Manufacturing Qualification Requirements Section C_1560011161902FJ.pdf
PDF 210 KB Posted
- Attached to
- A-10 NACELLE SHROUD DOORS Federal contract opportunity
- Solicitation number
- FA8212-22-R-0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Manufacturing Qualification Requirements Section C_1560011144711FJ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MANUFACTURING QUALIFICATION REQUIREMENTS
NSN: 1560-01-116-1902
P/N: 160J414500-3 Noun: FWD Shroud Door Application: A-10 Aircraft
9 Oct 2021 Section C 1/4
SECTION C:
1. QUALIFICATION REQUIREMENTS THAT MUST BE SATISFIED TO BECOME A QUALIFIED SOURCE
Prequalification Notice/Sources Sought: The offeror shall notify the appropriate government Small Business Office or, if responding to a solicitation, the contracting officer in the appropriate government contracting office, of intent to qualify as a source for this FWD Shroud Door. The offeror shall prepare a Source Approval Request (SAR) in accordance with AFMCI 23-113 and submit to 416th SCMS/GUEAB for their review and approval to include, but not limited to, the following requirements:
a. Facilities, Testing, and Inspection Capabilities: The offeror must certify to the government that they have, or have access to, the required facilities and equipment to manufacture, inspect, test, package, and store the item. The offeror shall certify to the government the availability of the necessary test, inspection, diagnostic and manufacturing facilities, equipment and personnel or its provisions to obtain them. If the offeror proposes to obtain them, the offeror will open its related facilities, equipment, tooling procedures, hiring plans, facility, and equipment orders to inspection and evaluation by the government. The offeror must show availability of facilities to manufacture to the levels required by standards outlined in the data package and shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.
b. Data Verification: The offeror must verify that he has a complete data package. This verification must include a complete list of all models, procedures, drawings, and specifications, including change notices, in the offeror’s possession. The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.
c. Manufacture/Process Verification: The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the government requirements as prescribed by 416 SCMS and in accordance with AFMCI 23-113. The offeror must show that they have experience working with all A-10 process and specification requirements per the tech data, or capability to produce similar components using similar processes, specifications, or materials. If offeror would like to show capability using similar processes, specification, and materials for the purpose of becoming a qualified source, the 416 SCMS Engineering reserves the right to determine if those similar process, specifications, or materials used are an adequate representation of A-10 process requirements of the tech data.
The offeror will need to have the capability, or contract with an approved company with the capability of chemical milling aluminum parts IAW A-F201. The offeror shall identify its source for chemical milling of aluminum parts and if the offeror wishes to qualify additional sources, they may do as prescribed by A-F201 and the 416 SCMS qualification requirements. The offeror must also be willing to open their facility to show their chemical milling of aluminum parts capability to government personnel.
P/N: 160J414500-3
9 Oct 2021 Section C 2/4
Some of the components require very accurate machining. The offeror must show they have the capability, or contract with a company with the capability, of producing accurate machining of these components. The offeror must also be willing to open their facility to show their machining capability to government personnel.
d. Test and Evaluation and/or Verification: If applicable, the offeror, at their own expense, shall prepare and submit to 416 SCMS for their prior approval, a qualification test plan/procedure detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by drawing 160J414500. After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 416 SCMS for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 30 days in advance of the occurrence of any testing that will be used as a basis for qualification. The offeror’s facilities shall be made available for government inspection during these tests.
e. Qualification Article Verification: The offeror may provide, at their own expense, a pre-contract award qualification article for evaluation by the government. This article must comply with all of the requirements of drawing 160J414500. This article shall be subjected to a form, fit, and function evaluation to demonstrate compatibility with the weapon system and to evaluate the manufacturing capability of the offeror. Offeror’s will be notified whether or not their qualification article passed or failed the required qualification testing within 90 days of submitting a product for qualification testing. Note that successful completion of the qualification testing does not guarantee any contract award. If the offeror is deemed qualified and awarded the contract, a post-contract award first article exhibit may be required to verify production capability.
f. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified: $3000.
g. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 30 days for SAR package evaluation and up to 90 days if a qualifying article is submitted. This is based on complexity of the FWD Shroud Door and other factors.
h. Qualification Time Limitation: An offeror may not be denied the opportunity to submit and have considered an offer for a contract if the offeror can demonstrate to the satisfaction of the contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed to provide the vendor with an opportunity to demonstrate its ability to meet the standards specified in this qualification requirement.
P/N: 160J414500-3
9 Oct 2021 Section C 3/4
i. Evaluation of Proposals Not Previously Qualified: The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in the qualification requirement before the date specified for award of the contract. Once all requirements are met, the offeror will be listed as an approved source for this item. Approval, however, does not guarantee subsequent contract award.
P/N: 160J414500-3
9 Oct 2021 Section C 4/4
2. SOURCE QUALIFICATION WAIVER REQUIREMENTS
Sources who meet any of the following source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify production capability:
a. QWC1: The potential source submits written certification that the articles have been supplied to the government or original equipment manufacturer (e.g., DD Form 250, Material Inspection and Receiving Report, Purchase Order invoice, etc).
b. QWC2: The potential source is qualified on the right-hand article and requests to be qualified on the left-hand article. If the right-and left-hand articles are mirror images of each other, then approval can generally be given.
c. QWC3: A source qualified to provide an assembly is usually qualified to provide subassemblies, major components, and items of that assembly.
d. QWC4: A source qualified to provide earlier dash numbers of a basic P/N may be qualified to provide other dash numbers of that same basic P/N, provided there is no increase in complexity, criticality, or other relevant requirements.
e. QWC5: A source qualified to provide a similar or like item can be qualified to provide the required item. However, for approval, the engineering authority must verify that there is no increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written proof, such as purchase orders, shipping documents, etc., to show that the similar item was provided to the original equipment manufacturer or DoD.
f. QWC6: A source previously qualified to provide an item, but which has been purchased, sold, merged, absorbed, reformed, split, etc., may qualify if it can be established that the qualification is currently with the requester and that the requester has the same or equivalent facilities, tooling, equipment, personnel, and utilizes the original forging, castings, etc., in the manufacturing process.
| 160J414500-3 MQR 5.pdf |
| 160J414500-3 MQR 6.pdf |
| 160J414500-3 MQR 7.pdf |
| 160J414500-3 MQR 8.pdf |
File details come from the government source that posted it. Updated .