TILLAMOOK ROAD AND CULVERT REPAIR
Solicitation number
L15PS00389
Issued by

About this file

L15PS00389 Solicitation

View the file

Other files

File Type Posted
Sol_L15PS00389_Amd_000001.pdf PDF
Sol_L15PS00389.pdf PDF
ODFW2008inwater_guide.pdf PDF
Tillamook_Road_and_CuPlans_5-1-15.pdf PDF
OR1.txt TXT text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TILLAMOOK ROAD AND CULVERT REPAIR, TILLAMOOK COUNTY, OR

SOLICITATION NO. L15PS00389

BLM SALEM DISTRICT OFFICE

SUPPLIES OR SERVICES AND PRICES/COSTS

Item no.
Item Description
Quantity
Unit of Measure
Unit Price
Total
0001
151(01) Mobilization
1
LS
0002
204(01) Excavation and Embankment
1
LS
0003
251(01) Riprap
80*
CY
$
$
0004
301(01) Surface Course Aggregate
130*
TN
$
$
301(02) Subbase
260*
TN
$
$
602(01) Culverts
1
LS
0007
629(01) Jute Matting
1
LS

GRAND TOTAL

* Estimated Quantity

LS = Lump Sum

CY = Cubic Yard TN = Ton PERFORMANCE PERIOD: See clause 52.211-10 in Contract Clauses Section

ESTIMATED START WORK DATE: JULY 6, 2015

THIS SOLICITATION IS SET ASIDE FOR SMALL BUSINESS CONCERNS.

(End of Supplies or Services and Prices/Costs)

DESCRIPTION/SPECIFICATIONS

SUPPLEMENTAL SPECIFICATIONS FOR THE CONSTRUCTION OF TILLAMOOK ROAD AND CULVERT REPAIRS Description of Work The work to be done under this contract includes all labor, supervision, transportation, equipment, tools, supplies, and materials (not furnished by BLM) necessary to remove and dispose of existing metal culvert pipes at two sites and install two new culverts, embankment construction, aggregate courses, and other work as necessary for a complete project. The work includes de-watering one site; excavation and construction of road prisms; structure excavation and backfill; removal and disposal of existing culvert, shaping and grading streambed materials, construction of riprap slope and stream protection, and other related site work. The Salem District Site is located on BLM Rd# 3-7-32 in Tillamook County, approximately 5 miles (12 road miles) east of the town of Blaine, Oregon.

Applicable Standard Specifications The General Requirements (Division 100) and applicable sections of Division 150 through 700 of the Federal Highway Administration's “Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects -- FP-03, U.S. Customary Units" of the U.S. Department of Transportation, Federal Highway Administration apply to this project as modified by these Supplemental Specifications and by the Special Contract Requirements and Contract Clauses contained in the contract. Unless otherwise noted, all reference headings in these supplemental specifications refer to divisions, sections, articles or paragraphs of the Standard Specifications, FP-03, and bear like headings.

Federal Highway Administration Standard Specifications are available electronically at:

http://flh.fhwa.dot.gov/resources/pse/specs/fp-03/fp-03usc.pdf

INCLUDED DRAWINGS

TITLE SHEET

GENERAL NOTES AND DETAILS

TYPICAL SECTIONS

SITE-1 EXISTING SITE PLAN

SITE-1 PROPOSED ROAD PLAN AND PROFILE

SITE-1 PROPOSED PIPE PLAN AND PROFILE

SITE 2 EXISTING SITE PLAN

SITE-2 PROPOSED ROAD PLAN AND PROFILE

SITE-2 PROPOSED PIPE PLAN AND PROFILE

Supplemental Specifications include the following divisions:

DIVISION 100 GENERAL REQUIREMENTS

Section 101

TERMS, FORMAT, AND DEFINITIONS

Section 102

BID, AWARD, AND EXECUTION OF CONTRACT

Section 103

SCOPE OF WORK

Section 104

CONTROL OF WORK

Section 105

CONTROL OF MATERIAL

Section 106

ACCEPTANCES OF WORK

Section 107

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

Section 108

PROSECUTION AND PROGRESS

Section 109

MEASUREMENTS AND PAYMENT

DIVISION 150 PROJECT REQUIREMENTS

Section 151

MOBILIZATION

Section 152

CONSTRUCTION SURVEY AND STAKING

Section 154

CONTRACTOR SAMPLING AND TESTING

Section 156

PUBLIC TRAFFIC

Section 157

SOIL EROSION CONTROL

DIVISION 200 ASPHALT PAVEMENTS AND SURFACE TREATMENTS

Section 201

CLEARING AND GRUBBING

Section 203

REMOVAL OF STRUCTURES AND OBSTUCTIONS

Section 204

EXCAVATION AND EMBANKMENT

Section 209

STRUCTURE EXCAVATION AND BACKFILL

DIVISION 250 SLOPE REINFORCEMENT AND RETAINING WALLS

Section 251

RIPRAP

DIVISION 300 AGGREGATE COURSES

Section 301

UNTREATED AGGREGATE COURSES

DIVISION 600 INCIDENTAL CONSTRUCTION

Section 602

CULVERTS AND DRAINS

Section 605

UNDERDRAINS, SHEET DRAINS, AND PAVEMENT EDGE DRAINS

Section 625

TURF ESTABLISHMENT

Section 629

ROLLED EROSION CONTROL PRODUCTS AND CELLULAR CONFINEMENT SYSTEMS

Section 635

TEMPORARY TRAFFIC CONTROL

DIVISION 100

GENERAL REQUIREMENTS

Section 101. - TERMS, FORMAT, DEFINITIONS

101.02 Specification Format. Delete the first sentence of the third paragraph.

101.04 Definitions. Delete the definitions for the following terms:

Award
Contractor
Plans
Bid
Contract Time
Right-of-Way
Bidder
Day
Solicitation
Bid Form
Drawings
Subcontract
Bid Guarantee
Government
Subcontractor
Bid Schedule
Notice to Proceed
Substantial Completion
Contract
Pay Item
Surety
Contracting Officer
Payment Bond
Contract Modification
Performance Bond

Modify the following definition as follows:

Special Contract Requirements -- Delete this definition and replace with the following:

Supplemental Specifications -- Modifications to the standard specifications applicable to an individual project.

Section 102. -- BID, AWARD, AND EXECUTION OF CONTRACT

Delete this section in its entirety.

Section 103. -- SCOPE OF WORK

103.02 Disputes. Delete in its entirety.

103.03 Value Engineering. Delete in its entirety.

103.04 Contract Records. Delete in its entirety.

103.05 Partnering. Delete in its entirety.

Section 104. -- CONTROL OF WORK

104.01 Authority of the Contracting Officer (CO). Delete in its entirety.

104.02 Authority of Government Inspectors. Delete in its entirety.

104.03 Specifications and Drawings.

(a) General. Delete the text and replace with the following:

Shop drawings for any part of the permanent work shall include, but not be limited to, stress sheets, anchor bolt layouts, shop detail drawings, erection plans, equipment lists, material certifications, manufacturer’s literature, and any other information specifically required elsewhere in the specifications that shall be reviewed and approved by the Contracting Officer before any work involving these plans is performed. Submittals shall be made sufficiently in advance of the start of the affected work to allow a minimum of seven (7) days for review by the Government. Additional time will be required for revisions, rejections and resubmittals.

Shop drawings shall be submitted through the Contracting Officer’s Representative for review by the Government for the following item:

(1) Catalog cuts of proposed culverts

Shop drawings shall be submitted electronically via email or other electronic means, in such a manner that clear and legible copies can be made and each drawing and calculation sheet shall include the project name, number and other identification shown on the contract plans.

104.04 Coordination of Contract Documents. Delete in its entirety.

Section 105. – CONTROL OF MATERIAL

105.02 Material Sources. Delete (a) Government-provided sources in its entirety.

105.03 Material Source Management. Delete in its entirety.

Section 106. -- ACCEPTANCE OF WORK

106.07 Partial and Final Acceptance.

(a) Partial Acceptance. Delete the first paragraph.

Section 107. -- LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

107.01 Laws to be Observed. Delete in its entirety.

107.02 Protection and Restoration of Property and Landscape. Delete the text and replace with the following:

Follow the requirements of FAR Clause 52.236-9 Protection of Existing Vegetation, Structures, Equipment, and Improvements. FAR Clause 52.236-9 is supplemented as follows:

Preserve public and private property and protect land monuments and property markers. When necessary to destroy a monument, use a licensed land surveyor to reference and reestablish the monument according to State requirements.

Do not disturb the area beyond the construction limits.

107.04 Railroad Protection. Delete in its entirety.

107.05 Responsibility for Damage Claims. Delete in its entirety.

107.06 Contractor’s Responsibility for Work. Delete in its entirety.

107.08 Sanitation, Health, and Safety. Delete in its entirety.

107.09 Legal Relationship of the Parties. Delete in its entirety.

107.10 Environmental Protection. Delete in its entirety and replace with the following:

In performance of the contract, the contractor shall not operate any equipment that is leaking or that is lacking spark arrestors that meet the requirements of State of Oregon Regulations. The contractor shall follow laws and regulations related to the Endangered Species Act and other laws and regulations that may be in place that may regulate the contractors operations in order to protect the environment.

(a) Work Schedule

In order to protect critical habitat near the work site, for any work performed before August 5th, the contractor shall not work for two hours after sunrise and shall stop work 2 hours before sunset.

(b) In- Stream Work

The Contractor shall perform all in-stream portions of work during the ODF&W In-Stream Work Period ending September 15th, 2015. Refer to ODF&W 2008 Oregon guidelines for timing of in-water work to protect fish and wildlife resources.

The project is located near critical habitat for aquatic species. The Contractor shall perform in-stream work using Best Management Practices that will include monitoring turbidity downstream of the project. Turbidity within 50-feet downstream of the project shall not exceed the following allowable increase from background levels, measured with a Turbidimeter, per ASTM D7315 test methods:

Monitoring with Turbidimeter

Allowable Exceedance Turbidity Level
Action Required at 1st Monitoring Interval
Action Required at 2nd Monitoring Interval
0 to 5 NTU above background
Continue to monitor every 4 hours
Continue to monitor every 4 hours
5 to 29 NTU above background
Modify BMPs and continue to monitor every 4 hours
Stop work after 8 hours at 5-29 NTU above background
30 to 49 NTU above background
Modify BMPs and continue to monitor every 2 hours
Stop work after 2 hours at 30-49 NTU above background
50 NTU or more above background
Stop work
Stop work

Alternatively, the Contractor may use visual standards as follows:

Visual Monitoring

No visible turbidity plume
Continue to monitor every 4 hours
Continue to monitor every 4 hours
Plume observed within 50 -feet
Modify BMPs and continue to monitor every 4 hours
Stop work after 8 hours with an observed plume
Plume observed beyond 50-feet
Stop Work
Stop Work

In the case that the Contractor is required to stop work due to not meeting these requirements, a written plan for approval shall be submitted to the government, detailing the Contractor’s BMPs that will bring the work into compliance. No work shall start until the plan is approved by the CO.

The government reserves the option of enforcing the requirements of Monitoring with Turbidimeter.

(c) Spill Prevention

1. The contractor shall have a Spill Prevention, Control and Countermeasures Plan (SPCC) in place before performing any operation on lands managed by the BLM. In the event of a release as defined in Oregon Administrative Rules (OAR), Chapter 340, Division 142, Oil and Hazardous Materials Emergency Response Requirements, shall immediately implement the SPCC Plan and shall immediately notify the government (typically the COR or PI). The Salem District will initiate its Hazardous Materials Contingency Plan and/or Spill Containment Plan and reporting requirements. The Contractor may be responsible for any or all costs associated with this level of effort.

The Contractor’s SPCC Plan shall be developed as defined under 40 CFR, Part 112. The SPCC Plan shall be reviewed and approved by the Contracting Officer. The SPCC Plan shall contain the following information:

A. Response Priorities

B. Contractor Representative in Charge

C. Duties of Contractor Personnel

D. Contractor Emergency Response Procedures

E. Contents of Spill Containment Kit (SCK)

F. Spill Response Diagram

2. The Contractor shall have a Spill Containment Kit (SCK), as described in the SPCC, on-site during any operation and provide training to employees on how components of the SCK are used. The SCK must be designed for use with petroleum products, and must contain, as a minimum, the following items:

A. Two Bales (4 Booms/Bale, of 8" dia. X 10’ length Oil-only Absorbent Booms)

B. Two Bales (100 Pads/Bale, of Oil-only Absorbent Pads, minimum of 17"x19"x1/4")

C. One Oil-only Absorbent Sweep (minimum of 18" dia. X 100' length)

D. One Floating On-Water Containment Boom (minimum 18” width x 100’ length) (only required for in-stream or riparian work within 50 feet or less of a waterway.)

E. Gloves (PVC and Latex), Goggles, and Garbage Bags sufficient to contain soiled absorbents.

3. The Contractor shall implement the Emergency Response Actions described in the SPCC plan. Those actions include, but are not limited to, immediate action to protect employee health and safety, immediate action to stop the flow of product from the equipment, removal of equipment from the waterway if required and/or possible, deployment of the absorbent booms and pads downstream from the equipment, and any other immediate action as specified by Federal and/or State On-Scene Coordinators or his/her representative. The Contractor shall be responsible for cleanup/removal and proper disposal of contaminated materials from the site.

4. The Contractor shall not store fuel or refuel any equipment within 150-feet from any waterway.

(d) Endangered Species

The Government may direct the Contractor to discontinue all operations in the event that:

a) Threatened, or endangered plants or animals protected under the Endangered Species Act of 1973, as amended, may be affected by the operation, and a determination is made that consultation or reinitiation of consultation is required concerning the species prior to continuing operation, or;

b) Federal candidate (Categories 1 and 2), sensitive or State listed species protected under BLM Manual 6840 - Special Status Species Management, have been discovered, and a determination is made that continued operations would affect the species or its habitat, or;

c) Species have been discovered which were identified for protection through survey and manage and/or protection buffer standards and guidelines established in the April 13, 1994, Record of Decision for Amendments to Forest Service and Bureau of Land Management Planning Documents Within the Range of the Northern Spotted Owl or in a subsequently adopted resource management plan applicable to the land involved in this contract, and a determination is made that continued operations would affect the species or its habitat, or;

d) Other active raptor or owl nests have been discovered, and a determination is made that continued operations under this contract would adversely affect the present use of the discovered nesting area by the raptor or owl.

107.11 Protection of Forests, Parks, and Public Lands. Delete in its entirety.

Section 108. -- PROSECUTION AND PROGRESS

Delete this section in its entirety.

Section 109. -- MEASUREMENT AND PAYMENT

109.02 Measurement Terms and Definitions. Modify as follows:

(b) Contract quantity. Delete in its entirety.

109.05 Scope of Payment. Delete in its entirety.

109.06 Pricing of Adjustments. Delete in its entirety.

109.07 Eliminated Work. Delete in its entirety.

109.08 Progress Payments. Delete in its entirety.

109.09 Final Payment. Delete in its entirety.

DIVISION 150

PROJECT REQUIREMENTS

Section 151. – MOBILIZATION

Description Delete in its entirety and replace with the following:

151.01 This work consists of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site; obtaining of permits, insurance, and bonds. This work also includes washing and treating construction equipment and vehicles necessary for equipment transport to remove seeds, plants, and plant fragments before the equipment is used on BLM lands, according to the requirements within.

Construction Requirements

Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment. Only equipment inspected by the BLM will be allowed to operate within the project area. All subsequent move-ins of equipment to the project area will be treated in the same manner as the initial move-in. This requirement does not apply to cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas off of BLM administered lands.

All mechanized equipment shall be steam-cleaned before being used below ordinary high water until all visible external oil, grease, mud, and other visible contaminants are removed.

Measurement

Delete in its entirety and replace with the following:

151.02 All work under this section shall be measured Lump Sum. All costs associated with the initial and subsequent cleaning of equipment shall be included in the Lump Sum unit bid price for Mobilization. Measure Mobilization according to Subsection 109.02.

Payment

Delete in its entirety and replace with the following:

151.03 The accepted quantity will be paid at the contract price. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

Progress payments for mobilization lump sum will be allowed as follows:

(a) If applicable, bond premiums will be reimbursed according to FAR Clause 52.232-5 Payments Under Fixed-Price Construction Contracts, after receipt of the evidence of payment.

(b) When 5 percent of the original contract amount is earned from other bid items, 50 percent of the mobilization item, or 5 percent of the original contract amount, whichever is less, will be paid.

(c) When 10 percent of the original contract amount is earned from other bid items, 100 percent of the mobilization item, or 10 percent of the original contract amount, whichever is less, will be paid.

(d) Any portion of the mobilization item in excess of 10 percent of the original contract amount will be paid after final acceptance.

Section 152. — CONSTRUCTION SURVEY AND STAKING

152.03 Survey and Staking Requirements. Delete items (a) to (k) and substitute the following:

Perform all survey, staking, recording of data, and calculations as necessary to construct the project from the initial layout to final completion.

(a) Control Points. Relocate initial horizontal and vertical control points in conflict with construction to areas that will not be disturbed by construction operations. Furnish the coordinates and elevations for the relocated points before the initial points are disturbed.

(b) Slope Stakes and References. Establish reference markers to assure cut and fill slopes are constructed properly.

(c) Centerline Re-establishment. Re-establish road and waterway centerline from instrument control points.

(d) Culverts. Set adequate horizontal and vertical control and reference points for all components.

(e) Clearing Limits. Clearing limits shall be staked five (5) feet beyond the catch points of all earthwork area.

152.06 Payment. Delete this Subsection in its entirety and replace with the following:

Contractor Construction Surveying and Staking is considered incidental to Pay Items 204(01), 251(01), 301(01), 301(02) and 602(01), no additional payment will be made.

Section 154. — CONTRACTOR SAMPLING AND TESTING

154.02 Sampling.

Delete this Subsection in its entirety and replace with the following:

Sample material to be tested in accordance to the items required to be tested in Subsection 154.03.

154.03 Testing.

Delete the first sentence and replace with the following:

Testing to be conducted in accordance to acceptable industry procedures.

Add the following:

For aggregate and subbase materials, contractor shall submit testing of aggregates and certify that the materials meet project requirements. For compaction, the contractor shall demonstrate that the material is compacted sufficiently so that a fully loaded dump truck does not visibly displace the materials.

154.07 Payment. Delete this Subsection in its entirety and replace with the following:

Contractor Sampling and Testing is considered incidental to Pay Items 204(01), 301(01), 301(02), and 602(01), no additional payment will be made.

Section 156. – PUBLIC TRAFFIC

156.03 Accommodating Traffic During Work. Supplement this section with the following:

The Contractor shall perform work in a manner that the exiting Nestucca Access Road remains open during construction, warning signs shall meet MUTCD.

The Contractor shall close Bear Ridge Road at the work sites. Type III Barricades shall be placed at each side of the work area.

156.10 Measurement and Payment. Delete this Subsection in its entirety and replace with the following:

Work required under this section will not be measured and is considered 151(01), no additional payment will be made.

Section 157. – SOIL EROSION CONTROL

157.04 Controls and Limitations on Work. Supplement this section with the following:

The Contractor shall submit an Erosion Control Plan for approval. The Erosion Control Plan shall completely detail how the contractor will control sediment and protect downstream water quality. The plan shall incorporate requirements detailed in the Plan Sheets. The plan shall be submitted no less than 7 days before any work that disturbs the site.

157.09 Diversions. Delete in its entirety and substitute the following:

Construct a temporary system to divert water around the disturbed areas and slopes as follows:

(a) The contractor shall submit a Stream Management Plan for approval; the plan shall be submitted no less than 7 days before any work that disturbs the site. The Stream Management Plan shall completely detail how the contractor is to divert the stream during construction of the new stream channel or culvert installation. The contractor shall not inhibit flows during construction to the extent that downstream reaches are dewatered.

(b) Before excavating in the work area, the contractor shall have in-place a system to dewater the work area below the levels of specified excavation continuously, until such time as dewatering is no longer required, according to specifications. The dewatering system shall be capable of protecting downstream water quality, dispose of water removed on slopes away from the project site, or in sediment retention structures if necessary. Provide standby equipment in case any system becomes inadequate or fails.

(c) The dewatering plan shall implement concepts detailed in the plans.

Measurement

157.015 Delete in its entirety and substitute the following:

Soil erosion control measures include all work required to support the Stream Management Plan, the Erosion Control Plan, the Dewatering Plan, the Re-watering Plan, any sediment fence, unsupported sediment fence, aggregate construction entrances, check dams, dewatering structure and associated materials for impounding and transmitting flows, or any other work required under this section.

Payment

157.016 Delete in its entirety and substitute the following:

Section 157 Temporary erosion control measures are considered incidental to Pay Items 204(01), 251(01), and 602(01), no additional payment will be made.

DIVISION 200

EARTHWORK

Section 201. – CLEARING AND GRUBBING

201.01 Description

Replace with the following:

This work consists of clearing and grubbing within clearing limits as shown in the plan or as determined under Section 152.

201.04 Clearing.

Supplement with the following:

(f) Trim branches of remaining trees or shrubs to give a clear height of 14 feet above the roadbed unless otherwise indicated. Trim tree limbs as near flush with the trunk as practicable.

(g) Trees shall be removed with stumps intact, as much as possible and shall be placed along the existing stream at locations designated by the COR, outside of the stream channel.

(h) Woody debris to be scattered onsite as designated by the COR.

201.06 Disposal

Replace with the following:

(a) Top Soil shall utilized as cover material for disturbed areas within the clearing limits.

(b) Trees shall be removed with stumps intact and placed on final slopes.

(c) Woody debris to be scattered onsite in an area designated by the COR.

(d) Excess material to be incorporated into designated disposal areas, fill slopes and riprap cover.

201.09 Payment. Delete in its entirety and substitute the following:

Work under this section is considered incidental to Pay Items 204(01), no additional payment will be made.

Section 203. – REMOVAL OF STRUCTURES AND OBSTRUCTIONS

203.01 Description. Delete in its entirety and substitute the following:

This work consists of the removal and disposal of existing culverts.

203.05 Disposing of Material.

(a) Remove from project. Add the following: Removed culverts/pipe structures shall become the property of the Contractor and shall be removed from the project site.

(b) Burn. Delete in its entirety.

(c) Bury. Delete in its entirety.

203.08 Payment. Delete in its entirety and substitute the following:

Work under this section is considered incidental to Pay Item 204(01), no additional payment will be made.

Section 204. – EXCAVATION AND EMBANKMENT

204.01 Description Replace with the following:

This work shall consist of excavating material, reserving the most suitable material for embankment construction, embankment construction including borrow materials, reshaping the existing streambed materials, placing conserved topsoil. This includes hauling, stockpiling, placing, sloping, shaping, compacting, and finishing earthen and rocky materials. The work shall also include disposing of unsuitable materials along the slopes around the jobsite.

204.05 Conserved Topsoil

Add the following:

Contractor shall reserve organic soils with woody debris to be utilized as cover material for disturbed areas within the clearing limits.

The contractor shall place reserved topsoil on the top 4-feet of slope, including over any riprap. The thickness over the riprap shall be at least one foot.

204.10 Embankment Construction.

(b) Embankment within the roadway prism. Delete in its entirety and substitute the following:

Place embankment material in horizontal layers not exceeding 12 inches in compacted thickness. Remove boulders and rock fragments exceeding 12 inches in diameter and stockpile for use as riprap or stream features.

(c) Individual rock fragments and boulders. Delete in its entirety.

Measurement

204.16 Delete in its entirety and substitute the following:

All Excavation and Embankment, including borrow, under this section is measured by lump sum. The measurement shall include all work in the roadway prism, all work to contour the existing streambed materials as shown in the plans, and all work to haul, dispose of, shape excess materials, all work to move materials from the borrow site and any other work to completely construct the embankment as shown in the plans.

204.17 Payment. Delete in its entirety and substitute the following:

Requirements under this section shall be paid at the contract price.

Section 209. – STRUCTURE EXCAVATION AND BACKFILL

209.13 Measurement. Delete in its entirety and substitute the following:

Work under this section will not be measured.

209.14 Payment. Delete in its entirety and substitute the following:

Structure Excavation and Backfill is incidental to Pay Items 204(01) and 602(01), no additional payment will be made.

DIVISION 250

SLOPE REINFORCEMENT AND RETAINING WALLS

Section 251. — Riprap

251.01 Description.

Replace the second paragraph with the following:

Riprap is designated as follows:

The contractor shall sort the required quantities of riprap from the borrow site. The contractor shall utilize the larger rocks that are available, but shall have a well graded mix.

251.08 Measurement.

Delete the reference to riprap measurement and replace with the following:

Measure Riprap by the Cubic Yard in the Hauling Vehicle.

251.09 Payment.

Requirements under this section shall be paid at the contract price.

DIVISION 300

AGGREGATE COURSES

Section 301. – UNTREATED AGGREGATE COURSES

301.01 Description. Supplement with the following:

This work consists of constructing courses of surface course aggregate and courses of sub-base aggregate.

301.02 Material. Supplement with the following:

Surface Course Aggregate shall be a dense graded 1-1/2” aggregate from a commercial source that is a supplier for forest road construction.

Subbase shall be a 6” graded base rock from a commercially available source that is a supplier for forest road construction.

Construction Requirements

301.04 Mixing and Spreading. Delete in its entirety and substitute the following:

(a) Preparation: The Contractor shall prepare the subgrade for aggregate subbase placement by blading out any surface irregularities before the aggregate subbase and surface courses are placed. The subgrade shall be roller compacted until visible displacement ceases.

(b) Placement: Place compacted depth of aggregate subbase course in lifts of four (4) inches each and the surface course in four (4) inch lifts. See 301.05 for compaction requirements.

(c) Grading: The aggregate shall be graded uniformly over the entire width of the surface to the required thickness as shown in the plans.

301.08 Acceptance. Delete the first sentence.

301.08(a) Aggregate gradation. Delete in its entirety.

301.09 Measurement. Add the following:

Surface Course Aggregate (1-1/2”) shall be measured by the Ton. The contractor shall submit weight tickets from a certified scale.

Base Rock (6”) shall be measured by the Ton. The contractor shall submit weight tickets from a certified scale.

301.010 Payment. Add the following:

Requirements under this section shall be paid at the contract price.

DIVISION 600

INCIDENTAL CONSTRUCTION

Section 602. – CULVERTS AND DRAINS

602.03 General. Supplement with the following:

Culverts shall be field fit to conditions.

Furnish culverts and flumes as detailed in the plans. Culverts shall be ribbed plastic pipe.

Culverts shall be bedded with surface aggregate to a depth of ½ foot above the culvert.

602.09 Measurement. Supplement with the following:

Work under this section shall be measured lump sum and shall include all work for a complete installation, including bedding the culverts with surface aggregate.

602.10 Payment. Supplement with the following:

Requirements under this section shall be paid at the contract price.

Section 605. – UNDERDRAINS, SHEET DRAINS, AND PAVEMENT EDGE DRAINS

605.01 General. Supplement with the following:

This section includes all work to install the fabric wrapped French drain shown in the plans.

209.13 Measurement. Delete in its entirety and substitute the following:

Work under this section will not be measured.

209.14 Payment. Delete in its entirety and substitute the following:

Work under this section is incidental to Pay Items 204(01) and 602(01), no additional payment will be made.

Section 625. – TURF ESTABLISHMENT

625.01 Description. Delete in its entirety and replace with the following:

Government shall provide and the contractor shall apply seed and mulch to all disturbed areas within the clearing limits. Contractor shall be liable for covering excessive disturbed areas outside of the clearing limits.

625.12 Payment. Add the following:

Requirements under this section are considered incidental to Pay Item 204(01), no additional payment will be made.

Section 629. – ROLLED EROSION CONTROL PRODUCTS AND CELLULAR CONFINEMENT SYSTEMS

629.01 Description. Add the following:

This work shall include installation of Jute Matting (Open Weave Textile) on slopes indicated in the plans.

629.02 Material. Delete in its entirety and replace with the following:

Jute Matting shall be an Open Weave Textile that the manufacturer recommends for the conditions shown in the plans. Provide manufacture’s written recommendations.

629.08 Measurement. Delete and replace with the following:

All work under this section shall be measured as lump sum.

629.01 Payment. Add the following:

Requirements under this section shall be paid at the contract price.

Section 635. – TEMPORARY TRAFFIC CONTROL

635.01 Description. Supplement with the following:

Road closure signs and Type III Barricades shall be placed at road closures.

635.27 Payment. Delete and replace with the following:

Requirements under this section are considered incidental to Pay Item 151(01) and no additional payment will be made.

(End of Descriptions/Specifications)

INSPECTION AND ACCEPTANCE

The following clauses are incorporated by reference:

52.246-12
INSPECTION OF CONSTRUCTION
AUG 1996

(End of Inspection and Acceptance)

DELIVERIES OR PERFORMANCE

1.0

PERIOD OF PERFORMANCE

See clause 52.211-10 in Contract Clauses section.

The Contractor shall perform all in-stream portions of work during the ODF&W In-Stream Work Period ending September 15th, 2015.

2.0

PROGRESS PLAN

At the prework conference, the Contractor shall provide to the COR a written "work progress plan" that details it’s proposed work force and schedule to provide for orderly completion of the work within the contract performance time. This work schedule must be acceptable to the Government. At a minimum, the schedule must reflect a work progress rate equal to the available amount of contract performance time.

(End of Deliveries or Performance)

CONTRACT ADMINISTRATION DATA

G.1.0

CONTRACTING OFFICER'S REPRESENTATIVE DEFINITION

The “Contracting Officer’s Representative (COR)” is delegated expressed limited authority by the Contracting Officer to assist in the technical monitoring and administration of the contract.

G.2.0

RESPONSIBILITIES OF THE CONTRACTING OFFICER'S REPRESENTATIVE

G.2.1 The COR’s authorities and responsibilities are defined in the COR’s Designation Letter. The COR is authorized to clarify technical requirements, and to review and approve work which is clearly within the scope of work. The COR is NOT authorized to issue changes or modify the scope of work in any way.

G.2.2 The COR is responsible for verifying the Contractor’s compliance with the technical specifications, drawings, work schedule, and labor provisions at the site of the work.

The following local clauses are provided in full text:

CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (JULY 2010)

(a) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR42.15.

(b) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.

(c) We request that you furnish the Contracting Officer with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official. The report information must be protected as source selection sensitive information not releasable to the public.

(d) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive an automatically-generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at http://www.cpars.csd.disa.milJ. The CPARS User Manual, registration for On Line Training for Contractor Representatives, and a practice application may be found at this site.

(e) Within 60 days after the end of a performance period, the Contracting Officer will complete an interim or final past performance evaluation, and the report will be accessible at http://www.cpars.csd.disa.mil/. Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment. Comments are limited to the space provided in Block 22. Your comments should focus on objective facts in the Assessing Official's narrative and should provide your views on the causes and ramifications of the assessed performance. In addition to the ratings and supporting narratives, blocks 1 - 17 should be reviewed for accuracy, as these include key fields that will be used by the Government to identify your firm in future source selection actions. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating ''No comment" in Block 22, and then signing and dating Block 23 of the form. Without a statement in Block 22, you will be unable to sign and submit the evaluation back to the Government. If you do not sign and submit the CPAR within 30 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment." Your response is due within 30 calendar days after receipt of the CPAR.

(f) The following guidelines apply concerning your use of the past performance evaluation:

(1) Protect the evaluation as "source selection information." After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the Contracting Officer for instructions.

(2) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

(3) Prohibit the use of or reference to evaluation data for advertising, promotional material, preaward surveys, responsibility determinations, production readiness reviews, or other similar purposes.

(g) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the Contracting Officer no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 30- day review period.

(h) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.

(End of clause)

ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING PLATFORM (IPP) (APR 2013)

Payment requests must be submitted electronically through the U.S. Department of the Treasury’s Invoice Processing Platform System (IPP).

“Payment request” means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions – Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

1.

Invoice billed according to contract line items and rates.

2.

Certified payrolls and Statement of Compliance in accordance with clause 52.222-8.

3.

If the partial payment is billed and the invoice states a lump sum, the invoice shall include an itemized breakdown and narrative progress summary of the work performed during this invoice period.

4.

If final payment is billed, the last invoice shall state “FINAL”.

5.

Contractor’s Release of Claims shall be submitted with the final invoice.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contract (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 – 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

(End of Contract Administration Data)

SPECIAL CONTRACT REQUIREMENTS

H.1.0

WORK HOURS

Unless otherwise specified in Section C, Specifications, work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset each day. No work will be done on Saturday, Sunday, or Federal holidays unless authorized by the COR.

H.2.0

ENVIRONMENTAL INTERRUPTION OF WORK

H.2.1 Environmental - The Contracting Officer, by issuance of a suspend work order, may direct the Contractor to shut down any work that may be subject to damage due to weather conditions, fire danger, or because it is impracticable to work during the winter season. The Contractor will be given a resume work order which will document the date the work suspension ends. An allowance has been included in the contract time for all environmental delays. The count of contract time will therefore continue during all periods of suspension due to normal weather conditions, including fire danger. The Contractor will not be entitled to additional contract time for any suspensions except to the extent that they are due to unusually severe weather conditions. The Contractor will not be entitled to additional monetary compensation for such suspensions regardless of duration.

H.2.2 Endangered Species - The Government may direct the Contractor to discontinue all operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species Act of 1973, as amended, or Federal candidate (Category 1 and 2), sensitive or state listed species, identified under BLM Manual 6840, are discovered to be present in or adjacent to the project area.

H.3.0

DRAWINGS

H.3.1 Reduced Size Drawings. Drawings appearing in this package may be photographically reduced in size. Accordingly, measurements and dimensions should not be taken or be based on any numerical scales shown. The Contractor may request full-size drawings from the Contracting Officer.

H.4.0

PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA

H.4.1 Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of the terrain as a result of any Federal construction project.

H.4.2 The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, or archeological data the contractor will notify the Contracting Officer immediately in writing giving the location and nature of the findings.

H.4.3 Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in the Contract Clauses Section of this contract.

H.4.4 The Contractor agrees to insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.

H.5.0

SUBSTITUTION – PROCESSION OF WORK

Any proposed key personnel, minimum qualifications for incoming or replacement key personnel, subcontractors, processes, procedures or materials included in the quotation are hereby incorporated into the contract. Performance shall be limited to the personnel, qualifications, firms, procedures, and materials that were specifically identified in the quotation accepted. The Contractor shall obtain the Contracting Officer’s written consent before making any substitutions or changes. All substitutions or replacements shall comply with the terms and conditions of the contract.

H.6.0

ENVIRONMENTAL IMPACT

All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by his subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to Executive Order 12088, 13 October 1978, Federal Compliance with Pollution Control Standards; the Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 ET SEQ); the Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ); the Endangered Species Act, as amended (16 U.S.C. Sec 1531, ET SEQ); the Toxic Substances Control Act, as amended (15 U.S.C. Sec 2601, ET SEQ); the National Historic Preservation Act, as amended (16 U.S.C. Sec 470, ET SEQ); the Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ); and the Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ). Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.

H.7.0

HAZARDOUS MATERIALS

Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating.

Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR 1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.

H.8.0

GREEN PROCUREMENT REQUIREMENTS

In the performance of this service or construction contract, the Contractor shall make maximum use of products identified on the mandatory environmental purchasing list at the following links, if applicable:

· U.S. EPA Comprehensive Procurement Guidelines published at www.epa.gov/cpg/products.htm.

· USDA Biobased product listings published at www.biopreferred.gov.

· Energy Star® product listings published at www.energystar.gov/products.

· FEMP Low Standby Power product listings published at http://energy.gov/eere/femp/covered-product-categories Contractor shall comply with all reporting requirements stated in the applicable clause(s):

· 52.223-1 Biobased Product Certification

· 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts

· 52.223-4 Recovered Material Certification

· 52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items

· 52.223-15 Energy Efficiency in Energy Consuming Products

· 52.223-17 Affirmative Procurement of EPA Designated Items in Service and Construction Contracts

H.9.0

UNAUTHORIZED PERSONNEL

The contractor shall inform all personnel working under his jurisdiction (including subcontractor and visiting supplier personnel) that access to restricted areas outside of the immediate work area; excluding direct haul and access routes, contracting and Civil Engineering offices and points of supply and storage; is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.

H.10.0

DAVIS-BACON WAGE RATES APPLICABLE TO TRUCK DRIVERS

29 CFR 5.2(j) limits coverage of construction contractor or subcontractor employees performing as truck drivers under the Davis-Bacon Act (FAR 52.222-6) to only their time spent directly upon the "site of the work" or when hauling between the site of the work and a facility which is dedicated to and located in the proximity of the actual construction location. Other transportation of materials or supplies to or from the site of work by employees of the construction contractor or subcontractor is not “construction” at the site of work and accordingly is not subject to the Davis-Bacon Act.

H.11.0

FIRE DANGER SEASON

If the COR allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR and outlined in the attachment at the end of this section.

FIRE REQUIREMENTS PROCEDURES OUTLINE

This outline covers the fire protection requirements of a contractor or private party who performs service or construction contracts on BLM land. In western Oregon, the BLM allows Oregon Forest Law (ORS) and Oregon Administrative Rules (OAR) to apply to these operations on BLM lands rather than develop similar rules applicable only to BLM lands.

1. CLOSED FIRE SEASON

The closed fire season means that fire season has been declared. ORS 477.505 gives the State Forester the authority to establish the fire season. The authority has been delegated to the District Foresters around the state who issue public notices through the newspapers and radio when fire season will be closed for their individual districts.