Mary Passage MS HVAC Replacement Combined (01-26-24).pdf

PDF 39 MB Posted

Attached to
Mary Passage Middle School HVAC System Replacement
Solicitation number
60894
Issued by
Newport News City, Virginia

About this file

This document is a Combined Scope of Work and Specifications for the Mary Passage Middle School HVAC System Replacement project located in Newport News, Virginia. The project involves the removal and replacement of the existing HVAC systems at the school. The City of Newport News is overseeing this project. The document provides a detailed scope of work for the project, including specifications for the new HVAC equipment and systems to be installed. It also includes information on the project timeline, with the work to be completed by January 26, 2024.

The document outlines pricing and procurement requirements for the project. It notes that the project is funded through state and local sources, but does not provide specific funding amounts or sources. The document does not mention any set-asides or incumbent contractors. Overall, this document provides the technical requirements and scope of work for the Mary Passage Middle School HVAC System Replacement project in Newport News, Virginia.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T0.1

TI

TL

E

SH

EE

T

CEP

JAR

KDA

DATE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

COMM. NO:

TE

LE

PH

O

N E:

7)

-4

C on su lti ng E ng in ee rs

TH

O

M

PS

O N

E

N

TE

RP

RI

SE

P

A

RK

W A

Y

H

M

PT

O N

, V A

PR

O

JE

C

T N

U M

BE

R:

2-

01/26/2024

22-113

N

EW

PO

R

T N

EW

S

VI

R

G

IN

IA

N

EW

PO

R

T N

EW

S

PU

BL

IC

S

C H

O O

LS

M

AR

Y

L

PA

SS

AG

E M

ID

D

LE

S

C H

O O

L H

VA

C

R

EP

LA

C

EM

EN

T

01-26-2024

C O

X

RO

D

G

LE

N A

LL

EN

, V A

VICINITY MAP

TITLE SHEET

DRAWING TITLESSHEET NO.

T0.1

DRAWING INDEX

GENERAL NOTES, LEGEND AND ABBREVIATIONSM0.1

MECHANICAL SCHEDULESM0.2

DRAWING TITLESSHEET NO.

DRAWING INDEX

M1.1

MECHANICAL SCHEDULESM0.3

FIRST FLOOR PLAN - AREA "A" - MECHANICAL - DEMOLITIONMD1.1

FIRST FLOOR PLAN - AREA "B" - MECHANICAL - DEMOLITIONMD1.2

FIRST FLOOR PLAN - AREA "C" - MECHANICAL - DEMOLITIONMD1.3

GENERAL SITE PLANG0.1

THOMPSON CONSULTING ENGINEERS PROJECT NO. 22-113

IFB #014-0-2024/SNB

AREA MAP

M1.2 M1.3 M1.4

M1.6

M2.1

M1.7

MARY L PASSAGE MIDDLE SCHOOL

400 ATKINSON BLVD.

NEWPORT NEWS, VA 23608

FIRST FLOOR PLAN - AREA "D" - MECHANICAL - DEMOLITIONMD1.4

FIRST FLOOR REFLECTED CEILING PLAN - AREA "A" - DEMOLITION AND NEW WORKCP1.1

FIRST FLOOR REFLECTED CEILING PLAN - AREA "B" - DEMOLITION AND NEW WORKCP1.2

FIRST FLOOR REFLECTED CEILING PLAN - AREA "C" - DEMOLITION AND NEW WORKCP1.3

FIRST FLOOR REFLECTED CEILING PLAN - AREA "D" - DEMOLITION AND NEW WORKCP1.4

M2.2 M2.3 M2.4

MARY PASSAGE MIDDLE SCHOOL

M1.5

SECOND FLOOR PLAN - AREA "E" - MECHANICAL - DEMOLITIONMD1.5

SECOND FLOOR PLAN - AREA "F" - MECHANICAL - DEMOLITIONMD1.6

DRAWING TITLESSHEET NO.

DRAWING INDEX

· CURRENT BUILDING CODE: VIRGINIA UNIFORM STATEWIDE BUILDING

CODE 2018 EDITION.

· CURRENT CONSTRUCTION CODE: VIRGINIA CONSTRUCTION CODE 2018

EDITION.

· CURRENT BUILDING CODE: VIRGINIA EXISTING BUILDING CODE 2018

EDITION. LEVEL 1 ALTERATION.

· TOTAL GROSS FLOOR AREA: 138,760 SF.

· USE GROUP CLASSIFICATION: EDUCATION GROUP E AND ASSEMBLY

GROUP A3.

· CONSTRUCTION TYPE: TYPE 2A, NONCOMBUSTIBLE - FULLY

SPRINKLERED AND TYPE 3A, ORDINARY - FULLY SPRINKLERED.

BUILDING CODE SUMMARY

NEWPORT NEWS, VIRGINIA

MARY L PASSAGE MIDDLE SCHOOL

HVAC REPLACEMENT

NEWPORT NEWS PUBLIC SCHOOLS

SECOND FLOOR REFLECTED CEILING PLAN - AREA "E" - DEMOLITION AND NEW WORKCP1.5

SECOND FLOOR REFLECTED CEILING PLAN - AREA "F" - DEMOLITION AND NEW WORKCP1.6

SECOND FLOOR REFLECTED CEILING PLAN - AREA "G" - DEMOLITION AND NEW WORKCP1.7

MECHANICAL SCHEDULESM0.4

VENTILATION CALCULATIONSM0.5

VENTILATION CALCULATIONSM0.6

SECOND FLOOR PLAN - AREA "G" - MECHANICAL - DEMOLITIONMD1.7

ROOF PLAN - MECHANICAL - DEMOLITIONMD1.8

FIRST FLOOR PLAN - AREA "A" - PIPING - DEMOLITIONMD2.1

FIRST FLOOR PLAN - AREA "B" - PIPING - DEMOLITIONMD2.2

FIRST FLOOR PLAN - AREA "C" - PIPING - DEMOLITIONMD2.3

SECOND FLOOR PLAN - AREA "G" - PIPING - DEMOLITIONMD2.7

ENLARGED FLOOR PLAN - MECHANICAL ROOM - DEMOLITIONMD3.1

ENLARGED FLOOR PLAN - MECHANICAL MEZZANINE - DEMOLITIONMD3.2

FIRST FLOOR PLAN - AREA "A" - MECHANICAL - NEW WORK

FIRST FLOOR PLAN - AREA "B" - MECHANICAL - NEW WORK

FIRST FLOOR PLAN - AREA "C" - MECHANICAL - NEW WORK

FIRST FLOOR PLAN - AREA "D" - MECHANICAL - NEW WORK

SECOND FLOOR PLAN - AREA "E" - MECHANICAL - NEW WORK

SECOND FLOOR PLAN - AREA "F" - MECHANICAL - NEW WORK

SECOND FLOOR PLAN - AREA "G" - MECHANICAL - NEW WORK

ROOF PLAN - MECHANICAL - NEW WORKM1.8

FIRST FLOOR PLAN - AREA "A" - PIPING - NEW WORK

FIRST FLOOR PLAN - AREA "B" - PIPING - NEW WORK

FIRST FLOOR PLAN - AREA "C" - PIPING - NEW WORK

FIRST FLOOR PLAN - AREA "D" - PIPING - NEW WORK

SECOND FLOOR PLAN - AREA "E" - PIPING - NEW WORKM2.5

SECOND FLOOR PLAN - AREA "F" - PIPING - NEW WORKM2.6

SECOND FLOOR PLAN - AREA "G" - PIPING - NEW WORKM2.7

ENLARGED FLOOR PLAN - MECHANICAL ROOM - NEW WORKM3.1

ENLARGED FLOOR PLAN - MECHANICAL MEZZANINE - NEW WORKM3.2

ENLARGED FLOOR PLAN - MECHANICAL MEZZANINE - NEW WORKM3.3

ENLARGED FLOOR PLAN - MECHANICAL MEZZANINE - DEMOLITIONMD3.3

CHILLED / CONDENSER WATER PIPING DIAGRAMS - DEMOLITION AND NEW WORKMD4.1

FIELD PICTURES - MECHANICALMD5.1

FIELD PICTURES - MECHANICALMD5.2

MECHANICAL DETAILSM4.1

MECHANICAL DETAILSM4.2

AUTOMATIC TEMPERATURE CONTROLSM5.1

AUTOMATIC TEMPERATURE CONTROLSM5.2

AUTOMATIC TEMPERATURE CONTROLSM5.3

AUTOMATIC TEMPERATURE CONTROLSM5.4

AUTOMATIC TEMPERATURE CONTROLSM5.5

AUTOMATIC TEMPERATURE CONTROLSM5.6

W

ARW

ICK BLVD.

ATKINSON BLVD.

E0.1

ED1.1

ED1.2

ED1.3

ED1.4

ED1.5

ED1.6

ED1.7

ELECTRICAL LEGEND, ABBREVIATIONS, NOTES

PARTIAL FIRST FLOOR PLAN - AREA 'A' - LIGHTING & AUXILIARY SYSTEMS - DEMOLITION & NEW WORK PARTIAL FIRST FLOOR PLAN - AREA 'B' - LIGHTING & AUXILIARY SYSTEMS - DEMOLITION & NEW WORK PARTIAL FIRST FLOOR PLAN - AREA 'C' - LIGHTING & AUXILIARY SYSTEMS - DEMOLITION & NEW WORK PARTIAL FIRST FLOOR PLAN - AREA 'D' - LIGHTING & AUXILIARY SYSTEMS - DEMOLITION & NEW WORK PARTIAL SECOND FLOOR PLAN - AREA 'E' - LIGHTING & AUXILIARY SYSTEMS - DEMOLITION & NEW WORK PARTIAL SECOND FLOOR PLAN - AREA 'F' - LIGHTING & AUXILIARY SYSTEMS - DEMOLITION & NEW WORK PARTIAL SECOND FLOOR PLAN - AREA 'G' - LIGHTING & AUXILIARY SYSTEMS - DEMOLITION & NEW WORK

ED2.1

ED2.2

ED2.3

ED2.4

PARTIAL FIRST FLOOR PLAN - AREA 'A' - HVAC POWER - DEMOLITION

PARTIAL FIRST FLOOR PLAN - AREA 'B' - HVAC POWER - DEMOLITION

PARTIAL FIRST FLOOR PLAN - AREA 'C' - HVAC POWER - DEMOLITION

PARTIAL FIRST FLOOR PLAN - AREA 'D' - HVAC POWER - DEMOLITION

E1.1 E1.2 E1.3 E1.4

PARTIAL FIRST FLOOR PLAN - AREA 'A' - HVAC POWER - NEW WORK

PARTIAL FIRST FLOOR PLAN - AREA 'B' - HVAC POWER - NEW WORK

PARTIAL FIRST FLOOR PLAN - AREA 'C' - HVAC POWER - NEW WORK

PARTIAL FIRST FLOOR PLAN - AREA 'D' - HVAC POWER - NEW WORK

ED2.5 PARTIAL SECOND FLOOR PLAN - AREA 'E' - HVAC POWER - DEMOLITION

ED2.6 PARTIAL SECOND FLOOR PLAN - AREA 'F' - HVAC POWER - DEMOLITION

ED2.7 PARTIAL SECOND FLOOR PLAN - AREA 'G' - HVAC POWER - DEMOLITION

ED2.8 ROOF PLAN - HVAC POWER - DEMOLITION

E1.5 PARTIAL FIRST FLOOR PLAN - AREA 'E' - HVAC POWER - NEW WORK

E1.6 PARTIAL FIRST FLOOR PLAN - AREA 'F' - HVAC POWER - NEW WORK

FIRST FLOOR PLAN - AREA "D" - PIPING - DEMOLITIONMD2.4

SECOND FLOOR PLAN - AREA "E" - PIPING - DEMOLITIONMD2.5

SECOND FLOOR PLAN - AREA "F" - PIPING - DEMOLITIONMD2.6

E1.7 PARTIAL FIRST FLOOR PLAN - AREA 'F' - HVAC POWER - NEW WORK

E1.8 ROOF PLAN - HVAC POWER - NEW WORK

HOT WATER PIPING DIAGRAMS - DEMOLITION AND NEW WORKMD4.2

EXISTING AUTOMATIC TEMPERATURE CONTROLSM5.7

EXISTING AUTOMATIC TEMPERATURE CONTROLSM5.8

EXISTING AUTOMATIC TEMPERATURE CONTROLSM5.9

CONTROL RISER DIAGRAMSM6.1

CONTROL RISER DIAGRAMSM6.2

Mary Passage MS - Mechanical (01-31-24)
Mary Passage MS - Electrical (01-26-24)