MAPR615170515_Attach_3_Profl_Qual.docx
DOCX document 23 KB Posted
- Solicitation number
- MAPR615170515
About this file
Attachment 3 Professional Qualifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MAPR615170515_Attach_2_Special_Exper.docx | DOCX document | |
| MAPR615170515_Attach_1_Offeror_Info.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT (3)
PROFESSIONAL QUALIFICATIONS
(b) PROFESSIONAL QUALIFICATIONS
| NAME |
| ROLE IN THIS CONTRACT |
| TOTAL EXPERIENCE (YR) |
| WITH CURRENT FIRM (YR) |
FIRM NAME AND LOCATION
| EDUCATION |
| CURRENT PROFESSIONAL REGISTRATION (DISCIPLINE & STATE) |
OTHER PROFESSIONAL QUALIFICATIONS
| EXAMPLE PROJECT KEY NUMBER: |
| 1 |
| TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
| EST. CONSTRUCTION COMPLETED (YR) |
| ROLE |
| ALTERATION (A) CONSTRUCTION (NC) OR REPAIR (R) |
| CONSTRUCTION COST: |
DESCRIBE PROJECT SCOPE. INCLUDE RELEVANT FACILITY TYPE IN DESCRIPTION FROM ATTACHMENT (2):
| EXAMPLE PROJECT KEY NUMBER: |
| 2 |
| TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
| EST. CONSTRUCTION COMPLETED (YR) |
| ROLE |
| ALTERATION (A) CONSTRUCTION (NC) OR REPAIR (R) |
| CONSTRUCTION COST: |
DESCRIBE PROJECT SCOPE. INCLUDE RELEVANT FACILITY TYPE IN DESCRIPTION FROM ATTACHMENT (2):
| EXAMPLE PROJECT KEY NUMBER: |
| 3 |
| TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
(NOT INCLUDING PCAS)
EST. CONSTRUCTION COMPLETED (YR)
| ROLE |
| ALTERATION (A) CONSTRUCTION (NC) OR REPAIR (R) |
| CONSTRUCTION COST: |
DESCRIBE PROJECT SCOPE. INCLUDE RELEVANT FACILITY TYPE IN DESCRIPTION FROM ATTACHMENT (2):
| EXAMPLE PROJECT KEY NUMBER: |
| 4 |
| TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| ROLE |
| ALTERATION (A) CONSTRUCTION (NC) OR REPAIR (R) |
| CONSTRUCTION COST: |
DESCRIBE PROJECT SCOPE. INCLUDE RELEVANT FACILITY TYPE IN DESCRIPTION FROM ATTACHMENT (2):
| EXAMPLE PROJECT KEY NUMBER: |
| 5 |
| TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| ROLE |
| ALTERATION (A) CONSTRUCTION (NC) OR REPAIR (R) |
| CONSTRUCTION COST: |
DESCRIBE PROJECT SCOPE. INCLUDE RELEVANT FACILITY TYPE IN DESCRIPTION FROM ATTACHMENT (2):
File details come from the government source that posted it. Updated .