Mary Passage MS HVAC Replacement Combined (01-26-24).pdf
PDF 39 MB Posted
- Solicitation number
- 60894
- Issued by
- Newport News City, Virginia
About this file
This document is a Combined Scope of Work and Specifications for the Mary Passage Middle School HVAC System Replacement project located in Newport News, Virginia. The project involves the removal and replacement of the existing HVAC systems at the school. The City of Newport News is overseeing this project. The document provides a detailed scope of work for the project, including specifications for the new HVAC equipment and systems to be installed. It also includes information on the project timeline, with the work to be completed by January 26, 2024.
The document outlines pricing and procurement requirements for the project. It notes that the project is funded through state and local sources, but does not provide specific funding amounts or sources. The document does not mention any set-asides or incumbent contractors. Overall, this document provides the technical requirements and scope of work for the Mary Passage Middle School HVAC System Replacement project in Newport News, Virginia.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T0.1
TI
TL
E
SH
EE
T
CEP
JAR
KDA
DATE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
COMM. NO:
TE
LE
PH
O
N E:
7)
-4
C on su lti ng E ng in ee rs
TH
O
M
PS
O N
E
N
TE
RP
RI
SE
P
A
RK
W A
Y
H
M
PT
O N
, V A
PR
O
JE
C
T N
U M
BE
R:
2-
01/26/2024
22-113
N
EW
PO
R
T N
EW
S
VI
R
G
IN
IA
N
EW
PO
R
T N
EW
S
PU
BL
IC
S
C H
O O
LS
M
AR
Y
L
PA
SS
AG
E M
ID
D
LE
S
C H
O O
L H
VA
C
R
EP
LA
C
EM
EN
T
01-26-2024
C O
X
RO
D
G
LE
N A
LL
EN
, V A
VICINITY MAP
TITLE SHEET
DRAWING TITLESSHEET NO.
T0.1
DRAWING INDEX
GENERAL NOTES, LEGEND AND ABBREVIATIONSM0.1
MECHANICAL SCHEDULESM0.2
DRAWING TITLESSHEET NO.
DRAWING INDEX
M1.1
MECHANICAL SCHEDULESM0.3
FIRST FLOOR PLAN - AREA "A" - MECHANICAL - DEMOLITIONMD1.1
FIRST FLOOR PLAN - AREA "B" - MECHANICAL - DEMOLITIONMD1.2
FIRST FLOOR PLAN - AREA "C" - MECHANICAL - DEMOLITIONMD1.3
GENERAL SITE PLANG0.1
THOMPSON CONSULTING ENGINEERS PROJECT NO. 22-113
IFB #014-0-2024/SNB
AREA MAP
M1.2 M1.3 M1.4
M1.6
M2.1
M1.7
MARY L PASSAGE MIDDLE SCHOOL
400 ATKINSON BLVD.
NEWPORT NEWS, VA 23608
FIRST FLOOR PLAN - AREA "D" - MECHANICAL - DEMOLITIONMD1.4
FIRST FLOOR REFLECTED CEILING PLAN - AREA "A" - DEMOLITION AND NEW WORKCP1.1
FIRST FLOOR REFLECTED CEILING PLAN - AREA "B" - DEMOLITION AND NEW WORKCP1.2
FIRST FLOOR REFLECTED CEILING PLAN - AREA "C" - DEMOLITION AND NEW WORKCP1.3
FIRST FLOOR REFLECTED CEILING PLAN - AREA "D" - DEMOLITION AND NEW WORKCP1.4
M2.2 M2.3 M2.4
MARY PASSAGE MIDDLE SCHOOL
M1.5
SECOND FLOOR PLAN - AREA "E" - MECHANICAL - DEMOLITIONMD1.5
SECOND FLOOR PLAN - AREA "F" - MECHANICAL - DEMOLITIONMD1.6
DRAWING TITLESSHEET NO.
DRAWING INDEX
· CURRENT BUILDING CODE: VIRGINIA UNIFORM STATEWIDE BUILDING
CODE 2018 EDITION.
· CURRENT CONSTRUCTION CODE: VIRGINIA CONSTRUCTION CODE 2018
EDITION.
· CURRENT BUILDING CODE: VIRGINIA EXISTING BUILDING CODE 2018
EDITION. LEVEL 1 ALTERATION.
· TOTAL GROSS FLOOR AREA: 138,760 SF.
· USE GROUP CLASSIFICATION: EDUCATION GROUP E AND ASSEMBLY
GROUP A3.
· CONSTRUCTION TYPE: TYPE 2A, NONCOMBUSTIBLE - FULLY
SPRINKLERED AND TYPE 3A, ORDINARY - FULLY SPRINKLERED.
BUILDING CODE SUMMARY
NEWPORT NEWS, VIRGINIA
MARY L PASSAGE MIDDLE SCHOOL
HVAC REPLACEMENT
NEWPORT NEWS PUBLIC SCHOOLS
SECOND FLOOR REFLECTED CEILING PLAN - AREA "E" - DEMOLITION AND NEW WORKCP1.5
SECOND FLOOR REFLECTED CEILING PLAN - AREA "F" - DEMOLITION AND NEW WORKCP1.6
SECOND FLOOR REFLECTED CEILING PLAN - AREA "G" - DEMOLITION AND NEW WORKCP1.7
MECHANICAL SCHEDULESM0.4
VENTILATION CALCULATIONSM0.5
VENTILATION CALCULATIONSM0.6
SECOND FLOOR PLAN - AREA "G" - MECHANICAL - DEMOLITIONMD1.7
ROOF PLAN - MECHANICAL - DEMOLITIONMD1.8
FIRST FLOOR PLAN - AREA "A" - PIPING - DEMOLITIONMD2.1
FIRST FLOOR PLAN - AREA "B" - PIPING - DEMOLITIONMD2.2
FIRST FLOOR PLAN - AREA "C" - PIPING - DEMOLITIONMD2.3
SECOND FLOOR PLAN - AREA "G" - PIPING - DEMOLITIONMD2.7
ENLARGED FLOOR PLAN - MECHANICAL ROOM - DEMOLITIONMD3.1
ENLARGED FLOOR PLAN - MECHANICAL MEZZANINE - DEMOLITIONMD3.2
FIRST FLOOR PLAN - AREA "A" - MECHANICAL - NEW WORK
FIRST FLOOR PLAN - AREA "B" - MECHANICAL - NEW WORK
FIRST FLOOR PLAN - AREA "C" - MECHANICAL - NEW WORK
FIRST FLOOR PLAN - AREA "D" - MECHANICAL - NEW WORK
SECOND FLOOR PLAN - AREA "E" - MECHANICAL - NEW WORK
SECOND FLOOR PLAN - AREA "F" - MECHANICAL - NEW WORK
SECOND FLOOR PLAN - AREA "G" - MECHANICAL - NEW WORK
ROOF PLAN - MECHANICAL - NEW WORKM1.8
FIRST FLOOR PLAN - AREA "A" - PIPING - NEW WORK
FIRST FLOOR PLAN - AREA "B" - PIPING - NEW WORK
FIRST FLOOR PLAN - AREA "C" - PIPING - NEW WORK
FIRST FLOOR PLAN - AREA "D" - PIPING - NEW WORK
SECOND FLOOR PLAN - AREA "E" - PIPING - NEW WORKM2.5
SECOND FLOOR PLAN - AREA "F" - PIPING - NEW WORKM2.6
SECOND FLOOR PLAN - AREA "G" - PIPING - NEW WORKM2.7
ENLARGED FLOOR PLAN - MECHANICAL ROOM - NEW WORKM3.1
ENLARGED FLOOR PLAN - MECHANICAL MEZZANINE - NEW WORKM3.2
ENLARGED FLOOR PLAN - MECHANICAL MEZZANINE - NEW WORKM3.3
ENLARGED FLOOR PLAN - MECHANICAL MEZZANINE - DEMOLITIONMD3.3
CHILLED / CONDENSER WATER PIPING DIAGRAMS - DEMOLITION AND NEW WORKMD4.1
FIELD PICTURES - MECHANICALMD5.1
FIELD PICTURES - MECHANICALMD5.2
MECHANICAL DETAILSM4.1
MECHANICAL DETAILSM4.2
AUTOMATIC TEMPERATURE CONTROLSM5.1
AUTOMATIC TEMPERATURE CONTROLSM5.2
AUTOMATIC TEMPERATURE CONTROLSM5.3
AUTOMATIC TEMPERATURE CONTROLSM5.4
AUTOMATIC TEMPERATURE CONTROLSM5.5
AUTOMATIC TEMPERATURE CONTROLSM5.6
W
ARW
ICK BLVD.
ATKINSON BLVD.
E0.1
ED1.1
ED1.2
ED1.3
ED1.4
ED1.5
ED1.6
ED1.7
ELECTRICAL LEGEND, ABBREVIATIONS, NOTES
PARTIAL FIRST FLOOR PLAN - AREA 'A' - LIGHTING & AUXILIARY SYSTEMS - DEMOLITION & NEW WORK PARTIAL FIRST FLOOR PLAN - AREA 'B' - LIGHTING & AUXILIARY SYSTEMS - DEMOLITION & NEW WORK PARTIAL FIRST FLOOR PLAN - AREA 'C' - LIGHTING & AUXILIARY SYSTEMS - DEMOLITION & NEW WORK PARTIAL FIRST FLOOR PLAN - AREA 'D' - LIGHTING & AUXILIARY SYSTEMS - DEMOLITION & NEW WORK PARTIAL SECOND FLOOR PLAN - AREA 'E' - LIGHTING & AUXILIARY SYSTEMS - DEMOLITION & NEW WORK PARTIAL SECOND FLOOR PLAN - AREA 'F' - LIGHTING & AUXILIARY SYSTEMS - DEMOLITION & NEW WORK PARTIAL SECOND FLOOR PLAN - AREA 'G' - LIGHTING & AUXILIARY SYSTEMS - DEMOLITION & NEW WORK
ED2.1
ED2.2
ED2.3
ED2.4
PARTIAL FIRST FLOOR PLAN - AREA 'A' - HVAC POWER - DEMOLITION
PARTIAL FIRST FLOOR PLAN - AREA 'B' - HVAC POWER - DEMOLITION
PARTIAL FIRST FLOOR PLAN - AREA 'C' - HVAC POWER - DEMOLITION
PARTIAL FIRST FLOOR PLAN - AREA 'D' - HVAC POWER - DEMOLITION
E1.1 E1.2 E1.3 E1.4
PARTIAL FIRST FLOOR PLAN - AREA 'A' - HVAC POWER - NEW WORK
PARTIAL FIRST FLOOR PLAN - AREA 'B' - HVAC POWER - NEW WORK
PARTIAL FIRST FLOOR PLAN - AREA 'C' - HVAC POWER - NEW WORK
PARTIAL FIRST FLOOR PLAN - AREA 'D' - HVAC POWER - NEW WORK
ED2.5 PARTIAL SECOND FLOOR PLAN - AREA 'E' - HVAC POWER - DEMOLITION
ED2.6 PARTIAL SECOND FLOOR PLAN - AREA 'F' - HVAC POWER - DEMOLITION
ED2.7 PARTIAL SECOND FLOOR PLAN - AREA 'G' - HVAC POWER - DEMOLITION
ED2.8 ROOF PLAN - HVAC POWER - DEMOLITION
E1.5 PARTIAL FIRST FLOOR PLAN - AREA 'E' - HVAC POWER - NEW WORK
E1.6 PARTIAL FIRST FLOOR PLAN - AREA 'F' - HVAC POWER - NEW WORK
FIRST FLOOR PLAN - AREA "D" - PIPING - DEMOLITIONMD2.4
SECOND FLOOR PLAN - AREA "E" - PIPING - DEMOLITIONMD2.5
SECOND FLOOR PLAN - AREA "F" - PIPING - DEMOLITIONMD2.6
E1.7 PARTIAL FIRST FLOOR PLAN - AREA 'F' - HVAC POWER - NEW WORK
E1.8 ROOF PLAN - HVAC POWER - NEW WORK
HOT WATER PIPING DIAGRAMS - DEMOLITION AND NEW WORKMD4.2
EXISTING AUTOMATIC TEMPERATURE CONTROLSM5.7
EXISTING AUTOMATIC TEMPERATURE CONTROLSM5.8
EXISTING AUTOMATIC TEMPERATURE CONTROLSM5.9
CONTROL RISER DIAGRAMSM6.1
CONTROL RISER DIAGRAMSM6.2
| Mary Passage MS - Mechanical (01-31-24) |
| Mary Passage MS - Electrical (01-26-24) |
File details come from the government source that posted it. Updated .