2016_ITMAINT-QASP.doc

DOC document 73 KB Posted

Attached to
Electronic Range Maintenance Federal contract opportunity
Solicitation number
M67001-16-T-0019
Issued by
United States Marine Corps

About this file

Quality Assurance Surveillance Plan(QASP) for M67001-16-T-0019

View the file

Other files for this federal contract opportunity

Other files attached to Electronic Range Maintenance, newest first.
File Type Posted
Range_Maint_Amend__2.docx DOCX document
M67001-16-T-0019-0001_Range_Maint_Amend.docx DOCX document
Elec_Maint_Service_Contract_PWS2016.doc DOC document
RFQ_16-T-0019.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MARINE CORPS INSTALLATION EAST MISSION ASSURANCE PROGRAM

QUALITY ASSURANCE SURVEILLANCE PLAN

UNITED STATES MARINE FORCES, MARINE CORPS INSTALLATION EAST MISSION ASSURANCE PROGRAM

QUALITY ASSURANCE SURVEILLANCE PLAN

(QASP)

MMP100-16-SU-TM007/M67001-16-T-0019

1. Purpose. This Quality Assurance Surveillance Plan (QASP) has been developed for non-personal services in support of the Camp Lejeune Range Maintenance Division Electronic Maintenance services. The Contracting officer will appoint William VanPelt as the Contracting Officer Representative (COR) for this contract. COR contact information: (DSN 751) 451-7899. As the COR, Mr. VanPelt will serve as the Quality Assurance Evaluator (QAE) and will use this QASP to ensure the contractor is conforming to the Performance Work Statement (PWS) requirements.

2. Performance Standards. The QASP provides a systematic method to evaluate the service the Contractor is required to furnish. The COR will assess the Contractor’s performance to ensure the Contractor is performing up to the specified standards. The performance standards for this Performance Work Statement (PWS) are stated in the Performance Requirements Summary (PRS) included in this QASP. The standards for this procurement are subjective since specific metric-driven standards are not appropriate.

3. Management and Oversight. The QASP is based on the premise that the Contractor and not the Government, is responsible for the management and any Quality Control action required to meet the terms of the contract. The performance requirements recognize that the Contractor is not a perfect manager and that unforeseen requirements and uncontrollable problems do occur. Good management and use of an adequate Quality Control Plan will allow the Contractor to operate within specific performance requirements. QASPs are designed to be objective, fair and consistent in evaluating Contractor performance against the provided standards.

4. Acceptable Quality Levels (AQLs). AQLs have been established in the PRS and provide performance standards that the Contractor will meet in performing this contract. In the event the Contractor does not meet the established AQLs, the Contracting Officer has the right to exercise the negative incentives stated in this QASP.

5. Primary Method of Surveillance/Evaluation. The COR will perform evaluation based on using one of the various methods outlined in the PRS table included in this QASP. The following methods may be incorporated into the PRS to monitor contract performance:

100% inspection: Inspection where specific characteristics of every performance unit are examined and tested to determine conformance with requirements.

Planned Inspections: Planned inspections will be performed as deemed necessary by the POC to ensure adhere to PWS.

Random inspection: Sampling method in which each unit of the population has an equal chance of being selected.

Customer Surveys and Feedback: A review method where customers and end users are surveyed to provide input on specific service levels.

Ongoing Review: A review method where performance units are examined on a continuous basis to determine conformance with requirements.

6. Negative Incentives. If any of the performance requirements does not meet the AQL set in the PRS table, the COR shall document the discrepancy(s) and shall notify the Contractor promptly, and the Contracting Officer, on a monthly basis, for appropriate action. When the performance is below the AQL standard, the Government may implement a negative incentive that includes increased surveillance and/or Contractor reporting, as well as, documentation on the Contractor’s Performance Assessment Reporting System (CPARS).

7. Notification. The COR will notify the Contracting Officer, in writing, of unacceptable quality levels. The Contracting Officer will promptly provide written notification of discrepancies on a monthly basis, or immediately if the situation significantly affects the well-being of the project. The Contractor will be given the opportunity to respond, in writing, to each discrepancy.

8. Response. The Contractor shall provide a written response to the cause and the corrective action to prevent recurrence within 10 working days after receipt of Contracting Officer’s notification. The Contractor should cite specific quality assurance program procedures or new procedures instituted to prevent recurrence.

9. Records. The COR will maintain contract surveillance files as directed by the Contracting Officer. Surveillance files will include, in part, the following documentation:

a. A copy of the contract and all contract modifications

b. QASP and any other tools, checklists, etc.

c. All correspondence including Contracting Officer notifications and the Contractor’s responses

d. Contractor monthly status reports.

e. Evidence of satisfactory performance.

f. Quarterly reviews

g. Surveillance reports will be prepared by the COR, and submitted to the Contracting Officer quarterly and annually.

h. Out-of-cycle reports may be submitted in support of unacceptable performance identified during the performance period by the COR, or when there is a significant change in performance that alters the assessment in one or more evaluation areas.

i. Annual in-progress reviews will be conducted and entered into CPARS.

