Mandrel Recoat SOW - REV SMR.pdf
PDF 303 KB Posted
- Attached to
- Smokey Sam Refurbishment of Mandrels
- Solicitation number
- N0017423Q0075
About this file
This statement of work outlines requirements for recoating 2000 mandrels with Teflon for use in producing rockets. The contractor must remove old Teflon coating and reapply new coating per the specified drawing. The contractor shall maintain quality control processes adhering to ISO 9001:2015 standards and calibrate equipment per ANSI/NCSL Z540.3 or ISO/IEC 17025. The contractor must submit a certificate of compliance and notify the contracting officer of any nonconforming products within one business day, responding with recommended dispositions within another day. The contractor is responsible for packing, packaging, marking, and shipping by the required delivery date of 6-8 weeks to prevent damage. The related federal contract opportunity is a solicitation from the Department of the Navy Naval Sea Systems Command to refurbish Smokey Sam mandrels.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0017423Q0075 - Solicitation NonComm.pdf | ||
| Mandrel_Form 43 Shipping and Packaging Instructions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REFURBISHMENT OF MANDRELS TEFLON RECOATING
STATEMENT
1.0 Scope of Work
The requirements in this document contain the information necessary to recoat Smokey SAM
Mandrels with Teflon for use in the production of GTR-18A Smokey SAM Rockets Naval
Surface Warfare Center Indian Head Division (NSWC IHD).
2.0 Applicable Documents
Drawing 34447E
2.1.1 General Specifications
American National Standards Institute (ANSI)/National Conference of Standards
Laboratories (NCSL) Standards:
ANSI/NCSL Z540.3 Requirements for the Calibration of Measuring and Test Equipment
Department of Defense Specifications
MIL-STD-129 Marking for Shipment and Storage
International Organization for Standardization (ISO)/International Electrotechnical
Commission (IEC) Standards:
ISO 9001 Quality Management Systems
ISO/IEC 17025 General Requirements for the Competence of Testing and Calibration
Laboratories
Society of Automotive Engineers (SAE) Standards:
SAE AS6174 Counterfeit Material; Assuring Acquisition of Authentic and
Conforming Material
2.1.2 Conflicting Document Requirements
If there are any conflicts between specifications, drawings, or requirements listed herein, the contractor shall notify the Contracting Officer (KO) and the Technical Point of Contact (TPOC), in writing for interpretation, clarification, and resolution.
3.0 Requirements
3.1 General
The Contractor shall remove old Teflon coating and reapply new Teflon coating to 2000 Smokey
SAM mandrels per Drawing 34447. Deliverables shall be packaged and ready for use. The
Contractor shall provide, design, and fabricate all necessary tooling to remove and reapply the
Teflon coating.
3.1.1 Deliverable Lot Homogeneity
Material shall be made from one single homogeneous lot. A single continuous production run or batch may be used to meet several deliverable line items.
3.1.2 Product Certification
The Contractor shall submit a Certificate of Compliance in accordance with DI-QCIC-81356A per CDRL A001 to accompany the shipment the recoated mandrels. The certificate shall state compliance of the material with its respective drawing or specification, and contract/order requirements. The certificate shall as a minimum state the company name, contract/order number, drawing or specification number, and date.
The Certificate of Compliance shall state, above the signature of a legally authorized representative of the company, the following:
“This certification concerns a matter within the jurisdiction of an agency of the United States and making a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code 1001.”
3.2 Quality Control
3.2.1 Quality System and Quality Control Processes
The Contractor shall maintain a quality system which adheres, at minimum, to the requirements of Para. 4.5. ISO 9001:2015 standards.
The Contractor quality management system shall ensure products are in compliance with the applicable drawings, specifications, and contract. The quality management system shall outline processes to identify, record, and disposition nonconforming material or other characteristic discrepancies for the entire duration of this contract. Procedures, planning, and all other relevant documentation and data which comprise the quality management system, if requested, shall be made available to the Government for review.
3.2.2 Calibration of Measuring and Testing Equipment
Calibration of measuring and testing equipment shall, as a minimum, adhere to the requirements of either ANSI/NCSL Z540.3 or ISO/IEC 17025.
3.2.3 Acceptance of Product
Final acceptance of the production deliverables will be based on the Certificate of Compliance accompanying the product shipment.
3.2.4 Government-Identified Nonconformity Reporting Procedures
The Government shall alert the Contractor to any nonconforming deliverables within one (1) working day of identifying the nonconformity. The Contractor shall respond with their recommended disposition on the deliverables within one (1) working day.
3.3 Packing and Shipping
The Contractor shall be responsible for packing, packaging, and marking of deliverables to prevent any potential damage during transport.
3.4 Counterfeit Material
The Contractor shall maintain a counterfeit material prevention program in accordance with SAE
AS6174A, or comparable. The Contractor shall notify the Contracting Officer (KO) if material cannot be obtained from an authorized supplier.
4.0 Deliverables
The Technical Point of Contact and Contracting Officer (KO) for this contract will approve all deliverables as specified. The following Certificates shall include the signature of the
Contractor’s representative authorized to make such certification.
CDRL Spec Section Title
A001 DI-MISC-81356A 3.1.2 Certificate of Compliance
4.1 Deliveries
The Contractor shall notify the Contracting Officer 30 days in advance if the Contractor cannot meet the contract delivery schedule.
The Contractor shall be responsible for coordinating and shipping all the equipment to the required destination.
Item Year Nomenclature Quantity QTY Due
1 Base Mandrel
Refurbishment with coating
1 2000 6-8 weeks
File details come from the government source that posted it. Updated .