PROJECT SUMMARY
PROJECT NAME:
PROJECT ADDRESS:
PROJECT SUMMARY / SCOPE OF WORK:
INTERAGENCY NATURAL RESOURCE CENTER (INRC) - SITEWORK & WAREHOUSE - PHASE 1
3815 SCHREIBER WAY, COEUR D'ALENE, ID 83815 - CLIMATE ZONE B5
PROJECT INCLUDES A ENTIRELY NEW WAREHOUSE THAT WILL BE A PRE-ENGINEERED, METAL FRAMED BUILDING.
SPACES WILL INCLUDE: RADIO DISPATCH (OFFICE), HOTSHOTS (OFFICE + STORAGE), GENERAL STORAGE, AND VEHICLE STORAGE FOR THE INRC OFFICE BUILDING. A SECURE, FENCED WAREYARD WILL BE BETWEEN THE NURSERY
PROPERTY AND THE WAREHOUSE BUILDING.
IDAHO STATE MAP VICINITY MAP
Image Courtesy of Google Earth
PROJECT LOCATION
COEUR D'ALENE
IDAHO FALLSBOISE
TWIN FALLS
POCATELLO
SPOKANE
LEWISTON
MISSOULA
I90
N R
A M
S E
Y R
D
W. KATHLEEN AVE.
L
IN
C O
L N
W A
Y
MT
WA
DRAWING INDEXPROJECT TEAM
OWNER
US DEPARTMENT OF AGRICULTURE - USDA
IDAHO PANHANDLE NATIONAL FORESTS
3815 SCHREIBER WAY
COEUR D'ALENE, ID 83815
(208) 765-7204 office
MIKE SHOUP, CONTRACTING OFFICER REPRESENTATIVE
ARCHITECT
A&E ARCHITECTS
222 NORTH HIGGINS
MISSOULA, MT 59802
406.721.5643 office
CHRIS MARTISON, AIA, PRINCIPAL-IN-CHARGE
BRANDON PRINZING, PROJECT MANAGER
CIVIL ENGINEER
MORRISON-MAIERLE, INC.
3011 PALMER ST
MISSOULA, MT 59808
406.542.8880 office
TOBY MCCLUE, CIVIL ENGINEER
STRUCTURAL ENGINEER
BEAUDETTE CONSULTING ENGINEERS
131 W. MAIN ST
MISSOULA, MT 59802
406.721.7315 office
TOM BEAUDETTE, STRUCTURAL ENGINEER
M/P/E ENGINEER
MORRISON-MAIERLE, INC.
3011 PALMER ST
MISSOULA, MT 59808
406.542.8880 office
ARIAN BLOOMFIELD, BUILDINGS DIVISION TEAM LEAD, ELECTRICAL ENGINEER
JODY WAVEREK, MECHANICAL & PLUMBING ENGINEER
LANDSCAPE ARCHITECT
KENT WATSON AND ASSOCIATES
210 N. HIGGINS AVE., ST. 334
MISSOULA, MT 59802
406.721.3500 office
KENT WATSON, LANDSCAPE ARCHITECT
SYSTEMS FURNITURE DESIGNER
INSITE INC.
631 PARK LANE
BILLINGS, MT 59102
(406) 256-6232 office
MARY SUE GUNNIFSON, INTERIOR DESIGNER
1. EVERY ATTEMPT HAS BEEN MADE TO ASSURE THE ACCURACY OF THE DRAWINGS THROUGH FIELD VERIFICATION & EXISTING PLAN REVIEW. THE CONTRACTOR REMAINS RESPONSIBLE TO VERIFY EXISTING CONDITIONS, SIZES, QUANTITIES, & COORDINATE ALL ASPECTS OF THE PROJECT BEFORE CONSTRUCTION/ ORDERING/ OR INSTALLATION OF ANY COMPONENT. NOTIFY ARCHITECT IMMEDIATELY FOR WRITTEN CLARIFICATION IF ANY DISCREPANCY EXISTS.
2. DRAWINGS CONTAINED WITHIN THESE DOCUMENTS ARE ABBREVIATED IN NATURE. THE CONTRACTOR IS EXPECTED TO USE QUALITY, ACCEPTABLE, CONSTRUCTION PRACTICES & TECHNIQUES FOR THE EXTENT & TYPE OF WORK DESCRIBED HEREIN. SPECIAL CONSTRUCTION METHODS MAY BE REQUIRED DUE TO THE NATURE OF THE
WORK.
3. ALL CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE STANDARDS & REGULATIONS AS PRESCRIBED BY THE 2012 INTERNATIONAL EXISTING BUILDING CODE, 2012 INTERNATIONAL ENERGY CONSERVATION CODE, IDAPA 07.03.01 - RULES OF BUILDING SAFETY AMENDING PREVIOUSLY MENTIONED CODES, IDAHO STATE PLUMBING CODE BASED ON THE 2009 UNIFORM PLUMBING CODE, IDAHO RULES GOVERNING PLUMBING SAFETY IDAPA 07.02.02-07.02.07, 2014 NATIONAL ELECTRICAL CODE, INCLUDING AMENDMENTS AS LISTED IN IDAPA 07.01.06, 2014 NATIONAL ELECTRICAL CODE INCLUDING AMENDMENTS AS LISTED IN IDAPA 07.01.06, 2012 INTERNATIONAL MECHANICAL CODE - IDAPA RULE 07.07.01.004, 2012 INTERNATIONAL FUEL GAS CODE - IDAPA RULE 07.07.01.005, 2012 IDAHO FIRE CODE, UNIFORM FIRE CODE, AMERICAN NATIONAL STANDARDS, NFPA, THE AMERICANS WITH DISABILITIES ACT, & ANY APPLICABLE LOCAL CODES & REGULATIONS AND ALL WORK SHALL BE PERFORMED IN ACCORDANCE
WITH ALL REQUIREMENTS OF THE LOCAL AUTHORITY OF JURISDICTION
4. THE CONTRACTOR IS RESPONSIBLE FOR DOCUMENTING ACCURATE AS-BUILT INFORMATION BEFORE DEMOLITIONS COMMENCES.
5. DO NOT SCALE DRAWINGS. VERIFY ALL EXISTING DIMENSIONS IN THE FIELD; IF A DIMENSION DOES NOT EXIST OR IS IN ERROR, CONTACT THE ARCHITECT IMMEDIATELY
FOR WRITTEN CLARIFICATION.
6. CONTRACTOR(S) SHALL GUARANTEE THEIR WORK FOR A PERIOD OF NO LESS THAN ONE YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION. CONTRACTOR(S)
SHALL REPLACE ALL DEFECTIVE PARTS & SUPPLIES AT THEIR COST.
7. CONTRACTOR SHALL SUPPLY ALL PARTS, MATERIALS, & LABOR REQUIRED TO COMPLETE THE WORK INDICATED INCLUDING ALL ACCESSORIES, FINISHES, & SYSTEMS NECESSARY OR APPLICABLE TO ENSURE A COMPLETE & FUNCTIONAL PROJECT UPON COMPLETION.
8. ANY ITEM SHOWN OR REFERENCED IN ONE INSTANCE SHALL BE AS IF SHOWN IN ALL INSTANCES.
9. CONTRACTOR TO REFER TO ALL DRAWINGS INCLUDED IN THIS SET FOR DESCRIPTION OF WORK. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL REQUIREMENTS BETWEEN THE DRAWINGS & THE WORK OF ANY & ALL EMPLOYEES, SUB-CONTRACTORS, SUB-SUB-CONTRACTORS OR ANY PERSON OR TRADE
PARTICIPATING IN ANY ASPECT OF THE WORK OUTLINED.
10. PROVIDE & MAINTAIN ALL NECESSARY BARRICADES, FLAGMEN, SIGNAGE, & TEMPORARY STRUCTURES NECESSARY TO FACILITATE SAFE ACCESS & TRAVEL TO THE
GENERAL PUBLIC.
11. CONTRACTOR SHALL COORDINATE ALL SIZES OF EXISTING OPENINGS WITH THE REQUIREMENTS FOR ANY NEW WORK.
12. ALL NEW FINISHES SHALL ALIGN WITH ADJOINING SURFACES UNLESS NOTED OTHERWISE. CONTRACTOR SHALL PROVIDE SMOOTH, EVEN TRANSITIONS FROM ONE SURFACE TO ANOTHER. COORDINATE FINISHES TO MATCH HISTORIC CONDITIONS UNLESS SPECIFICALLY NOTED OTHERWISE.
13. ALL FINISHES SHALL BE SCRIBED TO ADJACENT SURFACES TO ENSURE COVERAGE OF ANY GAPS OR SPACES NOT INTENDED TO BE EXPOSED.
14.ALL DAMAGED OR DETERIORATED BUILDING ELEMENTS SHALL BE REPAIRED OR REPLACED WETHER INDICATED OR NOT BY IN-KIND MATERIALS AND METHODS TO
PROVIDE A SOUND & VISUALLY COMPLETE FINISHED STRUCTURE.
GENERAL NOTES
PHASING PLAN
PHASE 1
SITE WORK, UTILITIES AND WAREHOUSE (NORTH END)
(DESCRIBED IN THESE DOCUMENTS)
PHASE 2
WAREHOUSE (SOUTH END) BUILDING AND FINISHES ONLY
(NOT DESCRIBED IN THESE DOCUMENTS)
PHASE 3
OFFICE BUILDING & LANDSCAPING
(NOT DESCRIBED IN THESE DOCUMENTS)
PHASE 1
P H
A S
E
PHASE 3
WORK TO BE PERFORMED
WORK TO BE PERFORMED IN A FUTURE PHASE
NOTE: REFER TO CIVIL DRAWINGS FOR
SITEWORK PHASING
PHASE 1 - UNDERGROUND UTILITIES,
FOOTINGS, FOUNDATION, AND SLAB
ONLY
FOREST SUPERVISOR
DATETECHNICAL SERVICES OFFICER
DATE
REGIONAL ENGINEER DATE
SIGNATURES
REGIONAL FACILITIES PROGRAM MANAGER DATE
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
6/
/2
:3 0:
A
M
CV-1
03.01.17
COVERSHEET & GENERAL INFORMATION
13083.00
INRC WAREHOUSE - PHASE 1
USDA FOREST SERVICE
CM
BP/MEH
BP
INRC WAREHOUSE - PHASE 1
GENERAL INFORMATION - PHASE 1
CV-1 COVERSHEET & GENERAL INFORMATION
BUILDING AREAS (GROSS SF)
Name Area (GSF)
WAREHOUSE
(PHASE II)
17163 SF
HOTSHOTS
(PHASE I)
3651 SF
DISPATCH
(PHASE I)
6909 SF
27723 SF
ARCHITECTURAL DRAWINGS - PHASE 1
A0.1 GENERAL INFORMATION
A0.2 INTERIOR WALL TYPES
A0.3 LIFE SAFETY / CODE REVIEW
A1.0 ARCHITECTURAL SITE PLAN
A1.1 MONUMENT SIGN
A2.0 FIRST LEVEL PLAN - PHASE 1
A2.0F FIRST LEVEL FINISH PLAN - PHASE 1
A2.2 MEZZANINE PLAN - PHASE 1
A2.3 ROOF PLAN - PHASE 1
A3.0 ENLARGED PLANS - PHASE 1
A3.1 PLAN DETAILS - PHASE 1
A4.0 EXTERIOR ELEVATIONS - PHASE 1
A4.1 EXTERIOR ELEVATIONS - PHASE 1
A5.0 BUILDING SECTIONS - PHASE 1
A5.2 WALL SECTIONS - PHASE 1
A5.3 WALL SECTIONS - PHASE 1
A6.1 INTERIOR ELEVATIONS - PHASE 1
A6.2 INTERIOR ELEVATIONS - PHASE 1
A6.3 INTERIOR ELEVATIONS - PHASE 1
A6.4 INTERIOR ELEVATIONS - PHASE 1
A6.5 INTERIOR ELEVATIONS - PHASE 1
A6.6 INTERIOR ELEVATIONS - PHASE 1
A6.7 INTERIOR ELEVATIONS - PHASE 1
A6.8 INTERIOR ELEVATIONS - PHASE 1
A6.9 INTERIOR ELEVATIONS - PHASE 1
A7.0 RCP - FIRST/GROUND LEVEL - PHASE 1
A8.0 VERTICAL CIRCULATION - PHASE 1
A9.0 SCHEDULES - PHASE 1
FURNITURE DRAWINGS - PHASE 1
F2.1 FIRST LEVEL FURNITURE PLAN
F9.1 FURNITURE - DETAILS
MECHANICAL DRAWINGS - PHASE 1
M0.1 HVAC NOTES, SCHEDULES & LEGENDS
M0.3 HVAC SCHEDULES
M0.6 MEP COORDINATION
M2.1 1ST FLOOR HVAC PLAN
M2.3 ROOF HVAC PLAN
M2.5 MEZZANINE HVAC PLAN
M9.1 HVAC DETAILS
M9.2 HVAC DETAILS
FIRE PROTECTION DRAWINGS - PHASE 1
FP0.1 FIRE PROTECTION NOTES
FP2.1 FIRE PROTECTION PLANS
FP9.1 FIRE PROTECTION DETAILS
PLUMBING DRAWINGS - PHASE 1
P0.1 PLUMBING NOTES, SCHEDULES & LEGENDS
P2.1 FIRST LEVEL UNDERSLAB PLUMBING PLAN
P2.1A 1ST LEVEL UNDERSLAB PLUMBING - OPTION ITEM #1
P2.3 FIRST LEVEL PLUMBING PLAN
P2.5 MEZZANINE PLUMBING PLAN
P9.1 PLUMBING DETAILS
ELECTRICAL DRAWINGS - PHASE 1
E0.1 SYMBOLS AND ABBREVIATIONS
E1.1 ELECTRICAL SITE PLAN
E1.2 RADIO TOWER GROUNDING
E2.1 1ST LEVEL POWER PLAN
E2.1A 1st LEVEL POWER PLAN - OPTION ITEM #1
E2.3 SERVER MEZZANINE POWER PLAN
E2.4 1ST LEVEL SIGNAL PLAN
E2.6 SERVER MEZZANINE SIGNAL PLAN
E7.1 RCP 1ST LEVEL LIGHTING PLAN
E7.3 MEZZANINE LIGHTING PLAN
E9.1 DETAILS
E9.2 DETAILS
E9.3 DETAILS
E9.4 DETAILS
E9.5 DETAILS
E9.6 DETAILS
E9.7 DETAILS
E9.8 SCHEDULES
E9.9 SCHEDULES
E9.10 SCHEDULES
E9.11 SCHEDULES
E9.12 SCHEDULES
CIVIL DRAWINGS - PHASE 1
C1.1 2013 TOPOGRAPHIC SURVEY
CD1.1 DEMOLITION PLAN
C1.2 OVERALL PHASING PLAN
C1.3 PROPOSED SITE PLAN
C1.3A BUILDING SLAB OPTION
C1.4 GRADING & DRAINAGE PLAN
C1.5 GRADING & DRAINAGE PLAN
C1.6 PROPOSED UTILITY PLAN
C1.7 INTERSECTION IMPROVEMENTS
C1.8 WAREHOUSE SECURITY FENCING & GATE LAYOUT
C1.9 WATER & FIRE SERVICE PLAN & PROFILE
C1.10 SANITARY SEWER PLAN & PROFILE
C1.11 SIGNAGE PLAN
C1.12 COORDINATE LAYOUT PLAN
T1.1 TRAFFIC SIGNAL TABLE OF QUANTITIES (SHT. 1 OF 2)
T1.2 TRAFFIC SIGNAL TABLE OF QUANTITIES (SHT. 2 OF 2)
T1.3 TRAFFIC SIGNAL PLAN
T1.4 TRAFFIC SIGNAL CONDUIT & WIRING DIAGRAM
T1.5 TRAFFIC SIGNAL FIELD WIRING DIAGRAM
T1.6 TRAFFIC SIGNAL VIDEO DETECTION DIAGRAM
T1.7 TRAFFIC SIGNAL POLES & MAST ARM DETAILS
T1.8 TRAFFIC SIGNAL POLE AND MASTARM STANDARD
C9.1 CIVIL DETAILS
C9.2 CIVIL DETAILS
C9.3 CIVIL DETAILS
C9.4 CIVIL DETAILS
C9.5 CIVIL DETAILS
C9.6 CIVIL DETAILS
C9.7 CIVIL DETAILS
C9.8 CIVIL DETAILS
C9.9 TRAFFIC DETAILS
C9.10 TRAFFIC DETAILS
LANDSCAPING DRAWINGS
CP1.1 TREE PRESERVATION PLAN
STRUCTURAL DRAWINGS - PHASE 1
S0.1 GENERAL NOTES
S0.2 SITE PLAN
S1.0 FOUNDATION PLAN
S2.0 MEZZANINE FRAMING PLAN
S2.1 ROOF FRAMING PLAN
S9.1 DETAILS
1 1
No. Date
1 05.04.17
RFQ No.: 12034320Q0200 – INRC HVAC Preventive Maintenance - Idaho Panhandle N.F. / Attach 02: 191009 Warehouse Mechanical Drawings / Page 1 of 16
PROJECT SPECIFICATIONS
A. ALL WORK ON THE PROJECT SHALL CONFORM TO ALL LOCAL CITY, STATE AND
NATIONAL CODES AND REGULATIONS, INCLUDING BUT NOT LIMITED TO THE
N.F.P.A., N.E.C., U.B.C., I.E.C.C., I.M.C., U.P.C., THE LOCAL UTILITY SERVING
COMPANIES AND THE AUTHORITY HAVING JURISDICTION.
B. THE WORK ON THIS PROJECT SHALL CONSIST OF ALL ITEMS, ARTICLES,
MATERIALS, EQUIPMENT, AND LABOR FURNISHED TOGETHER ALONG WITH ALL
INCIDENTAL ITEMS REQUIRED BY GOOD PRACTICE AND WORKMANSHIP TO
PROVIDE A SATISFACTORY, COMPLETE AND FUNCTIONAL SYSTEM IN
ACCORDANCE WITH THE DRAWINGS AT NO ADDITIONAL COST TO THE
CONTRACTING OFFICER.
C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR AND PAY FOR ALL FEES AND
PERMITS REQUIRED FOR WORK UNDER THEIR CONTRACT AND UNDER THEIR
SUPERVISION BY SUBCONTRACT.
D. MANUFACTURER'S TRADE NAMES AND CATALOG NUMBERS ARE LISTED TO
INDICATE SPECIAL CONDITIONS AND QUALITY OF MATERIALS OR EQUIPMENT
SUPPLIED. ALTERNATIVE EQUIPMENT OR MATERIALS MAY BE SUBMITTED FOR
REVIEW AFTER BIDS HAVE BEEN AWARDED.
E. ALL WORK BY THE CONTRACTOR IS SUBJECT TO REVIEW AT ANY TIME BY THE
CONTRACTING OFFICER.
F. ALL WORK TO BE PERFORMED SHALL FIRST BE SCHEDULED AND SUBMITTED TO
THE CONTRACTING OFFICER FOR ACCEPTANCE.
G. SMOKING SHALL NOT BE PERMITTED ANYWHERE IN THIS FACILITY.
H. THE CONTRACTOR SHALL BE CAREFUL NOT TO BLOCK ANY PATHS OF EGRESS
WHILE PERFORMING THE WORK SPECIFIED.
I. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP OF ALL MATERIALS
RESULTING FROM HIS/HER WORK. CLEANUP SHALL BE PERFORMED TO THE
LEVEL OF ACCEPTANCE OF THE CONTRACTING OFFICER.
J. THE CONTRACTOR SHALL AND HEREBY DOES WARRANT AND GUARANTEE THAT
ALL WORK EXECUTED UNDER HIS/HER CONTRACT SHALL BE FREE OF DEFECTS
OF MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE(1) YEAR FROM THE
DATE OF SUBSTANTIAL COMPLETION.
K. SUBMIT ALL SHOP DRAWINGS FOR ALL EQUIPMENT ASSOCIATED WITH THIS
PROJECT TO THE CONTRACTING OFFICER FOR REVIEW/APPROVAL PRIOR TO
ORDERING ANY EQUIPMENT. ALL MATERIALS AND OR EQUIPMENT SHALL BE NEW.
L. UPON SUBSTANTIAL COMPLETION THE CONTRACTOR SHALL SUBMIT AN
OPERATIONS AND MAINTENANCE (O&M) MANUAL/BROCHURE OF ALL EQUIPMENT
TO THE CONTRACTING OFFICER FOR REVIEW/APPROVAL. AFTER RECEIVING
APPROVAL FROM CONTRACTING OFFICER, PROVIDE (2 APPROVED COPIES) TO
CONTRACTING OFFICER AND PROVIDE THE NECESSARY TRAINING TO THE
FACILITIES PERSONNEL REGARDING ALL EQUIPMENT ASSOCIATED WITH THIS
PROJECT.
SEISMIC GENERAL NOTES
A. ALL MECHANICAL AND PLUMBING EQUIPMENT SHALL BE SEISMICALLY BRACED
PER THE 2012 INTERNATIONAL BUILDING CODE. SEISMIC DESIGN
REQUIREMENTS FOR THE PROJECT ARE AS FOLLOWS:
• SEISMIC DESIGN CATEGORY: D
• IMPORTANCE FACTOR (Ip): 1.0
• IMPORTANCE FACTOR FOR GAS PIPING: 1.5
B. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE TO INCLUDE BRACING
AND RESTRAINTS. BRACING & RESTRAINT DETAILS SHALL BE INCLUDED IN SHOP
DRAWING SUBMITTAL FOR REVIEW AND BY THE CONTRACTING OFFICER.
