- Construction Manager at Risk - One Step Process Plano East Senior High School Phase 2 Connector 3
- Solicitation number
- 2026-09-30
- Issued by
- Collin County, Texas
About this file
This document is a Scope of Work for a Construction Manager at Risk (CMaR) project by the Plano Independent School District in Plano, Texas, for the Plano East Senior High School Phase 2 Connector 3 addition. The project encompasses approximately 5,000 square feet of new construction to create a secure, conditioned corridor connecting two existing buildings on the campus, along with approximately 3,000 square feet of interior renovation work within the existing structures. Additional scope includes reshaping existing retention ponds, modifying storm water utilities, and constructing five solid masonry walls with metal panel fencing and gates as part of the district's broader campus security master plan. The project will be executed in phases to minimize disruption to the active senior high school campus, with construction anticipated to commence in early 2027 and substantial completion targeted for December 31, 2027. The CMaR one-step selection process will allow the selected construction manager to collaborate on design development and constructability reviews prior to final pricing.
The document establishes the operational and technical requirements for the construction manager's involvement throughout design and construction phases. The selected firm will be responsible for providing preconstruction services, constructability analysis, cost estimating, and schedule development in coordination with the architect and owner. The project requires specialized expertise in phased construction methodologies, campus-based construction management, and coordination with active school operations. All work must comply with applicable building codes, accessibility standards, and district specifications. The construction manager will be expected to maintain an active safety program and coordinate with multiple trades operating simultaneously on the occupied campus.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .