Summary of Contract Documents
This is a sealed bid package issued by the Fayetteville Public Works Commission (PWC) for the replacement and upgrade of Longview Acres Lift Station #41 and associated sanitary sewer force main in Fayetteville, North Carolina. The project scope includes installation of 2,056 feet of 8-inch force main and a new submersible lift station, along with associated site work, utility construction, and electrical components. The bid package specifies estimated quantities for multiple line items, including mobilization/demobilization, traffic control, erosion control, clearing and grubbing, demolition of the existing lift station, pavement work, installation of various sanitary sewer components at different depths, force main installations using multiple materials (DR18, RJDIP, and DIP), and lift station enclosure and generator installation. A non-mandatory pre-bid meeting is scheduled for July 7, 2026, at 11:00 a.m., with the deadline for written questions at 5:00 p.m. on July 9, 2026. Bids are due by 2:00 p.m. on July 23, 2026, at the PWC Administrative Building in Fayetteville. The contract time is 60 days from the Notice to Proceed, with liquidated damages of $1,000 per day for delays beyond the completion date.
Bidders must provide a 5 percent bid bond and, if awarded, furnish performance and payment bonds in the amount of 100 percent of the contract price. Contractors must hold a North Carolina contractor license classified as Public Utilities (Water and Sewer) with unlimited or unclassified status. Personnel qualifications are required, including a superintendent with 10 years of experience and foreman/crew leaders and operators with 8 years of experience in sewer and water construction. Subcontracting is limited to 49 percent of the contract value. The Small and Disadvantaged Business Enterprise (SDBE) program applies, requiring bidders to demonstrate good-faith efforts to engage certified SDBEs and Small Local Suppliers (SLS) from Cumberland, Hoke, and Harnett Counties, with documentation of efforts required at bid submission. All bidders must complete multiple certifications and affidavits, including non-collusion, equal employment opportunity, debarment certification, lobbying certification, and E-Verify compliance statements. Plans and specifications are available online through the PWC Procurement website and the Fayetteville State University Construction Resource Office, which provides services to support small, minority, veteran, and women-owned businesses in bid preparation and certification assistance.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DOCUMENTS &
TECHNICAL SPECIFICATIONS
PWC2526099
LONGVIEW ACRES LIFT STATION 41 REPLACEMENT &
SANITARY SEWER FORCE MAIN
ISSUED FOR BID
June 25, 2026
Fayetteville Public Works Commission Administrative Building
955 Old Wilmington Road Fayetteville, NC 28301
PWC2526099 - LONGVIEW ACRES LIFT STATION 41 REPLACEMENT & SANITARY SEWER FORCE MAIN
TABLE OF CONTENTS
SECTION A – PROJECT SPECIFICS
General
Advertisement for Bids 00100 – Instructions to Bidders
Bid Submittal Documents Bid Schedule – Performance and Delivery Bid Checklist 00300 – Bid Pricing Form Contractor Qualification Forms Bid Supplemental Forms and Attachments Small and Disadvantaged Business Enterprise (SDBE) Program
SDBE Program Forms SDBE/SLS Disclosure Form
SECTION B – CONTRACT EXECUTION DOCUMENTS
Notice of Award Acceptance of Award Construction Agreement PWC General Conditions Contract Supplemental Forms and Attachments Notice to Proceed
SECTION C – ADMINISTRATIVE PROVISIONS
DIVISION 1 – GENERAL REQUIREMENTS
01000 – Supplementary Conditions 01025 – Measurement and Payment 01300 – Submittals 01310 – Construction Schedule 01400 – Quality Control 01700 – Project Closeout
SECTION D – TECHNICAL SPECIFICATIONS
DIVISION 2 – SITE WORK
02000 – Special Provisions 02110 - Site Clearing 02111 - Site Clearing, (Utility) 02211 - Grading, Utilities 02222 - Excavation and Backfilling for Utility Systems rev 1.1.16 02272 - Erosion Control - General Provisions 02273 - Temporary Silt Fence 02274 - Gravel Construction Entrance/Exit 02500 - Traffic Control 02505 - Adjustment of Existing Structures rev 1.1.17 02573 - Permanent Pavement Patch rev 1.1.17 02574 - Temporary Pavement Patch (Type I-19.0C) 02575 - Driveway Replacement 02660 - Water Distribution rev 12.10.19 02730 - Sanitary Sewer System rev 1.1.16 02732 - Sewage Force Mains rev 6.1.18 02750 - Wastewater Flow Control rev 9.8.19
02753 - Submersible Pump Lift Station rev 1.1.10 02756 - Pre-Cast Concrete Enclosures for Lift Stations 02831 - Chain Link Fencing 02931 - Lawns and Grasses (Sodding) 02933 - Lawns and Grasses (Seeding) 03301 - Concrete Construction (Utility) 09801 - Anti-Microbial Additive rev 1.1.17 09802 - Special Coatings (Ceramic Epoxy) 09804 - Special Coatings (Epoxy Lining Ductile Iron Pipe and Fittings rev 3.31.15 13446 – Duplex pump Station Control Center and Telemetry Scada 16010 – Electrical Lift Station 16619 – Automatic Transfer Switch 16622 – Package Engine Generator Set
APPENDICES
Appendix A – Sanitary Sewer Permit Appendix B – Duke Encroachment Appendix C – Plansns
SECTION A – PROJECT SPECIFICS GENERAL
*** THIS PAGE WAS INTENTIONALLY LEFT BLANK ***
ADVERTISEMENT FOR BID
FAYETTEVILLE PUBLIC WORKS COMMISSION
LONGVIEW ACRES LIFT STATION 41 REPLACEMENT & SANITARY SEWER FORCE MAIN
Cumberland County North Carolina
Pursuant to N.C.G.S 143-129, sealed bids are solicited and will be received at Fayetteville Public Works Commission, Administration Building, Conference Room 107, 955 Old Wilmington Road, Fayetteville, NC 28301, until 2:00 p.m., EST Thursday, July 23, 2026, at which time they will be publicly opened and read.
This project includes the replacement and upgrade of the existing Longview Acres Lift Station #41 and force main. The project consists of 2,056 feet of 8” Force Main and the installation of a new submersible Lift Station.
The foregoing description shall not be construed as a complete description of all work required.
All work shall be done in accordance with PWC technical specifications and standard contract terms.
A NON-MANDATORY pre-bid meeting will be held at 11:00 a.m., EST Tuesday, July 7, 2026, in the Conference Room 107, Fayetteville Public Works Commission, Administrative Building, 955 Old Wilmington Road, Fayetteville, NC 28301. Representatives of the Owner and Project Engineer will be available to answer questions.
Questions will be fielded at the pre-bid meeting and all prospective bidders are required to attend the meeting. Individual telephone inquiries are prohibited. PWC assumes no responsibility to fully inform absentees of clarifications not issued by addendum.
Bids must be enclosed in a sealed envelope addressed to Shelby Lesane, Procurement Advisor II, Fayetteville Public Works Commission, 955 Old Wilmington Road, Fayetteville, North Carolina 28301. The outside of the envelope must be marked SEALED BID: LONGVIEW ACRES LIFT STATION 41 REPLCAMENT & SANITARY SEWER FORCE MAIN and shall indicate the name, address and state license number of the bidder. Bids shall be submitted on the printed forms, or exact copies thereof, contained in the Contract Documents.
Each bid shall be accompanied by a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina to execute the Contract in accordance with the bid bond and upon failure to forthwith make payment, the surety shall pay the obligee an amount equal to the amount of said bond. Said deposit shall be retained by the Owner as liquidated damages in event of failure of the successful bidder to execute the Contract within ten
(10) days after the Notice of Award or give satisfactory surety as required by law.
Performance and Payment Bonds are required in the amount of 100% of the Contract amount and shall be furnished by the Contractor.
All Contractors are notified that North Carolina Statutory provisions as to licensing of Contractors will be followed as applicable in receiving and evaluating bids and in reading and awarding the Contract (Chapter 87 of the North Carolina General Statutes).
The license classification shall be:
Part 1: Public Utilities (Water and Sewer) - Unlimited Unclassified - Unlimited
Plans and Specifications including Contract Documents will be available online for viewing and downloading on or about Thursday, June 25, 2026 on the PWC Procurement website at https://www.faypwc.com/purchasing. In addition, the documents will be available from the Fayetteville State University Construction Resource Office (FSU CRO) at https://www.uncfsu.edu/academics/colleges-schools-and-departments/ broadwell-college-of-business-and-economics/outreach-centers/construction-resource-office. In collaboration with the North Carolina Institute of Minority Economic Development, the FSU CRO offers services and support to help small, minority, veteran, and women-owned businesses identify and compete for construction-related projects.
At the FSU CRO, potential bidders may:
• Research, view and print project drawings to scale free of charge;
• Use available software to prepare their bid; and
• Receive certification and pre-qualification assistance.
Please email the FSU CRO to make an appointment: fsucro@uncfsu.edu
Fayetteville Public Works Commission reserves the right to reject any and all bids, to waive any and all informalities and irregularities, and to disregard all nonconforming, nonresponsive, or conditional bids. PWC further reserves the right to request additional information from any or all bidders for evaluation purposes; failure or refusal to furnish such information as requested may result in rejection of the bid.
The bid tabulation and announcement of the apparent low bidder at the bid opening do not constitute a binding contract with PWC. No contract will be considered awarded until a formal written Agreement is executed by both PWC and the successful bidder. The award of a contract, if made, will be to the lowest responsible, responsive bidder whose qualifications indicate the award will be in the best interest of PWC.
PWC also reserves the right, at its sole discretion, to re-advertise for bids if deemed in the best interest of PWC.
The bidder to whom the contract may be awarded must comply fully with the requirements of North Carolina General Statutes Section 143-129, as amended.
No bids may be withdrawn after the scheduled Bid Opening for a period of ninety (90) calendar days.
FAYETTEVILLE PUBLIC WORKS COMMISSION
Nikole Bohannon Procurement Manager https://www.faypwc.com/purchasing/ https://www.uncfsu.edu/academics/colleges-schools-and-departments/broadwell-college-of-business-and-economics/outreach-centers/construction-resource-office https://www.uncfsu.edu/academics/colleges-schools-and-departments/broadwell-college-of-business-and-economics/outreach-centers/construction-resource-office mailto:fsucro@uncfsu.edu
00100 - INSTRUCTIONS TO BIDDERS
FAYETTEVILLE PUBLIC WORKS COMMISSION
LONGVIEW ACRES LIFT STATION 41 REPLACEMENT & SANITARY SEWER FORCE MAIN
A. DEFINED TERMS
Terms used in these Instructions to Bidders are defined in the Definitions and Terminology sections of PWC General Conditions.
B. COPIES OF BIDDING DOCUMENTS
1. Complete sets of the Bidding Documents as stated in the Invitation to Bidders, may be obtained from the PWC Procurement Department.
2. Complete sets of Bidding Documents shall be used in preparing Bids. PWC assumes no responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
C. EXAMINATION OF CONTRACT DOCUMENTS, OTHER RELATED DATA, AND PROJECT
SITE
1. Before submitting a Bid, each Bidder shall (a) examine the Contract Documents thoroughly, (b) visit the site and become familiar with the site and any local conditions that may in any manner affect the cost, progress, or performance of the Work, (c) be familiar with federal, state and local laws, ordinances, rules and regulations that may in any manner affect cost, progress or performance of the Work, and (d) study and carefully correlate Bidder's observations with the Contract Documents, and (e) give the PWC Procurement Advisor written notice of all conflicts, errors or discrepancies in the Contract Documents.
2. Bidders should consult the Specifications for the identification of those reports of investigations and tests of subsurface and latent physical conditions at the site or reports that otherwise may affect cost, progress, or performance of the Work which may have been utilized in the preparation of the Drawings and Specifications. PWC will make copies of such reports if available at the cost (non-refundable) of reproduction to any Bidder requesting them. These reports are not intended to constitute any explicit or implicit representation as to the nature of the subsurface and latent physical conditions, which may be encountered at the site or to constitute explicit or implicit representations as to any other matter, contained in any report. Such reports are not guaranteed as to accuracy or completeness and are not part of the Contract Documents. Before submitting a Bid, each Bidder will, at its own expense, make such investigations and tests as the Bidder may deem necessary to determine his Bid for the performance of the Work in accordance with the Contract Documents.
3. On request (minimum 48 hours advance notice), PWC will provide each Bidder access to the site to conduct such investigations and tests, as each Bidder deems necessary for submission of its Bid.
4. The lands upon which the Work is to be performed, right-of-way for access thereto, and other lands available for use by the Contractor in performing the Work are identified in the Contract Documents.
5. The submission of a Bid constitutes an incontrovertible representation by the Bidder that it has complied with every requirement of this Section and that the Contract Documents are sufficient in scope and detail to indicate and convey an understanding of all terms and conditions for the performance of the Work.
D. INTERPRETATIONS AND ADDENDA
1. All questions about the meaning or intent of the bid or Contract Documents shall be submitted in writing to Shelby Lesane, Procurement Advisor II, by email to procurement@faypwc.com. In order to receive consideration, questions must be received by Thursday, July 9, 2026 @ 5:00 p.m. Any interpretations of questions so raised, which in the opinion of the Project Engineer require interpretations, will be issued by Addenda via email or posted online by the Owner and/or Project Engineer. An Addendum extending the Bid Opening date may be issued up to five (5) business days before the Bid Opening date. An Addendum withdrawing the Invitation for Bid may be issued any time prior to the Bid Opening date. The Owner and Project Engineer will not be responsible for oral interpretations or clarifications, which anyone presumes to make on their behalf.
Bidders are expressly prohibited from contacting any PWC official or employee associated with this project, except as noted above. Violation of this prohibition is grounds for the immediate disqualification of the bidder.
2. PWC may issue such additional Addenda as may be necessary to clarify, correct, or change the Contract Documents. Such Addenda, if any, will be issued in the manner and within the time stated in Paragraph 1 of this Section.
3. Each Bidder shall be responsible for determining that all Addenda issued by PWC have been received before submitting a Bid for the Work.
4. Each Bidder shall acknowledge the receipt of each Addendum on the Bid Form.
E. VENDOR REGISTRATION VIA ISUPPLIER
1. All vendors interested in doing business with PWC must register as a vendor through the iSupplier Portal using the link below. The iSupplier self-service portal enables vendors to have real-time access to information regarding purchase orders, invoices, and payments through a secure environment. Attach a copy of your W9 to your online registration.
https://www.faypwc.com/isupplier-doing-business-with-pwc/
F. QUALIFICATION OF CONTRACTORS
1. Bidder Qualification Form – The Bid package shall include the completed Contractor
Qualification Form and all supporting documentation.
2. Statutory Requirements – The Bidder shall comply with all federal, state, and local statutes, regulations, and codes as they relate to the Project. Failure to comply with these requirements shall be considered a breach of Contract.
3. Contractor to provide utility references for similar projects completed by identified crews.
4. PWC is looking for utility contractors with experienced personnel in all facets of water and/or sewer main replacement services. The minimum work experience of the following https://www.faypwc.com/isupplier-doing-business-with-pwc/
Personnel Classifications will be required:
• Superintendent: Must have a minimum of 10 years of experience as a superintendent, coordinating and managing all aspects of sewer and/or water construction projects.
• Foreman/Crew Leader: Must have a minimum of 8 years of experience as a foreman/crew leader, coordinating and supervising a team of crew members for sewer and/or water construction projects.
• Operator: Must have a minimum of 8 years of experience operating heavy equipment for sewer and/or water construction projects.
5. Equipment Requirements (Minimum)
• Excavator, 65,000 to 85,000 LB Class
• Excavator, 38,000 to 64,999 LB Class
• Excavator, 18,000 to 37,999 LB Class Contractor will only be paid for equipment and tools in use on work-site.
G. SUBSTITUTE MATERIAL AND EQUIPMENT
The Contract, if awarded, will be on the basis of material and equipment described in the Drawings or required in the Specifications without consideration of possible substitute or "or-equal" items. The procedure for submittal of substitute or “or-equal” items for consideration is set forth in the PWC General Conditions.
H. CONTRACTOR'S LICENSE
1. No General Contractor shall engage in contracting work in the State of North Carolina unless it has been licensed under in accordance with North Carolina law.
2. Bidders are prohibited from contracting for, or bidding upon, the construction, removal, repair or improvements to or upon real property owned, controlled or leased by Fayetteville Public Works Commission without a North Carolina Contractor's License.
3. Each bidder shall indicate its North Carolina Contractor's License number on the bid envelope and the Bid Form.
4. License Classification shall be:
• Public Utilities Water and Sewer
• Unclassified
I. SUBCONTRACTORS
1. Contractor shall subcontract no more than 49 percent (49%) of the value of the Contract.
2. Each Bidder shall submit to PWC with its bid the List of Subcontractors, Suppliers, other persons, and organizations proposed for those portions of the Work for which such identification is required. If PWC, after due investigation has reasonable objection to any proposed Subcontractor, Supplier, other person or organization, PWC may, before Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute without an increase in the Bid.
3. If the apparent Successful Bidder declines to make such a substitution, PWC may award the Contract to the next lowest responsive, responsible Bidder that proposes to use acceptable Subcontractors, Suppliers, and other persons, and organizations. The declining to make requested substitutions will not constitute grounds for sacrificing the bid security of any Bidder. If PWC does not make written objection to a Bidder’s list of Subcontractors, Suppliers, other persons, or organizations prior to giving Notice of Award, the list will be considered acceptable, subject to revocation as provided in the PWC General Conditions.
J. SMALL & DISADVANTAGED BUSINESS ENTERPRISE (SDBE) PROGRAM / SMALL
LOCAL SUPPLIER (SLS) PROGRAM
1. Program Commitment: Fayetteville Public Works Commission (PWC) is committed to promoting the utilization of Small and Disadvantaged Business Enterprises (SDBEs) and Small Local Suppliers (SLS) in PWC’s procurement of construction contracting. PWC seeks to provide equitable access and opportunity to qualified businesses across its operational areas.
• The SDBE Program encourages participation from firms certified through recognized third-party agencies, including the NC Department of Administration (HUB Office), NC Department of Transportation (DBE Program), and the U.S. Small Business Administration (SBA).
• The SLS Program continues to promote engagement of small, local firms within the Fayetteville Metropolitan Statistical Area (MSA), consisting of Cumberland, Hoke, and Harnett Counties.
2. Applicability and Bidder Requirements: For procurements of construction exceeding $30,000, Bidders must demonstrate good-faith efforts to engage certified SDBEs and, when applicable, SLSs. This includes outreach to certified firms, solicitation of quotes, and attendance at pre-bid meetings. Documentation must include completed Affidavit forms (A–E) as outlined in the SDBE Compliance Provisions within the Contract Documents.
Attendance at the Pre-Bid Meeting is strongly recommended to review program expectations and compliance procedures.
3. Certification and Verification: Certifications recognized under this program include:
• NC Department of Transportation (NCDOT) Disadvantaged Business Enterprise
(DBE)
• NC Department of Administration (DOA) Historically Underutilized Business (HUB)
• U.S. Small Business Administration (SBA) certifications, including 8(a), WOSB, SDVOSB, and HUBZone designations Firms holding current certifications with these agencies are acceptable for listing in the bidder’s submittal and will be counted toward participation goals.
Vendor directories can be accessed via the following links:
• NCDOT DBE Directory: https://www.ebs.nc.gov/VendorDirectory
• NC HUB Directory: https://ncadmin.nc.gov/businesses/hub
K. SUBMISSION OF BIDS
https://www.ebs.nc.gov/VendorDirectory https://ncadmin.nc.gov/businesses/hub
1. All Bidders shall use the enclosed Bid Forms, or exact copies thereof, in submitting their bid prices. Failure to provide full and complete Bid Forms using the form provided herein will result in a bid being deemed non-responsive.
2. PWC will not accept modified Bid Forms, oral Bids, or Bids received by telephone, email, or telecopier (FAX machine) for this Bid.
3. All prices must be F.O.B. delivered to the point as indicated by this Bid. PWC will grant no allowance for boxing, crating, or delivery unless specifically provided for in this Bid.
4. The Bid Form must be completed in black ink. Black or blue pen ink is acceptable if handwritten. Discrepancies between amounts shown in words and amounts shown in figures will be resolved in favor of the amounts shown in words. Discrepancies in the multiplication of units of Work and the unit prices will be resolved in favor of the correct multiplication of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
5. Bid submittals sent by mail should be registered mail. The sealed Bid, marked as indicated above, should be enclosed in an additional sealed envelope similarly marked and addressed to:
Fayetteville Public Works Commission Attn: Shelby Lesane, Procurement Advisor II 955 Old Wilmington Road Fayetteville, North Carolina 28301
6. Mark the envelope in the lower left-hand corner with the project title, hour and due date of Bid, and the Bidder’s North Carolina contractor registration number.
7. Bids sent by mail and arriving after the time for the opening of Bids shall not be considered valid Bids. In such instances, the Bidders shall have no claim against PWC.
8. All items contained in the Bid Checklist shall be completely filled out and submitted with the bid. Failure to submit any of the items requested with the Bid Form may be just cause for rejection of the Bid by PWC.
9. All erasures, insertions, additions, and other changes made by the Bidder to the Bid Form shall be signed or initialed by the Bidder. Bids containing any conditions, omissions, erasures, alterations, or items not called for in the Bid, may be rejected by PWC as being incomplete or nonresponsive.
10. The Bid Form must be signed in order to be considered. If the Bidder is a corporation, the Bid must be submitted in the name of the corporation, not simply the corporation's trade name. In addition, the Bidder must indicate the corporate title of the individual signing the Bid.
11. The Bid Form, the Bid security, if any, and any other documents required, shall be enclosed in a sealed opaque envelope. Any notation or notations on the exterior of the envelope purporting to alter, amend, modify, or revise the bid contained within the envelope shall be of no effect and shall be disregarded.
12. All Bids received in the Procurement Department by the deadline indicated will be kept sealed until the time and date of the Bid Opening.
13. All late Bids shall be returned unopened to the sender.
L. BID BOND
1. Each Bid shall be accompanied by an acceptable Bid bond in the amount of five percent
(5%) of the Bid amount, and made payable to Fayetteville Public Works Commission, North Carolina.
2. The Bid bond is a guarantee that if the contract is awarded by PWC to the Bidder, the Bidder shall enter into the contract with PWC for the work mentioned in this Bid or forfeit the Bid bond to PWC, not as a penalty, but as liquidated damages.
3. No forfeiture under a Bid bond shall exceed the lesser of (a) the difference between the Bid for which the Bid bond was written and the next low Bid of another Bidder, or (b) the face amount of the Bid bond.
4. All bonds shall be executed by a surety company selected by the Bidder, which is legally authorized to do business in the State of North Carolina (NCGS §44 A-26), and the bond shall be the same in both form as well as substance as AIA Document A310, Bid Bond.
5. The Bidder shall require the attorney-in-fact, who executed the required bond on behalf of the surety company, to affix thereto a certified and current copy of the power of attorney.
6. The bond premium shall be paid by the Bidder and the cost shall be included in the Bid price.
7. Any inspection of procurement transaction records shall be subject to reasonable restrictions to ensure the security and integrity of the records.
M. OPENING OF BIDS
1. Bids will be opened publicly and read aloud on the date and time set for the Bid
Opening in the Notice to Bidders.
2. Any Bidder, upon request, shall be afforded the opportunity to inspect Bid records within a reasonable time after the opening of all Bids but prior to award, except in the event that PWC decides not to accept any of the Bids and to reopen the contract. Otherwise, bid records shall be open to public inspection only after the award of the Contract.
3. Any inspection of procurement transaction records shall be subject to reasonable restrictions to ensure the security and integrity of the records.
N. MODIFICATION OF BIDS
1. A Bid may be modified or withdrawn by the Bidder at any time prior to the time and date set for the Bid Opening. The Bidder shall notify the PWC Procurement Department in writing of its intentions.
2. Modified and withdrawn Bids may be resubmitted to the PWC Procurement Department up to the time and date set for the Bid Opening.
O. WITHDRAWAL OF BID DUE TO ERROR
1. If the Bidder desires to withdraw its Bid, the Bidder must do so before the time fixed for the opening, without prejudice, by communicating its purpose in writing to PWC. After bids are open, bids may only be withdrawn in strict accordance with N.C.G.S. Section 143-129-1.
P. BIDS TO REMAIN OPEN
1. All Bids shall remain open for ninety (90) calendar days after the day of the Bid Opening.
Q. ESTIMATED QUANTITIES
1. The estimated quantities contained herein in certain items in the Bid are for the purpose of comparing bids, and while they are believed to be close approximations, they are not guaranteed, and settlement will be made on the basis of the work as actually executed at the unit prices in the Bid as accepted. PWC further reserves the right to delete any single line item or combination of items from the bid and cannot guarantee that all quantities listed in the Contract Documents will be utilized.
2. The Contractor should verify quantities before submitting a bid. Due to conditions that may be found under pavement such as the accurate location of existing water lines, sewer lines, gas lines, and structure services of all types, quantities are subject to change during construction, but this contingency shall not be used for a claim to change unit prices submitted in the Bid.
R. AWARD OF CONTRACT
1. PWC reserves the right to reject any and all bids, to waive any and all minor informalities and irregularities, and to disregard all nonconforming, nonresponsive, or conditional bids.
PWC further reserves the right to request additional information from any or all bidders for evaluation purposes; failure or refusal to furnish such information as requested may result in rejection of the bid. The bid tabulation and announcement of the apparent low bidder at the bid opening do not constitute a binding contract with PWC. No contract will be considered awarded until a formal written Agreement is executed by both PWC and the successful bidder. The award of a contract, if made, will be to the lowest responsible, responsive bidder whose qualifications indicate the award will be in the best interest of PWC. PWC also reserves the right, at its sole discretion, to re-advertise for bids if deemed in the best interest of PWC.
2. In case of a tie Bid, the tie shall be decided by lot.
3. It is the intent of PWC to recommend the award of this contract to the lowest responsive, responsible Bidder provided the Bid has been submitted in accordance with the requirements of the Bidding Documents and does not exceed the funds available. In determining the lowest responsible Bidder, PWC may consider, among other criteria, the Bidder's past performance conduct on other contracts, and other information provided by the Bidder as noted below.
4. In determining the lowest responsive Bidder, PWC will evaluate the Bidder’s proposed Bid price and the completeness of the submitted bid in accordance with the requirements of the Contract Documents.
5. PWC may consider the operating costs, maintenance considerations, performance date, and guarantees of materials and equipment.
6. PWC may conduct such investigations as deemed necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial ability of the Bidders, as well as other considerations, to include but not limited to resources available to the Bidder to perform the work effectively, proposed Subcontractors and other persons and organizations to do the work in accordance with the Contract Documents to PWC’s satisfaction within the prescribed time.
7. PWC reserves the right to reject the Bid of any Bidder who does not pass any such evaluation to PWC’s satisfaction.
8. If the Contract is to be awarded, PWC will give the Successful Bidder a Notice of Award within ninety (90) days after the day of the Bid Opening.
9. The Bidder to whom the contract is awarded shall, within ten (10) days after prescribed documents are presented for signature, execute and deliver the Contract Documents and any other forms or bonds required by the Bid to PWC.
10. The Bidder is required to complete the attached forms that will allow PWC to verify that the Bidder is qualified to perform the Work described in these Contract Documents. All forms shall be completed and submitted with the Bid. Failure to submit all the required forms shall be considered grounds for PWC to reject the bid.
PWC will review all of the bids and qualification data to determine the lowest responsive, responsible Bidder. PWC reserves the right to not award the Contract to the lowest bidder if the information provided is not complete, does not meet the satisfaction of PWC, or has been falsified. PWC will not request any additional information in order to allow the Contractor to complete bid.
11. During the evaluation phase, bid submittals will be reviewed to ascertain which bids technically and otherwise address all the requirements of these Contract Documents. Bid submittals determined to be technically non-responsive or not sufficiently responsive may be disqualified.
The Bidder shall address each of the Evaluation Criteria as requested in the Technical Evaluation Criteria Form located within Section A Project Specifics Bid Submittal Documents. To be considered substantive, the information must respond to all requirements.
12. PWC may conduct such investigations/verifications as deemed necessary to establish the responsibility, qualification and financial ability of the Bidder. Should PWC find that the apparent low bidder is not the lowest responsive, responsible bidder by integrity of the information furnished, said apparent low bidder will be so notified and its bid bond shall be returned without prejudice. Failure or refusal to furnish any items of information requested by PWC shall be considered as non-responsive and therefore basis for rejection of the bid.
S. TAXES
1. The Successful Bidder shall pay all county, city, state and federal taxes required by laws in effect at the time Bids are received and resulting from the Work or traceable thereto, under whatever name levied.
2. Said taxes shall not be in addition to the contract price between PWC and the Successful Bidder. The taxes shall be an obligation of the Successful Bidder and not of PWC. PWC shall be held harmless from same by the Successful Bidder.
T. PERFORMANCE AND OTHER BONDS
1. The PWC General Conditions set forth PWC's requirements as to Performance and other
Bonds.
U. E-VERIFY REQUIREMENTS
1. Contractor hereby acknowledges that “E-Verify” is the federal E-Verify program operated by the US Department of Homeland Security and other federal agencies which is used to verify the work authorization of newly hired employees pursuant to federal law and in accordance with Article 2, Chapter 64 of the North Carolina General Statutes.
2. Contractor further acknowledges that all employers, as defined by Article 2, Chapter 64 of the North Carolina General Statutes, must use E-Verify and after hiring an employee to work in the United States, shall verify the work authorization of the employee through E- Verify in accordance with NCGS §64-26(a).
3. Contractor hereby pledges, attests and warrants through execution of this Agreement that Contractor complies with the requirements of Article 2, Chapter 64 of the North Carolina General Statutes and further pledges, attests and warrants that any subcontractors currently employed by or subsequently hired by Contractor shall comply with any and all E-Verify requirements. Failure to comply with the above requirements shall be considered a breach of this Agreement.
V. IRAN DIVESTMENT ACT
1. As mandated by N.C.G.S. 147-86.59(a), the Contractor hereby certifies that it is not listed on the Final Divestment List created by the North Carolina State Treasurer pursuant to N.C.G.S. 147-86.58. Contractor further certifies that in accordance with N.C.G.S. 146- 86.58(b) that it shall not utilize any subcontractor found on the State Treasurer's Final Divestment List. Contractor certifies that the signatory to this Purchase Order authorized by the Contractor to make the foregoing statement.
*** END OF SECTION ***
SECTION A – PROJECT SPECIFICS
BID SUBMITTAL DOCUMENTS
BID SCHEDULE – PERFORMANCE AND DELIVERY
FAYETTEVILLE PUBLIC WORKS COMMISSION
LONGVIEW ACRES LIFT STATION 41 REPLACEMENT & SANITARY
SEWER FORCE MAIN
Pre-Bid Meeting:
(NON-MANDATORY)
11:00 a.m., Tuesday, July 7, 2026
Fayetteville Public Works Commission Administrative Building Conference Room 107 955 Old Wilmington Road Fayetteville, NC 28301
Deadline for Questions from Bidders1
5:00 p.m., Thursday, July 9, 2026
Deadline for Addenda issued by PWC Procurement Department and Project Engineer2
5:00 p.m., Tuesday, July 16, 2026
Bid Opening (Submittal Deadline) 2:00 p.m., Thursday, July 23, 2026
Fayetteville Public Works Commission Administrative Building Conference Room 107 955 Old Wilmington Road Fayetteville, NC 28301
Target Commission Meeting Wednesday, August 12, 2026
Target City Council Meeting Monday, August 24, 2026
Contract Time: 60 days
Liquidated Damages: $1,000.00 per day for each day beyond the Final Completion Date
Bid Acceptance Period Within ninety (90) Calendar Days unless otherwise noted
1. Questions regarding this bid must be submitted in writing to the attention of Shelby Lesane Procurement Advisor II, by email to procurement@faypwc.com.
Bidders are expressly prohibited from contacting any FPWC official or employee associated with this Invitation to Bid, except as noted above. Violation of this prohibition is grounds for the immediate disqualification of the bidder.
2. Any addenda to these Contract Documents will be issued by the Project Engineer no later than the date and time stated above.
mailto:insertadvisoremail@faypwc.com
BID SUBMITTAL CHECKLIST
1. Enter Contractor’s License Number where called for in the Bid Form and on the outside of the sealed envelope containing the Bid.
2. Photocopy of Contractor’s License.
3. Bid Bond
4. Bid Forms Section 00300.
5. Provide the responsible North Carolina Registered Agent for Insurance Claims. Include contact information.
6. Provide the proposed responsible Bonding Company name. Include contact information.
7. List of proposed Subcontractors and material suppliers exceeding 5% of the Contract Value.
8. Non-Collusive Affidavit.
9. Nondiscrimination Clause.
10. Affidavit of Organization and Authority and Sworn Statement.
11. Equal Employment Opportunity Acknowledgment.
12. Certification regarding Debarment, Proposed Debarment, and other Responsible Matters.
13. FTA Certification Regarding Lobbying.
14. Affidavit A – Listing of Good Faith Efforts, et al.
15. Affidavit B – (Only if the Contractor will perform ALL ELEMENTS OF THE WORK on this project with their own forces AND will complete ALL ELEMENTS OF THIS PROJECT
WITHOUT THE USE OF SUBCONTRACTORS, MATERIAL SUPPLIERS, OR PROVIDERS
OF PROFESSIONAL SERVICES.
16. Affidavit E - Identification of Minority Business Participation Form.
17. SLS / SDBE Disclosure Form.
18. The Completed Contractor Qualification Form.
**FAILURE TO SUBMIT THE ABOVE FORMS WITH THE BID FORM PROVIDED HEREIN MAY
BE JUST CAUSE FOR REJECTION OF THE BID BY THE OWNER**
*** THIS PAGE INTENTIONALLY LEFT BLANK ***
00300 - BID FORM
TO: Fayetteville Public Works Commission Attn: Shelby Lesane, Procurement Advisor II
955 Old Wilmington Road Fayetteville, North Carolina 28301
PROJECT: PWC2526099 - LONGVIEW ACRES LIFT STATION 41 REPLACEMENT &
SANITARY SEWER FORCE MAIN
FROM: BIDDER
ADDRESS
DATE OF BID , 20
A. The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into a Contract with OWNER in the form included in the Contract Documents to perform and furnish all Work (as that term is defined in the Construction Agreement) specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the Contract Documents.
B. BIDDER accepts all of the terms and conditions of the Instructions to Bidders, including, without limitation, those dealing with the disposition of payment and performance bonds, and insurance certificates. This bid will remain open for ninety (90) calendar days after the day of Bid opening. BIDDER will sign the Contract and submit the Contract Security and other documents required by the Contract Documents within ten (10) days after the date of receipt by the BIDDER.
C. In submitting this Bid, Bidder represents, as more fully set forth in the Contract, that:
1. BIDDER has examined copies of all the Contract Documents and of the following addenda, receipt of all which is acknowledged on the bid summary page:
2. BIDDER has examined the site and locality where the Work is to be performed, the legal requirements (federal, state, and local laws, ordinances, rules and regulations) and the conditions affecting cost, progress of performance of the work and has made such independent investigations as BIDDER deems necessary.
3. BIDDER acknowledges that OWNER does not assume responsibility for the accuracy of dimensions or completeness of information and data shown or indicated in the Bidding Documents with respect to existing facilities.
4. BIDDER has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site of the Work (expect underground facilities) and all drawings of physical conditions in or relating to existing surface or subsurface structures, pipelines, and utilities at or contiguous to the site are provided within these Contract Documents. Geotechnical Reports and other information regarding subsurface conditions are identified in the attached appendices and detailed in Article V of the PWC General Conditions. BIDDER acknowledges that the OWNER does not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Bidding Documents with respect to underground facilities at or contiguous to the site of Work. BIDDER had obtained and carefully studied (or assumes responsibility for have done so) all such additional or supplementary examinations investigations, explorations, tests, studies, and data that are necessary to identify and understand conditions (surface, subsurface, and underground facilities) at or contiguous to the site of Work or otherwise which may affect cost, progress, performance, or furnishing the Work or which relate to any aspect of means, methods, techniques, sequences, and procedures of construction to be employed by Bidder and safety precautions and programs incident thereto. BIDDER waives all rights to claim that any additional examinations, investigations, explorations, tests, studies, or data are necessary for the proper submission of the Bid for the performance and furnishing of the Work in accordance with the Contract Time, Contract Price, and other terms and conditions of the Contract Documents.
5. BIDDER hereby certifies that, if awarded the Contract for construction of the Project, it will take all possible actions to minimize costs to the OWNER which are related to any disruptions in any part of the Work resulting from unforeseeable conditions which may be encountered and work changes or additions which may be made.
6. BIDDER has correlated the information known to BIDDER, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, exploration, tests, studies, and data with the Contract Documents.
7. BIDDER has given OWNER written notice of all conflicts, errors, ambiguities, or discrepancies that BIDDER has discovered in the Contract Documents and the written resolution thereof by OWNER is acceptable to BIDDER, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted.
8. By bidding in response to this invitation, the BIDDER represents that in the preparation and submission of this Bid, said BIDDER did not, either directly or indirectly, enter into any combination or arrangement with any person, firm or corporation or enter into any agreement, participate in any collusion, or otherwise take any action in the restraint of free, competitive bidding in violation of the Sherman Act (15 U.S.C. Section 1).
9. Bid form must be completed in blue or black ink or by typewriter. The Bid price of each item on the form must be stated in both words and numerals. In case of a conflict, words shall take precedence. Discrepancies in the multiplication of units of work and unit prices will be resolved in favor of the correct multiplication of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
10. BIDDER understands that the award of contract will be made on the basis of the total Bid amount which will be determined as the sum of the unit price and lump sum Bid Items.
11. BIDDER understands that quantities are estimated and are not guaranteed; they are solely for comparing Bids and establishing the total Bid amount. The Price will be modified by Change Order, and final payment will be based on the quantities of work actually furnished and installed by the successful BIDDER.
12. BIDDER shall complete the Work for the prices indicated on the next page.
FAYETTEVILLE PUBLIC WORKS COMMISSION
LONGVIEW ACRES LIFT STATION 41 REPLACEMENT &
SAN. SEWER FORCE MAIN
FAYETTEVILLE, NORTH CAROLINA
BID FORM
Longview Acres Lift Station 41 00300 - 1 Bid Form
BIDDER NAME:
Item No. Ref. No. Item Estimated Quantities Unit Unit Price Cost Extension
PART "A" INCIDENTALS
A-1 1.01 Mobilization and Demobilization
@ lump sum 1 LS A-2 1.02 Traffic Control and Traffic Plan
@ lump sum 1 LS A-3 1.03 Erosion and Sedimentation Control
@ lump sum 1 LS A-4 1.04 Clearing and Grubbing
@ lump sum 1 LS A-5 1.05 Demolition of Existing Lift Station
@ lump sum 1 LS A-6 1.06 Install Permanent Pavement Patch (NOA) (PWC)
@ per square yard 591 SY A-7 1.07 Incidental Stone
@ per square yard 633 SY A-8 1.08 Install 2” SF9.5A Asphalt Pavement
@ per square yard 598 SY A-9 1.09 Submersible Lift Station
@ lump sum 1 LS A-10 1.10 Install Bollards
@ per each 5 EA A-11 1.11 Replace Gravel Driveway
@ per square yard 52 SY A-12 1.12 Undercut Excavation
@ per cubic yard 50 CY A-13 1.13 Borrow Excavation (Select Backfill)
@ per cubic yard 75 CY A-15 1.14 Sod (No Overage Allowed)
@ per square yard 517 SY
SAN. SEWER FORCE MAIN
FAYETTEVILLE, NORTH CAROLINA
BID FORM
Longview Acres Lift Station 41 00300 - 2 Bid Form
Item No. Ref. No. Item Estimated Quantities Unit Unit Price Cost Extension
A-16 1.15 Seeding @ per square yard 2,448 SY
TOTAL PART "A" INCIDENTALS
Item No. Ref. No. Item Estimated Quantities Unit Unit Price Cost Extension
PART "B" UTILITY CONSTRUCTION
B-1 2.01 Lift Station Water Service
@ lump sum 1 LS B-2 2.02 Install Sanitary Sewer Doghouse Manhole 4’ Dia 0’-6’ Depth
@ per each 1 EA B-3 2.02 Install Sanitary Sewer Doghouse Manhole 5’ Dia 6’-8’ Depth
@ per each 1 EA B-4 2.03 Install Sanitary Sewer 5’ Dia. Manhole 14’-16’ Depth
@ per each 1 EA B-5 2.04 Install 12” CL 50 DIP Sanitary Sewer 0’-6’ Depth
@ per linear foot 22 LF B-6 2.04 Install 8” CL 50 DIP Sanitary Sewer 6’-8’ Depth
@ per linear foot 5 LF B-7 2.04 Install 8” CL 50 DIP Sanitary Sewer 8’-10’ Depth
@ per linear foot 5 LF B-8 2.04 Install 8” CL 50 DIP Sanitary Sewer 10’-12’ Depth
@ per linear foot 6 LF B-9 2.04 Install 8” CL 50 DIP Sanitary Sewer 12’-14’ Depth
@ per linear foot 13 LF B-10 2.04 Install 8” CL 50 DIP Sanitary Sewer 14’-16’ Depth
@ per linear foot 27 LF
BIDDER NAME:
SAN. SEWER FORCE MAIN
FAYETTEVILLE, NORTH CAROLINA
BID FORM
Longview Acres Lift Station 41 00300 - 3 Bid Form
Item No. Ref. No. Item Estimated Quantities Unit Unit Price Cost Extension
B-11 2.05 Install 8” DR18 Sanitary Sewer Force Main @ per linear foot 1,606 LF
B-12 2.06 Install 8” RJDIP Sanitary Sewer Force Main @ per linear foot 390 LF
B-13 2.07 Install 8” DIP Sanitary Sewer Force Main @ per linear foot 60 LF
B-14 2.08 Remove and Dispose Existing Force Main @ per linear foot 80 LF
B-15 2.09 Grout Fill and Abandon Existing 6” Force Main @ per linear foot 1,791 LF
B-16 2.10 Test San. Sewer Force Main & Gravity Sewer @ per linear foot 2,134 LF
B-17 2.11 Install Air Release/Vacuum Valve @ per each 1 EA
B-18 2.12 Connection To Existing Structures 8” @ per each 1 EA
TOTAL PART "B" UTILITY CONSTRUCTION
Item No. Ref. No. Item Estimated Quantities Unit Unit Price Cost Extension
PART "E" LIFT STATION ELECTRICAL CONSTRUCTION
E-1 3.01 Lift Station Enclosure
@ lump sum 1 LS E-2 3.02 Standby Engine Generator
@ lump sum 1 LS
TOTAL PART "E” LIFT STATION ELECTRICAL CONSTRUCTION
SAN. SEWER FORCE MAIN
FAYETTEVILLE, NORTH CAROLINA
BID FORM
Longview Acres Lift Station 41 00300-4 Bid Form
TOTAL PART "A" INCIDENTALS
TOTAL PART "B" UTILITY CONSTRUCTION
TOTAL PART "E" LIFT STATION ELECTRICAL CONSTRUCTION
TOTAL BASE BID
- BID SUMMARY-
TOTAL PART “A” INCIDENTALS $______________
TOTAL PART “B” UTILITY CONSTRUCTION $______________
TOTAL PART “C” OMITTED
TOTAL PART “D” OMITTED
TOTAL PART “E” LIFT STATION ELECTRICAL CONSTRUCTION $______________
TOTAL BASE BID $______________
(Total Part A+B+E)
The BIDDER has received, acknowledged, and used the following addenda in completing the Bid. (Initial and Date as appropriate).
Addendum No. 1 Date _______________ Addendum No. 2 Date _______________ Addendum No. 3 Date _______________ Addendum No. 4 Date _______________ Addendum No. 5 Date _______________ Addendum No. 6 Date _______________ Addendum No. 7 Date _______________
The undersigned BIDDER ______________________ (Contractor Name) certifies that they are licensed as a Contractor under N.C.G.S § 87, and that their license number is________________ (License Number).
The undersigned BIDDER hereby agrees to accept an award of the Contract based on the Total Contract Amount as accepted by the OWNER and as indicated on the Notice of Award.
A. BIDDER agrees that Work shall be completed within the time frame indicated in the Agreement as follow:
1. All work described herein to be complete, including restoration and all punch list items from Notice to Proceed until the competition date noted in the Notice to Proceed.
2. The BIDDER acknowledges that time is of the essence in this Contract and that the OWNER will suffer financial loss if the Work is not complete within the time specified in Paragraph D.1 above plus any extensions thereof allowed in accordance with these Contract Documents. BIDDER also recognizes the delays, expense and difficulties involved in proving in a legal proceeding the actual loss suffered by the OWNER if the Work is not complete on time. The Bidder agrees to diligently pursue all available work and complete all work in an expeditious manner.
B. The following documents are attached to and made part of this bid:
Required Bid Security in the form of either a cashier's check or certified check or Bid Bond in the amount of 5% of maximum Bid price.
Communications concerning this Bid shall be addressed to: (SURETY’s Name, Address, Telephone Number, and Email)
A. Communications concerning this Bid shall be addressed to: (CONTRACTOR's Name, Address, Telephone Number, and Email)
B. The terms used in this Bid which are defined in Definitions and Terminology Section of the PWC General Conditions or as otherwise specifically defined in the Contract Documents have the meanings assigned to them therein, which are incorporated by reference as if fully set forth herein.
C. An individual contractor is required to furnish his social security number and sole proprietorship, partnership and corporation are required to furnish their employer identification numbers to Fayetteville Public Works Commission. Please indicate this information on this Bid Form as follows:
Social Security Number: ___________________________________
Federal Employer Identification Number: ___________________________________
SUBMITTED ON day of_____________2026
AN INDIVIDUAL
BY: (SEAL)
(Individual's Name and Signature) Doing Business as: ___________________________________________________ North Carolina Contractor Registration Number: _____________________________ Business Address: ____________________________________________________ Phone Number: ______________________________________________________ Subscribed and sworn to before me this day of_____________2026
NOTARY PUBLIC
My Commission Expires: _____________
A PARTNERSHIP
(Firm Name)
(General Partner and Signature)
North Carolina Contractor Registration Number: _____________________________ Business Address: ____________________________________________________ Phone Number: ______________________________________________________ Subscribed and sworn to before me this day of_____________2026
NOTARY PUBLIC
My Commission Expires: _____________
A CORPORATION
BY: _________________________________________ ___________________
(Corporation Name) (State of Incorporation)
(Name and Title of Person Authorized to Sign and Signature)
ATTEST: ___________________________________________________________
(Secretary or Assistant Secretary and Signature) North Carolina Contractor Registration Number: _____________________________ Business Address: ____________________________________________________ Phone Number: ______________________________________________________…