Draft_17R7602_QASP_v15_-_10_Mar_2017.pdf
PDF 299 KB Posted
- Attached to
- Tactical Systems Support II
- Solicitation number
- M68909-17-R-7602
- Issued by
-
United States Marine Corps
About this file
Draft QASP for the Pre-solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Draft_17R7602_PWS_v23_-_10_Mar_2017.pdf | ||
| Draft_17R7602_QA_Format_v1_-_10_Mar_2017.pdf | ||
| Draft_17R7602_RFP_v30_-_10_Mar_2017.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For Information Purposes Only
PWS Enclosure (2)
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
FOR
TACTICAL SYSTEMS SUPPORT
CONTRACTOR SUPPORT SERVICES
MARINE CORPS TACTICAL SYSTEMS SUPPORT ACTIVITY
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) was developed to assess the overall performance of the technical support for the
Tactical Systems Support (TSS) effort. This document will be used by the Government to evaluate Contractor performance and ensure the services and products specified in the contract are delivered in a timely and effective manner.
This QASP does not detail how the contractor accomplishes the work.
Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP provides the methodology to monitor Contractor performance and establish performance benchmarks to measure effectiveness. This
QASP is designed to limit government surveillance when evaluating
Contractor performance. Surveillance will be conducted in accordance with (IAW) the Performance Standards outlined in paragraph 7 of this
QASP. The performance standards correspond to the deliverables, performance measures, and performance standards in the PRS.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Updates shall ensure that the
QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and
Government officials implementing surveillance activities.
The following FAR clauses may apply depending on contract type:
FAR 52.246-6 Inspection of Services - FFP
2. GOVERNMENT SURVEILLANCE
The COR’s authority is limited to administering specific technical aspects of the contract. The PWS identifies specific guidelines and clearly details the limits of the COR’s authority.
The COR will:
a. Monitor Contractor performance IAW with this QASP.
b. Coordinate and prioritize support, resources, and associated schedules.
3. SURVEILLANCE METHODS
Surveillance is used by the Government to determine whether the
Contractor is effectively and efficiently complying with the terms and conditions of the contract.
The COR may use the following surveillance methods in the administration of this QASP:
a. INSPECTION:
Visual examination of a product (e.g., meeting minutes, data from testing, plans, procedures, reports) or process.
b. ANALYSIS:
A detailed examination to assess the applied techniques to determine if they are appropriate and effective.
c. DEMONSTRATION:
The operation of a process from start to finish or the operation of the system, or part of the system, that relies on observable functional operation.
d. CUSTOMER FEEDBACK:
Solicit customer and end user satisfaction of technical services performed by the Contractor.
4. PERFORMANCE REVIEWS & EVALUATIONS
COR RESPONSIBILITY:
The COR will conduct monthly performance reviews and evaluations with the Contractor, based on information obtained through the surveillance methods identified in section 3 pertaining to the performance outlined in the performance standards. The following criteria will be used for performance evaluations:
EXCEPTIONAL
PERFORMANCE SIGNIFICANTLY EXCEEDS CONTRACTUAL REQUIREMENTS TO THE GOVERNMENT’S
BENEFIT; ABOVE THE MINIMAL ACCEPTABLE LEVEL.
VERY GOOD
PERFORMANCE MEETS CONTRACTUAL REQUIREMENTS AND EXCEEDS SOME TO THE GOVERNMENT’S
BENEFIT. THE CONTRACTUAL PERFORMANCE OF THE ELEMENT OR SUB-ELEMENT BEING
EVALUATED WAS ACCOMPLISHED WITH SOME MINOR PROBLEMS FOR WHICH CORRECTIVE ACTIONS
TAKEN BY THE CONTRACTOR WAS EFFECTIVE.
SATISFACTORY PERFORMANCE MEETS CONTRACTUAL REQUIREMENTS; MINIMAL ACCEPTABLE LEVEL.
MARGINAL
PERFORMANCE DOES NOT MEET SOME CONTRACTUAL REQUIREMENTS. THE CONTRACTUAL
PERFORMANCE OF THE ELEMENT OR SUB-ELEMENT BEING EVALUATED REFLECTS A SERIOUS
PROBLEM FOR WHICH THE CONTRACTOR HAS NOT YET IDENTIFIED CORRECTIVE ACTIONS.
UNSATISFACTORY
PERFORMANCE DOES NOT MEET CONTRACTUAL REQUIREMENTS; BELOW THE MINIMAL ACCEPTABLE
LEVEL.
CONTRACTOR RESPONSIBILITY:
The failure of the Contractor to meet the AQL may result in a reduction of contract payment. Reviews and evaluations form the basis for determining compliance with performance requirements, measures, and standards. Performance reviews will identify the degree of success or failure by the Contractor. Failure to perform due to
Contractor delay or failure to comply with the mutually developed project schedule is considered a performance failure, threatening the execution of the program and will result in a basis for Government consideration. The Government reserves the right to withhold payment of invoices until deficient action is completed or consideration is provided.
5. GOVERNMENT ROLES & RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities:
CONTRACTING OFFICER:
The Contracting Officer is the only person appointed with the authority to enter into, administer, or terminate contracts and make related determinations and findings on behalf of the Government. The
Contracting Officer will ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and will safeguard the interests of the United States in the contractual relationship. The Contracting Officer is the single point of contact for addressing performance issues. The Contracting Officer will also assure that the contractor receives impartial, fair and equitable treatment under this contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of
Contractor performance.
Assigned Contracting Officer: Sandra L. Ingram
Organization or Agency: Marine Corps Systems Command
Telephone: (760) 725-9189
Email: sandra.ingram@usmc.mil
Assigned Contract Specialist: Jon D. Aaron
Organization or Agency: Marine Corps Systems Command
Telephone: (760) 725-2295
Email: jon.d.aaron@usmc.mil
CONTRACTING OFFICER’S REPRESENTATIVE (COR):
The COR is an individual designated and authorized in writing by the
Contracting Officer to perform specific technical or administrative functions of a contract. The COR engages in Government surveillance of Contractor performance. The COR may evaluate Contractor performance and document non-compliance, but only the Contracting
Officer may take action against the Contractor for unacceptable performance. The COR is not authorized to make any commitments or changes that affect price, quality, quantity, delivery, or any other term or condition of the contract.
Assigned COR: TBD
Telephone: TBD
Email: TBD
6. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
mailto:sandra.ingram@usmc.mil mailto:jon.d.aaron@usmc.mil
PERFORMANCE OBJECTIVE
PWS
PARA
PERFORMANCE
STANDARD
(WHAT SHOULD THE STANDARDS FOR COMPLETENESS, RELIABILITY, ACCURACY,
TIMELINESS, QUALITY, AND/OR COST BE?)
ACCEPTABLE
QUALITY LEVEL
(AQL)
(HOW MUCH ERROR WILL YOU
ACCEPT?)
SURVEILLANCE
METHOD
(HOW WILL YOU DETERMINE THAT
SUCCESS HAS BEEN ACHIEVED?)
OFTSSC ON-SITE TECHNICAL
SUPPORT
3.1
A. PROVIDES ON-SITE TECHNICAL SUPPORT TO THE OFTSSC 11 HOURS A
DAY, 5 DAYS A WEEK, FROM 0630 TO 1730, MONDAY THROUGH
FRIDAY, PACIFIC STANDARD TIME. PROVIDES SHIFT WORK AND ON-
CALL SUPPORT, AS REQUIRED, FROM 1730 TO 0630 MONDAY THROUGH
FRIDAY, AND 24 HOURS A DAY SATURDAY AND SUNDAY.
B. PROVIDES ISSUE RESOLUTION, TROUBLESHOOTING, ASSISTANCE WITH
SYSTEM ADMINISTRATION, SYSTEM SOFTWARE AND HARDWARE
INSTALLATION, TECHNICAL GUIDANCE, SYSTEMS INTEGRATION,
ENGINEERING ASSESSMENTS AND TESTING, DOCUMENTATION OF ISSUES,
AND RECOMMENDED SOLUTIONS.
C. ASSISTS IN MANAGING RECEIPT, ROUTING, RESOLUTION, AND TREND
ANALYSIS OF REQUESTS FOR SUPPORT IN ACCORDANCE WITH THE OFTSSC
STANDARD OPERATING PROCEDURES (SOP).
A. PROVIDES 95% OF
SCHEDULED SUPPORT.
B. PROVIDES 95% OF
RESPONSES IN ACCORDANCE
WITH SOLUTIONS DOCUMENTED
AT OFTSSC.
C. RECORDS 95% OF SUPPORT
REQUESTS AND
RESOLUTION(S) IN
ACCORDANCE WITH OFTSSC
SOP.
RANDOM
INSPECTION, ANALYSIS,
DEMONSTRATION, AND
CUSTOMER FEEDBACK
A. PROVIDES ISSUE RESOLUTION, TROUBLESHOOTING, ASSISTANCE WITH
SYSTEM ADMINISTRATION, SYSTEM SOFTWARE AND HARDWARE
INSTALLATION, TECHNICAL GUIDANCE, SYSTEMS INTEGRATION,
ENGINEERING ASSESSMENTS AND TESTING, DOCUMENTATION OF ISSUES,
RECOMMENDED SOLUTIONS, AND OVER-THE-SHOULDER TRAINING, AS
REQUIRED.
B. USE GOVERNMENT PROVIDED TOOLS/SOFTWARE INCIDENT MANAGEMENT
SYSTEM TO CAPTURE AND CATALOG SUPPORT REQUESTS AND RESOLUTION
ACTIONS.
A. RESOLVES 80% OF TIER
1 ISSUES WITHIN ONE WORK
DAY OF INITIAL CONTACT;
90% OF TIER 2 ISSUES
WITHIN FIVE WORK DAYS;
AND 98% OF TIER 3 ISSUES
WITHIN FIVE WORK DAYS.
B. DOCUMENTS 95% OF
REQUESTS AND RESPONSES
WITHIN 12 WORKING HOURS
OF INITIAL CONTACT WITH
REQUESTER.
PERIODIC
INSPECTION
ISSUE RESOLVED AS A RESULT OF TECHNICAL SUPPORT PROVIDED.
ASSISTANCE PROVIDED HAS AN IMMEDIATE POSITIVE IMPACT ON THE
SUPPORTED UNIT MISSION.
AFTER RESOLUTION, 90% OF
REQUESTERS CAN EXECUTE
(C4I) DUTIES OF THE
BILLET.
RANDOM
INSPECTION, ANALYSIS,
DEMONSTRATION, AND
CUSTOMER FEEDBACK
PARA
PERFORMANCE
STANDARD
(WHAT SHOULD THE STANDARDS FOR COMPLETENESS, RELIABILITY, ACCURACY,
TIMELINESS, QUALITY, AND/OR COST BE?)
ACCEPTABLE
QUALITY LEVEL
(AQL)
(HOW MUCH ERROR WILL YOU
ACCEPT?)
SURVEILLANCE
METHOD
(HOW WILL YOU DETERMINE THAT
SUCCESS HAS BEEN ACHIEVED?)
CONUS SUPPORT
OCONUS SUPPORT
3.3
3.5
A. PROVIDES SUPPORT DURING WORKING HOURS SET BY THE SUPPORTED
UNIT.
B. PROVIDES ISSUE RESOLUTION, TROUBLESHOOTING, ASSISTANCE WITH
SYSTEM ADMINISTRATION, SYSTEM SOFTWARE AND HARDWARE
INSTALLATION, TECHNICAL GUIDANCE, SYSTEMS INTEGRATION,
ENGINEERING ASSESSMENTS AND TESTING, DOCUMENTATION OF ISSUES,
AND RECOMMENDED SOLUTIONS.
C. MANAGE RECEIPT, ROUTING, RESOLUTION, AND TREND ANALYSIS OF
REQUESTS FOR SUPPORT IN ACCORDANCE WITH THE OFTSSC STANDARD
OPERATING PROCEDURES (SOP).
RESOLUTION(S) IN
ACCORDANCE WITH OFTSSC
SOP.
RANDOM
INSPECTION, ANALYSIS,
DEMONSTRATION, AND
CUSTOMER FEEDBACK
A. PROVIDES ISSUE RESOLUTION, TROUBLESHOOTING, ASSISTANCE WITH
SYSTEM ADMINISTRATION, SYSTEM SOFTWARE AND HARDWARE
INSTALLATION, TECHNICAL GUIDANCE, SYSTEMS INTEGRATION,
ENGINEERING ASSESSMENTS AND TESTING, DOCUMENTATION OF ISSUES,
ACTIONS.
A. RESOLVES 80% OF TIER
1 ISSUES WITHIN ONE WORK
DAY OF INITIAL CONTACT;
90% OF TIER 2 ISSUES
WITHIN FIVE WORK DAYS;
WITHIN 12 WORKING HOURS
OF INITIAL CONTACT WITH
REQUESTER.
RANDOM
INSPECTION
ISSUE RESOLVED AS THE RESULT OF TECHNICAL SUPPORT PROVIDED.
ASSISTANCE PROVIDED HAS AN IMMEDIATE POSITIVE IMPACT ON THE
SUPPORTED UNIT MISSION.
AFTER RESOLUTION, 90% OF
REQUESTERS CAN EXECUTE
(C4I) DUTIES OF THEIR
BILLET.
RANDOM
ANALYSIS, DEMONSTRATION,
AND CUSTOMER FEEDBACK
PARA
PERFORMANCE
STANDARD
(WHAT SHOULD THE STANDARDS FOR COMPLETENESS, RELIABILITY, ACCURACY,
TIMELINESS, QUALITY, AND/OR COST BE?)
ACCEPTABLE
QUALITY LEVEL
(AQL)
(HOW MUCH ERROR WILL YOU
ACCEPT?)
SURVEILLANCE
METHOD
(HOW WILL YOU DETERMINE THAT
SUCCESS HAS BEEN ACHIEVED?)
CONTINGENCY OPERATIONS
SUPPORT
3.7
A. PROVIDE SUPPORT DURING SUPPORTED UNIT WORKING HOURS.
B. PROVIDES ISSUE RESOLUTION, TROUBLESHOOTING, SYSTEM
ADMINISTRATION, SOFTWARE AND HARDWARE INSTALLATION, TECHNICAL
GUIDANCE, SYSTEMS INTEGRATION, ENGINEERING ASSESSMENTS AND
TESTING, ISSUE DOCUMENTATION AND SOLUTIONS.
C. ASSIST MANAGING RECEIPT, ROUTING, RESOLUTION, AND TREND
ANALYSIS OF REQUESTS FOR SUPPORT IN ACCORDANCE WITH THE OFTSSC
SOP.
D. PROVIDE READY TO DEPLOY PERSONNEL UPON ISSUANCE OF TASK
ORDER, FOR DURATION OF PERIOD OF PERFORMANCE OR UNTIL
REDEPLOYMENT TO CONUS.
RESOLUTION(S) IN
ACCORDANCE WITH OFTSSC
SOP.
D. DEPLOYS 95% OF
PERSONNEL UPON RECEIPT OF
TASK ORDER AND REMAIN FOR
PERIOD OF PERFORMANCE OR
UNTIL REDEPLOYMENT.
RANDOM
INSPECTION, ANALYSIS, AND
DEMONSTRATION
A. PROVIDES ISSUE RESOLUTION, TROUBLESHOOTING, ASSISTANCE WITH
SYSTEM ADMINISTRATION, SYSTEM SOFTWARE AND HARDWARE
INSTALLATION, TECHNICAL GUIDANCE, SYSTEMS INTEGRATION,
ENGINEERING ASSESSMENTS AND TESTING, DOCUMENTATION OF ISSUES,
ACTIONS.
A. RESOLVES 80% OF TIER
1 ISSUES WITHIN ONE WORK
DAY OF INITIAL CONTACT;
90% OF TIER 2 ISSUES
WITHIN FIVE WORK DAYS;
WITHIN 12 WORKING HOURS
OF INITIAL CONTACT WITH
REQUESTER.
RANDOM
INSPECTION
ISSUE RESOLVED AS A RESULT OF TECHNICAL SUPPORT PROVIDED.
ASSISTANCE PROVIDED HAS AN IMMEDIATE POSITIVE IMPACT ON THE
SUPPORTED UNIT MISSION.
AFTER RESOLUTION, 90% OF
REQUESTORS CAN EXECUTE
(C4I) DUTIES PER BILLET.
RANDOM
ANALYSIS, DEMONSTRATION,
PARA
PERFORMANCE
STANDARD
(WHAT SHOULD THE STANDARDS FOR COMPLETENESS, RELIABILITY, ACCURACY,
TIMELINESS, QUALITY, AND/OR COST BE?)
ACCEPTABLE
QUALITY LEVEL
(AQL)
(HOW MUCH ERROR WILL YOU
ACCEPT?)
SURVEILLANCE
METHOD
(HOW WILL YOU DETERMINE THAT
SUCCESS HAS BEEN ACHIEVED?)
MONTHLY SYSTEMS ANALYSIS
REPORT
MONTHLY PERFORMANCE REPORT
4.1.1
4.1.2
DELIVERS TO THE COR AN ELECTRONIC MONTHLY REPORT BY THE 15
TH
OF
EACH MONTH, IN THE CURRENT VERSION OF MICROSOFT OFFICE® WORD OR
EXCEL USED BY MCTSSA.
THE REPORT SHALL INCLUDE, BUT IS NOT LIMITED TO:
A. DESCRIPTION OF SERVICES, PRODUCTS, EVENTS, AND DELIVERABLES
COMPLETED DURING THE REPORTING PERIOD.
B. ANALYSIS OF INCIDENTS ENCOUNTERED THE PREVIOUS MONTH,
INCLUDING SIGNIFICANT ISSUES DISCOVERED, A DESCRIPTION OF THE
IDENTIFIED PROBLEM, ANY TEMPORARY OR WORK-AROUND SOLUTIONS
ATTEMPTED, THE TEMPORARY OR WORK-AROUND SOLUTION OF CHOICE,
AND THE RECOMMENDED PERMANENT.
C. A LIST OF CURRENT PROGRAMMATIC ISSUES WITH RECOMMENDED
SOLUTIONS.
THE CONTRACTOR SHALL PROVIDE A MONTHLY PERFORMANCE REPORT THAT
INCLUDES THE FOLLOWING:
D. A DESCRIPTION OF THE SERVICES PROVIDED, AND THE PRODUCTS,
EVENTS, AND DELIVERABLES COMPLETED AND ANY TECHNICAL DATA
CREATED OR COLLECTED, DURING THE REPORTING PERIOD.
E. OVER-THE-SHOULDER TRAINING PROVIDED TO INCLUDE NUMBER OF
PERSONNEL TRAINED AND SYSTEMS INVOLVED.
F. A REPORT CARD COVERING THE MEASURES OF PERFORMANCE FOR THE
REPORTING MONTH AGAINST THE TARGETED MEASURES OF EFFECTIVENESS
AND THE PRECEDING MONTH’S MEASURE OF PERFORMANCE.
A. IDENTIFIES 95% OF
SERVICES, EVENTS,
PRODUCTS, AND
DELIVERABLES.
B. ANALYZES 95% OF
TROUBLE CALLS; IDENTIFIES
95% OF TRENDS AND ROOT
CAUSES.
C. IDENTIFIES 95% OF
ISSUES AND SOLUTIONS.
D. OVER-THE-SHOULDER
TRAINING IS DOCUMENTED
95% OF THE TIME.
E. IDENTIFIES RESOURCE
DEFICIENCIES AND IMPACTS
95% OF THE TIME.
F. FORECAST DATA IS 95%
ACCURATE.
RANDOM INSPECTION
MONTHLY SYSTEMS ANALYSIS DELIVERED NO LATER THAN 15
TH
OF EACH
MONTH FOLLOWING THE REPORTING PERIOD.
MONTHLY PERFORMANCE DELIVERED NO LATER THAN 15
TH
OF EACH MONTH
FOLLOWING THE REPORTING PERIOD.
REPORTS ARE DELIVERED 95%
ON TIME (EXCLUDING
GOVERNMENT DELAYS).
PERIODIC
INSPECTION
THE REPORT CAPTURES ALL RELEVANT SYSTEMS ANALYSIS AND
PERFORMANCE DATA.
REPORTS ARE DELIVERED 95%
ON TIME (EXCLUDING
GOVERNMENT DELAYS).
RANDOM
INSPECTION, ANALYSIS,
DEMONSTRATION, AND
CUSTOMER FEEDBACK
PARA
PERFORMANCE
STANDARD
(WHAT SHOULD THE STANDARDS FOR COMPLETENESS, RELIABILITY, ACCURACY,
TIMELINESS, QUALITY, AND/OR COST BE?)
ACCEPTABLE
QUALITY LEVEL
(AQL)
(HOW MUCH ERROR WILL YOU
ACCEPT?)
SURVEILLANCE
METHOD
(HOW WILL YOU DETERMINE THAT
SUCCESS HAS BEEN ACHIEVED?)
MONTHLY FINANCIAL FORECAST
REPORT
4.1.3
THE REPORTS CAPTURE ALL RELEVANT SUPPORT PROVIDED AND IDENTIFY
TECHNICAL, FINANCIAL, AND STAFFING PROBLEMS OR ISSUES THAT MAY
IMPACT THE LEVEL OF SUPPORT TO THE OPERATING FORCES. THE
REPORT CAPTURES ALL COSTS ASSOCIATED WITH THE SUPPORT PROVIDED
PER TASK.
FORECAST DATA IS 95%
ACCURATE.
PERIODIC
INSPECTION
MONTHLY FINANCIAL FORECAST DELIVERED NO LATER THAN 10
TH
OF EACH
MONTH FOLLOWING THE REPORTING PERIOD.
REPORTS ARE DELIVERED 95%
ON TIME (EXCLUDING
GOVERNMENT DELAYS).
PERIODIC
INSPECTION
THE REPORTS CAPTURE ALL RELEVANT SUPPORT PROVIDED AND IDENTIFY
TECHNICAL, FINANCIAL, AND STAFFING PROBLEMS OR ISSUES THAT MAY
IMPACT THE LEVEL OF SUPPORT TO THE OPERATING FORCES. THE
REPORT CAPTURES ALL COSTS ASSOCIATED WITH THE SUPPORT PROVIDED
PER TASK.
FINANCIAL AND PERSONNEL
DATA ARE ACCURATELY
REPORTED AND DOCUMENTED
100% OF THE TIME.
ANALYSIS, DEMONSTRATION,
WEEKLY STAFFING STATUS
WEEKLY EMBEDDED DEPLOYED
SUPPORT STATUS
4.1.4
4.1.5
DELIVERS TO THE COR AN ELECTRONIC STATUS REPORT BY 1700 PST
ON FRIDAY OF EACH WEEK, IN THE CURRENT VERSION OF MICROSOFT
OFFICE® WORD OR EXCEL USED BY MCTSSA.
IDENTIFIES 100% OF
PERSONNEL BY NAME.
PERIODIC
INSPECTION
DUE TO COR BY 1700 PST ON FRIDAY OF EACH WEEK.
REPORTS ARE DELIVERED 95%
ON TIME (EXCLUDING
GOVERNMENT DELAYS).
PERIODIC
INSPECTION
THE REPORTS CAPTURE ALL RELEVANT SUPPORT PROVIDED AND IDENTIFY
TECHNICAL, FINANCIAL, AND STAFFING PROBLEMS OR ISSUES THAT MAY
IMPACT THE LEVEL OF SUPPORT TO THE OPERATING FORCES. THE
REPORT CAPTURES ALL COSTS ASSOCIATED WITH THE SUPPORT PROVIDED
PER TASK.
THE REPORTS CAPTURES ALL STAFF ASSOCIATED WITH THE SUPPORT
PROVIDED PER TASK.
STAFFING DATA ARE
ACCURATELY REPORTED AND
DOCUMENTED 100% OF THE
TIME.
PERIODIC
INSPECTION
PARA
PERFORMANCE
STANDARD
(WHAT SHOULD THE STANDARDS FOR COMPLETENESS, RELIABILITY, ACCURACY,
TIMELINESS, QUALITY, AND/OR COST BE?)
ACCEPTABLE
QUALITY LEVEL
(AQL)
(HOW MUCH ERROR WILL YOU
ACCEPT?)
SURVEILLANCE
METHOD
(HOW WILL YOU DETERMINE THAT
SUCCESS HAS BEEN ACHIEVED?)
CENSUS REPORT 4.1.6
EMPLOYEE CENSUS REPORT IS SUBMITTED ELECTRONICALLY TO THE
CONTRACTING OFFICER AND COR ON A MONTHLY BASIS. THE
INFORMATION PROVIDED IS CURRENT AS OF THE 25TH OF EACH MONTH
AND IS RECEIVED BY THE CONTRACTING OFFICER (KO) NO LATER THAN
THE 5
TH
BUSINESS DAY OF THE FOLLOWING MONTH.
INFORMATION IS PROVIDED FOR EACH PROVINCE IN WHICH WORK WAS
PERFORMED:
A. THE TOTAL NUMBER OF PERSONNEL (PRIME AND SUBCONTRACTORS AT
ALL TIERS).
B. THE TOTAL NUMBER OF U.S. CITIZENS (PRIME AND SUBCONTRACTORS
AT ALL TIERS).
C. NAME OF PROVINCE IN WHICH THE WORK WAS PERFORMED.
THE NAMES OF ALL COMPANY PERSONNEL WHO ENTER AND UPDATE
EMPLOYEE DATA IN THE SYNCHRONIZED PRE-DEPLOYMENT AND
OPERATIONAL TRACKER (SPOT) IAW DFARS 252.225-7040 OR DFARS
DOD CLASS DEVIATION 2007-O0010.
CENSUS REPORT PERSONNEL
INFORMATION IS ACCURATE
100% OF THE TIME.
SPOT LOAS ARE SUBMITTED
TIMELY TO REFLECT
PERSONNEL DEPLOYMENT 95%
OF THE TIME.
PERIODIC
INSPECTION
CENSUS REPORT IS PROVIDED TO THE CONTRACTING OFFICER BY THE 5TH
BUSINESS DAY OF THE FOLLOWING MONTH.
DELIVERED 95% ON TIME.
PERIODIC
INSPECTION
CENSUS REPORT IS ACCURATE AND REFLECTS THE SUPPORT BEING
PROVIDED AND THE TIME OF THE SERVICES.
REPORT IS ACCURATE 100%
OF THE TIME.
PERIODIC
INSPECTION
7. DOCUMENTING PERFORMANCE
A. EXCEPTIONAL, VERY GOOD, AND SATISFACTORY PERFORMANCE
The Government shall document positive performance. A report template is attached (Attachment 1).
Any report may become a part of the supporting documentation for the Contractor’s Performance
Assessment Report.
B. MARGINAL AND UNSATISFACTORY PERFORMANCE
When unacceptable performance occurs, the COR shall inform the Contract Specialist/Contracting
Officer. If substantiated, the Contract Specialist/Contracting Officer shall inform the contractor. The Contract Specialist/Contracting Officer will strive to work as a team with the contractor to ensure that the required work is performed in an efficient and proper manner. Less serious issues will be discussed and resolved on an impromptu basis. Meetings will be held with the Contract Specialist/Contracting Officer to resolve issues that are more serious. The COR will document unacceptable performance that is forwarded to the Contract Specialist and the Contracting
Officer. All issues will be documented in writing and placed in the Contracting file.
When the Contracting Officer determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor’s on-site representative. Anytime unacceptable performance is determined critical in nature and requires formal corrective action; and whenever an unfavorable trend is detected in contractor performance the COR will initiate a CDR. A CDR template is attached to this QASP (Attachment 2).
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the Contracting
Officer. The Government shall review the contractor’s corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for the Contractor’s Performance
Assessment Report or other actions deemed necessary by the Contracting Officer.
8. FREQUENCY OF MEASUREMENT
During contract/order performance, the COR shall take periodic measurements and analyze whether the frequency of measurement is appropriate for the work being performed.
The Contract Specialist/Contracting Officer shall meet with the contractor monthly to discuss performance and shall provide a written assessment. A formal assessment, for the performance period commencing from contract award through six months from contract award, will be documented through an Interim Report in the Contractor’s Performance Appraisal Report System (CPARS). An annual assessment will be documented through CPARS.
MONTHLY COR REPORT TO CONTRACTING OFFICER
DATE:
CONTRACT NUMBER:
SUPPLY/SERVICE:
CONTRACTOR'S NAME:
NAME AND TELEPHONE NUMBER OF COR:
1. Were any inspections conducted? YES_____ NO_____ If NO, explain.
2. Is the contractor performing in a satisfactory manner from technical, cost and schedule points of view? YES_____ NO_____ If NO, list any issues with the contractor's performance as they relate to:
a. Technical.
b. Cost.
c. Schedule.
(Use attachments as necessary.)
3. Did you receive any adverse feedback from customers regarding the contractor’s performance?
YES_____ NO_____ If YES, explain.
4. Have any contractually significant communications/meetings been held with the contractor?
YES_____ NO_____ If YES, explain.
5. Have any contractually significant communications/meetings been held with the client(s)?
YES_____ NO_____ If YES, explain. 94
6. Were any items, technical reports, services delivered and accepted? YES_____ NO_____ If NO, explain.
7. Were any items, technical reports, services delivered and rejected? YES_____ NO_____ If YES,
8. Have you assured the reporting data pursuant to Contractor Manpower Reporting (CMR) requirements has been completed if it is a deliverable under the contract? YES_____NO_____ If NO,
9. If invoices were not proper or complete or if the supplies were not delivered or services were not performed in accordance with the terms of the contract, and invoices were returned to the contractor, have you maintained this information in the COR file with evidence of the date and reasons returned? YES_____NO_____ If NO, explain.
10. Are you effectively using Wide Area Workflow for processing invoices and the receipt/inspection/acceptance of goods and services? YES_____NO_____ If NO, explain.
11. Is there any other matter concerning the contract/contractor under your cognizance as COR (see list of duties in your COR appointment letter) that needs to be surfaced to the KO?
YES_____NO_____ If YES, explain.
12. Do you have any questions for the KO applicable to your COR duties? YES_____NO_____ If YES, list questions.
13. Are there any significant issues, events, key milestones, and/or deliverables anticipated for next month? YES_____NO_____ If YES, explain.
CONTRACT DISCREPANCY REPORT (CDR)
CONTRACT NUMBER:
TO: [CONTRACTING OFFICER]
FROM:
DISCREPANCY OR PROBLEM:
(Describe in Detail: Include reference from PWS and provide dates and times as applicable)
CORRECTIVE ACTION PLAN:
A written corrective action plan ____Is ____Is Not required.
(If a written corrective action plan is required include the following statement)
{The written Corrective Action Plan will be provided to the undersigned not later than ____ days after receipt of this CDR.}
Prepared By: [COR’s name]
Contracting Officer’s Representative
Received By: [Contractor]
Contractor On-Site Representative