Section SF 1449 - CONTINUATION SHEET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
2
Each

Aeration Services

FFP

Background Information:

The Officer Candidate School (OCS) Physical Training (PT) fields are particularly prone to heavy foot traffic due to the candidate physical training (PT) which at times consists of roughly 2,500 candidates using the PT fields. This soil compaction reduces the ability for water to properly drain from the field and can directly result in standing water and puddles. If uncorrected, this soil compaction can lead to the thinning of the field turf. Aerating the OCS PT fields will assist in relieving the soil compaction, thus improving water drainage and improving the overall quality of the turf. On the safety side, standing water on the fields creates an unsafe condition for the candidates to PT. The standing water and resulting soft turf creates a situation where ankle injuries and lower extremity injuries are possible. In addition, the standing water provides breeding grounds for insects such as mosquitoes that can carry diseases. The aeration service OCS is currently requesting will ensure that the PT fields remain in a safe condition as well as remaining esthetically appealing. This will be a reoccurring annual service. Twice a year, once in April, and once in September.

Service Requested:

- Aeration of (2) PT Fields

- Jr PT Fields Dimension : 108 x 240 square ft

- Sr PT Fields Dimension : 120 x 240 sqare ft

- Quantities are broken down into (2) for services performed that year

- Each PT Field will be serviced once in April and once in September of 2012

FOB: Destination

MILSTRIP: M3038012SU00004

PURCHASE REQUEST NUMBER: M3038012SU00004

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
2
Each
OPTION
Aeration Services

FFP

Background Information:

The Officer Candidate School (OCS) Physical Training (PT) fields are particularly prone to heavy foot traffic due to the candidate physical training (PT) which at times consists of roughly 2,500 candidates using the PT fields. This soil compaction reduces the ability for water to properly drain from the field and can directly result in standing water and puddles. If uncorrected, this soil compaction can lead to the thinning of the field turf. Aerating the OCS PT fields will assist in relieving the soil compaction, thus improving water drainage and improving the overall quality of the turf. On the safety side, standing water on the fields creates an unsafe condition for the candidates to PT. The standing water and resulting soft turf creates a situation where ankle injuries and lower extremity injuries are possible. In addition, the standing water provides breeding grounds for insects such as mosquitoes that can carry diseases. The aeration service OCS is currently requesting will ensure that the PT fields remain in a safe condition as well as remaining esthetically appealing. This will be a reoccurring annual service. Twice a year, once in April, and once in September.

Service Requested:

- Aeration of (2) PT Fields

- Jr PT Fields Dimension : 108 x 240 square ft

- Sr PT Fields Dimension : 120 x 240 sqare ft

- Quantities are broken down into (2) for services performed that year

- Each PT Field will be serviced once in April and once in September of 2013.

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
2
Each
OPTION
Aeration Services

FFP

Background Information:

The Officer Candidate School (OCS) Physical Training (PT) fields are particularly prone to heavy foot traffic due to the candidate physical training (PT) which at times consists of roughly 2,500 candidates using the PT fields. This soil compaction reduces the ability for water to properly drain from the field and can directly result in standing water and puddles. If uncorrected, this soil compaction can lead to the thinning of the field turf. Aerating the OCS PT fields will assist in relieving the soil compaction, thus improving water drainage and improving the overall quality of the turf. On the safety side, standing water on the fields creates an unsafe condition for the candidates to PT. The standing water and resulting soft turf creates a situation where ankle injuries and lower extremity injuries are possible. In addition, the standing water provides breeding grounds for insects such as mosquitoes that can carry diseases. The aeration service OCS is currently requesting will ensure that the PT fields remain in a safe condition as well as remaining esthetically appealing. This will be a reoccurring annual service. Twice a year, once in April, and once in September.

