This is a Request for Price Quotation (RPQ) issued by Miami-Dade County, Florida's Water and Sewer Department for hazard mitigation and storm hardening improvements to Pump Station 683. The project involves furnishing all materials, labor, and equipment necessary to provide hardening and flood protection upgrades to the pump station located at 4801 SW 117th Ave., Miami, FL 33175. The scope of work requires the contractor to obtain and submit all permits prior to performing work and to supply all necessary items to achieve a complete functional, satisfactory, and legally operable installation. A mandatory pre-bid meeting and site meeting are scheduled for July 16, 2026, at 10:00 AM at the project location. Electronic bids must be submitted via the Trimble Unity Construct (eBuilder) Bid Portal no later than August 18, 2026, at 10:00 AM, with a hard copy postmarked within one business day of submission. The anticipated project start date is October 5, 2026, with 420 calendar days allowed for completion. The contract is a multiple trade project requiring a General Building Contractor as the primary license, with sub-licenses needed for Air Conditioning, Electrical, and Plumbing trades.

The estimated project value is $829,882, excluding contingencies and dedicated allowances, with the contract to be awarded to the lowest responsible bidder using scheduled monthly payments. Performance and payment bonds and bid bonds are required. Liquidated damages are assessed at $1,000 per day for project delays. A 2% User Access Program (UAP) fee will be deducted from all contractor payments, applicable to contracts with total values of $500,000 or more. Commercial General Liability insurance of at least $300,000 per occurrence and $600,000 in the aggregate is required, along with Worker's Compensation Insurance and Automobile Liability Insurance of $300,000 combined single limit. The contractor must comply with E-Verify employment eligibility requirements and ensure all subcontractors provide affidavits confirming they do not employ unauthorized aliens. No Davis-Bacon wages, maintenance wages, DBE participation requirements, or SBE set-asides apply to this contract. The RFI cut-off date is five business days prior to the bid due date.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Water and Sewer Douglas Building 3071 SW 38 Avenue Miami Fl 33146

MIAMI-DADE COUNTY, FLORIDA

REQUEST FOR PRICE QUOTATION (RPQ)

Contract No: MCC 7360 Plan RPQ No: P16176

INVITATION TO BID

A RPQ has been issued for the work identified below. If you are interested in submitting a bid for this project, please submit your bid via Electronic Bidding, attention to Cristian Garcia at no later than 8/18/2026 at 10:00 AM. If you have any questions, contact Heidy Amigot at 7865528216.

This RPQ is issued under the terms and conditions of the Miscellaneous Construction Contracts (MCC) Program MCC 7360 Plan.

RPQ DETAILED BREAKDOWN

Bid Due Date: 8/18/2026 Time Due: 10:00 AM Submitted Via: Electronic Bidding Estimated Value: $829,882 (excluding Contingencies and Dedicated Allowances) Project Name: HAZARD MITIGATION GRANT PROGRAM PUMP STATION 683 STORM HARDENING

IMPROVEMENTS

Project Location: 4801 SW 117th Ave., Miami, FL, 33175 License Requirements: Primary: General Building Contractor; General Engineering Sub: Air Conditioning Unlimited; Electrical Contractor; Plumber, Master Scope of Work: (Contractor must obtain and submit all permits prior to performing any work).

The Project consists of furnishing all materials, labor, and equipment necessary to provide hardening and flood protection upgrades to pump stations 0683.

It is the intent of WASD to obtain a complete functional, satisfactory and legally operable installation under this Project, and any items of labor, equipment or materials which may be reasonably assumed as necessary to accomplish this end shall be supplied whether or not they are specifically shown on the Drawings or stated herein. The Contractor shall provide all materials for the Project unless they are specifically called out in these Specifications as being supplied by the Department. The Contractor shall also supply all other labor, material or equipment required to preclude damage to or loss of functionality of any existing facility or system.

Document Pickup: Contact: Cristian Garcia Phone No: Date: 1/1/1900 Location:

Pre-Bid Meeting:: YES Mandatory: YES Date: 7/16/2026 Time: 10:00 AM Location: 4801 SW 117th Ave.

Site Meeting: YES Mandatory: YES Date: 7/16/2026 Time: 10:00 AM Location: 4801 SW 117th Ave.

Bid shall be submitted to: Contact: Cristian Garcia Address: 3071 SW 38 Avenue , Miami 33146 Email: cristg@miamidade.gov FAX # : 786-552-8613

Type of Contract: Multiple Trade Method of Award: Lowest Responsible Bidder Method of Payment: Scheduled Monthly Payments Insurance Required: YES

Additional Insurance Required: NO If Yes - Minimum Coverage:

Performance & Payment Bond Required: YES Bid Bond Required: YES

Davis Bacon: NO Maintenance Wages: NO AIPP: NO Amount:

DBE Participation: NO Percentage: 0.00% DBE Subcontractor Forms Required: NO SBE-S Requirements NO Percentage: 0.00% SBE-Services Commodity Set-Aside NO If Yes, Service = SBE-G Requirements NO Percentage: 0.00% SBE-Goods Commodity Set-Aside NO If Yes, Goods = Liquidated Damages: YES $$ Per Day: $1,000.00

For RPQ's less than $10,000, if no LD rate is specified, the County reserves the right to assess actual damages in lieu of LDs.

Design Drawing Included: NO Shop Drawing Included: NO Specifications Included: YES Anticipated Start Date: 10/5/2026 Calendar Days for Project Completion: 420 Comments: Pursuant to Section 2-8.10 of the Code of Miami-Dade County, this Contract is subject to a user access fee under the County’s User Access Program (UAP) in the amount of two percent (2%).

All construction services provided under this contract are subject to the 2% UAP. This fee applies to all Contract usage whether by County Departments or by any other governmental, quasi-governmental or not-for-profit entity. From every payment made to the Contractor under this contract (including the payment of retainage), the County will deduct the two percent (2%) UAP fee provided in the ordinance and the Contractor will accept such reduced amount as full compensation for any and all deliverables under the contract. The County shall retain the 2% UAP for use by the County to help defray the cost of its procurement program. Contractor participation in this pay request reduction portion of the UAP is mandatory.

Provided, however, UAP shall not be applicable for total contract values, inclusive of contingency and allowance accounts, of less than five hundred thousand dollars ($500,000.00).

Bid submission must be electronic, through the Trimble Unity Construct (eBuilder) Bid Portal, with a hard copy sent to WASD postmarked within one (1) business day of the bid submittal date, mailed to WASD [3071 SW 38th Avenue, Suite 107, Miami, FL 33146]

The original Bid Security (in the form of a bid bond or cashier’s check) MUST be delivered to WASD, at the address above, BEFORE the bids are opened. Failure to deliver the original will result in the bid submission being rejected as non-responsive.

Invited bidders should have received an Invitation to Bid with an Invitation Key linked to the Invitee’s email address. Upon request, an invitation can be sent to multiple email addresses within the same company. However, if multiple bids are submitted by the same company, ALL submitted bids will be rejected.

The bid set includes electronic bid instructions. Training on electronic bid submission is available every Monday from 9 – 10 and every Wednesday from 1 – 2. Email the Contracting Officer or paul.adams@miamidade.gov for further information or to schedule training on alternative dates.

The RFI cut-off date is five (5) business days prior to the bid due date

SPD department will process it as a “No Measure” ( no SBE Measure)

DISCLOSURE:

• Contractor shall indemnify and hold harmless the County and its officers, employees, agents and instrumentalities from any and all liability, losses or damages, including attorneys’ fees and costs of defense, which the County or its officers, employees, agents or instrumentalities may incur as a result of claims, demands, suits, causes of actions or proceedings of any kind or nature arising out of, relating to or resulting from the performance of this Agreement by the Contractor or its employees, agents, servants, partners principals or subcontractors. Contractor shall pay all claims and losses in connection therewith and shall investigate and defend all claims, suits or actions of any kind or nature in the name of the County, where applicable, including appellate proceedings, and shall pay all costs, judgments, and attorney’s fees which may issue thereon. Contractor expressly understands and agrees that any insurance protection required by this Agreement or otherwise provided by the Contractor shall in no way limit the responsibility to indemnify, keep and save harmless and defend the County or its officers, employees, agents and instrumentalities as herein provided.

The Contractor shall furnish to Water and Sewer, Douglas Building, 3071 SW 38 Avenue, Miami Fl 33146, Certificate(s) of Insurance which indicate that insurance coverage has been obtained which meets the requirements as outlined below:

A. Worker’s Compensation Insurance for all employees of the Contractor as required by Florida Statute 440.

a. If applicable should include coverage required under the U.S. Longshoremen and Harbor Workers’ Act (USL&H) and/or Jones Act for any activities on or about navigable water.

B. Commercial General Liability in an amount not less than $300,000 per occurrence, and $600,000 in the aggregate.

Miami-Dade County must be shown as an additional insured with respect to this coverage.

C. Automobile Liability Insurance covering all owned, non-owned and hired vehicles used in connection with the work, in an amount not less than $300,000 combined single limit per occurrence for bodily injury and property damage.

*Under no circumstances are Contractors permitted on the Aviation Department, Aircraft Operating Airside (A.O.A) at Miami International Airport without increasing automobile coverage to $5 million. Only vehicles owned or leased by a company will be authorized. $1 million limit applies at all other airports.

VERIFICATION OF EMPLOYMENT ELIGIBILITY (E-VERIFY):

By entering the Contract, the Awarded Bidder becomes obligated to comply with the provisions of Section 448.095, Florida Statute, titled "Verification of Employment Eligibility." This includes but is not limited to utilization of the U.S. Department of Homeland Security’s E-Verify System to verify the employment eligibility of all newly hired employees by the Awarded Bidder effective, January 1, 2021, and requiring all Subcontractors to provide an affidavit attesting that the Subcontractor does not employ, contract with, or subcontract with, an unauthorized alien. Failure to comply may lead to termination of this Awarded Bidder, or if a Subcontractor knowingly violates the statute, the subcontract must be terminated immediately.

Any challenge to termination under this provision must be filed in the Circuit Court no later than twenty (20) calendar days after the date of termination. If this Contract is terminated for a violation of the statute by the Awarded Bidder, the Awarded Bidder may not be awarded a public contract for a period of one year after the date of termination, and the Awarded Bidder may be liable for any additional costs incurred by the County resulting from the termination of the Contract. Public and private employers must enroll in the E-Verify System (http://www.uscis.gov/e-verify) and retain the I-9 Forms for inspection.

File details come from the government source that posted it. Updated .