ROADWAY SURFACING MATERIAL

1. Station: ___Sam D. Hamilton Noxubee NWR___________ Date:_____03/22/2022 Contact:_Travis Carpenter_Telephone No.:662-226-8286___________

Material Description (i.e., gravel, aggregate, etc.): __#610 crushed limestone_(Crush N Run)_____________________________________

Specification Section/Paragraph/No. (Reference applicable State
Department Standard and Specification, if known):_Mississippi Department of Transportation (MDOT) Standards Specification 703.04.3 Gradation, reference chart: Table of Sizes and Gradation of Crushed Stone Aggregate.

2. Total Tons/Yards Required: _approximately 1600 tons to be tailgate spread on Section Line Road on the Sam D. Hamilton Noxubee NWR._____

3. Check one or more: ____ Stock Piled (spot dumped) __X___ Tail Gate Spread Thickness: __approx 4 inches_______ The Fish & Wildlife Service will provide the equipment to spread limestone.

4. Maximum/Minimum Amount to be delivered daily: __12/10 trucks per day__________ ***The minimum of 10 trucks/day is critical on this large of a gravel project.

5. Attach a delivery and/or local site map.

6. Are there State certified scales in the area? __X__ Yes ____ No

NOTE: If yes, weight tickets are required for each delivery.
If no, delivery must be by cubic yards.

7. Required commencement date for delivery:

___(Flexible)_____________

8. Last date for delivery: ___10/1/2022___________________

9. Local conditions (bridge restrictions, weather conditions, water levels, road flooding, etc.) that may affect delivery: ___Weather could delay project due to access into Refuge. _______________

The following shall be attached to the acquisition request:

(A) A completed Roadway Surfacing Material Form

(B) Applicable Map

(C) List of suggested vendors with names, addresses and phone numbers

Then forward the acquisition package to:

(1)Appropriate Regional Office Supervisor
Contracting and General Services

File details come from the government source that posted it. Updated .