T
C
H
SP
D S
THERMOSTAT
CARBON DIOXIDE SENSOR
HUMIDISTAT
WALL SWITCH
STATIC PRESSURE SENSOR
DUCT SMOKE DETECTOR
HVAC CONTROLS LEGEND
REFRIGERANT
CONDENSATE
HVAC PIPING SYSTEMS LEGEND
AIR SEPARATOR
AUTOMATIC AIR VENT
MANUAL AIR VENT
AUTOFLOW VALVE
BACKFLOW PREVENTER
BALL VALVE
BUTTERFLY VALVE
CIRCUIT SETTER
CHECK VALVE
COMBINATION FLOW CONTROL
VALVE
COMBINATION STRAINER VALVE
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
HOSE END DRAIN
FLEXIBLE CONNECTOR
FLOW METERING STATION
FLOW SWITCH
GATE VALVE
MULTI-PURPOSE VALVE
PIPE WELL- EMPTY
PRESSURE GAUGE AND COCK
PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE
PRESSURE SENSOR
PRESSURE SWITCH
PRESSURE/TEMPERATURE PORT
SOLENOID VALVE
STRAINER
STRAINER W/ BLOWOUT
TEMPERATURE SENSOR
THERMOMETER
THREE-WAY VALVE
HVAC PIPING SPECIALTIES LEGEND
18x12
PROJECT INFORMATION
PIPE MATERIAL SCHEDULE
SYSTEM MATERIAL SIZES
INSULATION
THICKNESS** ADD'L DETAILS
COMBUSTION AIR & VENT PIPING SCHEDULE 40 PVC ALL NONE SEE BELOW
REFRIGERANT PIPING REFER TO SPECIFICATIONS.
CONDENSATE DRAIN PIPING SCHEDULE 40 PVC ALL NONE SEE BELOW
** BASED ON INSULATION HAVING A CONDUCTIVITY
(K) NOT EXCEEDING 0.27 BTU PER INCH/H*FT^2*DEG F
1. PROVIDE SEISMIC BRACING OF PIPING 2 1/2" AND LARGER OR AS REQUIRED BY LOCAL CODES.
2. INSULATION SHALL BE FIBERGLASS WITH ALL SERVICE JACKET
3. ALL SERVICE INSULATION JACKET IS TO BE SEALED AT ALL SEAMS, EDGES, ETC.
4. PROVIDE PVC COATED JACKET OVER INSULATION FOR MECHANICAL ROOM PIPING.
5. ANY CONNECTIONS THAT ARE DISSIMILAR METALS SHALL REQUIRE BRASS UNIONS OR FLANGE SEPARATION.
PIPE MATERIAL REMARKS:
TEMP. CONTROL GEN'L NOTES
A. THE MECHANICAL CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE
SUCCESSFUL OPERATION OF THE MECHANICAL INSTALLATION AND SYSTEMS
INCLUDING CONTROLS. THE M.C. SHALL HIRE A TEMPERATURE CONTROLS
CONTRACTOR AND ELECTRICAL CONTRACTOR AS NECESSARY TO ACHIEVE
THE SPECIFIED SEQUENCE OF OPERATIONS. CONTROL WIRING IS NOT SHOWN
ON THE ELECTRICAL DRAWINGS. ELECTRICAL WORK REQUIRED FOR SYSTEM
OPERATION BUT NOT SHOWN ON THE ELECTRICAL DRAWINGS SHALL BE THE
RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO HIRE AN ELECTRICIAN
INDEPENDENT FROM THIS PROJECTS CONTRACT DOCUMENTS.
B. IN GENERAL ALL TEMPERATURE CONTROLS ARE STAND ALONE FOR EACH
SPECIFIC PIECE OF MECHANICAL EQUIPMENT. THERE IS NOT A CENTRAL
BUILDING MANAGEMENT SYSTEM UNLESS OTHERWISE SHOWN ON THE
ELECTRICAL DRAWINGS. ROUGH-IN WIRING FOR THERMOSTATS AND OTHER
CONTROL COMPONENTS ARE THE RESPONSIBILITY OF THE MECHANICAL
CONTRACTOR.
DUCT MATERIAL SCHEDULE
DESCRIPTION SHAPE APPLICATION MATERIAL PRESSURE CLASS INSULATION JACKET R-VALUE ADDITIONAL DETAILS
SUPPLY RECTANGULAR INDOOR - CONDITIONED SHEET METAL 2" WRAP FACTORY APPLIED R-5 SEE BELOW
SUPPLY ROUND INDOOR - CONDITIONED SPIRAL SHEET METAL 2" WRAP FACTORY APPLIED R-5 SEE BELOW
RETURN AIR RECTANGULAR INDOOR - CONDITIONED SHEET METAL 2" NONE - - - - SEE BELOW
RETURN AIR ROUND INDOOR - CONDITIONED SPIRAL SHEET METAL 2" NONE - - - - SEE BELOW
EXHAUST AIR RECTANGULAR INDOOR - CONDITIONED SHEET METAL 2" NONE - - - - SEE BELOW
EXHAUST AIR ROUND INDOOR - CONDITIONED SPIRAL SHEET METAL 2" NONE - - - - SEE BELOW
5' LENGTH MAX - SUPPLY ROUND INDOOR - CONDITIONED FLEX 2" INTEGRAL FACTORY APPLIED R-5 SEE BELOW
OUTSIDE AIR RECTANGULAR INDOOR - CONDITIONED SHEET METAL 2" WRAP FACTORY APPLIED R-8 SEE BELOW
OUTSIDE AIR ROUND INDOOR - CONDITIONED
</=12" SNAPPY DUCT, >12"
SPIRAL SHEET METAL 2" WRAP FACTORY APPLIED R-8 SEE BELOW
ALL DUCTWORK IN UNCONDITIONED SPACE RECTANGULAR INDOOR - UNCONDITIONED SHEET METAL 2" WRAP FACTORY APPLIED R-8 SEE BELOW
ALL DUCTWORK IN UNCONDITIONED SPACE ROUND INDOOR - UNCONDITIONED SPIRAL SHEET METAL 2" WRAP FACTORY APPLIED R-8 SEE BELOW
GENERAL NOTES:
1. PROVIDE SEISMIC BRACING OF ALL DUCTWORK AS REQUIRED BY LOCAL CODES.
2. ALL SHEET METAL DUCTWORK SHALL BE A MINIMUM OF 24 GAGE SHEET METAL.
3. ALL DUCTWORK SHALL BE CONSTRUCTED AND INSTALLED PER SMACNA GUIDELINES.
4. SEAL AND INSULATED ALL DUCTWORK PER 2012 I.E.C.C.
5. INSULATE EXHAUST DUCTWORK WITHIN 10 FT OF PENETRATION THROUGH BUILDING ENVELOPE.
JACKET:
1. FACTORY APPLIED ALL SERVICE JACKETS (ASJ) SHALL BE FOIL SCRIM KRAFT
(FSK). SEAL AT ALL EXPOSED SEAMS/ EDGES/ CORNERS WITH FSK ADHESIVE TAPE,
REFER TO "DUCT INSULATION" SPECIFICATIONS FOR MORE INFORMATION
RECTANGULAR DUCTWORK
ROUND DUCTWORK
AIR DEVICE NUMBER AND CFM
CEILING SUPPLY DIFFUSER
CEILING RETURN GRILLE
CEILING EXHAUST GRILLE
CEILING SLOT DIFFUSER
FLOOR REGISTER
SIDEWALL DIFFUSER OR GRILLE
VERTICAL TRANSITION-
RECTANGULAR SUPPLY DUCT
VERTICAL TRANSITION-
ROUND SUPPLY DUCT
VERTICAL TRANSITION-
RECTANGULAR RETURN DUCT
VERTICAL TRANSITION-
ROUND RETURN DUCT
VERTICAL TRANSITION-
RECTANGULAR EXHAUST DUCT
VERTICAL TRANSITION-
ROUND EXHAUST DUCT
TURNING VANE
MANUAL VOLUME DAMPER
REMOTE VOLUME DAMPER
MOTORIZED DAMPER
ZONE DAMPER
FIRE DAMPER
SMOKE DAMPER
FIRE/SMOKE DAMPER
CFM
16 �
PROJECT LOCATION: COEUR D'ALENE, ID
PROJECT ALTITUDE: 2,188 FEET ABOVE SEA LEVEL
SUMMER DESIGN TEMP: 89°F DRY BULB, 62°F WET BUL B (ASHRAE 99% DESIGN)
WINTER DESIGN TEMP: -15°F DRY BULB
HVAC LEGEND
HVAC GENERAL NOTES
A. ALL NEW PIPING, DUCTWORK AND EQUIPMENT TO BE INSTALLED IN
ACCORDANCE WITH THE 2012 INTERNATIONAL MECHANICAL CODE AND THE 2012
INTERNATIONAL BUILDING CODE REQUIREMENTS.
B. DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT NECESSARILY SHOW
EXACT LOCATIONS AND SIZES OF ALL EXISTING DUCTWORK, PIPING, SYSTEM
AND EQUIPMENT UNLESS SPECIFICALLY DIMENSIONED. IT IS NOT THE INTENT OF
THESE DRAWINGS TO GRAPHICALLY REPRESENT ALL OF THE WORK REQUIRED
FOR A COMPLETE INSTALLATION IN EVERY RESPECT. THE PURPOSE OF THESE
PLANS IS TO INDICATE THE INTENDED SIZES, APPROXIMATE LOCATION AND
ROUTING OF MAJOR COMPONENTS. ADJUST TO FIELD CONDITIONS. ACTUAL
CONDITIONS AND LOCATIONS SHALL BE FIELD VERIFIED.
C. EXAMINE AND REFER TO ALL ARCHITECTURAL, STRUCTURAL, ELECTRICAL,
MECHANICAL, FIRE PROTECTION AND SITE CIVIL DRAWINGS FOR
CONSTRUCTION CONDITIONS WHICH MAY AFFECT THE CONTRACTORS WORK.
INSPECT THE EXISTING CONDITIONS AND SYSTEMS WHICH MAY HAVE AN
EFFECT ON HIS/HER WORK PRIOR TO SUBMISSION OF BID.
D. IT IS NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE WITH EACH
OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION OF DUCTS,
CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT THIS PROJECT
BEFORE FINAL PLACEMENT OF MATERIALS. REFER TO ARCHITECTURAL,
STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS AND FIRE
PROTECTION SHOP DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR
COORDINATION.
E. THE CONTRACTOR IS TO PROVIDE MATERIALS, LABOR, TRANSPORTATION,
TOOLS, PERMITS, FEES, INSPECTIONS, UTILITIES AND INCIDENTALS NECESSARY
FOR THE COMPLETE INSTALLATION OF THE WORK INDICATED AND DESCRIBED
IN THESE CONTRACT DOCUMENTS.
F. LOCATIONS AND DIMENSIONS ON THIS DRAWING ARE APPROXIMATE AND
REPRESENT THE BEST AVAILABLE INFORMATION BASED ON A COMBINATION OF
FIELD INVESTIGATIONS AND VARIOUS DESIGN AND RECORD DRAWINGS
AVAILABLE AT THE TIME OF DESIGN. FIELD VERIFY LOCATIONS AND DIMENSIONS
PRIOR TO ORDERING EQUIPMENT AND DURING PERFORMANCE OF THE WORK.
PROVIDE ALL DEMOLITION WORK, NECESSARY FITTINGS, TRANSITIONS, AND
OTHER COMPONENTS AS REQUIRED FOR A COMPLETE AND FUNCTIONAL
INSTALLATION OF NEW SYSTEMS AT NO ADDITIONAL COST TO THE
CONTRACTING OFFICER.
