miami springsOpenBids-DemandStar.pdf
PDF 115 KB Posted
- Solicitation number
- ITB-2-25/26-0-2026/JP
- Issued by
- Miami-Dade County, Florida
About this file
This is an Invitation to Bid (ITB) document issued by the City of Miami Springs, Florida, for the South Drive Stormwater and Roadway Improvement Project. The project encompasses stormwater management improvements, roadway enhancements, and landscape beautification along the South Drive corridor from NW 36th Street to South Royal Poinciana Boulevard. Key project components include localized drainage improvements, water quality enhancement, pedestrian and cyclist safety improvements, and a roundabout enhancement at the intersection of South Drive and Pinecrest Drive designed to reduce flooding in low-lying areas and mitigate flood impacts to private and public property. The project scope was prepared by the City's engineers, Bermello Ajamil and Partners, Inc., and is designed to capture, treat, and convey rainfall runoff for a 10-year 3-day storm event. The bid was broadcast on September 18, 2026, at 5:00 p.m. EDT with a response due date of October 14, 2026, at 2:00 p.m. EDT. A mandatory pre-bid meeting and site visit will be held on September 24, 2026, at 10:00 a.m. at 201 Westward Drive, 2nd Floor, Miami Springs, Florida 33166, with attendance required for all bidders planning to submit proposals.
The project has an estimated budget of $1,700,000.00. Bidders are required to submit a bid bond or cashier's check equal to five percent (5%) of their bid amount. The bid documents include comprehensive technical specifications, civil construction drawings, geotechnical reports, topographic surveys, a landscape plan, a schedule of values, and other supporting attachments totaling over 90 megabytes of electronic documentation. The project is funded through an FDEP grant (LPA0337) and requires electronic submission of bids through the eBidding platform. Nine planholders have registered for the project, including firms such as Arango Billboard & Construction, Brothers Construction Management, and Bush Builders LLC.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Show Less
Active
Download Bid Package Submit eBid Proposal Watch
Bid Details
Agency Name City of Miami Springs
Bid Writer Juan Pena
Bid ID ITB-2-25/26-0-2026/JP
Bid Type ITB - Invitation to Bid
Broadcast Date Sep 18, 2026 5:00pm (EDT)
Fiscal Year 2026
Due Oct 14, 2026 2:00pm (EDT)
Bid Status Text None
Additional Registration
(NEW)
NONE
Scope of Work
The City is seeking a qualified contractor to construct the South Drive Stormwater and Roadway Improvement Project (the “Project”).
The Project is intended to provide water quality, stormwater management through localized drainage improvements, roadway and landscape improvements and beautification along the South Drive corridor from NW 36th Street to the south and South Royal Poinciana Boulevard to the north, along South Drive (the “Project Area”). Additionally, the project will accommodate the safety of pedestrians, cyclists, and motorists by improving landscape features, roadway geometries (e.g. enhancing existing roundabout at the intersection of South Drive and Pinecrest Drive) as well as improving the stormwater management within the service area identified to reduce flooding in the area and thereby reduce flood impacts to private property and flood-related safety hazards to residents. This project considers the needs of the City of Miami Springs, and the main benefits of the project are: 1) Reduce flooding in low-lying areas within the service area and thereby reduce the threat of flood damage to private and public property. 2) Improve surface drainage to capture flood rains. 3) Improve groundwater quality. 4) Improve the water quality of surface drainage that outfalls into the C6 canal from the service area by reducing the sheet flow of rainwater to stormwater system connected to other outfalls. 5) Improve the environmental condition of the C-6 Miami Canal, the C-6 Miami River, and Biscayne Bay. 6) Provide roadway and sidewalk improvements to accommodate pedestrians, cyclists and vehicular activity, including a roundabout in the intersection of South Drive with Pinecrest Drive, that will improve pedestrian safety and beautify this section of roadway. The City of Miami Springs (City) owns, operates, and maintains the stormwater management system within its service area. The scope of work for the Project was prepared by the City’s Engineers, Bermello Ajamil and Partners, Inc. (“BA”). The proposed stormwater management system is designed to adequately capture (prevent longstanding flooding or ponding), treat and convey rainfall run-off for a 10-year 3-day storm within the service. Time is of the essence as to the performance of all obligations.
