MAPR615170515_Attach_3_Profl_Qual.docx

DOCX document 23 KB Posted

Attached to
DAO Naval Architect and Marine Engineering IDIQ Support Services
Solicitation number
MAPR615170515
Issued by

About this file

Attachment 3 Professional Qualifications

View the file

Other files

File Type Posted
MAPR615170515_Attach_2_Special_Exper.docx DOCX document
MAPR615170515_Attach_1_Offeror_Info.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT (3)

PROFESSIONAL QUALIFICATIONS

(b) PROFESSIONAL QUALIFICATIONS

NAME
ROLE IN THIS CONTRACT
TOTAL EXPERIENCE (YR)
WITH CURRENT FIRM (YR)

FIRM NAME AND LOCATION

EDUCATION
CURRENT PROFESSIONAL REGISTRATION (DISCIPLINE & STATE)

OTHER PROFESSIONAL QUALIFICATIONS

EXAMPLE PROJECT KEY NUMBER:
1
TITLE AND LOCATION (CITY & STATE)
DESIGN COMPLETED (YR)
EST. CONSTRUCTION COMPLETED (YR)
ROLE
ALTERATION (A) CONSTRUCTION (NC) OR REPAIR (R)
CONSTRUCTION COST:

DESCRIBE PROJECT SCOPE. INCLUDE RELEVANT FACILITY TYPE IN DESCRIPTION FROM ATTACHMENT (2):

EXAMPLE PROJECT KEY NUMBER:
2
TITLE AND LOCATION (CITY & STATE)
DESIGN COMPLETED (YR)
EST. CONSTRUCTION COMPLETED (YR)
ROLE
ALTERATION (A) CONSTRUCTION (NC) OR REPAIR (R)
CONSTRUCTION COST:

DESCRIBE PROJECT SCOPE. INCLUDE RELEVANT FACILITY TYPE IN DESCRIPTION FROM ATTACHMENT (2):

EXAMPLE PROJECT KEY NUMBER:
3
TITLE AND LOCATION (CITY & STATE)
DESIGN COMPLETED (YR)

(NOT INCLUDING PCAS)

EST. CONSTRUCTION COMPLETED (YR)

ROLE
ALTERATION (A) CONSTRUCTION (NC) OR REPAIR (R)
CONSTRUCTION COST:

DESCRIBE PROJECT SCOPE. INCLUDE RELEVANT FACILITY TYPE IN DESCRIPTION FROM ATTACHMENT (2):

EXAMPLE PROJECT KEY NUMBER:
4
TITLE AND LOCATION (CITY & STATE)
DESIGN COMPLETED (YR)

EST. CONSTRUCTION COMPLETED (YR)

ROLE
ALTERATION (A) CONSTRUCTION (NC) OR REPAIR (R)
CONSTRUCTION COST:

DESCRIBE PROJECT SCOPE. INCLUDE RELEVANT FACILITY TYPE IN DESCRIPTION FROM ATTACHMENT (2):

EXAMPLE PROJECT KEY NUMBER:
5
TITLE AND LOCATION (CITY & STATE)
DESIGN COMPLETED (YR)

EST. CONSTRUCTION COMPLETED (YR)

ROLE
ALTERATION (A) CONSTRUCTION (NC) OR REPAIR (R)
CONSTRUCTION COST:

DESCRIBE PROJECT SCOPE. INCLUDE RELEVANT FACILITY TYPE IN DESCRIPTION FROM ATTACHMENT (2):

File details come from the government source that posted it. Updated .