About this file
Attachment 1-Contract Data Requirements Lists
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
MEHPS
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B001
2. TITLE OF DATA ITEM
RECEIPT OF GOVERNMENT MATERIEL REPORT
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80389B
5. CONTRACT REFERENCE
SOW para 3.1.1
6. REQUIRING OFFICE
MARCORSYSCOM, PM CSS
7. DD 250 REQ
LT
9. DIST
STATEMENT
D
10. FREQUENCY
ASREQ
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION SEE BLK 16 Draft
Final
Reg Repro
16. REMARKS
BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT D: Distribution authorized to the DoD and U.S. DoD contractors only; To protect technical or operational data or information from the automatic dissemination under the International Exchange Program or by other means. This protection covers publications required solely for official use or strictly for administrative operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data; 31 March 2016. Other requests shall be referred to MARCORSYSCOM 2200 Lester St. Quantico VA 22134.
BLK 12 - Submit 5 calendar days after receipt of Government Furnished Equipment.
BLK 13 - GFE records will be audited annually.
BLK 14 - REPRO = electronic copy FORMAT - The report shall be in contractor format.
EPS/APS/PO: TBD
MCSC:
EPS/APS/PO 1
15. TOTAL --------- 0 0 1
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page __ of __ Pages
18. ESTIMATED
TOTAL PRICE
17. PRICE
GROUP
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
B002
GOVERNMENT FURNISHED INFORMATION DEFICIENCY
REPORT
DI-MGMT-80596
5. CONTRACT REFERENCE
SOW para 3.1.2
6. REQUIRING OFFICE
MARCORSYSCOM, PM CSS
7. DD 250 REQ
LT
ASREQ
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Final protect technical or operational data or information from the automatic dissemination under the International Exchange Program or by other means. This protection covers publications required solely for official use or strictly for administrative operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data; 31 March 2016. Other requests shall be referred to MARCORSYSCOM 2200 Lester St. Quantico VA 22134.
BLK 12 - Submit 5 calendar days after discovery of discrepancy.
BLK 13 - GFE records will be audited annually.
BLK 14 -
FORMAT - The report shall be in contractor format.
REPRO = Electronic copy
EPS/APS/PO: TBD
15. TOTAL --------- 0 0 1
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
A015
TECHNICAL REPORT - STUDY/SERVICES
BATTERY TRANSPORTATION DATA
DI-MISC-80508B(BT)
5. CONTRACT REFERENCE
SOW para 3.9.1.1
6. REQUIRING OFFICE
MARCORSYSCOM, PM CSS
7. DD 250 REQ
ONE/R
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Final
STATEMENT D: Distribution authorized to the DoD and U.S. DoD contractors only;
Information on systems or hardware in the development or concept stage when premature disclosure must be prevented; ***date of determination***. Other requests for this document shall be referred to MARCORSYSCOM ATTN: PM CSS 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12/13 - Draft data shall be submitted 15 calendar days prior to CDR. The Government will provide comments and recommendations 10 calendar days after CDR. The contractor shall submit final 30 calendar days prior to system delivery. Updates to be provided as changes in design or equipment occur which impacts this data.
BLK 14 - REPRO = Electronic copy.
EPS/APS/PO: TBD
EPS/APS/LE: TBD
MCSC:
EPS/APS/LE 1 1
15. TOTAL --------- 1 0 2
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
A016
LITHIUM BATTERY DATA
DI-MISC-80508B(LB)
5. CONTRACT REFERENCE
SOW para 3.9.1.2
6. REQUIRING OFFICE
ONE/R
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Final protect technical or operational data or information from the automatic dissemination under the International Exchange Program or by other means. This protection covers publications required solely for official use or strictly for administrative operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data; 31 March 2016. Other requests shall be referred to MARCORSYSCOM 2200 Lester St. Quantico VA 22134.
BLK 12/13 - Draft data shall be submitted 15 calendar days prior to CDR. The Government will provide comments and recommendations 10 calendar days after CDR. The contractor shall submit final 30 calendar days prior to system delivery. Updates to be provided as changes in design or equipment occur which impacts this data.
MCSC:
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
B003
CONFERENCE AGENDA
DI-ADMN-81249A
5. CONTRACT REFERENCE
SOW para 3.2.1
6. REQUIRING OFFICE
MARCORSYSCOM, PM CSS
7. DD 250 REQ
LT
ASREQ
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Final protect technical or operational data or information from the automatic dissemination under the International Exchange Program or by other means. This protection covers publications required solely for official use or strictly for administrative operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data; 31 March 2016. Other requests shall be referred to MARCORSYSCOM 2200 Lester St. Quantico VA 22134.
BLK 12/13 - Submit 16 calendar days prior to each conference, meeting, audit, or review.
The Government requires 5 calendar days to review. The contractor shall submit final 10 calendar days after receipt of Government comments.
BLK 14 - REPRO = Electronic Copy
EPS/APS/PO:TBD
EPS/APS/PO 1 1
15. TOTAL --------- 1 0 1
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
B004
CONFERENCE MINUTES
DI-ADMN-81250A
5. CONTRACT REFERENCE
SOW para 3.2.1
6. REQUIRING OFFICE
MARCORSYSCOM, PM CSS
7. DD 250 REQ
LT
ASREQ
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Final protect technical or operational data or information from the automatic dissemination under the International Exchange Program or by other means. This protection covers publications required solely for official use or strictly for administrative operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data; 31 March 2016. Other requests shall be referred to MARCORSYSCOM 2200 Lester St. Quantico VA 22134.
BLK 12/13 - Submit 15 calendar days after each conference, meeting, audit or review. The Government requires 5 calendar days to review. The contractor shall submit final 10 calendar days after receipt of Government comments.
Blk 14 - REPRO = Electronic Copy
EPS/APS/PO: TBD
Copy to each attendee 1
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
A001
DESIGN REVIEW INFORMATION PACKAGE (PDR)
DI-SESS-81757A
5. CONTRACT REFERENCE
SOW para 3.3.1.1
6. REQUIRING OFFICE
ONE/P
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Final protect technical or operational data or information from the automatic dissemination under the International Exchange Program or by other means. This protection covers publications required solely for official use or strictly for administrative operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data; 31 March 2016. Other requests shall be referred to MARCORSYSCOM 2200 Lester St. Quantico VA 22134.
BLK 12/13 - The contractor shall deliver to the Government a draft of all information to be presented and referenced at technical reviews no later than 15 calendar days prior to the review. The final information that was presented and referenced shall be delivered 30 calendar days after the review.
Topics the contractor shall cover at the PDR shall include, but not be limited to the following:
a. Detailed Program Plan indicating Design, Fabrication, and Test Phases
b. Electrical and mechanical design
c. Environment control and thermal design aspects
d. Electromagnetic compatibility of the preliminary design
e. Power distribution and grounding design aspects
f. Preliminary mechanical and packaging design of consoles, racks, drawers, printed circuit boards, connectors, etc.
g. ESOH engineering considerations
h. Preliminary lists of materials, parts, and processes
i. Pertinent reliability/maintainability/availability data
j. Preliminary weight data
k. Development test data
l. Corrosion prevention/control considerations
m. Transportability, packaging, and handling considerations
n. Standardization considerations
o. Trade-studies and design studies results
p. Functional flow, requirements allocation data, and schematic diagrams
q. Equipment layout drawings and preliminary drawings, including any proprietary or restricted design/process/ components and information
r. Interface requirements contained in configuration item development specifications and interface control data (e.g., interface control drawings) derived from these requirements
BLK 14 -
Format. Shall be in contractor format.
REPRO = Electronic copy.
MCSC:
EPS/APS/PO 1 1 1
EPS/APS/LE 1 1 1
15. TOTAL --------- 2 2 2
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
A002
DESIGN REVIEW INFORMATION PACKAGE (CDR)
5. CONTRACT REFERENCE
SOW para 3.3.1.2
6. REQUIRING OFFICE
ONE/P
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Final protect technical or operational data or information from the automatic dissemination under the International Exchange Program or by other means. This protection covers publications required solely for official use or strictly for administrative operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data; 31 March 2016. Other requests shall be referred to MARCORSYSCOM 2200 Lester St. Quantico VA 22134.
BLK 12/13 - The contractor shall deliver to the Government a draft of all information to be presented and referenced at technical reviews no later than 15 calendar days prior to the review. The final information that was presented and referenced shall be delivered 30 calendar days after the review.
Topics the contractor shall cover at the CDR shall include, but not be limited to the following:
a. Detailed Program Plan indicating Design, Fabrication, and Test Phases
b. Interface specification/drawings
c. Detailed Electrical/Mechanical/Software Design
d. EMI/Thermal/Cooling Design
e. Detailed Reliability/Maintainability Analysis
f. Detailed weight data
g. Environment, Safety, and Occupational Health (ESOH) Analysis
h. Packaging/Handling/Storage/Transportation
i. Testing documents
j. Interoperability
k. Transportability
l. Corrosion Prevention and Control (CPAC)
m. Critical Safety Items (CSIs)
n. Diminishing Manufacturing Sources and Material Shortages
(DMSMS)
o. Open Systems Design
p. Quality and Producibility for manufacturing
q. Supportability
r. Mock-ups, breadboards, and/or prototype hardware developed
Mock-ups, breadboards, and/or prototype hardware developed
BLK 14 -
EPS/APS/PO TBD
MCSC:
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
A003
DESIGN REVIEW INFORMATION PACKAGE (TRR)
5. CONTRACT REFERENCE
SOW para 3.3.1.3
6. REQUIRING OFFICE
ONE/P
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Final protect technical or operational data or information from the automatic dissemination under the International Exchange Program or by other means. This protection covers publications required solely for official use or strictly for administrative operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data; 31 March 2016. Other requests shall be referred to MARCORSYSCOM 2200 Lester St. Quantico VA 22134.
BLK 12/13 - The contractor shall deliver to the Government a draft of all information to be presented and referenced at technical reviews no later than 15 calendar days prior to the review. The final information that was presented and referenced shall be delivered at the review.
Topics the contractor shall cover at the TRR shall include, but not be limited to the following:
a. Overview of system operation
b. Results of testing conducted prior to delivery
c. Discrepancies or issues discovered during testing, including changes made as a result
d. Known limitations of the system which may cause issues during government testing
e. Review of RTM for system
Known limitations of the system which may cause issues during government testing
BLK 14 -
MCSC:
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
A004
TECHNICAL REPORT - STUDY SERVICES
REQUIREMENTS TRACEABILITY MATRIX
DI-MISC-80508B(RTM)
5. CONTRACT REFERENCE
SOW para 3.3.2
6. REQUIRING OFFICE
MARCORSYSCOM, PM CSS
7. DD 250 REQ
LT
ONE/R
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Final protect technical or operational data or information from the automatic dissemination under the International Exchange Program or by other means. This protection covers publications required solely for official use or strictly for administrative operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data; 31 March 2016. Other requests shall be referred to MARCORSYSCOM 2200 Lester St. Quantico VA 22134.
BLK 12/13 - Draft matrix shall be submitted 15 days prior to PDR. The Government will provide comments and recommendations 10 calendar days after PDR. The contractor shall submit an updated matrix 15 calendar days prior to CDR. The Government will provide comments and recommendations 10 calendar days after CDR. Updates to be provided as changes in design or equipment occur which impacts the matrix. The final matrix will be delivered 15 calendar days prior to TRR.
BLK 14 -
Format. The RTM shall be in contractor format.
MCSC:
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
A005
PRODUCIBILITY ANALYSIS REPORT
DI-MGMT-80797
5. CONTRACT REFERENCE
SOW para 3.4.1
6. REQUIRING OFFICE
ONE/R
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Final
BLK 4 - The Producibility Analysis Report format shall be contractor selected. Unless effective presentation would be degraded, the initially used format arrangement shall be used for all subsequent submissions.
The Producibility Analysis Report shall contain the following:
a. Individual trade-off studies on:
(1) Impact on program lifecycle
(2) Effectiveness
(3) Reproducibility schedule
(4) Resource constraints
(5) Reliability & Maintainability
(6) Interchangeability
(7) Inspectability
(8) Design to cost goals
(10) Other factors impacting program objectives
b. Identification of candidate items for cost reduction through:
(1) Material changes
(2) Development of manufacturing technology
(3) Changes to improve procedures
c. Marked-up or redrawn drawings and changes to any other technical documents to indicate recommended changes to the item.
protect technical or operational data or information from the automatic dissemination under the International Exchange Program or by other means. This protection covers publications required solely for official use or strictly for administrative operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data; 31 March 2016. Other requests shall be referred to MARCORSYSCOM 2200 Lester St. Quantico VA 22134.
BLK 12/13 - Draft report shall be submitted 15 calendar days prior to CDR. The Government will provide comments and recommendations 30 calendar days after CDR.
The contractor shall submit final report 15 calendar days prior to system delivery. Updates to be provided as changes in design or equipment occur which impacts this report.
BLK 14 - REPRO = Electronic copy.
EPS/APS/PO: TBD
EPS/APS/LE: TBD
MCSC:
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
A006
SAFETY ASSESSMENT REPORT (SAR)
DI-SAFT-80102C
5. CONTRACT REFERENCE
SOW para 3.5.1.2
6. REQUIRING OFFICE
MARCORSYSCOM, PM CSS
7. DD 250 REQ
LT
ONE/R
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Final protect technical or operational data or information from the automatic dissemination under the International Exchange Program or by other means. This protection covers publications required solely for official use or strictly for administrative operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data; 31 March 2016. Other requests shall be referred to MARCORSYSCOM 2200 Lester St. Quantico VA 22134.
BLK 12/13 - Draft report shall be submitted 15 calendar days prior to CDR. The Government will provide comments and recommendations 30 calendar days after CDR.
The contractor shall submit final report 15 calendar days prior to system delivery. Updates to be provided as changes in design or equipment occur which impacts this report.
RMRKS : The SAR shall be prepared in accordance with MIL-STD-882E, Task 301.
MCSC:
EPS/APS/LE 1
15. TOTAL --------- 0 0 2
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
A007
SYSTEM SAFETY HAZARD ANALYSIS (SSHA) REPORT
DI-SAFT-80101C
5. CONTRACT REFERENCE
SOW para 3.5.1.4
6. REQUIRING OFFICE
MARCORSYSCOM, PM CSS
7. DD 250 REQ
LT
ONE/R
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Final protect technical or operational data or information from the automatic dissemination under the International Exchange Program or by other means. This protection covers publications required solely for official use or strictly for administrative operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data; 31 March 2016. Other requests shall be referred to MARCORSYSCOM 2200 Lester St. Quantico VA 22134.
BLK 12/13 - Draft report shall be submitted 15 calendar days prior to CDR. The Government will provide comments and recommendations 30 calendar days after CDR.
The contractor shall submit final report 15 calendar days prior to system delivery. Updates to be provided as changes in design or equipment occur which impacts this report.
MCSC:
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
A008
OPERATING AND SUPPORT HAZARD ANALYSIS
DI-MISC-80508B(OSHA)
5. CONTRACT REFERENCE
SOW para 3.5.1.6
6. REQUIRING OFFICE
ONE/R
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Final protect technical or operational data or information from the automatic dissemination under the International Exchange Program or by other means. This protection covers publications required solely for official use or strictly for administrative operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data; 31 March 2016. Other requests shall be referred to MARCORSYSCOM 2200 Lester St. Quantico VA 22134.
BLK 12/13 - Draft report shall be submitted 15 calendar days prior to CDR. The Government will provide comments and recommendations 30 calendar days after CDR.
The contractor shall submit final report 15 calendar days prior to system delivery. Updates to be provided as changes in design or equipment occur which impacts this report.
RMRKS: The OSHA shall be conducted in accordance with MIL-STD-882E, Task 206.
MCSC:
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
A009
HEALTH HAZARD ASSESSMENT
DI-MISC-80508B(HHA)
5. CONTRACT REFERENCE
SOW para 3.5.1.7
6. REQUIRING OFFICE
ONE/R
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Final protect technical or operational data or information from the automatic dissemination under the International Exchange Program or by other means. This protection covers publications required solely for official use or strictly for administrative operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data; 31 March 2016. Other requests shall be referred to MARCORSYSCOM 2200 Lester St. Quantico VA 22134.
BLK 12/13 - Draft report shall be submitted 15 calendar ays prior to CDR. The Government will provide comments and recommendations 30 calendar days after CDR. The contractor shall submit final report 15 calendar days prior to system delivery. Updates to be provided as changes in design or equipment occur which impacts this report.
MCSC:
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
A010
ENVIRONMENTAL CONSIDERATIONS
DI-MISC-80508B(EC)
5. CONTRACT REFERENCE
SOW para 3.5.2
6. REQUIRING OFFICE
MARCORSYSCOM, PM CSS
7. DD 250 REQ
LT
ONE/R
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Final protect technical or operational data or information from the automatic dissemination under the International Exchange Program or by other means. This protection covers publications required solely for official use or strictly for administrative operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data; 31 March 2016. Other requests shall be referred to MARCORSYSCOM 2200 Lester St. Quantico VA 22134.
BLK 12/13 - Draft report shall be submitted 15 calendar days prior to CDR. The Government will provide comments and recommendations 30 calendar days after CDR.
The contractor shall submit final report 15 calendar days prior to system delivery. Updates to be provided as changes in design or equipment occur which impacts this report.
RMRKS: Environmental Hazard Analysis shall be prepared in accordance with MIL-STD- 882E, Task 210.
BLK 14 - REPRO = Electronic copy.
EPS/APS/PO: TBD
EPS/APS/LE: TBD
MCSC:
EPS/APS/LE 1
15. TOTAL --------- 0 0 2
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
A011
INTERFACE CONTROL DOCUMENT
DI-SESS-81248B
5. CONTRACT REFERENCE
SOW para 3.6.1
6. REQUIRING OFFICE
ONE/R
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Final
BLK 4 - The ICD shall be prepared in contractor format.
Content. The ICD shall identify:
a. All released/approved interface information for the project.
B. A revision record for all released/approved interface information for the project, including release dates.
C. A cross-reference listing relating all released/approved interface information for the project to the configuration items and system elements to which they apply.
D. A description of the physical and functional relationships between all released/approved interface information for the project.
E. The links to the actual documentation defining the released/approved interface information for the project.
F. All the electrical connection configuration, pin outs of connectors, software interfaces, communication protocol between components, data transitioned between components, rate of transmission, and any other information needed to operate the system components with each other and outside systems.
BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT D: Distribution authorized to the DoD and U.S. DoD contractors only; To protect technical or operational data or information from the automatic dissemination under the International Exchange Program or by other means. This protection covers publications required solely for official use or strictly for administrative operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data; 31 March 2016. Other requests shall be referred to MARCORSYSCOM 2200 Lester St. Quantico VA 22134.
BLK 12/13 - Draft report shall be submitted 15 calendar days prior to CDR. The Government will provide comments and recommendations 30 calendar days after CDR.
The contractor shall submit final report 15 calendar days prior to system delivery. Updates to be provided as changes in design or equipment occur which impacts this report.
BLK 14 - REPRO = electronic copy
EPS/APS/LE: TBD
MCSC:
15. TOTAL --------- 2 0 2
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting
C. CATEGORY:
TDP _X_ TM _ _ OTHER __ __
D. SYSTEM/ITEM
A012
DEVELOPMENTAL DESIGN DRAWINGS/MODELS AND
ASSOCIATED LISTS
DI-SESS-81002F
5. CONTRACT REFERENCE
SOW para 3.7.1
6. REQUIRING OFFICE
MARCORSYSCOM, PM CSS
7. DD 250 REQ
DD
ONE/R
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Final protect technical or operational data or information from the automatic dissemination under the International Exchange Program or by other means. This protection covers publications required solely for official use or strictly for administrative operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data; 31 March 2016. Other requests shall be referred to MARCORSYSCOM 2200 Lester St. Quantico VA 22134.
BLK 12/13 - Drawing requirement shall be in accordance with DD Form 2554-3. Submit 30 calendar days prior to PDR. The Government requires 30 calendar days for review and comment. Final copy to be delivered 30 calendar days after PDR.
BLK 14 - Original DD 250 plus final drawing to MCSC (PM) only.
REPRO = Electronic copy.
EPS/APS/PO: TBD
EPS/APS/LE: TBD
MCSC:
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting
E
C. CATEGORY:
TDP _X_ TM _ _ OTHER __ __
D. SYSTEM/ITEM
A013
COMMERCIAL DRAWINGS/MODELS AND ASSOCIATED
LISTS
DI-SESS-81003D
5. CONTRACT REFERENCE
SOW para 3.7.2
6. REQUIRING OFFICE
MARCORSYSCOM, PM CSS
7. DD 250 REQ
DD
ONE/R
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Final protect technical or operational data or information from the automatic dissemination under the International Exchange Program or by other means. This protection covers publications required solely for official use or strictly for administrative operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data; 31 March 2016. Other requests shall be referred to MARCORSYSCOM 2200 Lester St. Quantico VA 22134.
BLK 12/13 - Drawing requirement shall be in accordance with DD Form 2554-3. Submit 30 calendar days prior to CDR. The Government requires 30 calendar days for review. The contractor shall submit final 30 calendar days prior to receipt of hardware delivery.
BLK 14 - Original DD 250 and final copy to MCSC (PMCSS).
REPRO = Electronic copy.
EPS/APS/PO: TBD
EPS/APS/LE: TBD
MCSC:
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting
C. CATEGORY:
TDP _X_ TM _ _ OTHER __ __
D. SYSTEM/ITEM
A014
PRODUCT DRAWINGS/MODELS AND ASSOCIATED
LISTS
DI-SESS-81000E
5. CONTRACT REFERENCE
SOW para 3.7.3
6. REQUIRING OFFICE
MARCORSYSCOM, PM CSS
7. DD 250 REQ
DD
ONE/R
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Final protect technical or operational data or information from the automatic dissemination under the International Exchange Program or by other means. This protection covers publications required solely for official use or strictly for administrative operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data; 31 March 2016. Other requests shall be referred to MARCORSYSCOM 2200 Lester St. Quantico VA 22134.
BLK 12/13 - Drawing requirement shall be in accordance with DD Form 2554-3. Submit 30 calendar days prior to CDR. The Government requires 30 calendar days for review. The contractor shall submit final 30 calendar days prior to receipt of hardware delivery.
BLK 14 - In-process format review: 1 set each of Digital Data format and Blue/Black line format. In-process technical review: Blue/Black line. The initial in-process technical review submittal shall be by electronic copy.
Final Delivery: Two complete sets of Digital Data format with Master Artwork Gerber data for printed wiring boards. Final submittals shall be by DD-250.3.
In Process
Format Review
File details come from the government source that posted it. Updated .