Documents
South Drive Drainage and Roadway Improvement Project
Download all documents
Filename Type File Type
File Size
Date Modified
Status
ITB 02-26-26 South Drive Improvements Bid Document / Specifications
PDF 1.37 MB Sep 18, 2026 Complete
Attachment K Existing Conflicts Attachment PDF 29.72
MB
Sep 18, 2026 Complete
Attachment J South Drive Improvements BODR Attachment PDF 1.41 MB Sep 18, 2026 Complete
Attachment I Landscape Plan Attachment PDF 5.08 MB Sep 18, 2026 Complete
Attachment H FDEP Grant (LPA0337) Attachment PDF 2.42 MB Sep 18, 2026 Complete
Attachment G Schedule of Values Attachment PDF 141.82
KB
Sep 18, 2026 Complete
Attachment F Topographic Tree Survey Attachment PDF 6.75 MB Sep 18, 2026 Complete
Attachment E Topographic Survey Attachment PDF 3.93 MB Sep 18, 2026 Complete
Attachment D Geotechnical Report Attachment PDF 2.25 MB Sep 18, 2026 Complete
Attachment C Civil Construction Drawings Attachment PDF 61.45
MB
Sep 18, 2026 Complete
Attachment B Technical Specifications Attachment PDF 2.49 MB Sep 18, 2026 Complete
Distribution Info
Bid Bond Bid Bond or Cashier’s Check, five percent (5%)
Plan (blueprint) Electronic plan documents eBidding Submit
Distributed By DemandStar
Distribution Method Download
Distribution Options Uploading electronic plan files (.plt, .dwg, .dwf)
Project Estimated Budget $1,700,000.00
Publications
Daily Business Review
View Legal Ad
Pre-Bid Conference
MANDATORY A pre-bid meeting will be held in person on SEPTEMBER 24th, 2026, 10:00 A.M at 201 Westward Drive, 2nd Floor, Miami Springs, FL 33166. A site-visit will immediately follow the mandatory pre-bid meeting as referenced in this paragraph. Site-visit location details will be announced during the mandatory pre-bid meeting. All Bidders planning to submit a bid must attend both meetings.
https://www.demandstar.com/app/suppliers/bids/548733/order https://www.demandstar.com/app/suppliers/bids/548733/order https://www.demandstar.com/app/suppliers/bids/548733/order https://www.demandstar.com/app/suppliers/bids/548733/order https://www.demandstar.com/app/suppliers/bids/548733/order https://www.demandstar.com/app/suppliers/bids/548733/order https://www.demandstar.com/app/suppliers/bids/548733/order https://www.demandstar.com/app/suppliers/bids/548733/order https://www.demandstar.com/app/suppliers/bids/548733/order https://www.demandstar.com/app/suppliers/bids/548733/order https://www.demandstar.com/app/suppliers/bids/548733/order https://www.demandstar.com/app/suppliers/bids/548733/response
Show More
Commodity Code
[001-958-26] Construction Management Services
[005-155-05] Barriers and Enclosures, Construction
[005-155-38] Field Offices and Sheds, Construction Type
[012-330-55] Fencing, Temporary Construction and Other Industrial or Safety Uses
[012-545-31] Industrial and Construction Machinery, Equipment, Components and Parts (Not Otherwise Classified)
View more
View more
Upgrade Subscription
Similar Bids (39)
Franklin County Emergency Operations Center Franklin County Board of County Commissioners, Apalachicola, FL
Weems Carrabelle Pharmacy Project Franklin County Board of County Commissioners, Apalachicola, FL
MIDWAY HILLTOP PARK TRAIL EXTENSION PROJECT
City of Midway, Midway, FL
Planholders (9)
Arango Billboard & Construction
Brothers Construction Management
Bush Builders LLC
Dodge Data
Kailas Contractors https://www.demandstar.com/app/subscription/renewal https://www.demandstar.com/app/suppliers/bids/544645/details https://www.demandstar.com/app/suppliers/bids/545972/details https://www.demandstar.com/app/suppliers/bids/546882/details
File details come from the government source that posted it. Updated .