LNEO05686410.pdf

PDF 15 KB Posted

Attached to
Church Avenue Reconstruction CDBG Project
Solicitation number
BD-23-1650-DPW24-JL23-132004
Issued by
Worcester County, Massachusetts

About this file

This is an Invitation for Bid issued by the Town of Northbridge, Massachusetts for the Church Avenue Reconstruction Project (Phase 2), a water main and drainage infrastructure replacement initiative. The project involves the replacement of approximately 1,650 feet of water mains and 320 feet of drain lines with associated manholes and catch basins. Work includes excavation, removal and disposal of existing water pipes, drain lines, and catch basins, followed by installation of new ductile iron water lines, new gate valves, new hydrants with connections, and new drainage infrastructure. Trenches will be backfilled, compacted, and temporarily paved. Bids are due by 2:00 PM on Wednesday, August 26, 2026, at the Office of Town Manager, Northbridge Memorial Town Hall, 7 Main Street, Whitinsville, Massachusetts 01588, with public bid opening immediately following. Contract documents are available for download as PDF files at no charge beginning Wednesday, August 12, 2026, via www.accentblueprints.com, or printed copies are available for a fee through Accent Blueprints at 99 Chelmsford Road, North Billerica, Massachusetts 01862.

The estimated project cost is $850,000 and is being funded in part through a CDBG 2025 Grant administered by the Massachusetts Executive Office of Housing & Livable Communities. The project is subject to Chapter 30-Section 39M, Federal Labor Provisions, Massachusetts minimum wage rates under M.G.L. Chapter 149-Sections 26 to 27H, Davis/Bacon Federal Wage Rates (whichever is higher), Title VI of the Civil Rights Act of 1964, HUD Section 3 requirements, the Buy America Buy America Act, and Equal Employment Opportunity requirements. The Town of Northbridge reserves the right to reject any or all bids, accept any bid, waive informalities, and omit items as deemed advisable.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Town of Northbridge, MA invites bids from general contrac-tors for construction of Church Avenue Reconstruction Project (Phase 2) in accordance with documents prepared by Turning Point Engineering. Bids will be received by the Office of Town Manager, Northbridge Memorial Town Hall, 7 Main Street, Whitinsville, MA 01588 until 2:00 PM Wednes-day, August 26, 2026 at which time/place all bids will be publicly opened & read aloud. Bids submitted after this time will not be accepted.

Project is being funded in part by a CDBG 2025 Grant (Massachusetts Executive Office of Housing & Livable Communities). Bids are subject to Chapter 30-Section 39M, Federal Labor Provisions, and to Massachusetts minimum wage rates as required by M.G.L. Chapter 149- Sections 26 to 27H inclusive, or by Davis/Bacon Federal Wage Rate, whichever hourly rate pays more. Project is subject to Title VI of Civil Rights Act of 1964, HUD Section 3 requirements (24 CFR Part 75), Build America Buy America (BABA) Act & Equal Employment Opportunity. Northbridge is an Equal Opportunity Employer.

Church Avenue Reconstruction Project (Phase 2) will replace +/- 1,650 feet of water mains and +/- 320 feet of drain lines with associated manholes and catch basins. The project includes excavation, removal & disposal of existing water pipe, drain lines and catch basins and the installation of new ductile iron water lines, new gate valves, new hydrants with connections, & new drainage infrastructure. Trenches will be backfilled, compacted & paved over with temporary paving; work is estimated to cost $850,000.

Contract Documents may be viewed/downloaded as a PDF file free of charge on or after Wednesday, August 12, 2026 at www.accentblueprints.com. Printed copies may be obtained for fee by completing an order online or calling 978-362-8038 for each set. Completed orders may be picked up at the office of Accent Blueprints (99 Chelmsford Road, North Billerica, MA 01862). Printed copies may also be shipped to prospective bidders for an additional charge to cover handling and mailing fees. All payments for print-ing and shipping are non-refundable. To be added to the project plan holder’s list to guarantee receipt of addenda, it is recommended interested bidders obtain the Contract Documents directly from Accent Blueprints. Interested bidders will be prompted to register an email address with Accent Blueprints to access the documents. Town reserves the right to reject any or all bids, to accept any bid, to waive any informality on bids received, and to omit any item or items deemed advisable for the best interests of Town.

Adam Gaduette, Northbridge Town Manager August 6 2026