AMENDMENT #1 M00318-17-T-0015-0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMENDMENT__6.pdf | ||
| WAWF.pdf | ||
| EVALUATION_CRITERIA.pdf | ||
| Specifications_Revised.pdf | ||
| Performance_Work_Statement.pdf | ||
| M00318-17-T-0015.pdf | ||
| Attachment_3_Itemized_List.pdf | ||
| itemized_list_update.pdf | ||
| Space_Drawings.pdf | ||
| M00318-17-T-0015-0006.pdf | ||
| PWS.pdf | ||
| INSTRUCTIONS_TO_OFFERORS.pdf | ||
| MODIFICATION_17-T-0015-0003.pdf | ||
| M00318-17-T-0015-0007.pdf | ||
| Itemized_list-Revised.pdf | ||
| M00318-17-T-0015-0008.pdf | ||
| Attachment_2_Workspace_drawings.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M2002117SUMFPCG
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to increase the quantity in the revised attachment 3. End tables for phase 1 (Commander's off ice) by 1 each from 1 each to 2 each, add 6 each conference table chairs to phase 1 (Commander's off ice) from 0 to 6 each, add 4 each desk chairs to phase 3 (Staff secretary) from 0 to 4 each, add 1 each desk chairs to phase 4 (Protocol off ice) from 0 to 1 each. Also, to extend the due date and time from 10:00 AM HST on 8 June, 2017 to 10:00 AM HST on 16 June, 2017, and to answ er all submitted questions.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Jun-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X M0031817T0015
X 9B. DATED (SEE ITEM 11)
19-May-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Jun-2017
CODE
MCBH
COMMANDING OFFICER (CODE RCO) BOX 63063, BLDG
KANEOHE BAY HI 96863-3063
M00318 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
M0031817T0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS & ANSWERS
Question 1
Can you provide a list of the furniture items (along with approximate size) that will need to be removed from site?
Answer
The furniture being removed is approximately what is being installed. We are replacing the current furniture. One for one swap.
Question 2
Do you have a preference in the style of furniture you are interested in; laminate wood or metal based?
Answer
Traditional wood furniture. No metal.
Question 3
For the office and guest chairs, do you have a preference on upholstery; fabric or mesh and frame wood or metal?
Answer
All guest chairs need to be wood with fabric. Phase 1 and phase 2 are to be the same, and phase 3 and phase 4 are to be the same. Guest chairs need to match the furniture in office. We are looking for traditional furniture, so a black metal chair won't match.
The only office chairs are for the Commander and the Chief of Staff, and those are high back leather executive chairs.
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 08-Jun-2017 10:00 AM to 16-Jun-2017 10:00 AM.
The following have been modified:
ATTACHMENT 3 ITEMIZED LIST
Requirement New Furnishing Cubicles/Workstations/Desks Quantity Unit Unit Price Total Price
1 Service Workstation – Breakfront, Single Right Pedestal, Service Desk 1 ea $0.00 $0.00
2 Return – “L” workstation, Left Pedestal 1 ea $0.00 $0.00
3 Desk Chair - Traditional High-Back Executive Swivel Chair 1 ea $0.00 $0.00
4 Conference Table 1 ea $0.00 $0.00
5 Chairs for Conf Table 6 ea $0.00 $0.00
6 Coffee Table 1 ea $0.00 $0.00
7 End Table 1 ea $0.00 $0.00
Total: $0.00
Requirement New Furnishing Cubicles/Workstations/Desks Quantity Unit Unit Price Total Price
1 Service Workstation – Breakfront, Single Right Pedestal, Service Desk 1 ea $0.00 $0.00
2 Return – “L” workstation, Left Pedestal 1 ea $0.00 $0.00
3 Workstation Credenza 1 ea $0.00 $0.00
4 Double Height Overhead 1 ea $0.00 $0.00
5 Desk Chair - Traditional High-Back Executive Swivel Chair 1 ea $0.00 $0.00
6 Wardrobe Storage Closet 1 ea $0.00 $0.00
Total: $0.00
Requirement New Furnishing Cubicles/Workstations/Desks Quantity Unit Unit Price Total Price
1 Reception Front Desk with Counter, Right Pedestal 2 ea $0.00 $0.00
2 “U” Workstation Bridge 2 ea $0.00 $0.00
3 Workstation Credenza, Left Pedestal 2 ea $0.00 $0.00
4 Workstation Desk – Breakfront - Single Left Pedestal - Flush Top 2 ea $0.00 $0.00
5 Return – “L” workstation, Right Pedestal 2 ea $0.00 $0.00
6 Credenza 1 ea $0.00 $0.00
7 Lateral File Credenza, 4 drawer 1 ea $0.00 $0.00
8 Storage Crendenza 1 ea $0.00 $0.00
9 Guest Chair – 4 leg, low back, arm rest 5 ea $0.00 $0.00
10 Desk Chair 4 ea $0.00 $0.00
Total: $0.00
Requirement New Furnishing Cubicles/Workstations/Desks Quantity Unit Unit Price Total Price
1 Workstation Desk – Breakfront - Single Right Pedestal - Flush Top 1 ea $0.00 $0.00
2 “U” Workstation Bridge 1 ea $0.00 $0.00
3 Workstation Credenza, Right Pedestal 1 ea $0.00 $0.00
4 Double Height Overhead 1 ea $0.00 $0.00
5 Guest Chair – 4 leg, low back, arm rest 2 ea $0.00 $0.00
6 Tower Cabinet 1 ea $0.00 $0.00
7 36" diameter round table 1 ea $0.00 $0.00
8 Desk Chair 1 ea $0.00 $0.00
Total: $0.00
PHASE 1: COMMANDER'S OFFICE
PHASE 2: CHIEF OF STAFF OFFICE
PHASE 3: STAFF SECRETARY
PHASE 4: PROTOCOL OFFICE
(End of Summary of Changes)