G. THE CONTRACTOR IS TO BE RESPONSIBLE FOR ANY ADDITIONAL DETAILS OR
SPECIAL CONSTRUCTION REQUIRED IN ORDER TO COMPLETE THE
INSTALLATION, WHETHER MENTIONED OR NOT. THE CONTRACTOR IS TO
PROVIDE ALL MATERIALS AND EQUIPMENT THAT ARE TO BE FURNISHED FOR
THE PROPER INSTALLATION OF THE TYPE OF EQUIPMENT AND SYSTEMS
INDICATED.
H. ALL EQUIPMENT SHALL BE INSTALLED LEVEL, PLUMB, AND FIRMLY ANCHORED IN
LOCATIONS INDICATED. OBSERVE MANUFACTURER'S INSTALLATION
INSTRUCTIONS AND RECOGNIZED INDUSTRY PRACTICES TO INSURE THAT
PRODUCTS SERVE THEIR INTENDED FUNCTION.
I. FOLLOW MANUFACTURES WRITTEN INSTALLATION INSTRUCTION FOR RUNNING
THE COMBUSTION AIR AND VENT PIPING AS WELL AS THE TERMINATION
THROUGH THE ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.
J. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING, AND DUCTWORK AS
REQUIRED BY LOCAL CODES.
K. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL FIRE BARRIERS,
FIRE PARTITIONS, FIRE WALLS OR ANY OTHER FIRE AND/OR SMOKE SEPARATION
WITHIN THE BUILDING AS DEFINED BY THE ARCHITECTURAL CODE PLAN WITH A
UL LISTED FIRE AND/OR SMOKE STOP SYSTEM.
L. ALL MATERIAL IN A PLENUM RATED SPACE SHALL HAVE A SPREAD NOT
EXCEEDING 25 AND A SMOKE DEVELOPMENT RATING NOT EXCEEDING 50.
M. PROVIDE ACCESS DOORS TO ALLOW SERVICE AND INSPECTION OF EQUIPMENT,
VALVES, DAMPERS, DEVICES INSTALLED ABOVE NON-REMOVABLE CEILINGS.
N. ALL ELEMENTS PENETRATING BUILDING COMPONENTS (ROOF ASSEMBLIES,
WALL ASSEMBLIES, ETC.) SHALL BE SEALED WEATHER AND WATER TIGHT.
O. ALL NEW PIPING SHALL BE IDENTIFIED WITH SETON SETMARK PIPE MARKERS,
LETTERED TO MATCH EXISTING AND MARKED AT A MAXIMUM OF EVERY 25 FT.
ALSO, ALL NEW VALVES SHALL BE IDENTIFIED WITH BRASS OR ALUMINUM VALVE
TAGS.
P. PROVIDE PIPE GUIDES, EXPANSION JOINTS, AND HANGERS PER
MANUFACTURER'S RECOMMENDATIONS.
Q. ALL PIPING WALL PENETRATIONS SHALL HAVE A CHROME ESCUTCHEON PLATE.
ALL SOLDER TO BE LEAD-FREE TYPE. AT THE CONTRACTORS OPTION
MECHANICAL COMPRESSION TYPE FITTING (I.E. PRO-PRESS) MAY BE USED.
R. VERIFY THE LOCATION OF ALL THERMOSTATS AND SENSORS WITH THE
CONTRACTING OFFICER PRIOR TO INSTALLATION. INSTALL THERMOSTATS 48"
ABOVE FINISHED FLOOR PER ADA REQUIREMENTS.
S. ALL DUCT WORK SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE LATEST
REQUIREMENTS OF SMACNA DUCT WORK CONSTRUCTION MANUALS, MINIMUM
GAUGE OF 24, GALVANIZED STEEL. DUCTWORK SHALL BE AIRTIGHT (5%
LEAKAGE). ALL TRANSVERSE JOINTS AND LONGITUDINAL SEAMS SHALL BE
SEALED. FABRICATE ELBOWS WITH CENTERLINE RADIUS EQUAL TO 1.5 TIMES
THE DUCT WIDTH IN THE PLANE OF THE TURN; AND FABRICATE TO INCLUDE
FACTORY MANUFACTURED TURNING VANES IN ELBOWS WHERE SHORTER
RADIUS IS NECESSARY.
T. PROVIDE FLEX CONNECTIONS FROM ALL DUCT WORK TO EQUIPMENT
CONNECTIONS ON THIS PROJECT.
U. FLEXIBLE DUCT SHALL NOT BE USED IN PLACE OF ELBOWS.
V. A COMPLETE AIR AND WATER SYSTEM TEST AND BALANCE (T&B) SHALL BE
PERFORMED BY A NEBB OR AABC CERTIFIED T&B CONTRACTOR FOR ALL NEW
AND MODIFIED DEVICES. MECHANICAL CONTRACTOR SHALL MODIFY EQUIPMENT
AS DIRECTED BY BALANCING CONTRACTOR, IF REQUIRED, TO ACHIEVE DESIGN
PARAMETERS WITH NO EXTRA COST. T&B REPORT SHALL BE PREPARED AND
SUBMITTED TO CONTRACTING OFFICER. REPORT SHALL INCLUDE ALL AIR AND
WATER FLOW READINGS, ALL TEMPERATURE AND PRESSURE SETPOINTS AND
ALL ELECTRICAL CONDITIONS FOR ALL DEVICES. REPORT SHALL ALSO VERIFY
PROPER OPERATION OF ENTIRE CONTROL SYSTEM. WHERE REQUIRED FOR AIR
BALANCING, INSTALL ADDITIONAL MANUAL VOLUME DAMPERS.
W. THE MECHANICAL CONTRACTOR SHALL PROVIDE UP TO 4 HOURS OF TRAINING
TO ENSURE PROPER OPERATION AND MAINTENANCE OF THE SYSTEMS.
X. COORDINATE ALL CONCRETE PENETRATIONS WITH STRUCTURAL DRAWINGS TO
VERIFY HOW AND WHERE CONCRETE CAN BE CUT.
Y. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH SURROUNDINGS.
Z. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING AND DUCTWORK
PASSING THROUGH RATED CONSTRUCTION.
BILLINGS | BOZEMAN | MISSOULA
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
INRC WAREHOUSE (NORTH)
-PHASE 1
/2
/2
:2
:5
P
M
M0.1
03.01.17C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
HVAC NOTES, SCHEDULES, & LEGENDS
13083.00
USDA FOREST SERVICE
BJK/JTW
REB
DMP
Ø
P
R E E
NI
GN
ELANOISSEF
O R R
EG
ISTERE
D
S
T A
TE OF ID
AH
O
WAVERE
K
TYD
O J
11076
RFQ No.: 12034320Q0200 – INRC HVAC Preventive Maintenance - Idaho Panhandle N.F. / Attach 02: 191009 Warehouse Mechanical Drawings / Page 2 of 16
HVAC FAN SCHEDULE
MARK MANUFACTURER
MODEL
NUMBER TYPE SERVING CFM E.S.P. DRIVE H.P. MOTOR RPM
SOUND
(dBA)
WEIGHT
(LBS.) CONTROL ACCESSORIES REMARKS
EF-1 COOK 90C15DL DOWN BLAST
HOTSHOT TOOL
SHOP 300 0.5 DIRECT 1/8 1550 53 22 1 A,B,C,D,E SEE BELOW
EF-2 COOK 90C15DL DOWN BLAST HOTSHOT EQUIP. 300 0.5 DIRECT 1/8 1550 53 22 2 A,B,C,D,E SEE BELOW
EF-3 COOK 100C15DH DOWN BLAST HOTSHOT LOCKERS 400 0.5 DIRECT 1/8 1550 59 46 2 A,B,C,D,E SEE BELOW
EF-4 COOK 100 ACE-B DOWN BLAST RESTROOMS &
LOCKERS 700 0.5 BELT 1/6 1725 60 28 3 A,B,C,D,E SEE BELOW
ACCESSORIES
(A) -STANDARD DISCONNECT PREWIRED
(B) -LINE VOLTAGE MOTORIZED DAMPER.
(C) -14" ROOF CURB INSULATED.
(D) -FAN SPEED CONTROLLER FOR BALANCING.
(E) -BIRDSCREEN
ELECTRICAL DATA:
SEE MEP COORDINATION
SCHEDULE FOR
STARTER/DISCONNECT AND
ALL OTHER ELEC. DATA.
LOUVER SCHEDULE
MARK MANF. MODEL NUMBER SERVING SIZE TYPE FUNCTION MAX CFM
PRESSURE
DROP AIR VELOCITY MOUNTING NOTES
L-1 RUSKIN ELF6375DX
HOTSHOT TOOL
SHOP 36" x 12" STATIONARY INTAKE 300 0.01 285 WALL SEE BELOW
NOTES:
1. 6" DEPTH LOUVER
2. DRAINABLE LOUVER
3. PROVIDE PRIME COAT & FINISH PAINT COLOR AS SELECTED BY ARCHITECT.
4. PROVIDE MOTORIZED DAMPER WHERE SHOWN ON PLANS. SEE
CONTROL DAMPER SCHEDULE.
UNIT HEATER SCHEDULE
MARK AREA SERVED MANUF.
MODEL
NUMBER HEATING TYPE GAS CONN.
INPUT/OUTPUT
(MBH) COMB. AIR VENT CFM IGNITION H.P. WEIGHT ADDITIONAL DETAILS
UH-1 ROOM 125 - HOTSHOT TOOL SHOP REZNOR 30 UDAS NAT. GAS 1/2" 30 / 24.6 4" 4" 456 DIRECT SPARK 0.06 55 SEE BELOW
ACCESSORIES:
1. PROVIDE FACTORY MOUNTED DISCONNECT
2. HIGH ALTITUDE KIT AS REQIRED
3. WALL-MOUNTED TOTALLY ENCLOSED FAN MOTOR AS REQUIRED.
4. THERMOSTAT, RELAY KIT AND STEP DOWN TRANSFORMER
5. FOUR-POINT SUSPENSION/MOUNTING ISOLATION KIT FOR WALL OR CEILING MOUNTING AS REQUIRED.
6. MANUAL GAS SHUT-OFF AND UNION
7. SINGLE-STAGE NATURAL GAS VALVE & THERMOSTAT
8. PROVIDE FACTORY CONCENTRIC VENT KIT THROUGH ROOF
9. ALL STANDARD ACCESSORIES
CONTROLS:
1. WALL-MOUNTED THERMOSTAT,
LOW VOLTAGE SEE DETAIL 2/M9.2
COORDINATE WITH E.C.
