Section J-Attachment 6 Cross Reference Matrix (PSPEC/SOW)

View the file

Other files

File Type Posted
PERM_QA_22May15.xlsx XLSX spreadsheet
Section_J_Attachment_10_CLIN_1000_Configuration_Table.docx DOCX document
Section_J_Attachment__1_PERM_SOW_15MAY.rtf RTF text file
Section_J_Attachment_7_Incentive_Plan_15May15.docx DOCX document
Section_J_Attachment_3_GFP.xls XLS spreadsheet
Section_J_Attachment_8_Price_Matrix_18MAY.xlsx XLSX spreadsheet
RFP_DRAFT_18MAY.doc DOC document
Section_J_Attachment_9_Past_Performance_Questionnaire.docx DOCX document
Section_J_Attachment_4_DD254.pdf PDF
Section_J_Exhibit_A_CDRLs_15MAY15.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

120MM PRECISION EXTENDED RANGE MUNITION SOW & PERFORMANCE SPECIFICATION CROSS-REFERENCE MATRIX
Offeror: _________________________
Requirement Title/DescriptionSOW ParaP-Spec v3.1 ParaProposal Reference ParaMeet or Exceed RequirementIf Exceed Requirement, Explain how it exceeds the requirement.
Setter System3.1.2
AUR Container3.2.1
Setter System Interface3.2.2
Mortar Weapon Interface3.2.3
GPS Satellite Interface3.2.4
Logistics Interface3.2.5
States and Modes3.2.6
Weight and Length3.3.1
Container Quantity3.3.2
Projectile Initialization3.4.1
Launch3.4.2
Mortar Weapon3.4.2.1
Loading3.4.2.2
AUR3.4.2.3
Projectile3.4.2.4
Propelling Charge3.4.2.5
Separating Components3.4.2.6
Maximum and Minimum Range3.4.3.1
Time of Flight3.4.3.2
GPS Noise Interference3.4.3.3
Rocket Motor Initiation3.4.3.4
Accuracy3.4.4.1
Lethal Mechanism3.4.4.2
Warhead Fuzing3.4.4.3
Casualty3.4.5
Initialization BIT3.4.6
Depot BIT3.4.6.1
Shelf Life3.4.7
AUR Reliability3.4.8
Maintainability3.4.9
Maintenance3.4.10
Upgradeability3.4.11
Environmental Conditions3.5
Low Pressure3.5.1
Operational Temperature3.5.2.1
Storage Temperature3.5.2.2
Temperature Shock3.5.2.3
Safe to Fire3.5.2.4
Deicing3.5.3
Solar Radiation3.5.4
Rain3.5.5
Humidity3.5.6
Fungus3.5.7
Salt Fog3.5.8
Sand3.5.9
Dust3.5.10
Immersion3.5.11
Loose Cargo3.5.12
Shipboard Vibration3.5.13.1
Truck transportation Vibration3.5.13.2
Two-wheeled Trailer Vibration3.5.13.3
Fixed wing aircraft Vibration3.5.13.4
Aircraft-Helicopter Vibration3.5.13.5
Helicopter Sling Loads Vibration3.5.13.6
Rail Impact3.5.14.1
Handling drop3.5.14.2
Transit drop3.5.14.3
Shipboard Shock3.5.14.4
Decompression3.5.15
Ice3.5.16
Electromagnetic Environmental Effects3.5.17
EMC/EMI3.5.17.1
Electromagnetic Vulnerability (EMV)3.5.17.2
Lightning3.5.17.3
DC Magnetic Fields3.5.17.4
Electrostatic Discharge (ESD)3.5.17.5
Helicopter Transport ESD3.5.17.5.1
Personnel ESD3.5.17.5.2
HERO3.5.17.6
CBRN3.5.18
Selection3.6.1
Standardization3.6.2
Toxicity, Radioactivity, Carcinogenicity3.6.3
Susceptibility3.6.4
Dissimilar Metals3.6.5
Corrosion3.6.6
Reliability3.6.7
Plastic3.6.8
Adhesives3.6.9
Marking3.6.10
Identification3.6.10.1
Safety3.6.10.2
Loads Requirements3.7.1
Factors of Safety3.7.2
Casting Factors3.7.3
Material Properties3.7.4
Margin of Safety3.7.5
Finish3.7.6
Safety3.8
Insensitive Munitions3.8.1
Failure Modes3.8.2
Environmental Safety Effects3.8.3
Hot Barrel.3.8.4
Lead Azide3.8.5
EED Service Approval3.8.6.1
EED Protection3.8.6.2
EED Short Circuits3.8.6.3
EED Connector Mismatching3.8.6.4
EED Firing Circuits3.8.6.5
System Power Source3.8.7.1
RF Shielded Connectors3.8.7.2
Lithium Power Sources3.8.7.3
Energetic Material3.8.8
Energetic Material Qualification3.8.9
Operability3.9
Containerized AUR3.9.1
Propelling Charges3.9.2
Requirements3.0
Program Management3.1.1
Integrated Program Management Report3.1.1.1
Schedule Planning3.1.1.2
Subcontractor Management3.1.1.3
Data Management3.1.2
Security Requirements3.1.3
Government Furnished Equipment3.2.1
Government Furnished Information3.2.2
Meetings- Contractor Responsibilities3.3.1
Post Award Conference3.3.2
In-Process Review3.3.3
Test Readiness Reviews3.3.4
Physical Configuration Audit3.3.5
Production Readiness Review3.3.6
Systems Engineering3.4
Configuration Management3.4.1
Control/Accountability3.4.1.1
Engineering Change Proposals3.4.1.1.1
Technology Insertion3.4.1.1.2
Requests for Variance3.4.1.1.3
Notification of Changes3.4.1.1.4
System/Subsystem Design3.4.2.1
Commercial Drawings/Models3.4.2.2
Training Material3.4.2.3
Ammunition Data Cards3.4.2.4
FMECA3.4.2.5
Reliability Predictions3.4.2.6
Demilitarization and Disposition Plan3.4.3
Quality Management System3.5
Critical Characteristics Control Plan3.5.1
Restriction on Use of Energetics3.5.2
Software Requirements Specification3.6.1
Software Architecture Description3.6.2
Software Design Description3.6.3
Software Test Description3.6.4
Software Test Report3.6.5
Software Version Description3.6.6
Software Product Specification3.6.7
Software System Safety3.6.8
System Safety3.7.1
System Safety Program3.7.2
Hazard Management3.7.2.1
Safety Assessment Report3.7.3.1
Subsystem Hazard Analysis3.7.3.2
System Hazard Analysis3.7.3.3
Operating and Support Hazard Analysis3.7.3.4
Functional Hazard Analysis (FHA)3.7.3.5
Safety Engineering3.7.4.1
Review Board3.7.4.2
Operating and Support Hazard Analysis3.7.4.3
Health Hazard Analysis3.7.5
Explosive Safety3.7.6
Incident Reporting3.7.7
Hazardous Materials Management Plan3.7.8
Lithium Battery Safety Qualification3.7.9
Qualification Test3.8.1
Government Test Facilities3.8.1.1
Production Verification Test3.8.2
Lot Acceptance Test3.8.3
Nonconformance of Test Article3.8.3.1
Software Test3.8.4
Firing Tables Chart3.8.5
Information Assurance (IA) Controls3.9.1
Operators Technical Manual/Field Card3.10.1
Copyright Release3.10.2
Classroom Instruction3.10.3
New Equipment Training Development3.10.3.1.1
Formal School Training3.10.3.2.1
Conduct of Training3.10.3.2.2

Section J-Attachment 6

M67854-15-R-6007

Sheet2