Service Requested:

- Aeration of (2) PT Fields

- Jr PT Fields Dimension : 108 x 240 square ft

- Sr PT Fields Dimension : 120 x 240 sqare ft

- Quantities are broken down into (2) for services performed that year

- Each PT Field will be serviced once in April and once in September of 2014.

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Destination
Government
Destination
Government
1001
Destination
Government
Destination
Government
2001
Destination
Government
Destination
Government

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC
0001
POP 17-JAN-2012 TO

16-JAN-2013

N/A
OFFICER CANDIDATES SCHOOL

2189 ELROD AVE

ROOM NB-3, BLDG 2187

QUANTICO VA 22134-5033

MELODIE WALTON

703-432-6020

M30380

1001
POP 17-JAN-2013 TO

16-JAN-2014

N/A
(SAME AS PREVIOUS LOCATION)

M30380

2001
POP 17-JAN-2014 TO

16-JAN-2015

N/A
(SAME AS PREVIOUS LOCATION)

M30380

CLAUSES INCORPORATED BY REFERENCE

52.204-7
Central Contractor Registration
APR 2008
52.212-1
Instructions to Offerors--Commercial Items
JUN 2008
52.212-4
Contract Terms and Conditions--Commercial Items
JUN 2010
252.225-7002
Qualifying Country Sources As Subcontractors
APR 2003
252.243-7001
Pricing Of Contract Modifications
DEC 1991

CLAUSES INCORPORATED BY FULL TEXT

52.212-2 EVALUATION--COMMERCIAL ITEMS (JAN 1999)

(1) This acquisition will utilize Lowest Price Technically Acceptable (LPTA) procedures in accordance with FAR 15.101-2. Technical tradeoff will not be made and no additional credit will be given for exceeding acceptability. Award will be made to the acceptable offeror with the lowest evaluated price, which is deemed responsible in accordance with the Federal Acquisition Regulation and whose proposal conforms to the solicitation requirements. The solicitation requirements include all stated terms, conditions, representation and certifications, and other information required by this solicitation. The Government reserves the right to award without discussions. Therefore, each initial offer should contain the offeror’s best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if determined necessary by the Contracting Officer.

(2) The Government may reject any proposal that is evaluated to be unrealistic in terms of requirements, contract terms and conditions, or an unrealistically high or low price when compared to Government estimates, such that the proposal is deemed to reflect an inherent lack of competence or failure to comprehend the complexity and risk of the program.

(3) Technical acceptability will be evaluated on all proposals. Only those proposals determined to be technically acceptable, either initially or as a result of discussions, will be considered for award. Then, price will be evaluated and the proposal will be listed from lowest to highest price based on the total evaluated price and technical acceptability. Award will be made to the lowest evaluated priced proposal meeting the acceptability standards for the non-priced factors.

TECHNICAL EVALUATION STANDARD:

The contractor shall address the following three factors

1. Factor 1 - Technical Capability – Offeror shall clearly demonstrate its approach to technical ability to meet the requirements of CLIN/ Line Items based on specifications and quality.

2. Factor 2 - Past Performance – Provide three references supporting the ability to deliver, install/assemble the kennels on schedule and in quantities required. Quoters are to provide: Customer; Contract/Task Order number; Contract Type; Total Contract Value; Description of Work performed; relevancy pertaining to this requirement; Names; telephone number; and email address for Point of Contact.

3. Factor 3 – Price – The Offeror shall provide sufficient price information to allow the Contracting Officer to determine the completeness and reasonableness of the quote prices, in addition to the completed Line Items pricing. The Government will evaluate proposals for award purposes by adding the total price for all options (If applicable), to the total price of the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

DISCUSSIONS: If during the evaluation period it is determined to be in the best interest of the Government to hold discussions, Offeror responses to clarification/discussion notices will be considered in making the source selection decision.

AWARD DECISION: The award decisions will be made as follows:

(1) Step One – determine Technical Acceptability. The technical evaluation Factor 1, will assess the offerors capability to satisfy the government’s requirement. The Government will evaluate all technical capability quotes received by the required date/time. The Technical Capability factor will receive a rating of acceptable, or unacceptable. If any factor is rated “unacceptable”, the entire quote is rendered unacceptable, and the quote will be removed from the competitive range. Only quotes deemed technically acceptable (either initially or as the result of discussions) will be considered for award. The ratings are defined in the following paragraphs:

(a) Acceptable: The proposal meets all the minimum mandatory requirements in the solicitation identified as Technical Capability factor: Only those proposals determined acceptable, either initially or as a result of discussions, will be considered for award. Once deemed acceptable, all technical proposals are considered to be equal.

(b) Unacceptable: Fails to meet all the minimum mandatory requirements in the solicitation identified as factors within the Technical Evaluation Standards. Proposals with an unacceptable rating will not be considered for award.

(2) Past Performance Rating Scale – The following table illustrates the past performance ratings rationale that will be applied:

Rating
Past Performance Rationale
Acceptable
Based on the offerors performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the oferor’s performance record is unknown. (see note below).
Unacceptable
Based on the offerors performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.
Note
In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)). Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”

(3) Step Two – Evaluate Price. The offerors’ Price proposal will be evaluated, for award purposes, based upon the total price proposed as annotated under Factor 3 - Price.

(4) Step Three – Award Decision. Award will be made to the lowest priced, technically acceptable offeror, subject to a positive responsibility determination in accordance with FAR Part 9 and conformance of the offeror’s proposal to the terms and conditions of the solicitation.

A written notice of award or acceptance of a proposal, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the proposal shall result in a binding contract without further action by either party.

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS--COMMERCIAL ITEMS (MAY 2011)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).

___ Alternate I (Aug 2007) of 52.222-50 (22 U.S.C. 7104(g)).

(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (SEP 2006), with Alternate I (OCT 1995) (41 U.S.C. 253g and 10 U.S.C. 2402).

___ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (APR 2010)(Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)).

___ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

___ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUL 2010) (Pub. L. 109-282) (31 U.S.C. 6101 note).

___ (5) 52.204-11, American Recovery and Reinvestment Act—Reporting Requirements (JUL 2010) (Pub. L. 111-5).

___ (6) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (DEC 2010) (31 U.S.C. 6101 note). (Applies to contracts over $30,000). (Not applicable to subcontracts for the acquisition of commercially available off-the-shelf items).

___ (7) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (section 740 of Division C of Public Law 111-117, section 743 of Division D of Public Law 111-8, and section 745 of Division D of Public Law 110-161).

___ (8) 52.219-3, Notice of Total HUBZone Set-Aside or Sole-Source Award (JAN 2011) (15 U.S.C. 657a).

___ (9) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (JAN 2011) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

___ (10) [Reserved].

_x_ (11)(i) 52.219-6, Notice of Total Small Business Set-Aside (JUNE 2003) (15 U.S.C. 644).

___ (ii) Alternate I (OCT 1995) of 52.219-6.

___ (iii) Alternate II (MAR 2004) of 52.219-6.

___ (12)(i) 52.219-7, Notice of Partial Small Business Set-Aside (JUNE 2003) (15 U.S.C. 644).

___ (ii) Alternate I (OCT 1995) of 52.219-7.

___ (iii) Alternate II (MAR 2004) of 52.219-7.

___ (13) 52.219-8, Utilization of Small Business Concerns (JAN 2011) (15 U.S.C. 637 (d)(2) and (3)).

___ (14)(i) 52.219-9, Small Business Subcontracting Plan (JAN 2011) (15 U.S.C. 637(d)(4)).

___ (ii) Alternate I (OCT 2001) of 52.219-9 ___ (iii) Alternate II (OCT 2001) of 52.219-9.

___ (iv) Alternate III (JUL 2010) of 52.219-9.

___ (15) 52.219-14, Limitations on Subcontracting (DEC 1996) (15 U.S.C. 637(a)(14)).

___ (16) 52.219-16, Liquidated Damages--Subcontracting Plan (JAN 1999) (15 U.S.C. 637(d)(4)(F)(i)).

___ (17)(i) 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns (OCT 2008) (10 U.S.C. 2323) (if the offeror elects to waive the adjustment, it shall so indicate in its offer).

___ (ii) Alternate I (JUNE 2003) of 52.219-23.

___ (18) 52.219-25, Small Disadvantaged Business Participation Program--Disadvantaged Status and Reporting (DEC 2010) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).

___ (19) 52.219-26, Small Disadvantaged Business Participation Program--Incentive Subcontracting (OCT 2000) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).

___ (20) 52.219-27, Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside (MAY 2004) (U.S.C. 657 f).

_x_ (21) 52.219-28, Post Award Small Business Program Rerepresentation (APR 2009) (15 U.S.C. 632(a)(2)).

___ (22) 52.219-29 Notice of Total Set-Aside for Economically Disadvantaged Women-Owned Small Business (EDWOSB) Concerns (APR 2011).

___ (23) 52.219-30 Notice of Total Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible Under the WOSB Program (APR 2011).

_x_ (24) 52.222-3, Convict Labor (JUNE 2003) (E.O. 11755).

_x_ (25) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (JUL 2010) (E.O. 13126).

_x_ (26) 52.222-21, Prohibition of Segregated Facilities (FEB 1999).

_x_ (27) 52.222-26, Equal Opportunity (MAR 2007) (E.O. 11246).

___ (28) 52.222-35, Equal Opportunity for Veterans (SEP 2010) (38 U.S.C. 4212).

_x_ (29) 52.222-36, Affirmative Action for Workers with Disabilities (OCT 2010) (29

U.S.C. 793).

____ (30) 52.222-37, Employment Reports on Veterans (Sep 2010) (38 U.S.C. 4212).

____ (31) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496).

___ (32) 52.222-54, Employment Eligibility Verification (JAN 2009). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

___ (33) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (MAY 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

___ (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(c)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

___ (34) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007) (42 U.S.C. 8259b) ___ (35)(i) 52.223-16, IEEE 1680 Standard for the Environmental Assessment of Personal Computer Products (DEC 2007) (E.O. 13423) .

___ (ii) Alternate I (DEC 2007) of 52.223-16. .

___ (36) 52.223-18, Contractor Policy to Ban Text Messaging while Driving (SEP 2010) (E.O. 13513).

___ (37) 52.225-1, Buy American Act--Supplies (JUNE 2003) (41 U.S.C. 10a-10d).

___ (38)(i) 52.225-3, Buy American Act--Free Trade Agreements--Israeli Trade Act (JUN 2009) (41 U.S.C. 10a-10d, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, Pub. L. 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, and 110-138).

___ (ii) Alternate I (JAN 2004) of 52.225-3.

___ (iii) Alternate II (JAN 2004) of 52.225-3.

___ (39) 52.225-5, Trade Agreements (AUG 2009) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

_x_ (40) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

___ (41) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

___ (42) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).

___ (43) 52.232-29, Terms for Financing of Purchases of Commercial Items (FEB 2002) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)) ___ (44) 52.232-30, Installment Payments for Commercial Items (OCT 1995) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)).

_x_ (45) 52.232-33, Payment by Electronic Funds Transfer--Central Contractor Registration (OCT 2003) (31 U.S.C. 3332).

___ (46) 52.232-34, Payment by Electronic Funds Transfer--Other than Central Contractor Registration (MAY 1999) (31 U.S.C. 3332) ___ (47) 52.232-36, Payment by Third Party (FEB 2010) (31 U.S.C. 3332).

___ (48) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).

___ (49)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631).

___ (ii) Alternate I (APR 2003) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

____ (1) 52.222-41, Service Contract Act of 1965 (Nov 2007) (41 U.S.C. 351, et seq.).

____ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 1989) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).

____ (3) 52.222-43, Fair Labor Standards Act and Service Contract Act--Price Adjustment (Multiple Year and Option Contracts) (SEP 2009) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).

____ (4) 52.222-44, Fair Labor Standards Act and Service Contract Act--Price Adjustment (SEP 2009) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.)

____ (5) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (Nov 2007) (41 U.S.C. 351, et seq.).

____ (6) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services--Requirements (FEB 2009) (41 U.S.C. 351, et seq.).

____ (7) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Mar 2009) (Pub. L. 110-247).

____ (8) 52.237-11, Accepting and Dispensing of $1 Coin (SEP 2008)(31 U.S.C. 5112(p)(1)).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records--Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1)in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (APR 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note).

(ii) 52.219-8, Utilization of Small Business Concerns (DEC 2010) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(iii) Reserved.

(iv) 52.222-26, Equal Opportunity (MAR 2007) (E.O. 11246).

(v) 52.222-35, Equal Opportunity for Veterans (SEP 2010) (38 U.S.C. 4212).

(vi) 52.222-36, Affirmative Action for Workers with Disabilities (OCT 1998) (29 U.S.C. 793).

(vii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(viii) 52.222-41, Service Contract Act of 1965 (Nov 2007) (41 U.S.C. 351, et seq.).

(ix) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).

Alternate I (AUG 2007) of 52.222-50 (22 U.S.C. 7104(g)).

(x) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (Nov 2007) (41 U.S.C. 351, et seq.).

(xi) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services--Requirements (FEB 2009) (41 U.S.C. 351, et seq.).

(xii) 52.222-54, Employment Eligibility Verification (JAN 2009).

(xiii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (MAR 2009) (Pub. L. 110-247). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xiv) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the contractor May include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

(End of clause)

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

(End of clause)

252.212-7001 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS APPLICABLE TO DEFENSE ACQUISITIONS OF COMMERCIAL ITEMS (JUN 2011)

(a) The Contractor agrees to comply with the following Federal Acquisition Regulation (FAR) clause which, if checked, is included in this contract by reference to implement a provision of law applicable to acquisitions of commercial items or components.

___ 52.203-3, Gratuities (APR 1984) (10 U.S.C. 2207).

(b) The Contractor agrees to comply with any clause that is checked on the following list of Defense FAR Supplement clauses which, if checked, is included in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items or components.

(1) ___252.203-7000, Requirements Relating to Compensation of Former DoD Officials (JAN 2009) (Section 847 of Pub. L. 110-181).

(2) ___ 252.203-7003, Agency Office of the Inspector General (SEP 2010) (Section 6101 of Pub. L. 110-252, 41 U.S.C. 3509 note).

(3) ___ 252.205-7000, Provision of Information to Cooperative Agreement Holders (DEC 1991) (10 U.S.C. 2416).

(4) ___ 252.219-7003, Small Business Subcontracting Plan (DoD Contracts) (OCT 2010) (15 U.S.C. 637).

(5) ___ 252.219-7004, Small Business Subcontracting Plan (Test Program) (JAN 2011) (15 U.S.C. 637 note).

(6)(i) _x_ 252.225-7001, Buy American Act and Balance of Payments Program (JAN 2009) (41 U.S.C. 10a-10d, E.O. 10582).

(ii) ____ Alternate I (DEC 2010) of 252.225-7001.

(7) ____ 252.225-7008, Restriction on Acquisition of Specialty Metals (JUL 2009) (10 U.S.C. 2533b).

(8) ____ 252.225-7009, Restriction on Acquisition of Certain Articles Containing Specialty Metals (JAN 2011) (10 U.S.C. 2533b).

(9) ____ 252.225-7012, Preference for Certain Domestic Commodities (JUN 2010) (10 U.S.C. 2533a).

(10) ____ 252.225-7015, Restriction on Acquisition of Hand or Measuring Tools (JUN 2005) (10 U.S.C. 2533a).

(11) ____ 252.225-7016, Restriction on Acquisition of Ball and Roller Bearings (JUN 2011) (Section 8065 of Public Law 107-117 and the same restriction in subsequent DoD appropriations acts).

(12) )(i) ___ 252.225-7021, Trade Agreements (NOV 2009) (19 U.S.C. 2501-2518 and 19 U.S.C. 3301 note).

(ii) ___ Alternate I (SEP 2008)

(iii) ___ Alternate II (DEC 2010) of 252.225-7021.

(13) ____ 252.225-7027, Restriction on Contingent Fees for Foreign Military Sales (APR 2003) (22 U.S.C. 2779).

(14) ____ 252.225-7028, Exclusionary Policies and Practices of Foreign Governments (APR 2003) (22 U.S.C. 2755).

(15)(i) ____ 252.225-7036, Buy American Act--Free Trade Agreements--Balance of Payments Program (DEC 2010) (41 U.S.C. 10a-10d and 19 U.S.C. 3301 note).

(ii) ___ Alternate I (JUL 2009) of 252.225-7036.

(iii) ___ Alternate II (DEC 2010) of 252.225-7036.

(iv) ___ Alternate III (DEC 2010) of 252.225-7036.

(16) ____ 252.225-7038, Restriction on Acquisition of Air Circuit Breakers (JUN 2005) (10 U.S.C. 2534(a)(3)).

(17) ____ 252.226-7001, Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns (SEP 2004) (Section 8021 of Public Law 107-248 and similar sections in subsequent DoD appropriations acts).

(18) ____ 252.227-7015, Technical Data--Commercial Items (MAR 2011) (10 U.S.C. 2320).

(19) ____ 252.227-7037, Validation of Restrictive Markings on Technical Data (SEP 1999) (10 U.S.C. 2321).

(20) _x__ 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports (MAR 2008) (10 U.S.C. 2227).

(21) ____252.237-7010, Prohibition on Interrogation of Detainees by Contractor Personnel (NOV 2010) (Section 1038 of Pub. L. 111-84).

(22) ____ 252.237-7019, Training for Contractor Personnel Interacting with Detainees (SEP 2006) (Section 1092 of Public Law 108-375).

(23) ____ 252.243-7002, Requests for Equitable Adjustment (MAR 1998) (10 U.S.C. 2410).

(24)____252.246-7004, Safety of Facilities, Infrastructure, and Equipment for Military Operations (OCT 2010) (Section 807 of Public Law 111-84).

(25)____ 252.247-7003, Pass-Through of Motor Carrier Fuel Surcharge Adjustment to the Cost Bearer (SEP 2010) (Section 884 of Public Law 110-417).

(26)(i) _x__ 252.247-7023, Transportation of Supplies by Sea (MAY 2002) (10 U.S.C. 2631).

(ii) ____ Alternate I (MAR 2000) of 252.247-7023.

(iii) ____ Alternate II (MAR 2000) of 252.247-7023.

(iv) _x__ Alternate III (MAY 2002) of 252.247-7023.

(27) ____ 252.247-7024, Notification of Transportation of Supplies by Sea (MAR 2000) (10 U.S.C. 2631).

(c) In addition to the clauses listed in paragraph (e) of the Contract Terms and Conditions Required to Implement Statutes or Executive Orders--Commercial Items clause of this contract (FAR 52.212-5), the Contractor shall include the terms of the following clauses, if applicable, in subcontracts for commercial items or commercial components, awarded at any tier under this contract:

(1) 252.237-7010, Prohibition on Interrogation of Detainees by Contractor Personnel (NOV 2010) (Section 1038 of Pub. L. 111-84).

(2) 252.237-7019, Training for Contractor Personnel Interacting with Detainees (SEP 2006) (Section 1092 of Public Law 108-375).

(3) 252.247-7003, Pass-Through of Motor Carrier Fuel Surcharge Adjustment to the Cost Bearer (SEP 2010) (Section 884 of Public Law 110-417).

(4) 252.247-7023, Transportation of Supplies by Sea (MAY 2002) (10 U.S.C. 2631).

(5) 252.247-7024, Notification of Transportation of Supplies by Sea (MAR 2000) (10 U.S.C. 2631).

(End of clause) U3 –DD 250 RECEIVING REPORT SUBMISSION THROUGH WIDE AREA WORKFLOW - RECEIPT AND ACCEPTANCE (WAWF-RA)

NOTICE TO RECEIVERS/ACCEPTORS OF SUPPLIES AND/OR SERVICES:

It is the responsibility of the receiving activity to electronically submit to DFAS through WAWF-RA the DD-250, receipt/inspection and acceptance of supplies and/or services. Electronic submission shall be initiated no later than 7 days after receipt.

For further explanation refer to the following websites:

https://wawf.eb.mil http://www.marcorsyscom.usmc.mil/sies/pa/receipts.asp USMC WIDE AREA WORKFLOW IMPLEMENTATION (March 2008)

To implement DFARS 252.232-7003, "ELECTRONIC SUBMISSION OF PAYMENT REQUEST (MAR 2008)", the United States Marine Corps (USMC) utilizes Wide Area WorkFlow-Receipt and Acceptance (WAWF-RA) to electronically process vendor requests for payment. This application allows DoD vendors to submit and track Invoices and Receipt/Acceptance documents electronically.

The contractor is required to utilize this system when processing invoices and receiving reports under this contract/order, unless the provision at DFARS 252.232-7003(c) applies.

The contractor shall:

(i) Ensure an Electronic Business Point of Contact is designated in Central Contractor Registration at http://www.ccr.gov

(ii) Register on WAWF-RA at https://wawf.eb.mil, within ten (10) calendar days after award of this contract or modification. Systematic instructions on how to self- register on WAWF-RA are available at https://wawftraining.eb.mil/xhtml/unauth/web/wbt/wawfra/SelfRegister.xhtml

* Register cage/location code with WAWF-RA vendor helpdesk at 801-605-7095, before attempting to self-register your company.

The contractor shall use the following guidance when choosing a format for processing invoices, receiving report and cost vouchers:

- If billing for Materials Only, select “Combo”

- If billing for Materials & Services, select “Combo”

- If billing for Services Only, select 2-in-1 (Services Only)

- If billing for Cost Type/Reimbursable Contracts, select “Cost Voucher”

Contractor is to submit payment requests only for items delivered to the Government. Contractor is to provide tracking information (e.g. FedEx, UPS, Transportation/Shipping Documentation, etc.) allowing confirmation of delivery by the Government. Tracking information and packing slip or invoice indicating the quantity and ship-to location will be attached and uploaded into WAWF-RA as supporting documentation.

When entering the invoice into WAWF-RA, the contractor shall fill in the following DoDAAC fields or DoDAAC extensions:

The Contracting Office provides the following to assist the contractor with entering data in WAWF-RA, as follows:

Invoice Type
Combo
Contract Number
To be provided upon award
Delivery Order
To be provided upon award
Cage Code/Ext
To be provided upon award
Pay DoDAAC
M67443
Issue Date
To be provided upon award
Issue By DoDAAC
M00264
Admin By DoDAAC
Block 16 on SF 1449 or Block 7 of the DD Form 1155
Ship To Code/Ext
To be provided upon award
Acceptor Email Address
To be provided upon award
LPO DoDAAC
“Leave Blank” (Instruct the contractor to leave blank unless this is being paid out of a Navy Pay Office. If so, insert correct LPO DoDAAC)*
Inspect by DoDAAC
“Leave Blank” (Instruct the contractor to leave blank unless the contract requires an inspected at source. If the contract requires an inspection at source , the inspection DoDAAC should be entered which is normally a DCMA DoDAAC)*

* To be completed at time of award.

The USMC WAWF-RA point of contact (POC) for this contract is Ms. Lowe, Anita and can be reached at telephone number (703) 784-3397; email address anita.lowe@usmc.mil.

NOTE: The POCs identified above are for WAWF-RA issues only. Any other contracting questions/problems should be addressed to the POC identified below;

Contracting Officer: Ms. Jerri Newton Phone: 703-784-1930 Fax: 703-784-5908 E-mail: jerri.newton@usmc.mil Contract Specialist: Sgt Sung Monora Phone: 703-784-2579 Fax: 703-784-5908 E-mail: monora.sung@usmc.mil In some situations, the WAWF-RA system will pre-populate the “Issue by DoDAAC”, “Admin by DoDAAC” and “Pay DoDAAC”. Contractor shall verify those DoDAACs automatically entered by the WAWF-RA system match the above information. If these DoDAACs do not match, then the contractor shall correct the field(s) and notify the Contracting Officer of the discrepancy (ies). Step-by step procedures and a WAWF hands-on practice system are available at https://wawftraining.eb.mil/xhtml/unauth/web/wbt/WbtSummary.xhtml.

NOTE TO CONTRACTOR:

Before closing out of an invoice session in WAWF-RA, but after submitting the document or documents, the contractor will be prompted to send additional email notifications. Contractor shall click on “Send More Email Notification” on the page that appears. Add the acceptor’s/receiver’s email address (Note this address is their work email address not their WAWF-RA organizational email address) in the first email address block and add any other additional email addresses desired in the following blocks. This additional notification to the Government is important to ensure the acceptor/receiver is aware that the invoice documents have been submitted into the WAWF-RA system.

General DFAS information may be accessed using the DFAS website at http://www.dod.mil/dfas//. Payment status information may be accessed using the myInvoice system at https://myinvoice.csd.disa.mil// or by calling the DFAS Columbus helpdesk at 800-756-4571. (Select Option 1) Your contract number and shipment/invoice number will be required to check status of your payments

INSTRUCTION TO OFFERORS

INSTRUCTIONS TO OFFERORS

SITE SURVEY:

Site survey will be conducted on 10 January 2012 at 10:00 AM, EST. Location is at 2189 Elrod Ave, Quantico, VA 22134. Attendees must submit their names to Sgt Sung Monora via E-mail at monora.sung@usmc.mil if they plan to attend. No questions will be answered during the site survey. All questions must be submitted via E-mail in reference to the below paragraph.

QUESTIONS:

Offerors may submit questions requesting clarification of solicitation requirements. All questions must be received by 08:00 am, EST, 12 January 2012. No questions will be responded to after the cut off date. All questions must be submitted to, Sgt Sung Monora at monora.sung@usmc.mil. A modification to the solicitation will be released for answers to questions no later than 17 January 2012.

Instructions for Submissions of Proposals

Proposals must be submitted no later than 12:00 pm, EST, 23 January 2012.

All proposals shall be submitted to the below address, unless the offeror elects to provide submission electronically to monora.sung@usmc.mil

UPS/FedEx

Commanding General

Regional Contracting Office – NCR

Attention: Sgt Sung Monora

2010 Henderson Road

Marine Corps Base

Quantico, VA 22134

FAXED

703-784-5908

Attention: Sgt Sung Monora NOTE: The electronic and/or hard copy of your proposal must be received by the deadline in order to be considered. Due to the firewall protection at Marine Corps Base, Quantico, some files may not be transmitted successfully; it is the contractor’s responsibility to ensure that all electronic files are received by the Contracting Office. Any Contractor whose proposal fails to provide all required information due to a transmission error may be rejected as non-responsive.

Proposals not received by the closing date and time will not be considered.