TCSH_RFP_M67854-16-R-6000_20160315.docx
DOCX document 162 KB Posted
- Attached to
- USMC M1A1 Tank Commander Single Handle (TCSH)
- Solicitation number
- M67854-16-R-6000
- Issued by
-
United States Marine Corps
About this file
TCSH_RFP_M67854-16-R-6000_20160315
View the file
Other files
| File | Type | Posted |
|---|---|---|
| M67854-16-R-6000-0001_Questions_and_Answers.docx | DOCX document | |
| Attachment_(3)_TCSH_GFP_20160122.pdf | ||
| Attachment_(5)_TCSH_Section_B_Description_of_Supplies_Services_Pricing_20160315.xlsx | XLSX spreadsheet | |
| Attachment_(4)_Past_Performance_Questionnaire_20160307.docx | DOCX document | |
| Exhibit_(A)_TCSH_CDRLs_20160315.pdf | ||
| Attachment_(1)_TCSH_P-Spec_20160113_ver_1.0.pdf | ||
| TCSH_Statement_of_Work_Draft_ver_1-3_20151110.docx | DOCX document | |
| TCSH_System_Performance_Spec_ver_1-0_20151008.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M67854-16-R-6000
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
TCSH FAT AND PRODUCTION YEAR 1 UNITS
FFP
CLIN for TCSH First Article Test (FAT) Units (Qty 10) and Production Year 1 Units (Qty 90) shall be IAW the SOW, P-Spec, and CDRLs A001 through A008. See Section L-4.9.1 for pricing instructions.
PURCHASE REQUEST NUMBER: M6785415NR14217
MAX
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0001AA
| 10 |
| Each |
TCSH FIRST ARTICLE TEST (FAT) UNITS
Sub-CLIN for FAT Units shall be IAW the SOW, P-Spec, and CDRLs A004 through A007. See Section L-4.9.1 for pricing instructions.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0001AB
| 90 |
| Each |
TCSH PRODUCTION YEAR 1
TCSH Sub-CLIN for Production Units shall be IAW the SOW, P-Spec, and CDRLs A001 through A003 and CDRL A008. See Section L-4.9.1 for pricing instructions.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Lot |
TCSH DATA FOR CLINS 0001, 0003, and 0004
CLIN for Data and shall be IAW CDRLs A001 through A008. This CLIN shall be NOT SEPARATELY PRICED.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 300 |
| Each |
TCSH PRODUCTION YEAR 2 (Qty 100-300)
CLIN for TCSH shall be performed IAW the SOW and P-Spec. The CLIN shall be for a quantity of 100-300 systems. See Section L-4.9.1 for pricing instructions.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 300 |
| Each |
TCSH PRODUCTION YEAR 3 (Qty 100-300)
CLIN for TCSH shall be performed IAW the SOW and P-Spec. The CLIN shall be for a quantity of 100-300 systems. See Section L-4.9.1 for pricing instructions.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 50 |
| Each |
SPARES FOR LOGCOM (QTY 1-50)
See Sections L-4.9.1 for pricing instructions.
MAX
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
100.00
450.00
DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE
The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
1.00
300.00
CLIN MINIMUM/MAXIMUM QUANTITY AND CLIN VALUE
The minimum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not be less than the minimum quantity(s) and CLIN value(s) stated in the following table. The maximum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not exceed the maximum quantity(s) and CLIN value(s) stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
| 0001AA |
| 10.00 |
10.00
| 0001AB |
| 90.00 |
90.00
| 0002 |
| 1.00 |
1.00
| 0003 |
| 100.00 |
300.00
| 0004 |
| 100.00 |
300.00
| 0005 |
| 1.00 |
50.00
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
| 0001AA |
| 10.00 |
10.00
| 0001AB |
| 90.00 |
90.00
| 0002 |
| 1.00 |
1.00
| 0003 |
| 100.00 |
300.00
| 0004 |
| 100.00 |
300.00
| 0005 |
| 1.00 |
50.00
Section C - Descriptions and Specifications
SECTION C
1. SCOPE. This Statement of Work (SOW) defines the effort required for the procurement, testing and delivery of the Tank Commander’s Single Handle (TCSH). The Contractor shall provide the requisite program management to ensure that delivery schedules and performance requirements of the TCSH is accomplished as set forth in the contract.
This SOW includes the associated Program and Data Management, Government Furnished Property, Meeting and Reviews, Testing, Environment, Safety, and Occupational Health, Configuration Management, Item Unique Identification, Technical Publications, Packaging, Handling, and Storage and Transportation for the TCSH program.
The contractor is responsible for providing all/specific material, services and necessary support documentation needed to complete the tasks identified in this SOW.
2. APPLICABLE DOCUMENTS. The following documents form a part of this SOW to the extent specified herein. The most recent revision of the referenced document at the time of contract shall be used unless otherwise specified. All second tier and below references cited in mandatory compliance documents shall be considered as guidance only. In the event of conflict between the applicable documents and this SOW, the SOW shall take precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.
2.1 Military Standards and Specifications - Mandatory Compliance.
MIL-STD-130N Identification Marking of U.S. Military Property
MIL-STD-882E Standard Practice for System Safety
2.2 Other Government Documents.
| MARINE CORPS | Operator’s Manual; Operator Controls, | |
| TM 08953A-10 | PMCS, and Operation under Unusual | |
| SERIES MANUALS | Conditions |
TCSH PERF SPEC TCSH Performance Specification
FED-STD-313D Material Safety Data, Transportation Data and Disposal Data for Hazardous Materials Furnished to Government Activities
2.3 Handbooks - Guidance Only.
MIL-HDBK-61A Configuration Management Guide
2.4 Drawings.
13060585 Tank Commander Handle (USMC) Drawing
2.5 Other Publications.
Not Applicable.
2.6 Non-Government Documents.
EIA-649B National Consensus Standard for Configuration Management
(Copies of EIA documents are available from www.eia.org or Electronic Industries Alliance Corporate Engineering Department, 2500 Wilson Boulevard, Arlington, VA, 22201.)
NAS 411 Hazardous Materials Management Program
(Copies of NAS 411 are available from www.aia-aerospace.org or Aerospace Industries Association of America, 1250 Eye Street, NW, Suite 1200, Washington, DC 20005-3924.)
ISO 9001-2008 Quality Management Practices
(Copies of ISO documents are available from www.iso.org or ISO Central Secretariat: International Organization for Standardization (ISO) 1, rue de Varembe, Case postale 56 CH-1211 Geneva 20, Switzerland.)
3. REQUIREMENTS. The contractor shall build and deliver up to 450 TCSH systems that meet the requirements of the performance specification. The contractor shall perform all tasks required and delineated in this SOW to manufacture, test, deliver and prepare associated documentation and deliver the TCSH.
3.1 Program and Data Management.
3.1.1 Program Management. The contractor shall establish and maintain program management practices throughout the period of performance. Program management practices shall provide visibility into the contractor’s program schedule, organization and techniques used in managing the program, specifically subcontractor and data management. Documentation shall be readily available to Government representative(s) during planned visits.
3.1.2 Data Management. The contractor shall establish a single, centralized system for management of all data required under this contract. The contractor, in developing information that will be furnished to the Government, shall make the maximum use of existing data. The Government reserves the right to review all data associated with and developed for the TCSH.
3.1.3 Assignment of Responsibility and Authority. The contractor shall identify the organizational elements responsible for the conduct of the activities delineated in this SOW. Responsibilities shall be assigned and clear lines of authority defined for determining and controlling the resources necessary to satisfy each element of this SOW. The contractor shall notify the Government within five working days of any changes regarding authority, responsibility, or key personnel changes made by the contractor during the period of performance.
3.1.3.1 Program Manager. The contractor shall designate a Program Manager (PM) who shall possess sufficient corporate authority to manage, direct, execute and control all elements of the contract.
3.2 Meetings, Formal Reviews, Conferences, and Audits.
3.2.1 Contractor Responsibilities. The contractor shall plan, host, attend, coordinate, support and conduct the meetings, formal reviews, conferences, and audits (hereinafter called "reviews"). The reviews shall be conducted at contractor facilities. All such reviews shall be included in the program schedule and may be held concurrently with the Government’s approval. The Government reserves the right to cancel any review or to require any review to be scheduled at critical points during the period of performance.
3.2.2 Post Award Conference. The contractor shall host a Post Award Conference (PAC) at the contractor's facility within 30 days after Contract Award. The purpose of the PAC is for the contractor to review and demonstrate to the Government the management procedures, provide progress assessments, review of technical and other specialty area status, and to establish schedule dates for near term critical meetings/actions. The contractor shall present management, key personnel, and program implementation processes.
3.2.3 In-Process Review. In Process Reviews (IPR) shall be held on a quarterly basis or as needed basis, on a date mutually agreed upon at the contractor’s facility. The Government reserves the right to cancel any review or to require any review to be scheduled during the period of performance. The contractor shall prepare presentation materials providing an overview of all agenda items.
3.2.4 Quality Management System. The contractor's quality management system shall ensure product conformation to contractual requirements. The contractor shall implement and document the ability to maintain the quality management system to be used on the contract. The contractor shall make available all quality management documentation for the Government to review upon request.
3.3 Environment, Safety, and Occupational Health.
3.3.1 System Safety. The contractor shall identify and evaluate environmental, safety and health hazards, define risk levels, and establish a program that manages the probability and severity of all hazards associated with the operation, maintenance and disposal of the system in accordance with MIL-STD-882E.
3.3.1.1 Safety Assessment. The contractor shall perform and document a Safety Assessment to identify all safety features of the hardware design and to identify hardware related hazards that may be present in the TCSH. The contractor shall assess applicable Environmental, Safety and Occupational Health (ESOH) laws and regulations and identify any potential compliance issues. The contractor shall provide the results of these assessments, including the Material Safety Data Sheets, in the Safety Assessment Report.
3.3.1.2 Safety Assessment Report. The contractor shall provide a Safety Assessment Report (SAR) that documents the Safety Assessment and clearly identifies any residual risks of the TCSH.
CDRL A001, Safety Assessment Report (SAR)
3.3.2 Hazardous Materials Management Program and Pollution Prevention. The contractor shall implement a Hazardous Materials Management Program (HMMP) and Pollution Prevention (P2) in accordance with NAS 411. The contractor shall avoid the use of toxic chemicals, hazardous materials, and ozone depleting substances (ODS) in the design, operational support and disposal of the TCSH where possible. The HMMP shall establish a process to manage all requirements for asbestos, radioactive materials, cadmium, hexavalent chromium, and extremely toxic or hazardous materials in design, production, operation, and support. The use of Class I or Class II Ozone Depleting Chemicals (ODCs) is prohibited in the design or operational support of the system without specific written approval of the contracting officer.
3.3.2.1 Material Safety Data Sheets. The contractor shall make available Material Safety Data Sheets (MSDS) to the Government for review in accordance with FED-STD-313D for any materials, equipment, components or systems that have substances or hazardous materials as part of its composition that require an MSDS.
3.3.2.2 Environmental Considerations. The contractor shall provide information on the potential for any adverse environmental impacts from the manufacturing, maintenance, and disposal of the TCSH. This information will be used to assist the Government in making a preliminary National Environmental Policy Act (NEPA) decision and in the preparation of formal NEPA documents, which include CATEX, EA, and EIS. Such environmental impacts include air, soil, wetlands, water, flora, fauna, endangered species, emissions and toxic waste resulting from development, maintenance (coatings and primers), operation, and disposal.
3.4 Configuration Management (CM) Process. The contractor shall maintain a configuration management (CM) process for the control of all hardware configuration documentation, media and parts representing or comprising the TCSH. The principles contained in EIA-649B and MIL-HDBK-61A may be used for guidance. The contractor's CM process shall consist of configuration identification, configuration control, configuration status accounting, and configuration audits. Consideration for interfacing with other acquisition requirements such as design review, assurance, and other program related disciplines shall be addressed. The contractor shall notify the Government of any changes at the contractor's facility, which affect the contractor's established CM process.
3.4.1 Configuration Status Accounting. The contractor shall establish and maintain a Configuration Status Accounting (CSA) database, which represents the configuration of the TCSH. All baselines and changes shall be documented in the contractor’s CSA database. The contractor's CSA database shall permit acceptance of commercial product information; however, if requirements to report data outside of the contractor's CSA database or format exist, the information may be delivered as a supplement to prevent disruption to their existing system. The contractor's CSA database shall reconcile any differences between the supplier information and contractor practices to provide the Government with clear accountability of product information. Additionally, the CSA database shall provide a reliable source of configuration information to support TCSH activities, including program management, systems engineering, logistics support, and modification/maintenance actions. The contractor’s CSA database shall be capable of providing CSA data in a digital format. The Government shall have access to the contractor’s CSA database throughout the period of performance.
3.4.1.1 Configuration Status Accounting Serialized Tracking. The contractor shall utilize the CSA database to record the serial numbers for primary components of the TCSHs delivered to the Government. The contractor shall maintain the information that allows traceability of vendor assigned serial numbers to the USMC TCSH Serial number or Unique Item Identifier (UII). The contractor’s CSA database shall include the following data elements:
| a. | USMC Serial Number or UII |
| b. | Vendor Part Number/CAGE |
| c. | Vendor Serial Number |
| d. | Serialized Part Nomenclature |
| e. | Date of Report |
3.4.2 Configuration Control. The contractor shall implement configuration control methods and procedures, which maintain the integrity and traceability of an established baseline. Changes to established baselines shall only be made after Government approval of an Engineering Change Proposals (ECP) and/or Request for Deviation (RFD). Sufficient supporting data to evaluate the proposed change, such as drawings, supplemental drawings, sketches, specifications, or manufacturer's data sheets, shall be submitted with ECP's and RFD's. Changes shall be identified to the affected assembly serial number, or if not part of an assembly, to the affected equipment serial number. The contractor's configuration control process shall be available for Government review. The contractor shall submit all configuration control documentation in a digital format specified by the Government.
3.4.2.1 Engineering Change Proposals. Engineering Change Proposals (ECP) shall be submitted by the contractor, and shall be limited to those, which are necessary or offer significant benefit to the Government. MIL-HDBK-61A provides guidance concerning the classification of ECP’s. Class I ECP’s shall be submitted when changes are required to the following:
| a. | Correct deficiencies |
| b. | Add or modify interface or interoperability requirements. |
| c. | Make a significant and measurable effectiveness change to safety, operational capabilities or logistics supportability of the system. |
| d. | Effect substantial life cycle costs/savings. |
| e. | Prevent slippage in an approved production schedule. |
Class II ECP’s shall be submitted by the contractor to the Defense Contract Management Agency (DCMA) representative for approval of those engineering changes which impact none of the factors listed above; the Government will approve/disapprove the class designation of the ECP.
At a minimum, all ECP’s shall contain the following information:
| a. | Date prepared |
| b. | Originator |
| c. | ECP Classification |
| d. | ECP Number |
| e. | Reason/need for change |
| f. | System designation (nomenclature, model, P/N) |
| g. | Name of part (or lowest assembly) affected to include part numbers |
| h. | Baselines affected (to include drawings, specifications, CAGE, revision level, etc.) |
| i. | Title of change |
| j. | Description of change |
| k. | Effect on interfaces (Interchangeability and Interoperability) |
| l. | Total costs/savings w/ breakout |
| m. | Retrofit information |
| n. | Effectively (date and lot/serial number of the change) |
| o. | Impact on any engineering disciplines (such as quality, environmental, safety, health, reliability, maintainability, etc.) |
| p. | Justification for change |
| q. | Priority of change |
| r. | Impacts to any logistics support elements (such as software, manuals, spares, tools, etc.) being utilized by Government personnel in support of the product |
| s. | Alternatives evaluated or considered. |
CDRL A002, Engineering Change Proposal (ECP)
3.4.2.2 Requests for Deviation. The contractor shall process Requests for Deviation (RFD) from current approved configuration documentation. Authorized deviations are a temporary departure from the requirements and do not constitute a change in an approved baseline. Submission of recurring deviations is discouraged and shall be minimized. Where it is determined that a change should be permanent, the contractor shall process an Engineering Change Proposal. MIL-HDBK-61A provides guidance concerning the classification of RFDs. As a minimum, the RFD shall contain the following information:
| a. | Date prepared |
| b. | Originator |
| c. | RFD Classification (critical, major or minor) |
| d. | Designation for deviation (model/type, CAGE code, system designation, and deviation number) |
| e. | Class of deviation |
| f. | Part Number affected |
| g. | Cost/Price data |
| h. | Effectively |
| i. | Description of deviation |
| j. | Need for deviation |
| k. | Effect on delivery schedule |
| l. | Recommended corrective action |
| m. | Alternatives evaluated. |
CDRL A003, Request for Deviation (RFD)
3.5 Item Unique Identification. The Contractor shall implement specific Item Unique Identification (IUID) markings, as defined in MIL-STD-130N and DFARS clause 252.211-7003. The IUID marking shall be incorporated into data plates and/or applicable components and shall present a Unique Item Identifier (UII) in construct #2 which at a minimum shall encompass: Issuing Agency Code (IAC), Enterprise ID, Original Part Number, Serial Number and Current Part Number under “Other” if the two part numbers (the original and current numbers) are different. It should be noted that the IAC represents the registration authority that issued the enterprise identifier (i.e., Dun and Bradstreet, UCC.EAN, etc). The IAC can be derived from the data qualifier for the enterprise identifier and may need to be marked on the item.
The two-dimensional IUID data matrix shall be machine-readable with scanning devices and shall be accompanied by the corresponding human readable markings when practical. All 2D data matrix shall be permanently affixed or engraved and have the ability to withstand and perform within the same environmental conditions as the TCSH. Whenever practical, the location of the marking on the item shall ensure its readability. Proposed size and location of IUID markings shall be presented to the Government for approval.
All end items, spare parts, and components that exceed $5,000 when purchased separately, that are less than $5,000 and identified by the Product Manager as a traceable, high-pilferage asset requiring traceability, or part, component, assembly, or sub-assembly that is less than $5,000 and serialized, shall also be marked with the IUID prior to delivery to the Government.
3.6 Testing/Verification. The contractor shall build ten (10) First Article Test (FAT) units. Six of the FAT units shall be subjected to contractor FAT testing. The Government will require three (3) of the ten (10) FAT units to conduct on vehicle FAT testing per the TCSH Performance Specification. The contractor shall maintain one FAT unit at their facility for use as a spare for contractor or Government FAT testing. First Article Tests in Section 4, para 4.10 of the TCSH Performance Specification that requires the system to be mounted on the M1A1 tank will be performed by the Government at Government facilities.
3.6.1 First Article Test. The contractor shall develop an Acceptance Test (AT) Plan and FAT test procedures for all contractor conducted AT and FAT tests. Contractor FAT testing shall be performed on six of the FAT units. Contractor FAT shall consist of the following:
1. Performance Testing shall be conducted on three (3) units.
1. Environmental Testing shall be conducted on three (3) units.
1. One (1) unit shall be maintained by the contractor for use as a spare for either Government or contractor FAT testing in the event of damage to a system not related to a FAT testing event.
Following first article testing, the contractor shall provide a FAT test Report documenting the test results. Following successful completion of FAT testing, FAT units shall be delivered to the Government.
Additional FAT shall be conducted when:
1. A Class I ECP is made to the technical data.
1. Whenever there is a lapse in production for a period in excess of 180 days.
1. Whenever a major change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply.
1. When conditions of (a), (b) or (C) occur, the contractor shall notify the contracting officer so that a determination can be made concerning the need for an additional first article sample, or portion thereof, and instruction provided concerning the submission, inspection and notification of results. Costs of the first article testing resulting from production process change, change in place of performance or material substitution shall be borne by the contractor.
CDRL A004, Acceptance Test Plan
CDRL A005, First Article Test Procedure
CDRL A006, First Article Test/Inspection Report
CDRL A007, FAT Failure Summary and Analysis Preliminary and Final Report
3.7 Technical Publications.
3.7.1 Change Pages/Modification Instructions. The contractor shall produce and provide the necessary illustrations to support the development of the change pages. Any illustrations shall be sufficient to address the operation of the TCSH.
CDRL A008, Operator and Maintainer Technical Manual Changes
3.8 Government Furnished Material. For the base contract the government will provide one hundred (100) TC control handles for use as seed stock by the contractor. For the remaining production delivery orders the Government will provide the SCWS grip assemblies and the TC control handles for the contractor’s use in production once they have been removed from the tanks during installation of the TCSH.
4.0 Security Requirements. The information provided to the contractor will be Unclassified and/or Controlled Unclassified Information (CUI). The contractor is not required or expected to have a Facility Clearance and contractor personnel supporting this effort are not required to possess Personnel Clearance Levels. Any contractor personnel requiring access to U.S. Government CUI shall possess a completed background investigation (minimum of a NACI) for this Public Trust Position.
4.1 Common Access Card (CAC) Requirement. The COR will identify and approve those contractor employees performing on this contract that require Common Access Cards (CACs) in order to perform their job function. In accordance with Headquarters, United States Marine Corps issued guidance relative to Homeland Security Presidential Directive – 12 (HSPD-12), all personnel must meet eligibility criteria to be issued a CAC. In order to meet the eligibility criteria, contractor employees requiring a CAC, must obtain and maintain a favorably adjudicated Personnel Security Investigation (PSI.) Prior to authorizing a CAC, the employee’s JPAS record must indicate a completed and favorably adjudicated PSI or (at a minimum) that a PSI has been submitted and accepted (opened.) The minimum acceptable investigation is a National Agency Check with Written Inquiries (NACI.) If a contractor employee’s open investigation closes and is not favorably adjudicated, the CAC must be immediately retrieved and revoked.
Facility Security Officers (FSOs) are responsible for notifying the MCSC Security Director if any contractor performing on this contract receives an unfavorable adjudication after being issued a CAC. The FSO must also notify the MCSC Security Director of any adverse/derogatory information associated with the 13 Adjudicative Guidelines/Factors concerning any contractor issued a CAC, regardless of whether a JPAS Incident Report is submitted.
Each CAC is issued with a “ctr.usmc.mil” e-mail account that the individual contractor is responsible to keep active by logging in on a regular basis (at least twice a month), sending an e-mail and clearing any unneeded e-mails. Contractors are prohibited from “auto-forwarding” their .mil e-mail account to their .com e-mail account. If the ctr.usmc.mil e-mail account is not kept active, the G-6 will deactivate the account and CAC will lose its functionality.
Common Access Cards (CACs) will only be issued to those contractors supporting this contract that have been authorized by the COR. The COR will only authorize CACs for those contractors that meet current Homeland Security Presidential Directive – 12 (HSPD-12) criteria and have a definitive requirement.
If a contractor loses their eligibility for a CAC due to an adverse adjudicative decision, they have also lost their eligibility to perform on MCSC contracts. CACs are not issued for convenience.
Section D - Packaging and Marking
SECTION D PACKAGING & MARKING
D-1 TECHNICAL DATA ITEMS
All documentation deliverable under this contract shall be packaged and packed so as to preclude damage during transit. These items shall be packaged, packed, and marked in order to meet the requirements of the carrier, and ensure safe delivery at destination.
D-2 SUPPLY ITEMS
All supplies deliverable under this contract shall be prepared for delivery (Preserved, Packed, Palletized, and Marked) in accordance with the best commercial practices of ASTM D3951, so as to preclude damage during transit and ensure safe delivery. If wood is used in the bulk shipment configuration, only wood treated and certified against infestation of nematodes shall be used in accordance with Department of Defense (DoD) 4140.01-M-1 and International Standard for Phytosanity Measures (ISPM 15). Hazardous materials (HAZMAT) shall be P&P’d in accordance with the requirements of Federal Regulation 49CFR and the FED-STD-313.
D-3 MARKING INSTRUCTIONS
Marking of all deliverables (supplies and technical documentation) shall be in accordance with the contractor's best commercial practices, using the latest version of MIL STD 129 as guidance.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| N/A |
| N/A |
| N/A |
| Government |
| 0001AA |
| Origin |
| Government |
| Origin |
| Government |
| 0001AB |
| Origin |
| Government |
| Origin |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
| 0003 |
| Origin |
| Government |
| Origin |
| Government |
| 0004 |
| Origin |
| Government |
| Origin |
| Government |
| 0005 |
| Origin |
| Government |
| Origin |
| Government |
CLAUSES INCORPORATED BY REFERENCE
| 52.246-2 |
| Inspection Of Supplies--Fixed Price |
| AUG 1996 |
| 52.246-16 |
| Responsibility For Supplies |
| APR 1984 |
INSPECTION AND ACCEPTANCE
E-1 INSPECTION AND ACCEPTANCE RESPONSIBILITIES
CLINs 0001 and 0003 through 0005 - Inspection and Acceptance will be conducted at Origin by the cognizant Defense Contract Management Office.
CLIN 0002 – Inspection and Acceptance will be conducted at Destination by Marine Corps Systems Command, PdM Tank Systems.
Section F - Deliveries or Performance
| 52.242-15 |
| Stop-Work Order |
| AUG 1989 |
| 52.242-17 |
| Government Delay Of Work |
| APR 1984 |
| 52.247-34 |
| F.O.B. Destination |
| NOV 1991 |
| 52.247-48 |
| F.O.B. Destination--Evidence Of Shipment |
| FEB 1999 |
DELIVERIES OR PERFORMANCE
F-1 The Required Delivery Dates for TCSH shall be in accordance with the delivery schedule and locations established in each Delivery Order. (Note: Delivery locations and/or quantities may change)
SECTION F – DELIVERIES AND PERFORMANCE
| CLIN |
| QTY/ |
UNIT ISSUE
| DESCRIPTION |
| DESTINATION |
| DELIVERY DATE/ |
PERIOD OF PERFORMANCE
| 0001AA |
| 7 Each |
| FAT Units |
| Contractor’s Facility |
| Delivery shall be completed no later than 270 days after issuance of delivery order |
| 0001AA |
| 3 Each |
| FAT Units |
| Commander |
Marine Corps Systems Command PM AFSS, PdM Tanks Attn: Michael Kreiner Quantico, VA 22134 Delivery shall be completed no later than 270 days after issuance of delivery order
| 0001AB |
| 90 Each |
| Production Units |
| See Table Below |
| Delivery shall be completed no later than 400 days after issuance of delivery order |
| 0002 |
| Per DD Form 1423 |
| CDRLs A001-A008 |
| Per DD Form |
| Per DD Form 1423 |
| 0003 |
| NTE 300 Each |
| Production Units |
| See Table Below |
| Delivery shall be completed no later than 360 days after issuance of delivery order |
| 0004 |
| NTE 300 Each |
| Production Units |
| See Table Below |
| Delivery shall be completed no later than 360 days after issuance of delivery order |
| 0005 |
| NTE 50 Each |
| Production Units |
| See Table Below |
| Delivery shall be completed no later than 360 days after issuance of delivery order |
For Production CLINs 0003 and 0004, the Government anticipates procuring up to 300 TCSHs per year and may order out-year production CLINs early if additional funding becomes available, however, the Government does not intend to procure more than 450 TCSH over the life of this contract.
Shipping Addresses and Quantities for CLINs 0001AB, 0003, 0004 and 0005 are provided below for estimating shipping costs for proposal purposes only. The actual delivery locations and quantities will be identified in individual delivery orders.
| CLIN |
| QTY |
| LOCATION |
| 0001AA |
| 3 |
| M95450 |
SUPPLY OFFICER ATTN: PdM Tanks Mike Kreiner
MARINE CORPS SYSTEMS COMMAND
2201 WILLIS ST
QUANTICO VA 22134-6050
| 0001AB |
| 90 |
| W0LX ANNISTON DEPOT PROP DIV |
ATTN: Rod Sutton
ANNISTON ARMY DEPOT BLDG 513
7 FRANKFORD AVE
ANNISTON AL 36201-5021
256-235-6775
| 0003 and 0004 |
| 58 |
| DISTRIBUTION MANAGEMENT OFFICER |
M/F M21410 1ST TANK BN, 1ST MARDIV
MCAGCC BLDG 1102
TWENTYNINE PALMS CA 92278-8272
760-830-6830
| 0003 and 0004 |
| 30 |
| MATERIAL DISTRIBUTION CENTER |
BLDG 1119 MF M21420 2ND TANK BN
2D SUPPLY BN 2D MLG
CAMP LEJEUNE NC 28542
910-451-7862
| 0003 and 0004 |
| 8 |
| TRAFFIC MANAGEMENT OFFICER M21442 |
MF A CO 4TH TANK BN 4TH MAR DIV
MARINE CORPS BASE
CAMP PENDLETON CA 92055
760-725-0297
| 0003 and 0004 |
| 8 |
| DMO M21443 |
B CO, 4TH TANK BN, 4TH MARDIV
970 FIRING CENTER RD, USMRTC
YAKIMA WA 98901-9347
509-249-4044
| 0003 and 0004 |
| 8 |
| SUPO MF M21444 |
C CO 4TH TANK BN
4087 HARVARD ST
BOISE ID 83705-6507
208-422-6250
| 0003 and 0004 |
| 8 |
| COMMANDING OFFICER |
CO D 4TH TANK BN
MCRC BLDG 2070 13TH STREET
TWENTYNINE PALMS CA 92277
| 0003 and 0004 |
| 8 |
| COMMANDING OFFICER |
E CO 4TH TANK BN MARFORRES M21403
7TH ARMORED DIV CUTOFF RD BLDG 7241
FORT KNOX KY 40121-5770
502-624-7278
| 0003 and 0004 |
| 8 |
| DMO M21405 |
FOX CO 4TH TANK BN 4TH MARDIV
RR120 STONE BAY
SNEADS FERRY NC 28460
910-451-3734
| 0003 and 0004 |
| 28 |
| TRAFFIC MANAGEMENT OFFICER |
MF M92502 BLOUNT ISLAND PORT T E
6200 FLAGSHIP CIRCLE BLOUNT ISLAND
JACKSONVILLE, FL 32226-3404
| 0003 and 0004 |
| 28 |
| DISTRIBUTION MANAGEMENT OFFICE |
M/F M35014 EXERCISE SUPPORT DIV
BLDG 1102, DOOR 24, PH 760-830-6146
TWENTYNINE PALMS CA 92278-8108
| 0003 and 0004 |
| 6 |
| W26DJ2 |
Dept of the Army
NVESD
Ft. A.P. Hill Test Facilities 8715 Mosby Road Ft. A.P. Hill, VA 22427-3120
ATTN RON COLLINS
| 0003 and 0004 |
| 121 |
| TRAFFIC MANAGEMENT OFFICER |
MCLB BLDG 1221 DR 20
MF M99933 SET ASSY WHSE 1241 DR 13
ALBANY GA 31704-5000
ATTN SSGT GORE X5087
| 0003 and 0004 |
| 30 |
| W0LX ANNISTON DEPOT PROP DIV |
ANNISTON ARMY DEPOT BLDG 513
7 FRANKFORD AVE
ANNISTON AL 36201-5021
ATTN ROD SUTTON 256-235-6775
| 0003 and 0004 |
| 7 |
| TRAFFIC MANAGEMENT OFFICER |
MF MMFAF5 REPARABLE ISSUE POINT
MARINE CORPS BASE BLDG 1011
CAMP LEJEUNE NC 28542-0094
| 0003 and 0004 |
| 7 |
| FREIGHT TRAFFIC MANAGEMENT OFFICER |
MF RIP 1ST MAINT BN 1ST MLG
MARINE CORPS BASE BLDG 2262
CAMP PENDLETON CA 92055-5001
| 0003 and 0004 |
| 7 |
| OFFICER IN CHARGE |
MF MMFAX1 RIP
BLDG 1260 DR 9
ALBANY GA 31705-5000
| 0005 |
| 50 |
| OFFICER IN CHARGE |
MF MMFAX1 RIP
BLDG 1260 DR 9
ALBANY GA 31705-5000
Section G - Contract Administration Data
CLAUSES INCORPORATED BY FULL TEXT
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
Combo
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
See Section E
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* Field Name in WAWF Data to be entered in WAWF
| Pay Official DoDAAC | TBD | ||
| Issue By DoDAAC | M67854 | ||
| Admin DoDAAC | TBD | ||
| Inspect By DoDAAC | Per Section E | ||
| Ship To Code | Per Section F | ||
| Ship From Code | N/A | ||
| Mark For Code | Per Section F | ||
| Service Approver (DoDAAC) | M67854 Extension TANK | ||
| Service Acceptor (DoDAAC) | M67854 Extension TANK | ||
| Accept at Other DoDAAC | N/A | ||
| LPO DoDAAC | N/A | ||
| DCAA Auditor DoDAAC | N/A | ||
| Other DoDAAC(s) | N/A |
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
michael.kreiner@usmc.mil james.k.shaffer@usmc.mil lynn.frazier@usmc.mil lisa.phillips1@usmc.mil
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Bobby Walcott, bobby.walcott@usmc.mil
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
(End of clause)
SECTION G - CONTRACT ADMIN
G-1 POINTS OF CONTACT
1. Contract Administration Office
Contract administration functions see FAR 42.302 and DFAR 242.302 are assigned to:
TBD
Contract administration functions withheld, additional contract administration functions assigned, or special instructions (see FAR 42.202): NONE
1. Paying Office
The Paying Office which will make payments is designated as follows:
TBD
1. Purchasing Office
The Purchasing Office for this procurement is:
Lisa Phillips Contract Specialist Commander Marine Corps Systems Command Armor & Fire Support Systems 2200 Lester Street Quantico, VA 22134 703.432.5738 lisa.phillips1@usmc.mil and/or
Lynn Y. Frazier Contracting Officer Commander Marine Corps Systems Command Armor & Fire Support Systems 2200 Lester Street Quantico, VA 22134 703.432.8709 lynn.frazier@usmc.mil
1. Program Office:
The Contracting Officer Representative (COR) for this procurement is:
Michael Kreiner Project Officer Commander Marine Corps Systems Command Armor & Fire Support Systems 2200 Lester Street Quantico, VA 22134 703.432.5744 michael.kreiner@usmc.mil
G-2 ACCOUNTING CLASSIFICATION REFERENCE NUMBER (ACRN)
The Accounting Classification Reference Number (ACRN) is the double letter prefix to the long line accounting classification citation number contained in the accounting data. It is used as a method for tracking expenditures against individual contract line items. In instances where multiple long line accounting classification numbers are applicable to single line items, each will be prefixed by a separate ACRN. Each line item, subline item, task and subtask listed in the schedule or Statement of Work shall have an accounting classification reference number assigned at the time of award or upon issuance of the task or delivery order.
G-3 POSTING INVOICES IN WAWF
For payment purposes, all invoices posted in Wide Area Workflow shall reflect 'M67854' as the 'Ship To' DODAAC to allow the Project Officer approval access without regard to the actual destination of the equipment.
G-4 PAYMENT INSTRUCTIONS FOR DFAS
In accordance with DFARS 204.7108(c)(7), this contract contains Firm-Fixed Price (FFP) Contract Line Item Numbers (CLINs). Payments shall be made in accordance with DFARS 252.204-0010 Contract-Wide: By Cancellation Date, for FFP CLINs.
Section I - Contract Clauses
| 52.202-1 |
| Definitions |
| NOV 2013 |
| 52.203-3 |
| Gratuities |
| APR 1984 |
| 52.203-5 |
| Covenant Against Contingent Fees |
| MAY 2014 |
| 52.203-6 |
| Restrictions On Subcontractor Sales To The Government |
| SEP 2006 |
| 52.203-7 |
| Anti-Kickback Procedures |
| MAY 2014 |
| 52.203-8 |
| Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity |
| MAY 2014 |
| 52.203-10 |
| Price Or Fee Adjustment For Illegal Or Improper Activity |
| MAY 2014 |
| 52.203-12 |
| Limitation On Payments To Influence Certain Federal Transactions |
| OCT 2010 |
| 52.203-13 |
| Contractor Code of Business Ethics and Conduct |
| OCT 2015 |
| 52.203-14 |
| Display of Hotline Poster(s) |
| OCT 2015 |
| 52.203-15 |
| Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 |
| JUN 2010 |
| 52.203-16 |
| Preventing Personal Conflicts of Interest |
| DEC 2011 |
| 52.203-17 |
| Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights |
| APR 2014 |
| 52.204-4 |
| Printed or Copied Double-Sided on Postconsumer Fiber Content Paper |
| MAY 2011 |
| 52.204-10 |
| Reporting Executive Compensation and First-Tier Subcontract Awards |
| OCT 2015 |
| 52.204-13 |
| System for Award Management Maintenance |
| JUL 2013 |
| 52.209-6 |
| Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment |
| OCT 2015 |
| 52.209-10 |
| Prohibition on Contracting With Inverted Domestic Corporations |
| NOV 2015 |
| 52.210-1 |
| Market Research |
| APR 2011 |
| 52.211-5 |
| Material Requirements |
| AUG 2000 |
| 52.211-15 |
| Defense Priority And Allocation Requirements |
| APR 2008 |
| 52.215-2 |
| Audit and Records--Negotiation |
| OCT 2010 |
| 52.215-8 |
| Order of Precedence--Uniform Contract Format |
| OCT 1997 |
| 52.215-9 |
| Changes or Additions to Make-or-Buy Program |
| OCT 1997 |
| 52.215-11 |
| Price Reduction for Defective Certified Cost or Pricing Data--Modifications |
| AUG 2011 |
| 52.215-13 |
| Subcontractor Certified Cost or Pricing Data--Modifications |
| OCT 2010 |
| 52.215-14 |
| Integrity of Unit Prices |
| OCT 2010 |
| 52.215-21 |
| Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications |
| OCT 2010 |
| 52.215-23 |
| Limitations on Pass-Through Charges |
| OCT 2009 |
| 52.219-8 |
| Utilization of Small Business Concerns |
| OCT 2014 |
| 52.219-9 Alt II |
| Small Business Subcontracting Plan (OCT 2015) Alternate II |
| OCT 2001 |
| 52.219-16 |
| Liquidated Damages-Subcontracting Plan |
| JAN 1999 |
| 52.222-1 |
| Notice To The Government Of Labor Disputes |
| FEB 1997 |
| 52.222-3 |
| Convict Labor |
| JUN 2003 |
| 52.222-19 |
| Child Labor -- Cooperation with Authorities and Remedies |
| JAN 2014 |
| 52.222-20 |
| Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 |
| MAY 2014 |
| 52.222-21 |
| Prohibition Of Segregated Facilities |
| APR 2015 |
| 52.222-26 |
| Equal Opportunity |
| APR 2015 |
| 52.222-29 |
| Notification Of Visa Denial |
| APR 2015 |
| 52.222-35 |
| Equal Opportunity for Veterans |
| OCT 2015 |
| 52.222-36 |
| Equal Opportunity for Workers with Disabilities |
| JUL 2014 |
| 52.222-37 |
| Employment Reports on Veterans |
| OCT 2015 |
| 52.222-40 |
| Notification of Employee Rights Under the National Labor Relations Act |
| DEC 2010 |
| 52.222-50 |
| Combating Trafficking in Persons |
| MAR 2015 |
| 52.222-54 |
| Employment Eligibility Verification |
| OCT 2015 |
| 52.223-6 |
| Drug-Free Workplace |
| MAY 2001 |
| 52.223-18 |
| Encouraging Contractor Policies To Ban Text Messaging While Driving |
| AUG 2011 |
| 52.225-13 |
| Restrictions on Certain Foreign Purchases |
| JUN 2008 |
| 52.227-1 |
| Authorization and Consent |
| DEC 2007 |
| 52.227-2 |
| Notice And Assistance Regarding Patent And Copyright Infringement |
| DEC 2007 |
| 52.227-3 |
| Patent Indemnity |
| APR 1984 |
| 52.229-3 |
| Federal, State And Local Taxes |
| FEB 2013 |
| 52.232-1 |
| Payments |
| APR 1984 |
| 52.232-8 |
| Discounts For Prompt Payment |
| FEB 2002 |
| 52.232-9 |
| Limitation On Withholding Of Payments |
| APR 1984 |
| 52.232-11 |
| Extras |
| APR 1984 |
| 52.232-17 |
| Interest |
| MAY 2014 |
| 52.232-18 |
| Availability Of Funds |
| APR 1984 |
| 52.232-23 |
| Assignment Of Claims |
| MAY 2014 |
| 52.232-25 |
| Prompt Payment |
| JUL 2013 |
| 52.232-33 |
| Payment by Electronic Funds Transfer--System for Award Management |
| JUL 2013 |
| 52.233-1 |
| Disputes |
| MAY 2014 |
| 52.233-3 |
| Protest After Award |
| AUG 1996 |
| 52.233-4 |
| Applicable Law for Breach of Contract Claim |
| OCT 2004 |
| 52.237-8 |
| Restriction on Severance Payments to Foreign Nationals |
| AUG 2003 |
| 52.237-9 |
| Waiver of Limitation on Severance Payments to Foreign Nationals |
| MAY 2014 |
| 52.242-13 |
| Bankruptcy |
| JUL 1995 |
| 52.243-1 |
| Changes--Fixed Price |
| AUG 1987 |
| 52.243-6 |
| Change Order Accounting |
| APR 1984 |
| 52.245-1 |
| Government Property |
| APR 2012 |
| 52.245-9 |
| Use And Charges |
| APR 2012 |
| 52.246-23 |
| Limitation Of Liability |
| FEB 1997 |
| 52.247-63 |
| Preference For U.S. Flag Air Carriers |
| JUN 2003 |
| 52.249-2 |
| Termination For Convenience Of The Government (Fixed-Price) |
| APR 2012 |
| 52.249-8 |
| Default (Fixed-Price Supply & Service) |
| APR 1984 |
| 52.249-14 |
| Excusable Delays |
| APR 1984 |
| 52.253-1 |
| Computer Generated Forms |
| JAN 1991 |
| 252.201-7000 |
| Contracting Officer's Representative |
| DEC 1991 |
| 252.203-7000 |
| Requirements Relating to Compensation of Former DoD Officials |
| SEP 2011 |
| 252.203-7001 |
| Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies |
| DEC 2008 |
| 252.203-7002 |
| Requirement to Inform Employees of Whistleblower Rights |
| SEP 2013 |
| 252.203-7003 |
| Agency Office of the Inspector General |
| DEC 2012 |
| 252.204-7000 |
| Disclosure Of Information |
| AUG 2013 |
| 252.204-7002 |
| Payment For Subline Items Not Separately Priced |
| DEC 1991 |
| 252.204-7003 |
| Control Of Government Personnel Work Product |
| APR 1992 |
| 252.204-7012 |
| Safeguarding Covered Defense Information and Cyber Incident Reporting. |
| SEP 2015 |
| 252.204-7015 |
| Disclosure of Information to Litigation Support Contractors |
| FEB 2014 |
| 252.205-7000 |
| Provision Of Information To Cooperative Agreement Holders |
| DEC 1991 |
| 252.209-7004 |
| Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism |
| OCT 2015 |
| 252.211-7007 |
| Reporting of Government-Furnished Property |
| AUG 2012 |
| 252.219-7003 |
| Small Business Subcontracting Plan (DOD Contracts) |
| OCT 2014 |
| 252.219-7003 (Dev) |
| Small Business Subcontracting Plan (DOD Contracts) (Deviation 2013-O0014) |
| OCT 2014 |
| 252.225-7001 |
| Buy American And Balance Of Payments Program-- Basic (Nov 2014) |
| NOV 2014 |
| 252.225-7002 |
| Qualifying Country Sources As Subcontractors |
| DEC 2012 |
| 252.225-7012 |
| Preference For Certain Domestic Commodities |
| FEB 2013 |
| 252.225-7048 |
| Export-Controlled Items |
| JUN 2013 |
| 252.226-7001 |
| Utilization of Indian Organizations and Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns |
| SEP 2004 |
| 252.227-7013 |
| Rights in Technical Data--Noncommercial Items |
| FEB 2014 |
| 252.227-7014 |
| Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation |
| FEB 2014 |
| 252.227-7016 |
| Rights in Bid or Proposal Information |
| JAN 2011 |
| 252.227-7019 |
| Validation of Asserted Restrictions--Computer Software |
| SEP 2011 |
| 252.227-7020 |
| Rights In Special Works |
| JUN 1995 |
| 252.227-7027 |
| Deferred Ordering Of Technical Data Or Computer Software |
| APR 1988 |
| 252.227-7030 |
| Technical Data--Withholding Of Payment |
| MAR 2000 |
| 252.227-7037 |
| Validation of Restrictive Markings on Technical Data |
| JUN 2013 |
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| JUN 2012 |
| 252.232-7010 |
| Levies on Contract Payments |
| DEC 2006 |
| 252.243-7001 |
| Pricing Of Contract Modifications |
| DEC 1991 |
| 252.243-7002 |
| Requests for Equitable Adjustment |
| DEC 2012 |
| 252.245-7001 |
| Tagging, Labeling, and Marking of Government-Furnished Property |
| APR 2012 |
| 252.245-7002 |
| Reporting Loss of Government Property |
| APR 2012 |
| 252.245-7003 |
| Contractor Property Management System Administration |
| APR 2012 |
| 252.245-7004 |
| Reporting, Reutilization, and Disposal |
| MAR 2015 |
| 252.246-7000 |
| Material Inspection And Receiving Report |
| MAR 2008 |
| 252.246-7001 |
| Warranty Of Data |
| MAR 2014 |
| 252.246-7003 |
| Notification of Potential Safety Issues |
| JUN 2013 |
| 252.247-7023 |
| Transportation of Supplies by Sea |
| APR 2014 |
CLAUSES INCORPORATED BY FULL TEXT
52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)
(a) The Contractor shall test six (6) unit(s) of Lot/Item 01/Sub-CLIN 0001AA as specified in this contract. At least 30 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
(b) The Contractor shall submit the first article test report within 30 calendar days after the completion of first article testing to Commander, Marine Corps Systems Command, Armor and Fire Support Systems (PMM-114), PdM Tank Systems, Attn: Mr. Michael Kreiner, 2200 Lester Street, Quantico, VA 22134 marked "FIRST ARTICLE TEST REPORT: Contract No. TBD, Lot/Item No. 01/Sub-CLIN 0001AA" Within 30 calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the…