M00264-25-R-0003_Amendment 0002.pdf
PDF 503 KB Posted
- Attached to
- Training and Education Command (TECOM) Statistical Analysis Support Federal contract opportunity
- Solicitation number
- M00264-25-R-0003
- Issued by
- United States Marine Corps
About this file
This is Amendment 0002 to solicitation M00264-25-R-0003 for Training and Education Command (TECOM) Statistical Analysis Support services. The amendment extends the proposal due date to February 19, 2025 at 10:00 AM EST and the Assessor Past Performance Questionnaire (APPQ) due date to February 14, 2025 at 10:00 AM EST.
The solicitation seeks contractor support for TECOM's Policy and Standards Division, requiring expertise in Operations Research and Systems Analysis (ORSA), data science technologies, artificial intelligence/machine learning, and natural language processing within Marine Corps networks. The contract will be a single Firm Fixed Price award with cost reimbursement travel CLINs for a 12-month base period and four one-year options, with potential 6-month extension under FAR 52.217-8. Proposals must address Technical Capability/Performance Execution & Management (50-page limit), Past Performance (30-page limit), and Price (20-page limit). Questions were due December 16, 2024. The contract will support TECOM's Trends Reversal and Reinforcement Process Working Group and Assessment Working Group execution.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| M00264-25-R-0003_Amendment 0003.pdf | ||
| Attachment 4 M00264-25-R-0003_DD-254 (1).pdf | ||
| RFP M00264-25-R-0003 Attachment 2 APPQ_Rev.pdf | ||
| M00264-25-R-0003_Amendment 0001.pdf | ||
| M00264-25-R-0003.pdf | ||
| RFP M00264-25-R-0003 Attachment 1 Past Performance Questionnaire.docx | DOCX document | |
| RFP M00264-25-R-0003 Attachment 3 Pricing Sheet TECOM OAS.xlsx | XLSX spreadsheet | |
| RFP M00264-25-R-0003 Attachment 2 APPQ.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Extend the RFP due date to 19 February 2025 at 10:00 AM EST.
2. Extend the Assessor Past Performance Questionnaire (APPQ - Attachment 2), due date to 14 February 2025 at 10:00 AM EST.
POC: Shaye Nelson shaye.nelson@usmc.mil
1. CONTRACT ID CODE PAGE OF PAGES
S 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Jan-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X M0026425R0003
X 9B. DATED (SEE ITEM 11)
05-Dec-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Jan-2025
CODE
MCINCR - RCO
2010 HENDERSON RD SHAYE NELSON
QUANTICO VA 22134
M00264 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
M0026425R0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 30-Jan-2025 10:00 AM to 19-Feb-2025 10:00 AM.
The following have been modified:
FAR 52.212-1 ADDENDUM
52.212-1 Addendum – Instructions, Conditions, and Notices to Offerors
1. Multiple Offers
1.1 The Marine Corps Installations National Capital Region (MCINCR) Regional Contracting Office (RCO) does not encourage offerors to submit multiple offers presenting alternative terms and conditions for satisfying the requirements of this solicitation.
2. Overview
2.1 The Government intends to make a single Firm Fixed Price (FFP) contract award (with cost reimbursement travel CLINs) for one, twelve-month base period and four, one-year option periods as a result of the solicitation. The Government may extend the term of the contract not to exceed six (6) months, under FAR clause 52.217-8.
2.2 Each offeror shall submit an offer that clearly and concisely describes its response to the requirements of the solicitation. Use of general or vague statements such as “standard procedures will be used” will not satisfy this requirement. Unnecessary elaboration or presentations beyond what is sufficient to present a complete and effective solution are not desired and may be construed as a lack of understanding of the requirement. Elaborate artwork and expensive visual or other presentation aids are neither necessary nor desired.
3. Guidance
3.1 Offerors must submit a proposal and other information in strict accordance with these instructions. Failure to do so may result in the Offeror’s submission being determined unacceptable and ineligible for award. Each Offeror’s submission will be screened by the KO upon receipt to ensure completeness and compliance with the instructions contained in the Request for Proposal (RFP).
3.2 The contract award shall be made in accordance with the following information contained in the RFP. Each offeror must submit an offer including information pertaining to Technical Capability/Performance Execution & Management, Past Performance, and Price. The Government will evaluate each offeror's understanding of the contract and Performance Work Statement requirements, and each offeror's ability to perform the work on the basis of its proposal.
3.3 The Government reserves the right to incorporate all or part of the successful Offeror's proposal into any contract awarded pursuant to this RFP.
3.4 The purpose of this procurement is to obtain contractor support in providing services described in the PWS.
4. Confidential Information
4.1 The Freedom of Information Act (FOIA) and its amendments have resulted in an increasing number of requests from outside the Government for copies of contract qualifications and offers submitted to federal agencies. If an Offeror’s submissions contain information that he/she believes should be withheld from such requestors under FOIA on the grounds that they contain “trade secrets and commercial or financial information” (5 USC 552(b)(4)), the offeror should mark its submissions in the following manner:
4.2 The following notice should be placed on the title page: “Some parts of this document, as identified on individual pages, are considered by the submitter to be privileged or confidential trade secrets or commercial or financial information not subject to mandatory disclosure under the Freedom of Information Act. Material considered privileged or confidential on such grounds is contained on page(s) _______.”
4.3 Each individual item considered privileged or confidential under FOIA should be marked with the following notice: “The data or information is considered confidential or privileged and is not subject to mandatory disclosure under the Freedom of Information Act.”
5. Submission of Questions and Offers
5.1 Questions
5.1.1 All questions must be received by 16 December 2024 at 10:00AM EST. All questions shall be submitted via email to Shaye Nelson, Contract Specialist, at shaye.nelson@usmc.mil and Christa Eggleston-Scott, KO/Team Lead at christa.eggleston-sc@usmc.mil.
Please submit questions in the table format below via Microsoft Excel
Solicitation Section Comment/Question
Should any questions be received after the date stated above, the Government reserves the right not to provide an answer. If, however, in the Government's opinion, the question(s) cites an issue of significant importance, the Government may provide written responses.
PLEASE NOTE: The subject line for your email should read “TECOM OAS RFP M00264-25-R-0003- Questions”.
5.1.1.2 Note: Due to the firewall at Quantico, please be advised that it is the Offeror’s responsibility to ensure all electronic submittals of questions are received by the KO in the timeframe given above.
5.2 Offers
5.2.1 Offers will be accepted via e-mail only. Offers must be received prior to the date and time on Block 8 to Shaye Nelson, Contract Specialist, at shaye.nelson@usmc.mil and Christa Eggleston-Scott, KO/Team Lead at christa.eggleston-sc@usmc.mil.
PLEASE NOTE: The subject line for your email should read “TECOM OAS RFP M00264-25-R-0003-Offer”.
6. Offer Format
Contractors shall submit offers via email.
6.1 In order to maximize efficiency and minimize the time for offer evaluation, it is required that all Offerors submit their proposals in accordance with the format and content specified. All offers shall meet the following format requirements:
Page Setup 8.5 x 11in paper size 11 x 14 inch for foldouts, matrixes, Work Breakdown Structure Single-spaced typed lines 1-inch margins on all sides Page numbering: Pages shall be numbered consecutively within each volume showing volume and page.
For example, page 9 of Volume 1 would be numbered 1.9 and page 10 of Volume 2 would be numbered 2.10, No greater than 12-point font, Times New Roman for text material.
Graphs, drawings, tables, and “Screen Shots” of pictures depicting an element(s) of the offered approach must be clear and legible; use no less than 10-point font Times New Roman and no more than 12 pt. font Times New Roman
Headers/footers- ensure the company name and RFP number is included on each page Each page of the proposal shall include the following footer: “Source Selection Information – See FAR
2.101 and 3.104.”
Microsoft Office compatible files or Adobe Acrobat are required.
The offer shall be prepared so that, when printed, the offer meets the format requirements. The offer submitted via email shall be compatible with and capable of being opened in Microsoft Office 2010 or earlier, or Adobe Acrobat.
All documentation shall be provided in Microsoft Word format, except for the following exceptions: documents requiring signature shall be provided in PDF; supporting price information shall be provided in Microsoft Word and Excel format (completed pricing template and basis of estimates). All spreadsheets shall be in Microsoft Excel (MS Excel 2013 or earlier) format such that each mathematical equation is obvious. No fields shall be password protected.
Offerors are advised the Government may be unable to receive other types of electronic files (e.g., .zip files) or files in excess of 20 megabytes. To be timely, an electronic proposal must be received in its entirety in the designated e‐mail inbox by the due date and time for Proposal. An E‐mail proposal that resides on a government server but has not appeared in the designated E‐mail inbox by the due date and time for proposal submission will be considered late unless an exception at FAR 52.215‐1(c)(3) applies.
Number of page limits required per volume is as follows:
Volume Volume Title Page Limit 1 Compliance Documentation No Page Limit 2 Factor 1: Technical Capability/Performance Execution &
Management Not to Exceed (NTE) 50 pages
3 Factor 2: Past Performance Not to Exceed (NTE) 30 pages 4 Factor 3: Price Not to Exceed (NTE) 20 pages
6.2 Offer Content
Each offer shall contain the following volumes/sections:
Volume 1: Compliance Documentation Volume 2: Factor 1: Technical Capability/Performance Execution & Management Volume 3: Factor 2: Past Performance Volume 4: Factor 3: Price
6.3 Volume 1 - Compliance Documentation
The offer shall comply with the following information:
6.3.1 Adherence to offer format and content.
6.3.2 Include a cover letter with the following information:
1. The RFP number.
2. Company Information. Provide the name, address, UEI number, CAGE Code, and telephone number of the offeror.
3. Authorized Personnel. Provide the name, title, telephone number, facsimile number, and e-mail address of the company/division point of contact that can obligate your company contractually. Also, identify those individuals authorized to negotiate with the Government.
4. “Remit to” address, if different than mailing address.
5. Acknowledgment of Amendments (if applicable).
6. Agreement with terms. A statement specifying the extent of agreement with all terms, conditions, and provisions included in the RFP. Offerors are to clearly detail any exceptions taken and the rationale for the exceptions taken to the RFP. Please note that exceptions taken to the RFP may render the offer unacceptable to the Government.
7. Identify any enclosures being transmitted
8. State the length of offer validity (at least a minimum of 180 days).
9. Completed Standard Form (SF) 1449, of the Solicitation (Signed and dated). Failure to do so may lead to rejection of the offer.
10. A completed copy of all solicitation representations and certifications. If the offeror completed the representations and certifications in the System for Award Management (SAM), it shall include a statement stating its representations and certifications are up to date in SAM. Any representations and certification that are not available for completion within SAM must be submitted in this volume.
6.3.3 Organizational Conflict of Interest (OCI) Plan Submission: The offeror shall provide an affirmative statement that no OCIs exist or a detailed plan which mitigates existing or anticipated OCIs. If applicable, the offeror shall describe how the OCI Mitigation Plan was developed and the company's approach to avoiding, mitigating, or neutralizing any identified OCI risks. If an offeror determines that an actual or potential OCI does not exist, the offeror shall include a statement to that effect as part of its offer and does not need to submit an OCI Plan.
6.3.3.1 To facilitate resolution of any potential or actual OCIs, Offerors are encouraged to submit their OCI Plans in advance of the proposal submission due date. The OCI Mitigation Plan shall specifically address the OCI disclosures required in this section, and explain how the prime will fully avoid, neutralize, or mitigate any OCIs, as indicated in FAR 9.5. As part of its OCI Mitigation Plan, the Offeror must identify which contracts or subcontracts it will continue to support and those it intends to terminate or allow to lapse to eliminate any conflicts of interest. The OCI Mitigation Plan shall also address other OCI resolution and mitigation measures to include the divestment of business units.
6.4 Volume 2 – Factor 1 – Technical Capability/Performance Execution & Management
6.4.1 The offeror’s technical proposal shall not exceed 50 pages.
The Offeror shall address Factor 1 – Technical Capability/Performance Execution and Management. The factor shall include:
6.4.1.1 Factor 1 – Technical Capability/Performance Execution & Management: The offeror must demonstrate knowledge and understanding of the technical and programmatic requirements described in the Performance Work Statement (PWS), and they must clearly articulate their capability to perform all of the tasks outlined in the PWS so as to provide continuous quality support. The Offeror shall identify performance objectives that can be accomplished by their technical approach, and describe the benefits and advantages of that approach. The Offeror shall also illustrate the roles of staff and team resources to execute the intended strategy. The discussion must provide the evaluation panel with sufficient confidence that the Offeror has the capacity to support the identified mission areas, understands the priorities and emerging issues within those areas, and can execute a comprehensive approach that ensures quality performance and use of staff resources to meet PWS objectives to execute the intended strategy.
The Offeror must provide a demonstrated management approach suitable to respond to the types of requirements delineated in the PWS, consistent with their technical approach. The discussion must provide the evaluation panel with sufficient confidence that the Offeror understands the critical support areas, emerging issues, and risks associated with the support goals set forth in the PWS, and has the management techniques, controls, subcontractor management processes, and quality provisions necessary to execute their approach.
6.5 Volume 3 Factor 2 – Past Performance
6.5.1 Identify up to three recent, relevant contracts performed within five (5) years of the date of the issuance date of this offer request. All information provided should be references the offeror considers relevant to the requirements of the solicitation citing the specific RFP PWS paragraphs. Offerors shall provide a detailed explanation demonstrating the relevance of the contracts or efforts to the requirements of the solicitation. If subcontractor experience is provided as part of the three most relevant contracts or efforts, the subcontractor experience will be given weight relative to the scope, magnitude and complexity of the aspects of the work under the solicitation that the subcontractor is proposed to perform. Therefore, the offeror’s proposal shall detail clearly the aspects of the work in the solicitation that the subcontractor is proposed to perform. If the Offeror has not had any Government contracts, then information on recent and relevant subcontracts and/or commercial contracts may be submitted. If the Offeror does not have recent and relevant past performance experience, then the Offeror must make an affirmative statement to this effect.
6.5.2 The offeror shall complete a “Past Performance Questionnaire (PPQ)” (Attachment 1) for each reference. For additional information regarding a particular reference beyond that which will fit on the form, the offeror may continue onto another sheet of paper.
6.5.3 The offeror shall complete an “Assessor Past Performance Questionnaire (APPQ)” (Attachment 2) for each reference submitted that does not have an official CPARS assessment. The form shall be completed by an Assessor (PM, COR, etc.) responsible for the oversight of that reference. Completed APPQs (Attachment 2) are to be submitted directly to the RCO by the assessor via email to shaye.nelson@usmc.mil AND Christa.Eggleston-sc@usmc.mil with the subject line stating “TECOM OAS RFP M00264-25-R-0003-APPQ” by 14 February 2025 @ 10:00 am Eastern Time. Forms completed by the assessor and submitted to the Government by the assessor will not count against the page limits.
6.5.4 Any Offeror that submits any contract reference that is not relevant will receive a “Not Relevant” rating for that contract reference in Past Performance. Any Offeror indicating that they have no “Past Performance” will receive an “Unknown Confidence” rating for Past Performance.
6.5.5 The Government reserves the right to contact the references provided and to use recent and relevant past performance information obtained from sources other than those identified by the offeror. This past performance information may be used for the evaluation of past performance.
6.5.6 The Government may also use other information such as Contractor Performance Assessment Reporting System (CPARS) data available from Government sources to evaluate an offeror’s past performance. The Government reserves the right to limit or expand the number of references it decides to contact and to contact references other than those provided by the offeror.
6.5.7 When submitting a subcontractor effort, a commitment signed by offeror and subcontractor certifying that if a contract is awarded resulting from the proposal, the parties commit to joint performance as proposed shall be included and fully executed by both parties to be evaluated or considered. Affiliate companies, sister companies, teaming arrangements, joint venture agreement, etc., will be considered provided that sufficient documentation is included in the proposal. The primary offering entity must demonstrate that the affiliate will perform significant and critical aspects of the contract if awarded. Documentation includes a copy of the signed arrangement such as documented affiliation, a copy of the teaming agreement, a copy of the joint venture agreement, etc. If the signed commitment is not fully executed by both parties and provided with the Past Performance Proposal, subcontractor references will not be evaluated or considered.
6.6 Volume 4 – Factor 3 – Price
6.6.1 The Offeror’s price volume shall contain the SF1449 and a completed Government provided Pricing Sheet (Attachment 3). The Price Offer should reflect the Offeror’s best pricing available. If discrepancies are found in comparison of SF1449 and the completed Pricing Sheet (Attachment 3), the Pricing Sheet (Attachment 3) will take precedence. All information relating to pricing data shall be included in this volume ONLY.
6.6.2 General Information: The Offeror shall complete Attachment 3, Pricing Sheet. All pricing, including but not limited to unit pricing, subtotals and final price, shall be rounded to two decimal places (i.e., $12.34). Any amount beyond two decimal places will be rounded down.
6.6.3 SF 1449, Price Proposal corresponding to CLIN structure and supporting materials. The fully burdened total price for each CLIN of Schedule of Supplies /Services of the SF 1449 in the solicitation should be clearly annotated in the proposal.
6.6.4 Price Reasonableness and Completeness. The Government will verify that all solicitation requirements have been priced, figures are correctly calculated, and prices are presented in a clear and useful format. Additionally, unbalanced pricing poses an unacceptable risk to the Government and may be a reason to reject an Offeror’s proposal. Price submissions must be sufficiently detailed to demonstrate their reasonableness. Additionally, the following areas must be addressed:
Complete the provided Pricing Sheet (Attachment 3) with your pricing, including both prime and subcontractor/team member labor rates that make up the total pricing;
Identify all associated discounts you are proposing in clear, concise detail; and/or Subcontractors identified (If applicable) and rates/pricing developed pursuant to prime guidance.
6.6.5 Price Information. The total evaluated price will consist of the proposed price for the one-year base and four, one year option periods and the option in accordance with 52.217-8, which will be evaluated based on the price of the final option period divided by two. Pricing will be incorporated into Schedule of Supplies/Services of the SF 1449 upon contract award.
Information beyond that required by this instruction shall not be submitted unless you consider it essential to document or support your price position. All information relating to the proposed price, including all required supporting documentation must be included in the section of the proposal designated as the Price Volume. Under no circumstances shall this information and documentation be included elsewhere in the proposal.
(End of Provision)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .