MC-0322388-MCCM.pdf

PDF 416 KB Posted

Attached to
MC/CM Concourse HVAC Infrastructure Renewal/Replacement Project (CHIRRP)
Solicitation number
MC-0322388-MCCM
Issued by
King County, Washington

About this file

This is a General Contractor/Construction Manager (GC/CM) contract document for the Seattle-Tacoma International Airport (SEA) located in Washington State, with Mortenson Construction designated as the GC/CM. The Concourse HVAC Infrastructure Renewal/Replacement Program (CHIRRP) encompasses the phased renewal and replacement of aging HVAC infrastructure serving Concourses B, C, and D at SEA. The project addresses critical system deficiencies including insufficient air supply capacity, equipment at or beyond service life, absent integrated smoke control systems, and limited capacity to support current and future tenant operational demands. The work is characterized by significant operational, phasing, and coordination complexity that requires advanced planning, sequencing, and careful integration with ongoing airport operations to minimize disruption.

The document does not specify detailed pricing terms, set-aside provisions, response deadlines, or contract term lengths in the information provided. Mortenson Construction, located at 10230 NE Points Drive, Suite 300, Kirkland, Washington 98033, serves as the primary GC/CM responsible for executing this multi-phase infrastructure renewal program. The project reflects a strategic capital investment in critical airport infrastructure necessary to maintain operational reliability and accommodate future growth at a major commercial aviation hub.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .