reclaimed disturbed area. Approximate length of provided fence is 150 linear feet; reference 3-strand barb wire fence details and specifications.
2. Schedule B (Mesa #3 Outfall)
a. Remove and Dispose Two (2) valves, valve boxes, and associated HDPE pipe; reference
Figures 1 and 2. Excavation shall be included in the removal of Mesa #3 Impoundment.
Restore disturbed area as needed; included in this item. Hand broadcast seed and raking in disturbed area is acceptable.
b. Remove and Dispose Steel V-notch weir 4’ X 3’; reference Figures 3 and 4. Excavation, finish grading, dry mulch, and seeding is included in this item. Restore disturbed area as needed; included in this item. Hand broadcast seed and raking in disturbed area is acceptable.
c. Remove Rock Apron (15’x135’). Rock is approximately 4” - 6” diameter and is expected to be approximately less than one foot deep; reference Figures 3 and 4. This shall include capping the HDPE outfall pipe three (3) feet below finish grade. After rock and weir are removed, the area shall be contoured to blend and match into existing and new grading from the impoundment removal. Grade to provide for positive drainage, then seed; reference specification 02933 (Seeding) for application rates and seed mix. Restore disturbed area as needed; included in this item. Hand broadcast seed and raking in disturbed area is acceptable.
Utilize rock from rock apron removal in item “c” and install for stabilization of impoundment reclamation. Rock shall be used to construct rock check dams.
d. Remove and Dispose Rubber Tire Tank (8-foot diameter) with concrete center; reference figure 6. Restore disturbed area as needed; included in this item. Hand broadcast seed and raking in disturbed area is acceptable.
3. Schedule C (Mesa #3 Lower Road Erosion) Grade and Repair Road, approximately 300 linear feet of 1-foot deep gully and construct 2 water bars 10 feet long X 1 foot high, reference figure 7, and attached Middle Prong Statement of Work Map for location. Grade using native material, wheel compact, and provide for positive drainage away from road. This section of road shall be retained as a primitive two-track road. Restore
2020 BFO MIDDLE PRONG RECLAMATION DATA SUMMARY SHEET Page 2 of 3 disturbed area as needed; included in this item. Hand broadcast seed and raking in disturbed area is acceptable.
4. Schedule D (State Section Upper Road Erosion) Grade and Repair Road, approximately 300 linear feet of 8-inch deep gully and construct 2 water bars 12 feet long X 1 foot high; reference figure 9, water bar detail, and attached Middle Prong Statement of Work Map for location. Grade using native material, wheel compact, and provide for positive drainage away from road. This section of road shall be retained as a primitive two-track road. Restore disturbed area as needed; included in this item. Hand broadcast seed and raking in disturbed area is acceptable
5. Schedule E (Cement/Concrete & Bypass Valve)
a. Remove and Dispose cement/concrete pile, approximate size is 10 feet X 10 feet X 1 foot;
reference figure 8 and attached Middle Prong Statement of Work Map for location. Restore disturbed area as needed; included in this item. Hand broadcast seed and raking in disturbed area is acceptable
b. Remove and Dispose Bypass Valve Assembly; reference figure 13 and attached Middle Prong Statement of Work Map for location. Remove and dispose bypass valves, valve boxes, bypass pipe, and associated metal cages. Excavate to valves, cut and cap pipes, remove and dispose valves. The valves are 2 inch to 6 inch diameter, but may be as large as 8 inch diameter. Pipe is HDPE and typically less than three feet below ground surface but may be as deep as 10 feet;
reference figures 13. Backfill using excavated material, compact using backhoe bucket and mound material to provide for positive drainage. Seed disturbed area per specification 02933 (Seeding). Restore disturbed area as needed; included in this item. Hand broadcast seed and raking in disturbed area is acceptable
6. Schedule F (Section 21 Road Erosion) Grade and Repair Road, approximately 300 linear feet of ditch rilling. Regrade road by removing rills and constructing one (1) water bar 12 feet long X 1 foot high; reference figure 7 and attached Middle Prong Statement of Work Map for location. Grade using native material, wheel compact, and provide for positive drainage away from road. This section of road shall be retained as a primitive two-track road. Restore disturbed area as needed; included in this item. Hand broadcast seed and raking in disturbed area is acceptable
7. Schedule G (Debris – Stock Tank and Timbers at the outfall) Remove and Dispose Debris
a. 8-foot diameter rubber tire stock tank & valve. Restore disturbed area as needed; included in this item. Hand broadcast seed and raking in disturbed area is acceptable
b. Timbers and scattered rock located around the tank. Restore disturbed area as needed;
included in this item. Hand broadcast seed and raking in disturbed area is acceptable
8. Schedule (H) Electrical Debris Remove & Dispose Debris, including green box, wire & panel; reference figure 10 and attached Middle Prong Statement of Work Map for location. Wire shall be cut below the ground surface a minimum of 18”. Surface disturbance shall be restored to match existing and reseeded per specifications. Restore disturbed area as needed; included in this item. Hand broadcast seed and raking in disturbed area is acceptable
2020 BFO MIDDLE PRONG RECLAMATION DATA SUMMARY SHEET Page 3 of 3
9. Schedule I (Windmill #1 Outfall)
a. Remove & Dispose outfall, concrete, and scoria apron (20’ X 150). Restore disturbed area as needed; included in this item. Hand broadcast seed and raking in disturbed area is acceptable attached Middle Prong Statement of Work Map for location.
b. Stockpile Rock from scoria apron (20’ X 150’) at “ranch headquarters” located on the attached Middle Prong Statement of Work Map in the Southwest corner of Section 21. Restore disturbed area as needed; included in this item. Hand broadcast seed and raking in disturbed area is acceptable
10. Schedule J (Plug Monitoring Well with Bentonite Chips/Restore Disturbed Area) Plug monitor well, 2” PVC casing @ 100’. Fill full depth with bentonite chips and cut 3 feet below ground surface; reference figure 10 and attached Middle Prong Statement of Work Map.
Restore disturbed area as needed; included in this item. Hand broadcast seed and raking in disturbed area is acceptable.
11. Schedule K (Remove and Dispose Valve) Remove and dispose 22 valves, valve boxes, and associated metal cages. Two (2) of the twenty
(20) valves are at the Mesa #3 Outfall. Excavate to valve, cut and cap pipe, remove and dispose valve. The valves are 2 inch to 6 inch diameter, but may be as large as 8 inch diameter. Pipe is HDPE and typically less than three feet below ground surface but may be as deep as 10 feet;
reference figures 12, 15, and 16 for typical valves and cages. Backfill using excavated material, compact using backhoe bucket and mound material to provide for positive drainage. Seed disturbed area per specification 02933 (Seeding). Restore disturbed area as needed; included in this item. Hand broadcast seed and raking in disturbed area is acceptable
12. Schedule L (Plug MPU Middleprong Spellman 15-29ACY Well/Reclaim 1,200 LF Pipeline/Primitive Area)
Plug well with cement slurry, cut wellhead off 3-feet below finished grade. Plug at 755 feet deep;
9.625-inch diameter surface casing set at 79 feet and 7-inch diameter production casing set at 843 feet. Restore disturbed area; included in this item. Hand broadcast seed and raking in disturbed area is acceptable. Reference Middle Prong Statement of Work Map for location.
This Work includes preparatory work and operations, including, personnel, equipment, materials, and incidentals to plug the wells identified on the plans, exhibits, specifications, and herein; and other work and operations that must be performed to reclaim the well site.
In addition, reclaim approximately 1,200 linear feet of the pipeline/primitive access corridor after the well is plugged. Restore disturbed area as needed; included in this item. Hand broadcast seed and raking in disturbed area is acceptable.
DIVISION 1 SECTION 01505
GENERAL REQUIREMENTS MOBILIZATION / DEMOBILIZATION
2020 BFO MIDDLE PRONG RECLAMATION 01505 - 1 of 1
1.1 SUMMARY
A. This Section includes preparatory work and operations, including those necessary to the movement of personnel, equipment, materials, and incidentals to and from the project site; and for other work and operations that must be performed or costs incurred prior to beginning work on the various items on the project site.
B. This shall also include the project office, portable sanitary facilities, and other storage containers/trailers with jobsite tools and hand tools and small supplies necessary for the project. The location of these items shall not interfere with the traffic plan or Work.
C. Move to and remove from the project site all equipment, personnel, supplies, and incidentals which are necessary for completing the Work.
D. Provide all bonding fees, and other insurance fees not specifically called out for payment that are required for the Work or for operations which must be performed.
PART 2: PRODUCTS
(There are no applicable requirements in this section.)
(There are no applicable requirements.)
4.1 METHOD OF MEASUREMENT:
A. Mobilization / Demobilization covers the cost of equipment, materials, and labor for mobilizing and demobilizing to the site. No measurement of individual items will be made.
4.2 BASIS OF PAYMENT:
A. Payment shall constitute full compensation for all labor, expenses, supplies, equipment and incidentals, including bonding fees and insurance fees, required to complete the Work.
B. Final payment for all Work (including the lump sum amount shown on the bid form for mobilization and demobilization) can be withheld subject to the Contracting Officer’s approval of finished site conditions.
C. Payment will be made upon final completion of the project.
D. Payment: Full compensation for mobilization and demobilization, including preparation of staging/storage area, and cleanup shall be on a lump sum basis.
Pay Item Pay Unit
Mobilization / Demobilization Lump Sum
DIVISION 2 SECTION 02050
SITEWORK REMOVAL AND DISPOSAL OF STRUCTURES AND OBSTRUCTIONS
2020 BFO MIDDLE PRONG RECLAMATION 02050 - 1 of 2
SECTION 02050
REMOVAL AND DISPOSAL OF STRUCTURES AND OBSTRUCTIONS
1. PART 1 GENERAL
A. The work involved in this category consists of removing and satisfactorily disposing of pipes, water storage tanks, fencing, rip rap, debris piles, and other items designated for removal on the plans, other specifications, and/or directed by the Contracting Officer Representative (COR).
B. Removed items shall be property disposed of as required by Federal, State, and Local Government regulations. The COR shall receive written notification of disposal procedures and may require the Contractor to certify that proper disposal methods were used.
C. It shall include the salvaging of designated material, as shown on the plans, designated in other specifications, and backfilling the resulting trenches, holes, and pits. In addition, unless specified in another section, it shall include grading and blending surface to match into existing grades to promote positive drainage.
1.2 RELATED WORK SPECIFIED IN OTHER SECTIONS
A. Related Work is specified in other sections of the contract.
2. PART 2: PRODUCTS (NOT USED)
3. PART 3: EXECUTION
3.1 DEMOLITION AND DISPOSAL
A. All existing pipes, water storage tanks, fencing, rip rap, debris piles, and other items designated for removal on the plans and/or directed by the Contracting Officer Representative (COR), shall be removed and disposed of by the Contractor.
B. Remove standpipes three feet (3’) below finished grade elevation. Pipes designated to be capped shall be capped. If not designated to be capped, the Contractor shall fill pipes with native soil and compact. Saw cut and cap any intersecting pipes within three feet (3’) of the finished ground surface.
C. Rip rap shall be salvaged and reused to construct rock check dikes/dams.
D. Care shall be exercised in such removal to assure that adjacent facilities or structures which are to remain shall not be disturbed.
DIVISION 2 SECTION 02050
SITEWORK REMOVAL AND DISPOSAL OF STRUCTURES AND OBSTRUCTIONS
2020 BFO MIDDLE PRONG RECLAMATION 02050 - 2 of 2
E. Any damage to such existing facilities or structures resulting from carelessness or negligence on the Contractor’s part shall be satisfactorily restored to its original condition at the Contractor’s expense.
4. PART 4: MEASUREMENT AND PAYMENT
No separate measurement or payment will be made for removal and disposal of structures and obstructions. This work is subsidiary to the Contract and all specifications.
DIVISION 2 SECTION 02051
SITEWORK ROCK REMOVAL AND STOCKPILE
2020 BFO MIDDLE PRONG RECLAMATION 02051 - 1 of 2
SECTION 02051
ROCK REMOVAL AND STOCKPILE
1. PART 1 GENERAL
A. The work involved in this category consists of removing rock to be used in other areas on site, e.g. remove rock from an outfall and using it in rock check dams.
B. The work may also include removing rock from an outfall or other source and transporting rock offsite and stockpiling as designated on the plans, exhibits, and maps, and/or directed by the Contracting Officer Representative (COR).
C. Areas where rocks are removed shall be graded to promote positive drainage and seeded per specification 02933 (Seeding). Areas less than 500 square feet may be seeded using a hand broad caster.
1.2 RELATED WORK SPECIFIED IN OTHER SECTIONS
A. Related Work is specified in other sections of the contract.
Section 2310 (Site Grading) Rock Check Dams
2. PART 2: PRODUCTS (NOT USED)
3. PART 3: EXECUTION
3.1 ROCK REMOVAL AND RE-USED ONSITE
A. Rock shall be carefully removed from the designated area to avoid damage to such existing facilities or structures resulting from carelessness or negligence on the
Contractor’s part shall be satisfactorily restored to its original condition at the
Contractor’s expense. Rock shall be transported to the location to be used, e.g.
site of the rock check dams or the stockpile site.
B. Rip rap shall be salvaged and reused to construct rock check dikes/dams.
C. Rock Stockpile is from the outfall apron and is approximately 20 feet x 150 feet.
This rock shall be delivered to the “ranch headquarters” located in the Southwest corner of Section 21on the attached Middle Prong Statement of Work Map
D. Remove Rock Apron is from the Mesa #3 Outfall apron and is approximately 15 feet x 135 feet. This rock shall be moved and used in the rock check dams as identified in section 2310 Site Grading.
DIVISION 2 SECTION 02051
SITEWORK ROCK REMOVAL AND STOCKPILE
2020 BFO MIDDLE PRONG RECLAMATION 02051 - 2 of 2
4. PART 4: MEASUREMENT AND PAYMENT
A. Measurement of Rock Apron shall be Lump Sum for the rock removed and used (and transported to the location) in the rock check dams identified in 2310 (Site Grading) Rock
Check Dams.
B. Measurement of Stockpile Rock shall be by the Lump sum of rock removed and transported to the location identified herein. Grading shall be made by the acre as depicted in the Drawings, exhibits, and specified herein.
4.2 BASIS OF PAYMENT
A. Payment for each item shall be considered as full compensation for furnishing all labor, materials, tools, equipment, and other incidentals necessary to complete each component of the Work described in this Section.
B. All components of the Work described in this section not called out as pay items shall be considered subsidiary items of Work. No separate measurement and payment shall be made for subsidiary items.
C. Payment for Work described in this Section shall be based on the Contract unit price for each component of the Work in place, complete, and accepted as shown below:
Item Basis of Payment
Remove Rock Apron (15’ x 135’) Lump Sum (LS)
(Use in Rock Check Dam, item 9A)
Stockpile Rock (20’ x 150’) Lump Sum (LS))
DIVISION 2 SECTION 02310
SITEWORK SITE GRADING
2020 BFO MIDDLE PRONG RECLAMATION 02310 - 1 of 6
SECTION 02310
SITE GRADING
PART 1 GENERAL
A. Section Includes: Stripping and storage of topsoil, excavating, filling, grading, scarification, and other related work to reclaim the site including rock check dam installation.
B. Remove topsoil from all areas that will be disturbed during construction and place topsoil in stockpiles.
1. Areas from which topsoil may be removed generally include but not be limited to:
a. Embankments,
b. Areas used for borrow material,
c. Full extents of cut and fill areas,
d. Spoil stockpile locations or waste areas,
e. Temporary staging areas,
f. Any other locations as shown on the Drawings and/or as directed by the
Contracting Officer.
2. Remove topsoil from each area which is to be disturbed at the start of the Work in each of those areas.
C. Replace topsoil in all disturbed areas or as directed by the Contracting Officer. Topsoil will be placed on top of the constructed and approved finished ground surface as defined in the Drawings and as specified herein.
1. Areas in which topsoil must be replaced include but are not limited to:
a. The full extent of cut/fill construction limits, staging areas, waste excavation berms, and any other disturbed areas where topsoil was removed during construction.
1.2 DEFINITIONS
A. Unclassified Excavation: Shall consist of the material excavation and placement regardless of its nature.
B. Rock Excavation: Removal of material shall be considered rock excavation when it consists of igneous, metamorphic, and sedimentary rock which cannot be excavated without blasting or the use of a tractor having a power rating in excess of 145 kW (195 net horsepower), with a rear-mounted, heavy-duty, single-tooth, ripping attachment.
C. Common Excavation: Removal of materials which can be excavated using a rear-mounted, heavy-duty, single-tooth ripping attachment mounted on a crawler tractor with a power rating of 145 kW (195 net horsepower) or less shall be considered common excavation.
2020 BFO MIDDLE PRONG RECLAMATION 02310 - 2 of 6
D. Muck Excavation: Shall consist of the removal and disposal of deposits of saturated or unsaturated mixtures of soils and organic matter not suitable for foundation material regardless of moisture content.
E. Fill Material: Shall be mineral soil free from peat, frozen material, brush, trees, roots over 50 mm (2 inches) in diameter and rocks over 150 mm (6 inches) in greatest diameter obtained from site during excavation.
F. Topsoil: Surface soil approximately 150 mm (6 inches) in depth that supports growth of vegetation and contains organic matter. Topsoil shall be free from subsoil, debris, and stones larger than 25 mm (1inch) in diameter.
1.3 QUALITY ASSURANCE
A. Failure Criteria: Not limited to the following:
1. Formation of pools of moisture where positive drainage is indicated on the drawings or as specified herein.
2. Settlement of fill.
3. Flow of moisture toward, or entrapment against structures.
4. Refer to section 3.4 below.
1.4 PROJECT/SITE CONDITIONS
A. Environmental Conditions: Do not attempt to grade frozen or saturated material.
Water dry material to prevent dust.
2.1 MATERIALS
A. General: See definitions.
1. Straw Wattle: Twelve-inch diameter straw wattles shall be installed to prevent sediment from polluting the surface waters of the State. Straw wattles shall consist of certified seed-free agricultural straw inside a flexible and durable tubular netting with metal clips or knotted ends. Straw wattles shall have the following characteristics unless otherwise specified on the plans or details:
a. Minimum diameter: 11.5 inches (30.5 cm)
b. Wattle Density (+- 10%): 3.82 lb/ft3 (61.25 kg/m3)
c. Wattle Dimensions (W x L) (+- 10%) : 12 in. x 20ft (0.3048m x 6.096 m)
d. Straw wattle should be installed to intercept water flow and collect sediment on site. They may be placed over bare soil and are typically installed in a 2-inch trench with the ends of the wattle facing upstream.
e. Straw wattles are to be installed perpendicular to the flow of water.
2020 BFO MIDDLE PRONG RECLAMATION 02310 - 3 of 6
f. Stakes shall be 1 ½” x1 ½” x 24” wood stakes and shall be spaced every two lineal feet at alternating 90-degree angles and sunk 6” below grade minimum.
2. Rock Check Dam: Rock check dams shall be installed using riprap material size D50 - 6” with Class 2 geotextile erosion control fiber to provide a stable foundation.
a. Check dams are to be constructed with a maximum height above grade of 12-inches with 2:1 slopes.
b. The center of the check dam must be 6 inches lower than the outer edges so that stormwater runoff flows are diverted toward the center of the structure and prevent wash-out at the outer edges and dam failure.
c. For added stability, the base of the check dam must be keyed into the soil a minimum of 5 inches deep with Class 2 geotextile erosion control fiber as a foundation.
d. Stone should be placed mechanically or by hand to achieve complete coverage of the ditch or swale and to ensure the center of the dam is lower than the edges. Five (5) rock check dams shall be installed at 30-feet long each, measured along crest. Rock salvaged from site shall be used.
3. Contour Ditch: Contour ditches are dug along a slope following a contour and running perpendicular to the flow of water. They are constructed using placement of the excavated material to form a berm on the downhill edge of the ditch. The berm is planted with permanent vegetation to stabilize the soil and trap any sediment that would overflow from the trench during heavy runoff events.
a. Contour ditches will be constructed a minimum 12-inch depth with 2:1 slopes.
b. Ditches are to have a level bottom and minimum width of 2 feet to minimize scouring during runoff events.
4. Silt Barrier: A silt barrier shall be constructed to prevent silt from polluting the reservoir. The silt barrier shall consist of straw bales wrapped with geotextile fabric. The geotextile fabric shall be made of ultra-violet resistant material, silt-film fabric having the following characteristics:
a. Grab strength, according to ASTM D 4632: 90 lbs.(200 kg)
b. Burst strength, according to ASTM D 751: 145 lbs.(320 kg)
c. Elongation, according to ASTM D 4632: 15 percent @ 45 lbs.(100 kg)
d. Permeability coefficient, according to ASTM D 4491, at a constant head of
50 mm: 0.2 mm/sec.
e. Apparent opening size, according to ASTM D 4751: U.S. Standard Sieve
Number 20 minimum.
f. Retained strength after accelerated weathering and ultra-violet exposure, according to ASTM D 4355: 70 percent.
B. Embankment Cut
2020 BFO MIDDLE PRONG RECLAMATION 02310 - 4 of 6
1. Use excavated materials from existing embankment to obtain as homogenous mixture of native materials as possible during placement of compacted fill.
3.1 PERFORAMANCE STANDARDS
A. Soil Stripping and Stockpiling
1. The depth of topsoil to be excavated is indicated on the attached reservoirs reclamation drawings and as specified herein. The topsoil shall be stripped a minimum of 6 inches deep.
2. Topsoil will be excavated and stockpiled separate from subsoil. Topsoil will be temporarily stockpiled near the project site and then redistributed after the embankment area has been re contoured. Surface disturbance will be minimized by using the appropriately sized equipment for the scope and scale of the task.
When construction will rut the ground or damage the resource, Work will be suspended until conditions are favorable to minimize damage.
3. The construction process for most sites will be as follows:
a. Topsoil will be removed from the disturbance area.
b. After topsoil is removed, reservoir embankment fill will be re-graded to match blend to original grades based on the surrounding area per the contours shown in the attached reservoir reclamation drawings.
c. Topsoil will be re-distributed over the disturbed area.
d. The disturbed area will be scarified, “tracked”, re-seeded, and mulched.
B. Reconstruction of Water Courses and Drainage Features
1. The Contractor will conduct reclamation activities such that eroded or washed areas are stabilized, repaired, and re-vegetated to prevent gullying and erosion.
Additionally, the Contractor will stabilize stream channels, drainages, and impoundments such that they have similar hydrologic attributes as those in stable, naturally functioning systems.
C. Stabilization of Slopes
1. Stabilization of slopes will be accomplished using products designed to decrease the slope length, re-route and/or slow water flow so that seed can germinate, and establish, in the place where it was sown. Methods to accomplish this include stabilization polymers, erosion control blankets or hydro mulch. Certified weed-free straw mulch and a crimper may also be used to stabilize immediate, but temporary, erosion prevention, with the additional benefits of conserving moisture, bracing seed, amendments and topsoil, moderating soil temperature, and enhancing plant establishment. Contractor will provide the Owner with a detailed slope stabilization plan for approval prior to any disturbance.
D. Grading
2020 BFO MIDDLE PRONG RECLAMATION 02310 - 5 of 6
1. Notify the Contracting Officer immediately when adjustments are required to provide finish elevations indicated. Site drainage shall be considered of prime importance.
2. Maximum graded side slope: 3H:1V
3. Merge and blend graded surfaces smoothly with adjacent undisturbed surfaces.
4. Grade surfaces to a smooth, even consistency.
5. Bottom channel width shall be approximately 20 feet wide, consistent slope from each end. Water bars the full width of the bottom of the channel shall be installed approximately one (1) foot tall, shall be graded in the bottom channel every 100 feet as measured in the direction of water flow.
6. All slopes shall be “tracked” perpendicular to the slope before seeding. Tracking shall be accomplished with equipment such as a tracked dozer.
3.2 PREPARATION
A. Clearing: Section 02231 - Clearing and Grubbing. Not Used This Project B.