SOW_for_HR_Support_for_WO300_4_22_15_MW_(1).docx
DOCX document 37 KB Posted
- Attached to
- BLM WO Human Resources Management Support Federal contract opportunity
- Solicitation number
- L15PS00360
About this file
SOW
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW_for_HR_Support_for_WO300_4_29_15_Final.docx | DOCX document | |
| HR_Q A.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Human Resources Management Support Energy, Minerals, and Realty Management Bureau of Land Management, Washington D.C.
1.1 SCOPE
The Contractor shall provide human resources management support to the Bureau of Land Management’s Energy, Minerals, and Realty Management Directorate (Directorate), compliant with the rules, regulations and requirements of the Bureau of Land Management (BLM) and the Department of Interior (DOI). This support shall consist of reviewing old and new position descriptions; assisting with the development and revision of position descriptions; developing packages to advertise positions to include the job analysis and review of questions and weights; reviewing final certificates and resumes; and building classification packages for review and approval by the BLM’s National Operations Center (NOC). The classification packages shall include all documentation necessary for verification and approval.
1.2 BACKGROUND
The BLM Washington Office has been challenged in getting qualified applicants for the positions at the headquarters office. Some vacant positions have been advertised two or three times, sometimes still with no qualified applicants.
In addition, in FY 2014, the NOC implemented a national policy for classification review on position descriptions that were not approved, standard position descriptions. This has created an additional and time-consuming workload.
Critical position descriptions need to be revised, similar/like positions need to have standardized position descriptions, and classification packages need to be built. In addition, announcement packages need to be developed to enable the Directorate to fill vacant positions in a timely manner, as well as certificates and resumes need to be reviewed. This human resources management support shall assist the Directorate so that it can continue to fulfill the mission of the BLM.
1.3 TASK: POSITION REVIEW AND CLASSIFICATION
The Contractor shall provide written review of old position descriptions. The Contractor shall assist in rewriting and developing new position descriptions that accurately reflect the actions required of the vacancy and/or current incumbent and comply with the relevant provisions of the Government Performance and Results Modernization Act 2010 and OMB Circulars A-11, A-123 and A-136.
The Contractor shall develop classification packages that are fully documented and prepared for the review and approval of the NOC. The Contractor shall provide technical expertise to management on the potential impacts of reclassification and restructuring of positions or occupational groups.
The Contractor shall develop job analyses and review questions and weights to begin the advertisement process.
The Contractor shall provide management consultation and operational services on such matters as accretions of duties actions, establishment of new positions, and recruitment and classification of new positions.
Deliverables:
· The Directorate currently has 18 vacancies. Some are in the process of being advertised, while others need support from position description classification to advertisement/certificate review. Provide assistance to complete the advertising process and assist in the certificate review.
· In addition, the Directorate has 94 position descriptions, of which most have standalone position descriptions. Each of the position descriptions will need reviewed to determine if they should be standardized (if similar in title and grade) or remain as standalone. Position descriptions shall be developed and classification packages shall be prepared for approval by the NOC.
Timeline:
The Period of Performance is May 11, 2015 to May 10, 2016. Please include in your proposal quotes with Four Option Years.
1.4 CONTRACTOR PERSONNEL
Key personnel: The key personnel are those that are considered to be essential to the work the Contractor performs. Prior to diverting any key personnel to other programs, the Contractor shall notify the Contracting Officer reasonably in advance and submit justification, including proposed substitutions or replacements, in sufficient detail to allow the Contracting Officer to evaluate the impact on the work the Contractor is obligated to perform hereunder. The Contractor shall not replace any of the key personnel named to work on the contract without the written consent of the Contracting Officer.
Program Manager: The Contractor shall provide a working Program Manager who shall be responsible for all Contractor work performed under this contract. The Program Manager shall be a single point of contact for the Contracting Officer and the Contracting Officer’s Representative (COR).
The name of the Program Manager and the name of any alternate, who shall act for the Contractor in the absence of the Program Manager, shall be provided to the BLM as part of the Contractor’s proposal.
During any absence of the Program Manager, only one alternate shall have full authority to act for the Contractor on all matters relating to work performed under this contract. The Program Manager and all designated alternates must be able to read, write, speak and understand English. Additionally, the Contractor shall not replace the Program Manager without prior acknowledgment from the Contracting Officer.
The Program Manager shallbe available to the COR via telephone between the hours of 0800 and 1600 EST, Monday through Friday, and shall respond to a request for discussion or resolution of technical problems within 24 hours of notification.
The Program Manager be responsible for ensuring conformity to contractual obligations, establishing and maintaining master plans and schedules. The Program Manager shall perform day-to-day management of overall contract support operations.
The Program Manager Experience Requirements: The program manager should have experience performing in the field of human resources management for the Federal sector, including supporting the development of position descriptions and have working knowledge of the Directorate. The program manager should possess the ability to communicate effectively, both orally and in writing, with senior personnel. The Program Manager should possess the ability to read and interpret Government policy, regulations, and directives and to apply those interpretations fully and legally to all activities described in this statement of work. The program manager should have knowledge and experience of GPRA Modernization Act compliance and all matters related OMB Circular A-11, A-136 and A-123.
Qualified Personnel: The Contractor shallprovide capable and qualified personnel to perform all requirements and tasks under this contract. Contractor personnel proposed for each task must possess the experience, knowledge, expertise, and education to fulfill all the requirements listed for the task. Contractor employees supporting the contract must be able to read, write, speak and understand English fluently, and must be United States citizens.
Employee Identification: Contractor employees visiting BLM facilities and other Government facilities must wear an identification badge that, at minimum, displays the Contractor name, the employee’s photo, name, clearance-level and badge expiration date. Visiting Contractor employees must comply with all BLM and DOI rules and requirements. All Contractor employees must identify themselves as Contractors when their status is not readily apparent and display all identification and visitor badges in plain view.
Employee Conduct: The Contractor’s employees must observe and comply with all applicable local and headquarters regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security). The Contractor shall ensure that all Contractor employees present a professional appearance at all times, and their conduct does not discredit the United States, the DOI or the BLM. The Project Manager shall ensure Contractor employees understand and abide by BLM-established rules, regulations and policies concerning safety and security.
Key Personnel: Before replacing or adding any individual designated as Key by the Contractor, the Contractor notify the Contracting Officer no less than 15 business days in advance, submit written justification for replacement or addition, and provide the name and qualifications of any proposed Contractor employee.
Place of Performance: The Contractor shall be required to provide contract support primarily from the Contractor premises unless ordered differently by the contracting officer or COR.
1.5 TOTAL VALUE OF CONTRACT
The total value of the contract shall be determined upon award. Travel expenses should be included in Contractor’s total value. If the contract is to be extended, based on acceptable performance of the Contractor, that rate may be re-negotiated.
1.6 REPORTING REQUIREMENTS
Kick-Off Meeting: The Contractor shall attend a Kick-Off Meeting with the Contracting Officer, Program Manager and the COR no later than five (5) business days after the contract has been issued. The purpose of the Kick-Off Meeting is to discuss technical and contracting objectives of the Contract.
Monthly Status Reports: The Contractor shall provide a monthly status report to the COR and Contracting Officer via electronic mail. This monthly progress report shall include a summary of all Contractor work performed including a breakdown of labor hours by labor category, all direct costs by line items, an assessment of technical progress, schedule status, any travel conducted and any Contractor concerns or recommendations for the period being reported that may impact successful performance of the work.
Status Meetings: The Contractor must be available to meet with the Contracting Officer and COR upon request to discuss progress, exchange information and resolve emergent technical problems and issues. These meetings shall take place at the discretion of the BLM or the Contractor. The meeting may be by conference call or in a physical meeting place as determined by the Contractor and the BLM. A mutual effort shall be made to resolve all problems identified during these meetings.
General Report Requirements: The Contractor shall provide all written reports in electronic format with read/write capability using applications that are compatible with BLM systems. The Contractor shall use proven methodologies that assure all activities and deliverables are identified, documented, and tracked so that the Contractor’s performance can be continuously evaluated and monitored for timeliness and quality service.
Section 508 Compliance: Section 508 of the Rehabilitation Act (29 U.S.C. 794d), as amended by the Workforce Investment Act of 1998 (P.L. 105-220), August 7, 1998, requires that when Federal agencies develop, procure, maintain, or use electronic and information technology, they must ensure that it is accessible to people with disabilities, unless it would pose an undue burden to do so. Federal employees and members of the public who have disabilities must have access to and use of information and services that is comparable to the access and use available to non-disabled Federal employees and members of the public. For additional information, please refer to FAR 39.2 or http://www.section508.gov.
1.7 PROTECTION OF INFORMATION
Privacy Act Information: Contractor access to information protected under the Privacy Act may be required under this contract. The Contractor safeguard this information against unauthorized disclosure or dissemination in accordance with the law and Government policy and regulation.
Unclassified but Security Sensitive and Classified Information: Contractor access to unclassified, but security sensitive information and classified information may be required under this contract. Contractor employees shall safeguard this information against unauthorized disclosure or dissemination.
Proprietary Information: The Contractor may require access to proprietary information under this contract. Contractor employees shall safeguard this information against unauthorized disclosure or dissemination in accordance with all BLM regulations, laws and policies.
Safeguarding Sensitive but Unclassified Information: The Contractor shall ensure that all Contractor personnel having access to business or procurement sensitive information sign a non-disclosure agreement.
1.8 TRAVEL
Contractor travel may be required to support work to be accomplished under this contract. Travel required by the Government inside and outside the local commuting area(s) shall be paid to the Contractor in accordance with the Federal Travel Regulations under this contract. The Contractor shall be responsible for obtaining COR approval (electronic mail is acceptable) for all reimbursable travel in advance of each travel event.
1.9 GOVERNMENT FURNISHED PROPERTY/RESOURCES AND INFORMATION
Government furnished property/resources and information shall be specified as needed under this contract. The contract shall specify the scope, tasks, requirements, deliverables, schedules, places and periods of performance, and funding. The contract may also address security, travel, technical or environmental requirements as applicable. The Contractor may in some cases furnish all necessary facilities, materials and equipment necessary to fulfill the requirements of this contract. In other instances as necessary, the Government shall fulfil that requirement.
2.1 TECHNICAL EVALUATION
Procedures and Evaluation Criteria
The Government shall award a contract resulting from this solicitation to the responsible offer(s) or whose offer conforming to the solicitation shall be the best value to the Government, price and other factors considered.
The technical proposal shall be separate from the price proposal. Proposals must be in accordance with the labor categories and pricing set forth in your GSA Federal Supply Schedule or better. You may not quote items that are not contained within your schedule. The Contractor’s proposal must include all data and information required and must be submitted in accordance with these instructions. Non-conformance with specific organization and content may be cause for proposal rejection. The proposal must be clear and concise. It must include sufficient detail for effective evaluation and for substantiating the validity of stated claims.
The proposal shall not rephrase or restate the Government requirements, but rather provide a convincing rationale to address how the Contractor intends to meet these requirements. A proposal that simply restates the Government requirements may be judged non-responsive. Contractors must assume that the Government has no prior knowledge of its experience and shall base its evaluation on the information presented in the Contractor’s proposal.
The proposal must be written to the greatest extent possible on a stand-alone basis so that its contents may be evaluated with a minimum of cross-referencing to other sections of the proposal. Cross referencing within the proposal is permitted where its use would conserve space without impairing clarity.
The proposal shall comply with the following limitations:
(1) A maximum of fifteen (15) pages for the proposal, excluding past performance.
(2) 12 point type shall be used. The font shall be Times Roman.
Do not include cost/pricing information in your technical submittal. The pricing information shall be completely separate for the technical/management submittal and contain all information relative to cost and pricing.
Your submittal shall become the property of the Government and shall not be returned. If your submittal contains information that you do not want disclosed to the public or used by the Government for any purpose other than Government evaluation, such restriction must be clearly indicated on each sheet containing such information.
The following evaluation factors shall be used to evaluate the offeror’s proposal. The evaluation factors are listed in descending order of importance.
Evaluation Factors
Technical Expertise The offeror must have proven technical expertise as relevant to the tasks in the Statement of Work (SOW). The offer is evaluated as to whether the vendor understands the work requirements as embodied in the SOW and their proposed approach to meeting those requirements.
Project Management/Schedule The offeror shall be evaluated on their ability to meet the project management requirements as set forth in the SOW, including reporting.
Past Performance Information Describe the experience and capability of your organization in conducting similar work.
Provide a summary of at least two (2) similar contracts/orders performed by your organization for the last three (3) years. Include a brief description of the project, contract number, period of performance, contract amount, client identification (including agency), point of contact information (email and telephone number). The contract information must be current.
Rating/Description
The information below demonstrates the ratings, and corresponding descriptions, that will be used by the Department to rate each offeror’s technical proposal according to the Technical Evaluation Factors for this contract.
Blue The offeror exceeds the requirements of the solicitation, as explained in the statement of work and proposal evaluation criteria. The offeror has proposed a superior candidate(s) and there is no question as to the offeror’s ability to perform successfully. There are no deficiencies or weaknesses.
Green It appears that the offeror meets the basic requirements of the solicitation. While the proposed approach does not exceed expectations, the offeror shallmost likely be able to perform successfully, though minor deficiencies or weaknesses may exist. While further dialogue with the offeror may be needed, a revised proposal may not be necessary.
Yellow The offeror may meet the requirements of the solicitation, though there are doubts as to the offeror’s ability to perform successfully. In order to make their proposal fully acceptable, they would need to correct their deficiencies or weaknesses through submission of a revised proposal.
Red The offeror fails to meet the basic requirements of the solicitation. There are so many deficiencies and weaknesses that, should the offeror be allowed to correct them, it would be tantamount to submission of a new proposal. The proposal should not be considered for award.