AS Sacramento Kitchenette.docx
DOCX document 30 KB Posted
- Solicitation number
- Kitchenette001
About this file
This document is a Statement of Work (SOW) for the remodel of the Air Station Sacramento's avionics shop kitchenette. The SOW describes the scope of work, which includes the demolition and removal of the existing cabinets, countertop, and sink, and the installation of new cabinets, a recirculating microwave, a new sink, plumbing, countertops, and an oven. The government will provide the cabinets, microwave, oven, sink, and faucet, while the contractor will provide the quartz countertop and all other materials, equipment, and labor necessary to execute the renovation. Key requirements include submitting a demolition, construction, and safety plan, maintaining satisfactory standards of employee conduct, and adhering to OSHA safety standards. The government will make all payments for the contract upon completion of the SOW. The related federal contract opportunity is for the "SACRAMENTO AVIONICS/LINE CREW KITCHENETTE REMODEL" solicitation, issued by the Department of Homeland Security US Coast Guard.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK FOR AIR STATION SACRAMENTO AVIONICS/LINE CREW KITCHENETTE REMODEL
1.0 SCOPE
1.1 Scope of work. The purpose of this statement of work (SOW) is to describe the specifications and scope of the remodel of Air Station Sacramento’s avionics shop kitchenette.
1.2 Point of Contact and Place of Remodel. The principal point of contact will be the Aviation Engineering Officer or designated representative. The address for the room in need of remodel is:
Commanding Officer USCG Air Station Sacramento 6037 Price Ave Sacramento, CA 95652
2.0 REQUIREMENTS
2.1 Provide expert renovation of Air Station kitchenette:
2.1.1 The locations covered include the following:
2.1.1.1 Kitchenette located in the northwest corner of the Avionics and Line Crew shops. Walls of the kitchen are concrete construction.
2.1.2 Written demolition, construction, and a safety plan shall be submitted three days prior to the commencement of the work activity to the Air Station Safety Office. Written procedures must include a method of containment of area, demolition and removal of material, installation of new, and clean-up after completion of work.
2.1.3 Removal and haul away of all current cabinets, countertop, and backsplash (approximately 17 linear feet “L” shape); sink, old drainpipe, and associated debris.
2.1.4 Installation and hook up of new cabinets (including 30” wall cabinet), wall mounted recirculating microwave, sink, sink fixtures, plumbing to sink, countertops, and oven.
2.1.5 Sealing, and custom fitting of countertop around multiple beams, pipes, sink cutout, and conduit.
2.1.6 Complete any required vent duct of oven.
2.1.7 Clean-up of all affected areas.
3.0 MATERIALS.
3.1 Government. Government will provide cabinets, microwave, oven, sink, and faucet.
3.2 Contractor. Contractor will provide quartz countertop and all other materials, equipment, and labor necessary to execute renovation.
3.3 Contractors on-site Representative. The Contractor shall, at the time of award, designate their on-site representative during performance under this contract.
3.4 Conduct. The Contractor shall be responsible for the conduct of employees while on board the station. The Contractor shall maintain satisfactory standards of employee competency, conduct, appearance, and integrity, and shall be responsible for taking such disciplinary action as may be necessary. The Government reserves the right to direct the contractor to remove an employee from the worksite for failure to comply with the standards of conduct.
3.5 Other Spaces. Contract personnel shall not enter any spaces that are not specifically indentified in this contract.
4.0 SAFETY PRECAUTIONS
4.1 OSHA. The Contractor shall furnish instruction to their contract personnel in appropriate safety measures to ensure compliance with the Occupational Safety and Health Standards (OSHA) published in 29 CFR Part 1926. The prime contractor shall be responsible to ensure subcontractor compliance with said standards.
4.2 Alarms. USCG Air Station Sacramento is an operational Search and Rescue unit. It is imperative that contract personnel not impede Air Station aircrews or aircraft.
4.3 Fire. Contract personnel must adhere to station fire alarms by evacuating all buildings immediately and meeting in the ramp area south of building 1106.
5.0 USCG REPRESENTATIVE
5.1 Points of Contact. Notwithstanding the Contractor’s responsibility for total management during the performance of the contract, the administration of the contract will require maximum coordination between the Government and the Contractor. The individuals listed below will be the Government point of contract during the period.
| Aviation Engineering Watch Captain | : | (916) 634-2572 | ||
| OOD: | (916) 634-5190 |
5.2 Administrative Matters. Contractual administrative matters will be addressed to the Contracting Officer listed below. No other changes in, or deviation from, the scope of work shall be affected without written modification to the contract executed by the Contracting officer.
Contracting Officer:
6.0 PAYMENT
6.1 The Government will make all payments for this contract at the completion of the statement of work.