10. Ratings. The following criteria will be used for performance evaluations: Exceptional, Satisfactory, Marginal, or Unsatisfactory.

a. Exceptional. (100 – 96%) Indicates performance clearly exceeds contractual requirements. The area of evaluation may contain a few minor problems for which corrective action appears highly effective.

b. Satisfactory. (95 – 90%) Indicates performance clearly meets contractual requirements. The area of evaluation contains some minor problems for which the corrective actions appear satisfactory.

c. Marginal. (89 – 84%) Indicates performance meets contractual requirements. The area of evaluation contains one or more serious problems for which corrective actions have not yet been identified, appear only marginally effective, or have not been fully implemented.

d. Unsatisfactory. (83 – 79%) Indicates the Contractor is in danger of not being able to satisfy contractual requirements and recovery is not likely in a timely manner. The area of evaluation contains one or more serious problems for which the corrective actions appear ineffective.

11.

Documentation. Documentation used and referenced to perform surveillance will consist of monthly reports, Contractor plans and procedures, schedules, customer feedback and contract data requirements.

a. Recording Observations. Use Surveillance Logs to record information on scheduled observations and deficiencies noted. Each observation is recorded on the log. The documents then become a formal record for reference. The Contractor is to be told each time that a deficiency is found during scheduled observations. The COR makes a notation on the Surveillance Log of the date and time the deficiency was discovered, and subsequently requests that the Contractor initial the notation, documenting notification of the deficiency only.

b. Potential Unacceptable Performance. The COR must identify the specific service that is unacceptable and the possible causes, and ask a number of questions which if answered, will probably pinpoint the source of the problem.

c. Documenting Unacceptable Performance. The COR must attempt to resolve the problem with the Contractor. The original log and the attempted solution (along with an evaluation of results) are forwarded to the Contracting Officer through the COR.

Based on the severity of the discrepancy and the success of the solution, the COR will notify the Contracting Officer. The Contractor shall complete a response to the unacceptable evaluation if requested by the Contracting Officer or by its own choice.

12. Taking Action.

a. The COR may evaluate the Contractor’s performance and document any non-compliance, but only the Contracting Officer may take action against the Contractor for an unacceptable rating.

b. When the Contractor’s performance is unacceptable and a formal action is indicated, the COR will determine what action is appropriate for the specific circumstances and make a recommendation to the Contracting Officer.

13. Documentation. The COR retains a copy of all inspection schedules and surveillance activity logs during the course of the contract, and forwards them for inclusion in the contract file at the end of the surveillance period. However, when a specific service becomes unsatisfactory during a surveillance period, the inspection documentation supporting the contract discrepancy report is promptly forwarded to the Contracting Officer.

Performance Objective
PERFORMANCE REQUIREMENTS SUMMARY
Acceptable Quality Level (AQL)/Frequency
Goal
Surveillance Method
Monthly Penalty/

deduction if AQL is not met Incentive

Performance Standard

Maintenance and Repair of all electrical systems
The Contractor shall maintain, repair, and perform preventive maintenance services on all electronic systems and equipment to ensure they are fully functional and operational at all times. A System Status Report in spreadsheet format shall be included in the Daily Maintenance Status Report NLT 8am Monday-Friday.
The systems and equipment shall be maintained at a sufficient level in order to provide full functional capability 24 hours a day, 365 days a year. Submit daily maintenance and system status reports on time.
100% Electronic Equipment repairs completed within the designated time frame of Table 1 in the PWS.
Validated Complaints from the Blackburn Technicians. COR Conducts unscheduled visual inspections of electronic equipment.
5% of monthly contract price penalty for unsatisfactory

performance.

Exercise Option period for Satisfactory performance.

Electronic Maintenance Program
Review and submit reports, perform organizational analysis, maintain and update databases; system, component and test equipment lists.The contractor shall use established PM sheets; add, maintain and update PM sheets and descriptions for all electronic systems. Provide training relevant to electronic maintenance. Prepare and submit DRMO documents and maintain and update electronic systems manual.
Submit reports on time. Analyze electronic maintenance program to keep pace with technology. Training shall consist of the basic operation of the electronic equipment. Submit complete documents for action and update the electronic systems manual annually and within 1 week of any new or replaced equipment install.
90%
COR Conducts unscheduled visual inspections of electronic maintenance program files.
5% of monthly contract price penalty for unsatisfactory

Exercise Option period for Satisfactory performance.

Preventive Maintenance on Electronic and Communication Systems and Equipment
Submit Preventive Maintenance schedule on time and perform services according to the approved schedule. Schedule changes shall be made in advance and with prior approval of the COR before work begins. All parts, components, assemblies, and subassemblies shall be checked for safe operation and function, according to the manufacturer’s recommendations. Work shall include routine operation, inspection, checks, adjustments, and maintenance. Minimum acceptable frequencies shall be accomplished per manufacturer’s recommendations. Contractor shall physically be on site a minimum of five days a week to devote to preventive maintenance services at Blackburn facilities and other various locations.

Preventive Maintenance work shall include, but not be limited to: operational inspection and adjustment to ensure satisfactory functioning of equipment and systems, detecting and correcting causes of unusual noises, vibrations, temperatures, manufacturer’s recommended lubrications or adjustments to bring equipment or systems within manufacturers’ specifications, repairs, including defective parts and component replacements, equipment housekeeping and cleaning, maintaining lamps and active signals, battery replacement, and other services as required to maintain a safe and acceptable operating condition.

Conduct Daily Checks and scheduled Preventative Maintenance on time. Deficiencies discovered during preventative maintenance shall be corrected the same day or as soon as parts/consumables are available. Repair equipment failures that would interrupt normal daily operations. Maintain a rating of “Mission Capable” on all electrical systems and components; Mission capable is defined as range control being able to perform all of its designated missions.
95%

The contractor shall submit copies of the completed PM Checklist(s) with the monthly invoice to the government.

5% of monthly contract price penalty for unsatisfactory

Exercise Option period for Satisfactory performance.

Unscheduled Preventive Maintenance on Electronic and Communication Systems and Equipment
Provide routine maintenance services that permit the early detection and correction of items that could interfere with the effective operation of the system, endanger life and/or property, or involve a high cost or long lead time for repair.
Identify and order replacement parts for equipment that may become unserviceable due to the normal wear and tear or using the manufacturer’s recommendations for replacement.
90%
The COR will meet with the contractor semiannually and discuss the plan for procuring replacement parts for the electronic equipment.
5% of monthly contract price penalty for unsatisfactory

Exercise Option period for Satisfactory performance.

After Hours On-Call Repair Services
The Contractor shall provide on-call repair services to the Electronics Section of Blackburn after normal working hours for emergency repair services to non-operational equipment. Post roster of on-call personnel in Blackburn. Technicians or operators shall identify and report problems for maintenance requirements.
Identify and repair equipment failures using spare parts on hand. Notify the COR when repairs are not possible. Respond within 1 hour of after-hours call. Be on site within 2 hours of call. The on-call roster shall be updated to include the most current recall information of electronic technicians.
100%
Blackburn Technician will call the COR if any after-hours outages occur and provide the type of problem, date and time of the outage.
5% of monthly contract price penalty for unsatisfactory

Exercise Option period for Satisfactory performance.

Electronic Engineering Support
The Contractor shall provide the engineering level of expertise necessary to support the modifications or changes to the equipment/systems. The contractor shall attend meetings, site visits, conferences, conference calls in order to assist with engineering and technical matters.
Advise the COR on technical matters concerning the electronic equipment and provide a detailed written estimate identifying all equipment, supplies and labor to complete the installation or modification of the electronic systems.
90%
The COR will accompany the contractor on all meetings, site visits, conferences, conference calls pertaining to electronic maintenance.
5% of monthly contract price penalty for unsatisfactory

Exercise Option period for Satisfactory performance.

Electronic Engineering Support for New requirements
The Contractor shall provide the engineering level of expertise necessary (including research) to support new requirements or additional systems in new locations. The contractor shall provide assistance in planning and implementation for repurposing electronic equipment. The contractor shall attend meetings, site visits, conferences, and conference calls in order to assist with engineering and technical matters with new or additional system requirements.
Advise the COR on technical matters concerning the repurposing of electronic equipment. Advise the COR on technical matters concerning new electronic equipment and provide a detailed written estimate identifying all equipment, supplies, and labor to complete the installation or modification of new electronic equipment and systems.
80%
The COR will review the estimate, equipment and material plan. The COR will accompany the contractor on all meetings, site visits, conferences, and conference calls pertaining to electronic maintenance.
1% of monthly contract price penalty for unsatisfactory performance.
Exercise Option period for Satisfactory performance.

Failure to meet the above stated Acceptance Quality Level (AQL)/ Frequency will result in the Contracting Department opting to not exercise the following option period.

The Contractor shall provide maintenance (preventative and corrective) on electronic and communications systems and equipment throughout the Greater Camp Lejeune Training Complex.

Source Selection Information – See FAR 2.101 and FAR 3.104 For Official Use Only Source Selection Information – See FAR 2.101 and FAR 3.104 For Official Use Only