CONDENSING UNIT SCHEDULE
MARK MANUFACTURER MODEL
NUMBER
CAPACITY
(NOMINAL TONS) SEER REFRIGERANT COMPRESSOR COOLING STAGES SOUND DATA
(dBA)
UNIT PHYSICAL DATA
ADDITIONAL DETAILS
LENGTH (IN) WIDTH (IN)
HEIGHT
(IN)
OPERATING
WEIGHT
(LBS)
CU-1 CARRIER 24ACC642A003 3.5 16 R-410A SCROLL 1 74 35 35 39 - 1/8 234 SEE BELOW
CU-2 CARRIER 24ACC630A003 2.5 16 R-410A SCROLL 1 74 31 - 3/16 31 - 3/16 32 - 5/16 167 SEE BELOW
CU-3 CARRIER 24ACC648A003 4 16 R-410A SCROLL 1 74 35 35 32 - 5/16 248 SEE BELOW
CU-4 CARRIER 24ACC660A003 5 16 R-410A SCROLL 1 74 35 35 45 - 15/16 337 SEE BELOW
CU-5 CARRIER 24ACC642A003 3.5 16 R-410A SCROLL 1 74 35 35 39 - 1/8 234 SEE BELOW
CU-6 CARRIER 24ACC660A003 5 16 R-410A SCROLL 1 74 35 35 45 - 15/16 337 SEE BELOW
CU-7 CARRIER 24ACC648A003 4 16 R-410A SCROLL 1 74 35 35 32 - 5/16 248 SEE BELOW
CONDENSING UNIT ACCESSORIES:
1. TIME DELAY RELAY
2. EVAP. FREEZE T-STAT
3. CYCLE PROTECTOR
4. FILTER / DRYER
5. PERMANENTLY LUBRICATED BALL BEARING FAN MOTOR
6. HIGH PRESSURE SWITCH
7. LOW PRESSURE SWITCH
ELECTRICAL DATA:
1. SEE MEP COORDINATION SCHEDULE FOR
STARTER/DISCONNECT AND ALL OTHER ELEC. DATA.
LOW AMBIENT ACCESSORIES:
1. WINTER START CONTROL
2. CRANKCASE HEATER
3. START ASSIST CAPACITOR
4. LOW AMBIENT PRESSURE SWITCH
5. LOW AMBIENT CONTROLLER
CONTROLS:
1. FACTORY CONTROLS
FURNACE SCHEDULE
MARK AREA SERVED MANUF. MODEL NUMBER CONFIGURATION
SUPPLY AIRFLOW DESIGN
VENTILATION
E.S.P
(IN. W.C.)
FAN
MOTOR FAN SPEED ZONES BYPASS
DAMPER
HEATING SECTION COOLING ADD'L
DETAILSCOOLING HEATING MBH IN TYPE AFUE
COMB.
AIR VENT INDOOR COIL
OUTDOOR
UNIT
FN-1 HOTSHOT AREA CARRIER 59TP6A080-16 DOWNFLOW 1610 CFM 1505 CFM 240 CFM 0.5 3/4 HP VARIABLE 1 NO 80 NAT. GAS 96.2% 3" 3" CNPVP4221ALA CU-1 SEE
BELOW
FN-2
CORRIDOR AND
SHOWERS CARRIER 59TP6A060-12 DOWNFLOW 1065 CFM 1120 CFM 130 CFM 0.5 1/2 HP VARIABLE 1 NO 60 NAT. GAS 95.0% 3" 3" CNPVP3014ALA CU-2
SEE
BELOW
FN-3
ENTRY &
CLASSROOM CARRIER 59TP6A080-20 DOWNFLOW 1610 CFM 1555 CFM 320 CFM 0.5 1 HP VARIABLE 1 NO 80 NAT. GAS 96.5% 3" 3" CNPVP4821ALA CU-3
SEE
BELOW
FN-4 DISPATCH AREA CARRIER 59TP6A120-22 DOWNFLOW 2005 CFM 2375 CFM 320 CFM 0.5 1 HP VARIABLE 1 NO 120 NAT. GAS 96.5% 3" 3" CNPVP6024ALA CU-4
SEE
BELOW
FN-5 DISPATCH
BRIEFING ROOM CARRIER 59TP6A060-14 DOWNFLOW 1475 CFM 1135 CFM 220 CFM 0.5 3/4 HP VARIABLE 1 NO 60 NAT. GAS 96.3% 3" 3" CNPVP4217ALA CU-5 SEE
BELOW
FN-6
PHASE 2 &
STORAGE CARRIER 59TP6A120-22 DOWNFLOW 2005 CFM 2375 CFM 335 CFM 0.5 1 HP VARIABLE 1 NO 120 NAT. GAS 96.5% 3" 3" CNPVP6024ALA CU-6
SEE
BELOW
FN-7 TELE/COM CARRIER 59TP6A080-20 UPFLOW 1610 CFM 1555 CFM 300 CFM 0.5 1 HP VARIABLE 1 NO 80 NAT. GAS 96.5% 3" 3" CNPVP4821ALA CU-7 SEE
BELOW
ACCESSORIES:
1. CONCENTRIC VENT TERMINATION KIT
2. 7-DAY PROGRAMMABLE THERMOSTAT (LOW VOLTAGE)
3. CUBE ECONOMIZER MIXING BOX WITH DRYBULB
CONTROLS & INTEGRAL OA & RA DAMPERS.
4. CASED INDOOR EVAPORATOR COIL.
5. PROVIDE DUCT-MOUNTED SMOKE DETECTOR IN
RETURN DUCT FOR ANY FURNACE SUPPLYING OVER
2000 CFM OF AIR.
REMARKS:
1. PROVIDE CONDENSATE NEUTRALIZATION KIT. ROUTE
PIPING TO NEAREST FLOOR DRAIN. SEE 11/M9.1
CONTROLS:
1. CARRIER INFINITY CONTROL SYSTEM
ELECTRICAL DATA:
SEE MEP COORDINATION SCHEDULE
FOR STARTER/DISCONNECT AND ALL
OTHER ELEC. DATA.
ELECTRICAL DATA:
SEE MEP COORDINATION SCHEDULE
FOR STARTER/DISCONNECT AND ALL
OTHER ELEC. DATA.
ELECTRICAL DATA:
SEE MEP COORDINATION SCHEDULE
FOR STARTER/DISCONNECT AND ALL
OTHER ELEC. DATA.
NOTES:
1. PROVIDE MULTIPLE SECTIONS, ACTUATORS, & LINKAGE AS REQUIRED TO ACHIEVE TOTAL SIZE.
2. PROVIDE MOUNTING SLEEVE AS REQUIRED FOR EACH INSTANCE.
3. PROVIDE ACTUATOR(S) FOR EACH DAMPER TO APPLY THE TORQUE NECESSARY FOR THE SPECIFIC INSTALLATION PER THE MANUFACTURER'S
RECOMMENDATIONS. U.N.O., SEE DETAIL 12/M9.1 & COORDINATE WITH E.C.
4. PROVIDE INTERLOCK TO OPEN WHEN ASSOCIATED FAN IS OPERATING.
CONTROL DAMPER SCHEDULE
MARK MANF. MODEL NUMBER SIZE TYPE FUNCTION MAX CFM MOUNTING CONTROL NOTES
CD-1 RUSKIN CD40x2 36" x 12"
TWO-ROW, OPPOSED BLADE,
LOW-LEAKAGE, INSULATED INTAKE FOR EF-1 300 WALL
TWO-POSITION,
FAIL-CLOSED SEE BELOW
ELECTRICAL DATA:
SEE MEP COORDINATION
SCHEDULE FOR
STARTER/DISCONNECT AND ALL
OTHER ELEC. DATA.
GRAVITY VENTILATOR SCHEDULE
MARK AREA SERVED FUNCTION MANUFACTURER MODEL NUMBER CFM SP (INWC)
FREE AREA
(SQ. FT.)
THROAT VEL.
(FPM) THROAT SIZE
THROAT AREA
(SQ. FT.)
WEIGHT
(LBS)
HOOD SIZE
(IN) NOTES
GRV-1 NORTHWEST RELIEF COOK 30X72GR 6000 0.02 14.75 400 30"x72" 15 246 51 X 87 X
19.9 SEE BELOW
GRV-2 NORTHEAST RELIEF COOK 30X48GR 4000 0.019 10 400 30"x48" 10 278 51 X 63 X
18.5 SEE BELOW
GIV-1 MECHANICAL ROOM INTAKE COOK 42X84GI 11,400 0.018 28 407 48x84" 28 801 95 X 135 X
32.2 SEE BELOW
CONTROL:
MOTORIZED DAMPER PROVIDED
INTEGRAL WITH ERV. MOTORIZED
DAMPER NOT REQUIRED WITH GRV.
ACCESSORIES (BY DIV. 23):
1. FOR RELIEF VENTILATORS PROVIDE GRAVITY DAMPER BALANCED TO OPEN COMPLETELY WHEN FURNACES ARE IN ECONOMIZER MODE.
2. PROVIDE SEISMICALLY COMPLIANT ROOF CURB MIN 14" TO MATCH ROOF SLOPE. COORDINATE FLASHING WITH G.C.
3. PROVIDE BIRD SCREEN.
CONTROL
1. PROVIDE THERMOSTAT & MANUAL OVERRIDE. SEE DETAIL 2/M9.2.
2. PROVIDE WALL-MOUNTED MANUAL ON/OFF & SPEED CONTROLLER.
3. COORDINATE WITH E.C. FOR CONTROL BY OCCUPANCY SENSOR/LIGHT
SWITCH.
ELECTRIC HEATER SCHEDULE
MARK AREA SERVED MANUF. CAPACITY MODEL
NUMBER
DIMENSIONS
FINISH MOUNTING ADDITIONAL DETAILS
WIDTH HEIGHT DEPTH
EWH-1 HOTSHOT CORRIDOR KING 1500 W LPWA1215 13 7/8" 23 1/4" 3 3/4" ALUM. WALL-RECESSED SEE BELOW
EWH-2 DISPATCH CORRIDOR KING 1500 W LPWA1215 13 7/8" 23 1/4" 3 3/4" ALUM. WALL-RECESSED SEE BELOW
EWH-3 ENTRY/WAITING KING 1500 W LPWA1215 13 7/8" 23 1/4" 3 3/4" ALUM. WALL-RECESSED SEE BELOW
EWH-4 MECH 201 KING 500 W PAW1215 12 1/2" 6" 4 1/2" WHITE WALL-SURFACE SEE BELOW
EWH-5 MECH 201 KING 500 W PAW1215 12 1/2" 6" 4 1/2" WHITE WALL-SURFACE SEE BELOW
ETH-1 RECEPTION QMARK 1125 W QTS1100 15" 3 1/2" 8 8/7" WHITE TOE SPACE SEE BELOW
ACCESSORIES:
1. WALL-MOUNTED, LINE VOLTAGE T-STAT
2. INTEGRAL DISCONNECTING MEANS AND OVERLOADS
3. INTEGRAL FAN
ELECTRICAL DATA:
1. SEE MEP COORDINATION SCHEDULE
FOR STARTER/DISCONNECT AND ALL
OTHER ELEC. DATA.
GRILLE, REGISTER AND DIFFUSER SCHEDULE
MARK MODULE SIZE FUNCTION TYPE MAX CFM
PERFORMANCE DATA AT MAX CFM
NECK SIZE AT
MAX CFM
SELECTION MOUNTING & FINISH
ADDITIONAL
DETAILSNC AT MAX PRESSURE DROP AT MAX
CFM (IN. W.C.)
MAX THROW
(FT) VELOCITY (FPM) MANF. MODEL NUMBER THROW PATTERN MOUNTING MATERIAL
S-1 24"x24" SUPPLY CEILING DIFFUSER 265 - 0.03 15' 382 10"x10" KRUEGER 1240 4-WAY LAY-IN STEEL SEE BELOW
S-2 NECK + 5" SUPPLY CEILING DIFFUSER 670 16 0.05 23' 377 16"x16" KRUEGER 1240 4-WAY SURFACE STEEL SEE BELOW
S-3 NECK + 1-3/4" SUPPLY
DUCT MOUNTED
DIFFUSER 405 16 0.03 37' 405 24"x8" KRUEGER DMGDR
DOUBLE
DEFLECTION DUCT MOUNTED ALUMINUM SEE BELOW
S-4 NECK + 7" SUPPLY CEILING DIFFUSER 400 17 0.05 27' 400 12"x12" KRUEGER 1240P 4-WAY CEILING
MOUNTED STEEL SEE BELOW
R-1 24"x24" RETURN EGG CRATE 540 - 0.00 - 174 16"x16" KRUEGER EGC5 - LAY-IN SEE BELOW
R-2 NECK + 1-3/4" RETURN EGG CRATE 1610 22 0.04 - 520 30"x16" KRUEGER EGC5 - SURFACE ALUMINUM SEE BELOW
E-1 NECK + 1-3/4" EXHAUST EGG CRATE 200 14 0.04 - 548 8"x8" KRUEGER EGC5 - SURFACE SEE BELOW
REMARKS:
1. PROVIDE INTEGRAL OPPOSED BLADE DAMPER FOR ALL SURFACE MOUNTED AIR TERMINALS FOR BALANCING AIRFLOW.
2. FOR ALL AIR TERMINALS WHICH ARE NOT SURFACE-MOUNTED, PROVIDE A MANUAL VOLUME DAMPER AT EACH BRANCH
TAKE-OFF WHERE A CFM IS NOTED ON THE PLANS.
REMARKS FOR ALL:
1. SEE ARCHITECTURAL REFLECTED CEILING PLAN FOR CEILING TYPES.
2. SUBMITTAL DATA SHALL INCLUDE N.C., THROW, VELOCITY, PRESSURE DROP AS
WELL AS ALL PHYSICAL AND INSTALLATION DATA.
BILLINGS | BOZEMAN | MISSOULA
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
INRC WAREHOUSE (NORTH)
-PHASE 1
/2
/2
:2
:5
P
M
M0.3
03.01.17C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
HVAC SCHEDULES
13083.00
USDA FOREST SERVICE
BJK/JTW
REB
DMP
P
R E E
NI
GN
ELANOISSEF
O R R
EG
ISTERE
D
S
T A
TE OF ID
AH
O
WAVERE
K
TYD
O J
RFQ No.: 12034320Q0200 – INRC HVAC Preventive Maintenance - Idaho Panhandle N.F. / Attach 02: 191009 Warehouse Mechanical Drawings / Page 3 of 16
M.E.P. COORDINATION SCHEDULE
MARK DESCRIPTION
ELECTRICAL DATA CONTROL
NOTES
STARTER/DISCONNECT
LOAD VOLT-PH TYPE DIV TYPE DIV (NEMA)
CD-1 CONTROL DAMPER, INTAKE FOR EF-1
FRACTIONAL
HP 120 V - 1 PH SEE DETAIL 12/M9.1
CU-1 CONDENSING UNIT FOR FN-1 23.6 MCA 208 V - 1 PH T 23 / 23 2 FD 26 / 26
CU-2 CONDENSING UNIT FOR FN-2 16.7 MCA 208 V - 1 PH T 23 / 23 2 FD 26 / 26
CU-3 CONDENSING UNIT FOR FN-3 26.1 MCA 208 V - 1 PH T 23 / 23 2 FD 26 / 26
CU-4 CONDENSING UNIT FOR FN-4 28.0 MCA 208 V - 1 PH T 23 / 23 2 FD 26 / 26
CU-5 CONDENSING UNIT FOR FN-5 23.6 MCA 208 V - 1 PH T 23 / 23 2 FD 26 / 26
CU-6 CONDENSING UNIT FOR FN-6 28.0 MCA 208 V - 1 PH T 23 / 23 2 FD 26 / 26
CU-7 CONDENSING UNIT FOR FN-7 26.1 MCA 208 V - 1 PH T 23 / 23 2 FD 26 / 26
DWH1 DOMESTIC WATER HEATER 5.0 FLA 115 V - 1 PH UC 22 / 22 2 MSS 26 / 26
EF-1 HOTSHOT TOOL SHOP EXHAUST FAN 1/8 HP 115 V - 1 PH SEE DETAIL 13/M9.1
EF-2 HOTSHOT EQUIP. STORAGE EXHAUST FAN 1/8 HP 115 V - 1 PH MSS 23 / 23 9 FW 23 / 26
EF-3 HOTSHOT LOCKERS EXHAUST FAN 1/8 HP 115 V - 1 PH MSS 23 / 23 9 FW 23 / 26
EF-4 RESTROOM & LOCKER EXHAUST FAN 1/8 HP 115 V - 1 PH L / OCC 23 / 23 9 FW 23 / 26
ETH-1 RECEPTION TOE HEATER 4.7 MCA 120 V - 1 PH T 23 / 23 2 INT 23 / 26
EWH-1 HOTSHOT CORRIDOR WALL HEATER 1500 W 120 V - 1 PH T 23 / 23 2 INT 23 / 26
EWH-2 DISPATCH CORRIDOR WALL HEATER 1500 W 120 V - 1 PH T 23 / 23 2 INT 23 / 26
EWH-3 ENTRY/WAITING WALL HEATER 1500 W 120 V - 1 PH T 23 / 23 2 INT 23 / 26
EWH-4 MECHANICAL ROOM WALL HEATER 500 W 120 V - 1 PH T 23 / 23 2 INT 23 / 26
EWH-5 MECHANICAL ROOM WALL HEATER 500 W 120 V - 1 PH T 23 / 23 2 INT 23 / 26
FN-1 HOTSHOT AREA FURNACE 14.5 MCA 115 V - 1 PH T 23 / 23 12 MSS 26 / 26
FN-2 ENTRY & SHOWER AREA FURNACE 10.3 MCA 115 V - 1 PH T 23 / 23 12 MSS 26 / 26
FN-3 CLASSROOM FURNACE 19.3 MCA 115 V - 1 PH T 23 / 23 12 MSS 26 / 26
FN-4 DISPATCH AREA FURNACE 19.4 MCA 115 V - 1 PH T 23 / 23 12 MSS 26 / 26
FN-5 DISPATCH CONFERENCE ROOM FURNACE 14.5 MCA 115 V - 1 PH T 23 / 23 12 MSS 26 / 26
FN-6 LAB & STORAGE AREA FURNACE 19.4 MCA 115 V - 1 PH T 23 / 23 12 MSS 26 / 26
FN-7 TEL/COM FURNACE 19.3 MCA 115 V - 1 PH T 23 / 23 12 MSS 26 / 26
UH-1 HOTSHOT TOOL SHOP UNIT HEATER 1.9 FLA 115 V - 1 PH SEE DETAIL 12/M9.1
CONTROL TYPE DIVISION OF RESPONSIBILITIES:
DD
CO
CO2
L
MSS
T
UC
NA
DDC
H/O/A
PN
DUCT SMOKE DETECTOR
CARBON MONOXIDE DETECTORS
CARBON DIOXIDE DETECTORS
LIGHT SWITCH
MANUAL SPEED SWITCH
THERMOSTAT
UNIT CONTROLLER
NOT APPLICABLE
DIRECT DIGITAL CONTROLS
HAND / OFF / AUTO SWITCH
PNEUMATIC
22/22 22/26 23/23 23/26 26/26
FURNISHED AND INSTALLED BY DIV. 22, WIRED BY DIV. 22
FURNISHED AND INSTALLED BY DIV. 22, WIRED BY DIV. 26
FURNISHED AND INSTALLED BY DIV. 23, WIRED BY DIV. 23
FURNISHED AND INSTALLED BY DIV. 23, WIRED BY DIV. 26
FURNISHED AND INSTALLED BY DIV. 26, WIRED BY DIV. 26
STARTER/DISCONNECT TYPE NOTES:
FD
CSFD
RVSS
VFD
MSS
MOC
FW
NA
SC
INT
3PP
FUSED DISCONNECT PROVIDED BY MC
COMBINATION STARTER/DISCONNECT - HOA
REDUCED VOLTAGE SOLID-STATE
VARIABLE FREQUENCY DRIVE - HOA
MANUAL STARTER SWITCH PROVIDED BY EC
MOTOR OVER-CURRENT PROTECTION
FACTORY-WIRED SINGLE PT. CONNECTION
NOT APPLICABLE
SPEED CONTROL
INTEGRAL CONTROLS
THREE-PRONG PLUG
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
INTEGRAL DISCONNECTS AND OVERLOADS
INTEGRAL OVERLOADS
INTEGRAL OVERLOADS, RECEPTACLE
RECEPTACLE PROVIDED BY EC
SINGLE POINT CONNECTION. DISCONNECT PROVIDED BY MC
PROVIDE RECEPTACLE AND DATA CONNECTION FOR PANEL
MOUNT ON UNI-STRUT IN FRONT OF UNIT
PROVIDE EMERGENCY SHUNT TRIP AT EACH EXIT FROM THE SPACE
DISCONNECT SWITCH PROVIDED WITH EQUIPMENT BY MC
TOGGLE SWITCH DISCONNECT PROVIDED BY MC WITH EQPM.
DUCT SMOKE DECTOR PROVIDED BY EC
EC TO PROVIDE STARTER/DISCONNECT W/ IN SIGHT OF UNIT.
EC TO INSTALL SPEED CONTROL SWITCH FURNISHED BY MC.
CONTROL PANEL W/ INTEGRAL STARTERS PROVIDED BY MC WIRED
BY EC. INDOOR UNIT IS POWERED FROM OUTDOOR UNIT.
GENERAL NOTES:
1. ALL DUCT SMOKE DETECTORS FURNISHED BY DIV. 26, INSTALLED BY DIV. 23 AND WIRED BY DIV. 26. DIV 26 SHALL WIRE SMOKE DAMPER TO
SHUT WHEN ALARM IS INITIATED BY DUCT SMOKE DETECTOR.
BILLINGS | BOZEMAN | MISSOULA
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
INRC WAREHOUSE (NORTH)
-PHASE 1
/2
/2
:2
:5
P
M
M0.6
03.01.17C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
MEP COORDINATION
13083.00
USDA FOREST SERVICE
BJK/JTW
REB
DMP
P
R E E
NI
GN
ELANOISSEF
O R R
EG
ISTERE
D
S
T A
TE OF ID
AH
O
WAVERE
K
TYD
O J
RFQ No.: 12034320Q0200 – INRC HVAC Preventive Maintenance - Idaho Panhandle N.F. / Attach 02: 191009 Warehouse Mechanical Drawings / Page 4 of 16
R E
F
MAC
ROOM /
BRIEFING
ROOM
IA
FLOOR
CENTER
MNGR.
OFFICE
ASST.
CENTER
MNGR.
OFFICE
INTEL/DUTY
OFFICER
SHARED
TRAINING
ROOM/CLASSROOM
CORRIDOR
122A
ENTRY
WAITING
HOTSHOT
SQUAD
LEADER/SRFF
OFFICE
CORRIDOR
HOTSHOT
OFFICE
HOTSHOT
OFFICE
HOTSHOT
TOOL
SHOP/WORK
AREA
HOTSHOT
EQUIPMENT
STORAGE
HOTSHOT
READY
ROOM/PERSONAL
GEAR/LOCKERS
UNISEX
TOILET
PRINTER
AREA
MENS
LOCKERS/
SHOWERS
WOMENS
LOCKERS/
SHOWERS
WOMENS
RESTROOM
MENS
RESTROOM
ELEC.
RM.
STORAGE
RECEPTION
STG.
123A
STORAGE
103A
BREAKROOM
HISTORICAL
FILE
STORAGE
CORRIDOR
WATER
SERVICE
/ RISER
RM.
EWH-1
EWH-2
EWH-3
ETH-1
10 11 12 13
E
D
C
B
A
"ø
12"ø
8"ø 10"ø
8"x8" S-1
12"x12" R-1
12"x12" R-1
10"x10" S-1
16"x16" R-1
8"x8" S-1
6"x6" S-2
16"x16" S-2
TYP. 3
10"x10" S-1
TYP. 4
8"x8" S-2
12"x12" R-2
8"x8" S-2
TYP. 2
6"x6" S-2
6"ø
"ø
"ø
10"ø
"x
10"ø
6"ø
6"ø
6"ø
20"x20" R-1
"ø
16"ø16"x16"
"ø
"ø
"ø
UH-1
8"x8" S-1
TYP. 4
8"x8" S-2
8"x8" S-2
TYP. 2
TYP. 2
"ø
8" ø
10"ø
4 4
4 4
6"x6" S-3
"ø
"ø
8" ø
8"ø
10"ø
8" ø
8"ø
8"x8" E-1
TYP. 2
8"x8" E-2
TYP. 2
4 18"x18" 14"ø
"ø
"ø
"ø
12"ø
"x
"ø
"ø
8"ø
10"ø
6" ø
10"ø
10"ø
10"ø 10"ø
"ø
"ø
10"ø
8" ø
8" ø
10"x10" S-1
TYP. 3
12"x12" R-1
TYP. 3
10"x10" S-1
TYP. 4
20"x20" R-1
TYP. 2
10"x10"
S-1 21512"x12"
R-1
8"x8" S-1
TYP. 2
14"x14" R-1
6"x6" S-1
8"x8" S-2
6"x6" S-2
8"x8" S-2
18"x18" R-2
18"x18" R-2
10"x10" R-2
10"x10" E-1
8"x8" E-1
CU-3
CU-4
CU-7CU-2
CU-6
CU-5
CU-1
L-1
CD-1
6"ø
8"ø
8" ø
10"x10" S-1
TYP. 2
T
UH-1
EF-1
8" ø
8" ø
8"ø
10"ø 10"ø
8"ø
8" ø
6" ø
10"ø
T EWH-1
T FN-1
T
EWH-3
T
ETH-1
T EWH-2
T FN-5 T
FN-4
T FN-3
T FN-2
KEY NOTES:
BILLINGS | BOZEMAN | MISSOULA
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
INRC WAREHOUSE (NORTH)
-PHASE 1
/2
/2
:2
:0
P
M
M2.1
03.01.17C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
1ST FLOOR HVAC PLAN
13083.00
USDA FOREST SERVICE
BJK/JTW
REB
DMP
: 1/8" = 1'-0"M2.1
13 1ST LEVEL HVAC PLAN NORTH
P H
A S
E
9/ M
2.
P H
A S
E
/M
2.
M2.1
1. INTERLOCK CONTROL DAMPER TO OPEN WHEN ASSOCIATED EXHAUST FAN EF-1 OPERATES.
2. 12"Ø EXHAUST DUCT UP TO EXHAUST FAN EF-4 ON ROOF.
3. 10"Ø SA BRANCH DUCT DROPS FROM MAIN AT THIS LOCATION TO ENTER CEILING CAVITY BELOW MEZZANINE
FLOOR.
4. REMOTE BALANCING DAMPER, TYP. FOR ALL LOCATIONS ABOVE HARD LID. B.O.D.: GREENHECK RBDR-50. MOUNT
WALL PLATES WITH 9V CONTROL PORTS CLEARLY MARKED FOR ALL LOCATIONS IN MEZZANINE MECHANICAL
ROOM.
5. 10"Ø SA DROPS BELOW MEZZANINE LANDING AT THIS LOCATION.
6. AIR-COOLED CONDENSING UNIT ON CONCRETE PAD, TYP. 7. PROVIDE MANUFACTURER'S RECOMENDED
CLERARANCES IN ALL DIRECTIONS. PROVIDE LOCKING PORTS ON ALL REFRIGERATION LINES PER IMC
REQUIREMENTS.
7. 14"x14" EA UP TO EF-1 ON ROOF. PROVIDE LINE-VOLTAGE MOTORIZED DAMPER. TERMINATE EA DUCT OPEN-
ENDED IN SPACE.
8. 12"x12" SA & RA TO FURNACE FN-2 IN MEZZANINE MECHANICAL ROOM SEE 13/M2.5 FOR CONTINUATION.
9. 16"x16" SA & RA TO FURNACE FN-1 IN MEZZANINE MECHANICAL ROOM SEE 13/M2.5 FOR CONTINUATION.
10. 16"x16" SA & RA TO FURNACE FN-3 IN MEZZANINE MECHANICAL ROOM SEE 13/M2.5 FOR CONTINUATION.
11. 18"x18" SA & RA TO FURNACE FN-4 IN MEZZANINE MECHANICAL ROOM SEE 13/M2.5 FOR CONTINUATION.
12. 16"x16" SA & RA TO FURNACE FN-5 IN MEZZANINE MECHANICAL ROOM SEE 13/M2.5 FOR CONTINUATION.
13. 18"x18" SA & RA TO FURNACE FN-6 IN MEZZANINE MECHANICAL ROOM SEE 13/M2.5 FOR CONTINUATION.
14. TERMINATE 18"x18" SA & RA DUCT OPEN-ENDED IN MEZZANINE FOR FUTURE (PHASE 2) CONNECTION.
15. 4" FLUE AND VENT UP THROUGH ROOF IN CONCENTIC TERMINATION.
16. DASHED LINE REPRESENTS OUTLINE OF MEZZANINE ABOVE.
17. REFRIGERANT LINES FROM CONDENSING UNITS UP TO ATTIC AND THEN TO MEZZANINE ABOVE.
P
R E E
NI
GN
ELANOISSEF
O R R
EG
ISTERE
D
S
T A
TE OF ID
AH
O
WAVERE
K
TYD
O J
RFQ No.: 12034320Q0200 – INRC HVAC Preventive Maintenance - Idaho Panhandle N.F. / Attach 02: 191009 Warehouse Mechanical Drawings / Page 5 of 16
GRV-2
GRV-1
GIV-1
EF-4
11 12 13
E
D
C
B
A
EF-3
EF-2
EF-1
KEY NOTES:
BILLINGS | BOZEMAN | MISSOULA
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
INRC WAREHOUSE (NORTH)
-PHASE 1
/2
/2
:2
:0
P
M
M2.3
03.01.17C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
ROOF HVAC PLAN
13083.00
USDA FOREST SERVICE
BJK/JTW
REB
DMP
: 1/8" = 1'-0"M2.3E2.4
13 ROOF HVAC PLAN NORTH
P H
A S
E
9/ M
2.
P H
A S
E
/M
2.
M2.3
1. DOWNBLAST EXHAUST FAN ON 14" INSULATED ROOF CURB. SEE DETAIL 9/M9.1. COORDINATE FLASHING WITH G.C.
2. RELIEF VENTILATOR ON 14" INSULATED ROOF CURB WITH INTEGRAL GRAVITY DAMPER BALANCED TO 0.05 IN
W.G. (ADJ.). COORDINATE FLASHING WITH G.C.
3. INTAKE VENTILATOR ON 14" INSULATED ROOF CURB. COORDINATE FLASHING WITH G.C.
4. FURNACE FLUE AND VENT IN CONCENTRIC VENT KIT BY MANUFACTURER DOWN THROUGH ROOF. TYP. 7.
COORDINATE FLASHING WITH G.C. PROVIDE MIN. 10FT CLEARANCE FROM ALL AIR INTAKES.
5. FLUE & VENT DOWN THROUGH ROOF IN CONCENTRIC VENT KIT TO UH-1.
P
R E E
NI
GN
ELANOISSEF
O R R
EG
ISTERE
D
S
T A
TE OF ID
AH
O
WAVERE
K
TYD
O J
RFQ No.: 12034320Q0200 – INRC HVAC Preventive Maintenance - Idaho Panhandle N.F. / Attach 02: 191009 Warehouse Mechanical Drawings / Page 6 of 16
FN-2
FN-5 FN-4
FN-3
FN-1
FN-6
EWH-4
EWH-5
10 11
C
FN-7
12"ø 14"ø 12"ø 12"ø
"ø
12"ø
"ø
"x
10"ø
"ø
"x
16"x16" 16"x16"
16"x16"
16"x16"
16"x16"
16"x16"18"x18"
18"x18"
"x
"x
"x
"x
18"x18"
18"x18"
24"x8" S-3
30"x16" R-2
30"x16" R-2
30"x16"
"x
T
T
EWH-4
FN-7
24"x8" S-3 405 24"x8"
S-3 400 24"x8"
S-3
S D
S D
13 13
KEY NOTES:
BILLINGS | BOZEMAN | MISSOULA
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
INRC WAREHOUSE (NORTH)
-PHASE 1
/2
/2
:2
:0
P
M
M2.5
03.01.17C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
MEZZANINE HVAC PLAN
13083.00
USDA FOREST SERVICE
BJK/JTW
REB
DMP
: 1/4" = 1'-0"M2.5E2.4
13 2ND LEVEL MEZZANINE HVAC PLAN
M2.5
1. OA FROM INTAKE VENTILATOR TO ECONOMIZER MIXING BOX AT FURNACE INTAKE, TYP. ALL.
2. 42"x48" OA PLENUM UP TO INTAKE VENTILATOR GIV-1 ON ROOF.
3. U.N.O., RA DUCT STUB THROUGH MEZZANINE WALL TERMINATES IN PLENUM WITH 1/4" WIRE MESH SCREEN.
TYP. ALL. CONNECT RA TO ECONOMIZER MIXING BOX.
4. 30"x16" TRANSFER DUCT TERMINTATES IN PLENUM WITH 1/4" W.M .S.
5. DOWNFLOW FURNACE, TYP. 6. PROVIDE CONDENSATE NEUTALIZATION KIT & ROUTE TO FLOOR DRAIN. SEE
DETAIL 2/M9.2.
6. UPFLOW FURNACE. PROVIDE CONDENSATE NEUTALIZATION KIT & ROUTE TO FLOOR DRAIN. SEE DETAIL 2/M9.2.
7. FLUE & VENT UP THROUGH ROOF IN CONCENTRIC VENT KIT.
8. SA DUCT ROUTED IN PLENUM TO ZONE. SEE 13/M2.1.
9. 18"x18" SA MAIN DOWN THROUGH FLOOR.
10. TERMINATE 18"x18" SA & RA DUCTS OPEN-ENDED IN MEZZANINE FOR FUTURE (PHASE 2) CONNECTION.
11. SEE SHEET KEYNOTE 5 ON M2.1 FOR CONTINUATION.
12. REFER TO PLUMBING PLANS FOR GAS PIPING TO FURNACES.
13. REFRIGERANT LINES FROM ADJACENT ATTIC.
P
R E E
NI
GN
ELANOISSEF
O R R
EG
ISTERE
D
S
T A
TE OF ID
AH
O
WAVERE
K
TYD
O J
RFQ No.: 12034320Q0200 – INRC HVAC Preventive Maintenance - Idaho Panhandle N.F. / Attach 02: 191009 Warehouse Mechanical Drawings / Page 7 of 16
N.T.S. N.T.S. N.T.S. N.T.S.
N.T.S. N.T.S. N.T.S.
N.T.S.
N.T.S.
1"
EXTENDED BASE OR
MINIMUM 14" CURB
CURB FURNISHED AND
INSTALLED BY MECHANICAL
CONTRACTOR
EXHAUST DUCT W/
EXTERNAL
INSULATION
EXHAUST FAN
MOTORIZED BACKDRAFT
DAMPER PER SCHEDULE
ROOF
PROVIDE GALVANIZED
DRAIN PAN WITH MIN. 8" AIR
GAP.
BIRD SCREEN
COORDINATE FLASHING
WITH G.C.
SUPPORT WITH STEEL
ANGLE AS NEEDED
BIRD SCREEN
CAULK
MOTORIZED DAMPER
2-POSITION INTERLOCK
WITH EXHAUST FAN
SHEET METAL
SLEEVE
TILT DUCT AND MOTORIZED DAMPER
SLIGHTLY FOR DRAINAGE
SILL EXTENSION
EXTRUDED ALUM. OR
GALV. STEEL LOUVER
(SEE SPECIFICATIONS)
BUILDING WALL
HEAD SECTION (JAMB SIMILAR)
ANCHOR SECURELY TO WALL
CONSTRUCTION
CAULK ALL AROUND TO
MAKE WEATHER TIGHT
USE THIS WITH ROUND
DUCT TAKEOFF'S
SPIN-IN FITTING WITH
MANUAL VOLUME
DAMPER
USE THIS WITH
RECTANGULAR
DUCT TAKEOFF'S
MANUAL VOLUME DAMPER
REFER TO GRILLE-DIFFUSER
SCHEDULE
MAIN SUPPLY
RETURN OR
EXHAUST DUCT
INSULATION
12"X12" (300X300MM) MIN.
SIZE DUCT ACCESS
DOOR
24 GAGE METAL
INSULATION NOTE
EXHAUST
TUBE
INLET TUBE
HOLES FACE
UPSTREAM OF
AIR FLOW
AIR
DUCT
SMOKE DETECTOR
HOUSING MOUNTED TO
SIDE OF DUCT
NOTES
1. DETAIL SHOWS GENERAL INSTALLATION METHODS. REFER TO INDIVIDUAL
MFR. FOR THEIR SPECIFIC INSTALLATION & LOCATION INSTRUCTIONS.
2. STANDOFF BRACKET NOT REQUIRED ON NON-INSULATED DUCT.
NOTE:
CUT INLET AND
EXHAUST TUBES
TO LENGTH
SPECIFIED BY
MANUFACTURER
DIRECTION
RECTANGULAR
90 DEGREE DUCT
TURNING
VANE
NOTE:
REQUIRED IN ALL 90
DEGREE RECTANGULAR
ELBOWS IN BUILDING. AIR FLOW
L
L+2"
W+2"
45°
4" 12"
SUPPLY DUCTWORK
45 DEG. ENTRANCE TAP
DOUBLE DEFLECTION
SIDE WALL REGISTER
W
CL
LOCKING STRAPS PER
SPECIFICATIONS COLLAR WITH
TAPE AND POSITIVE SERCURE
FLEX DUCT TO SHEETMETAL
SUPPORT STRAP
INSULATED FLEX DUCT
(MAXIMUM 72") OR RIGID
DUCT AS INDICATED
ON PLANS
SHEETMETAL PLENUM WITH
1" LINER - INSIDE DIMENSIONS
SAME SIZE AS DIFFUSER NECK
OPPOSED BLADE DAMPER
AS SCHEDULED
GWB CEILING CEILING DIFFUSER LAY-IN SUSPENDED CEILING
COOLING COIL
CONDENSATE DRAIN PAN
OPEN VENT
DRAIN OUTLET
ALL PIPING SAME SIZE AS DRAIN PAN
CONNECTION (3/4" MINIMUM)
J"
H"
L"
H" = STATIC PRESSURE + 1"
J" = 1/2 x H"
L" = H" + J" + PIPE DIAMETER
1 DUCT BRANCH & SPIN-IN CONNECTION DETAIL
M2.1 : M9.1
2 RECTANGULAR DUCT TURNING VANE DETAIL
M2.1 : M9.1
3 DUCT-MOUNTED REGISTER DETAIL
M2.1 : M9.1
4 LOUVER DETAIL
M2.1 : M9.1
9 DUCT MOUNTED SMOKE DETECTOR DETAIL
M2.1 : M9.1
10 CEILING DIFFUSER/GRILLE DETAIL
M2.1 : M9.1
11 CONDENSATE TRAP DETAIL
M2.5 : M9.1
13 ROOF EXHAUST FAN DETAIL
M2.3 : M9.1
12 DOUBLE-ROW CONTROL DAMPER DETAIL
M2.1 : M9.1
OPPOSED DAMPER
BLADE W/ TPR BLADE
EDGE SEAL
BIRD SCREEN
LOUVER BLADE
DOUBLE-ROW
CONTROL DAMPERS
(AS SCHEDULED)
BILLINGS | BOZEMAN | MISSOULA
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
INRC WAREHOUSE (NORTH)
-PHASE 1
/2
/2
:2
:0
P
M
M9.1
03.01.17C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
HVAC DETAILS
13083.00
USDA FOREST SERVICE
BJK/JTW
REB
DMP
P
R E E
NI
GN
ELANOISSEF
O R R
EG
ISTERE
D
S
T A
TE OF ID
AH
O
WAVERE
K
TYD
O J
RFQ No.: 12034320Q0200 – INRC HVAC Preventive Maintenance - Idaho Panhandle N.F. / Attach 02: 191009 Warehouse Mechanical Drawings / Page 8 of 16
AIRFLOW
AIRFLOW
AIRFLOW
PIANO HINGE
1/4" OVERLAP
DOOR W/ (2)
SNAP LOCKS
MIXING BOX
RETURN AIR DUCT TO MIXING
BOX SEE SHEET M2.1 FOR DUCT
ROUTING
MERV-8, 30% EFFICIENT
PRE-FILTER
INSULATE ALL SUPPLY DUCTWORK PER
DUCTWORK MATERIAL SCHEDULE
FILTER
FRESH AIR INTAKE
SEE SHEET M2.1 FOR
DUCT ROUTING
MIXING BOX
MERV-13, 80% EFFICIENT FINAL-FILTER
FILTER HOUSING DETAIL
NOTE:
UPFLOW FURNACE SHOWN -
DOWNFLOW FURNACE SIMILAR
T
EXHAUST FAN
AND DISCONNECT
BY M.C.
HEAT
NOTE:
ALL 120 VOLT WIRING BY ELECTRICAL
CONTRACTOR. ALL LOW VOLTAGE WIRING,
THERMOSTATS AND DAMPER ACTUATORS BY
MECHANICAL CONTRACTOR/TEMPERATURE
CONTOLS CONTRACTOR.
THERMOSTAT
(1 OR 2 HEAT AS
SCHEULED / 1 COOL)
BY T.C.
120 VOLT WIRE IN
NEC APPROVED
CONDUIT (TYP OF ALL) BY T.C.
RELAY
BY T.C.
N
MANUAL OVERRIDE
SWITCH BY T.C.
DAMPER
ACTUATOR (TYP)
BY T.C.
CONTROL DAMPER
BY M.C.
HOT 24V
UNIT
HEATER
BY M.C.
N
TRANSFORMER
BY T.C.
H
N
120V
COOL
MOTORIZED
DAMPER INTEGRAL
TO EXHAUST FAN BY
M.C.
C
LINE
VOLTAGE
POWER BY
E.C.
24V
BY T.C.
BY T.C.
24V
BY T.C.
120V
BY E.C.
120V
BY E.C.
BILLINGS | BOZEMAN | MISSOULA
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
INRC WAREHOUSE (NORTH)
-PHASE 1
/2
/2
:2
:0
P
M
M9.2
03.01.17C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
HVAC DETAILS
13083.00
USDA FOREST SERVICE
BJK/JTW
REB
DMP
: N.T.S.M9.2
3 UNIT HEATER, EXHAUST FAN, & CONTROL DAMPER TEMPERATURE CONTROL SCHEMATIC
M2.5 : M2.1 :: 1/8" = 1'-0"M9.2
2 FURNACE DETAIL
P
R E E
NI
GN
ELANOISSEF
O R R
EG
ISTERE
D
S
T A
TE OF ID
AH
O
WAVERE
K
TYD
O J
RFQ No.: 12034320Q0200 – INRC HVAC Preventive Maintenance - Idaho Panhandle N.F. / Attach 02: 191009 Warehouse Mechanical Drawings / Page 9 of 16
PROJECT SPECIFICATIONS
A. ALL WORK ON THE PROJECT SHALL CONFORM TO ALL LOCAL CITY, STATE AND
NATIONAL CODES AND REGULATIONS, INCLUDING BUT NOT LIMITED TO THE
N.F.P.A., N.E.C., U.B.C., I.E.C.C., I.M.C., U.P.C., THE LOCAL UTILITY SERVING
COMPANIES AND THE AUTHORITY HAVING JURISDICTION.
B. THE WORK ON THIS PROJECT SHALL CONSIST OF ALL ITEMS, ARTICLES,
MATERIALS, EQUIPMENT, AND LABOR FURNISHED TOGETHER ALONG WITH ALL
INCIDENTAL ITEMS REQUIRED BY GOOD PRACTICE AND WORKMANSHIP TO
PROVIDE A SATISFACTORY, COMPLETE AND FUNCTIONAL SYSTEM IN
ACCORDANCE WITH THE DRAWINGS AT NO ADDITIONAL COST TO THE
CONTRACTING OFFICER.
C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR AND PAY FOR ALL FEES AND
PERMITS REQUIRED FOR WORK UNDER THEIR CONTRACT AND UNDER THEIR
SUPERVISION BY SUBCONTRACT.
D. MANUFACTURER'S TRADE NAMES AND CATALOG NUMBERS ARE LISTED TO
IND…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .