Kings Creek 100 Specification Book.pdf
PDF 12 MB Posted
- Solicitation number
- 26-16
- Issued by
- Harris County, Texas
About this file
This is a Project Manual and Specification Book for the City of Terrell, Texas, prepared by Huitt-Zollars, Inc., for the Kings Creek Park Improvements project, which is being financed through the Texas Parks and Wildlife Department Local Park Grant Program with federal assistance from the National Park Service (Award No. 48-01273). The project encompasses eight major components: an 8-foot-wide concrete loop trail with culvert crossings and benches, solar lighting along the trail and basketball court, a picnic grove with concrete paving and picnic tables, a concrete basketball court with tile surfacing, native shade and ornamental tree planting, an automatic underground irrigation system, minor fill and grading, and minor roadway paving removal and replacement for future restroom utilities. The City of Terrell solicited sealed bids under RFQ 26-16 with a bid opening scheduled for 2:00 p.m. on Thursday, September 10, 2026, at City Hall (201 E. Nash Street, Terrell, Texas 75160), with bid documents available online and at City Hall. A pre-bid meeting was held on September 3, 2026, at 2:00 p.m. The City reserved the right to hold bids for up to 60 days before award and to select the bid offering the best value using criteria including price, contractor reputation and experience, service quality, impact on historically underutilized businesses, safety record, proposed personnel, financial capability, and past City relationships.
A bid bond equal to 5 percent of the total bid amount (for contracts exceeding $100,000) was required, with performance and payment bonds mandated for contracts over specified thresholds ($100,000 for performance bonds; $50,000 for municipalities regarding payment bonds). The project is subject to Buy America, Build America Act (BABA) requirements ensuring all permanently installed iron, steel, manufactured products, and construction materials are manufactured in the United States. Contractors must comply with Davis-Bacon Act provisions, equal employment opportunity requirements, debarment and suspension certifications, and various other federal certifications including non-lobbying, child support obligation, energy company boycott, firearm discrimination, Iran sanctions compliance, and Israel boycott prohibitions. The City of Terrell is an Affirmative Action/Equal Opportunity Employer, and Section 3 residents, minority business enterprises, small business enterprises, women business enterprises, and labor surplus area firms are encouraged to submit bids. The contract requires comprehensive insurance coverage including workers' compensation, commercial general liability ($1,000,000 per occurrence/$2,000,000 aggregate), automobile liability ($1,000,000 combined single limit), and professional liability insurance ($1,000,000), with the City named as additional insured on all policies except workers' compensation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Invitation (1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
FOR
Kings Creek Park Improvements
Terrell, Texas
City of Terrell, Texas 201 E. Nash Street
Terrell, Texas 75160
HZ Job #R317377.01 July 10, 2026
5430 LBJ Freeway
Suite 1500 Dallas, Texas 75240-2675
(214) 871-3311 Firm F-761
Kings Creek Park Improvements HZ Project R317377.01
TABLE OF CONTENTS
DIVISION 01-GENERAL REQUIREMENTS
Section Section Title
000107 Seals Page 002113 Instruction to Bidders 011000 Summary 012100 Allowances 012300 Alternates 013100 Project Management and Coordination 013300 Submittal Procedures 014000 Quality Requirements 014200 References 015000 Temporary Facilities and Controls 017300 Execution 017419 Construction Waste Management and Disposal 017700 Closeout Procedures
DIVISION 02-EXISTING CONDITIONS
024119 Selective Demolition
DIVISION 03-CONCRETE
032000 Concrete Reinforcing 033000 Cast in Place Concrete
DIVISION 07-MOISTURE PROTECTION
079200 Joint Sealants
DIVISION 31-EARTHWORK
311000 Site Clearing 312000 Earth Moving 315000 Excavation Support and Protection
DIVISION 32-EXTERIOR IMPROVEMENTS
321313 Concrete Pavement 321373 Concrete Pavement Joint Sealants 323300 Site Furnishings 328400 Planting Irrigation 329113 Soil Preparation 329219 Seeding 329300 Plants
APPENDIX
Geotechnical Investigations Report – Geotex Engineering
Landscape Architect Huitt-Zollars, Inc.
5430 LBJ Freeway, Suite 1500 Dallas, TX 75240-2675 214.871.3311
Irrigation Designer
5430 LBJ Freeway, Suite 1500
Civil Engineer
5430 LBJ Freeway, Suite 1500
Structural Engineer
5430 LBJ Freeway, Suite 1500
SECTION 002113 - ADVERTISEMENT AND INVITATION FOR BIDS
The City of Terrell will receive bids for construction of Kings Creek Park Improvements in Terrell, Texas associated with the Texas Parks and Wildlife Department – Local Park Grant Program until 2 PM on Thursday, September 10, 2026 at City of Terrell City Hall 201 E. Nash St, Terrell, Texas 75160. All submittals must be clearly addressed to Director of Finance, City of Terrell and include the solicitation name RFQ 26-16 Kings Creek Park Improvements. The bids will be publicly opened and read aloud at 2 PM on Thursday, September 10, 2026 at City of Terrell City Hall.
Bids are invited for several items and quantities of work as follows:
1. 8’-0” wide concrete loop trail with culvert crossings and benches on concrete pads.
2. Solar lighting along trail and at basketball court
3. Picnic Grove with concrete paving and picnic tables.
4. Concrete basketball court with tile surfacing.
5. Native shade and ornamental tree planting along the trail, at the picnic grove and screening view to Interstate 20.
6. Automatic, underground irrigation system to serve the trees at the picnic grove
7. Minor fill and grading.
8. Minor roadway paving removal and replacement associated with Water and Sanitary stubouts for a future restroom by others.
Bid/Contract Documents, including Drawings and Technical Specifications are on file at City of Terrell City Hall 201 E. Nash St, Terrell, Texas 75160 or available online at https://www.cityofterrell.org/bids.aspx.
A pre-bid meeting will be held on September 3, 2026 at 2 PM at City of Terrell - City Hall 201 E. Nash St, Terrell, Texas 75160.
A bid bond in the amount of 5 percent of the bid issued by an acceptable surety shall be submitted with each bid [for those contracts that exceed $100,000]. A certified check or bank draft payable to the City of Terrell or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond.
All contractors/subcontractors that are debarred, suspended or otherwise excluded from or ineligible for participation on federal assistance programs may not undertake any activity in part or in full under this project.
The successful bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex, sexual identity, gender identity, or national origin.
The City of Terrell reserves the right to reject any or all bids or to waive any informalities in the bidding.
The City Council may award the bid that presents the best value for the City pursuant to Gov’t Code Section
2269.055 using the criteria set forth herein. In determining best value for the City, the City Council shall consider: (1) the price; (2) the reputation and experience of the contractor; (3) the quality of the contractor’s services; (4) the impact on the ability of the City to comply with rules relating to historically underutilized businesses; (5) the contractor’s safety record; (6) the contractor’s proposed personnel (7) whether the contractor’s financial capability is appropriate to the size and scope of the project; and (8) the contractor’s past relationship with the City.
Bids may be held by City of Terrell for a period not to exceed 30 / 60 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidder’s qualifications prior to the contract award.
Director of Finance, City of Terrell 201 E. Nash Street Terrell, Texas 75160
The City of Terrell is an Affirmative Action/Equal Opportunity Employer. Section 3 Residents, Minority Business Enterprises, Small Business Enterprises, Women Business Enterprises, and labor surplus area firms are encouraged to submit bids.
This project is being supported, in whole or in part, by federal award number 48-01273 awarded to City of Terrell by the National Park Service.
INSTRUCTION TO BIDDERS
FOR CONSTRUCTION
1. Use of Separate Bid Forms
These contract documents include a complete set of bid and contract forms which are for the convenience of the bidders and are not to be detached from the contract document, completed or executed. Separate bid forms are provided for your use.
2. Interpretations or Addenda
No oral interpretations will be made to any bidder. Each request for clarification shall be made in writing to the Grant Recipient or engineer no less than seven (7) days prior to the bid opening. Each interpretation made will be in the form of an Addendum to the contract documents and will be distributed to all parties holding contract documents no less than seven (7) days prior to the bid opening. It is, however, the bidder's responsibility to make inquiry as to any addenda issued. All such addenda shall become part of the contract documents and all bidders shall be bound by such addenda, whether or not received by the bidders.
If an addendum to the bid package is necessary, it must be distributed to each potential bidder.
The distribution of an addendum shall be verified either by statements of receipt or registered/certified mail receipts, which shall be included in the public works construction file. The addendum shall allow adequate time for consideration in bid preparation (usually at least one week). If adequate time is not available, the bid opening date must be extended and the Grant Recipient must republish the invitation for bids containing the place, time, and date for the new bid opening. Note that any change to the original bid opening date will require republication of the invitation for bids at least once in a locally published newspaper. The republished notice will include the place, time and date for the new bid opening and must be published at least seven days prior to the new bid opening date.
3. Inspection of Site
Each bidder should visit the site of the proposed work and should become acquainted with the existing conditions and facilities, the difficulties and restrictions pertaining to the performance of the contract. The bidder should thoroughly examine and become familiar with the drawings, technical specifications and all other contract documents. The contractor by the execution of the contract shall in no way be relieved of any obligation under it due to failure to receive or examine any form or legal document or to visit the site or the conditions existing at the site. The City/ County will be justified in rejecting any claim based on lack of inspection of the site prior to the bid.
4. Alternate bid items
No alternate bids or bid items will be considered unless they are specifically requested by the technical specifications.
5. Bids
a. All bids must be submitted on the forms provided and are subject to all requirements of the Contract Documents, including the Drawings.
b. All bids must be regular in every respect and no interlineation, excisions or special conditions may be made or included by the bidder.
c. Bid documents, including but not limited to the bid, the bid bond(s), the contractor’s certifications, local opportunity plan, and the statement of the bidder’s qualifications, shall be sealed in an envelope and clearly labeled with the words "Bid Documents”, the project number, name of bidder and the date and time of bid opening.
d. The City / County may consider as irregular any bid on which there is an alteration of or departure from the bid form and, at its option, may reject any irregular bid.
e. If a contract is awarded, it will be awarded to a responsible bidder on the basis of the lowest/best bid and the selected alternate bid items, if any. The contract will require the completion of the work in accordance with the contract documents.
6. Bid Modifications Prior to Bid Opening
a. Any bidder may modify its bid by submitting a modification or supplemental bid at any time prior to the scheduled closing time for receipt of bids, provided such modification or supplemental bid is received by the locality prior to the closing time. The modification or supplemental bid should not reveal the original bid price but should provide only the addition, subtractions or other modifications to the original bid so that the final prices or terms will not be known by the locality until the sealed bid is open.
7. Bid Bond
a. A bid bond in the amount of 5% of the bid issued by an acceptable surety shall be submitted with each bid [for contracts greater than $100,000,]. A certified check or bank draft payable to the locality or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond.
b. The bid bond or its comparable will be returned to the bidder as soon as practical after the opening of the bids.
8. Statement of Bidders Qualifications
Each bidder shall submit on the form furnished for that purpose a statement of the bidder's qualifications. The Grant Recipient shall have the right to take such steps as it deems necessary to determine the ability of the bidder to perform its obligations under the contract, and the bidder shall furnish the Grant Recipient all such information and data for this purpose as it may request. The right is reserved to reject any bid where an investigation of the available data does not satisfy the Grant Recipient that the bidder is qualified to carry out properly the terms of the contract.
9. Unit Price
The unit price for each of the several items in the bid shall include its pro rata share of overhead so that the sum of the products obtained by multiplying the quantity shown for each item by the unit price bid represents the total bid. Any bid not conforming to this requirement may be rejected as informal. Special attention is drawn to this condition, as the unit prices will be used to determine the amount of any change orders resulting from an increase or decrease in quantities.
10. Corrections
Erasures or other corrections in the bid must be noted over the signature of the bidder.
11. Time for Receiving Bids
Bids received prior to the advertised hour of opening shall be kept securely sealed. The officer appointed to open the bids shall decide when the specified time has arrived and no bid received thereafter will be considered; except that when a bid arrives by mail after the time fixed for opening, but before the reading of all other bids is completed, and it is shown to the satisfaction of the Grant Recipient that the late arrival of the bid was solely due to delay in the mail for which the bidder was not responsible, such bid will be received and considered.
12. Opening of Bids
The City/County shall, at the time and place fixed for the opening of bids, open each bid and publicly read it aloud, irrespective of any irregularities therein. Bidders and other interested individuals may be present.
13. Withdrawal of Bids
Bidder may withdraw the bid before the time fixed for the opening of bids, by communicating its purpose in writing to the Grant Recipient. Upon receipt of such notice, the unopened bid will be returned to the bidder. The bid guaranty of any bidder withdrawing his bid will be returned promptly.
14. Award of Contract/Rejection of Bids
a. The contract will be awarded to the responsive, responsible Bidder submitting the lowest/best bid. The bidder selected will be notified at the earliest possible date.
The locality reserves the right to reject any or all bids and to waive any informality in bids received where such rejection or waiver is in its interest.
b. The Grant Recipient reserves the right to consider as unqualified to do the work any bidder who does not habitually perform with his own forces the major portions of the work involved in construction of the improvements embraced in this contract.
15. Execution of Agreement/Performance and Payment Bonds
a. Performance Bonds - Requires all prime contractors which enter into a formal contract in excess of $100,000 with the State, a county, or a municipality; a department, board, or agency of the state, a county, or a municipality; and a school district or a subdivision thereof, to obtain a Performance Bond in the amount of the contract before commencing with work
b. Payment Bonds- Requires all prime contractors which enter into a formal contract with the State, a county, or a municipality; a department, board, or agency of the state, a county, or a municipality; and a school district or a subdivision thereof, to furnish to the governmental entity a payment bond in the amount of the contract.
The payment bond must be filed within 30 days from the date of the Notice of Award:
o Municipalities: If the contract is in excess of $50,000, a payment bond is required.
c. The failure of the successful bidder to execute the agreement and supply the required bonds within thirty (30) days from the date of the notice of award-or within such extended period as the locality may grant, shall constitute a default and the locality may, at its option, either award the contract to the next lowest responsible bidder, or re-advertise for bids. In either case, the locality may charge against the bidder the difference between the amount of the bid, and the amount for which a contract is subsequently executed irrespective of whether this difference exceeds the amount of the bid bond. If a more favorable bid is received through re-advertisement, the defaulting bidder shall have no claim against the locality for a refund.
16. Buy America, Build America Act (BABA)- Attention is called to the requirements to provide and install equipment and materials that comply with the requirements of the Buy America, Build America Act (BABA). This generally requires that all permanently installed iron and steel products, manufactured products, and construction materials are manufactured in the United States in compliance with Title IX of the Infrastructure Investment and Jobs Act (“IIJA”), Pub. L. 177-58.
17. Equal Employment Opportunity
Attention is called to the requirements for ensuring that employees and applicants for employment are not discriminated against because of race, color, religion, sex, sexual identity, gender identity, or national origin, and other civil rights requirements.
18. Certification Regarding Lobbying –
Contractors who apply or bid shall provide the required certification that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer of employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining a Federal contract, grant or any other award covered by 31 USC § 1352.
PROPOSED CONTRACTS BREAKDOWN
Type of Contracts No. of Contracts Approx. Total Dollar Amount
Estimated No. to local Business
Estimated $ Amount Local Business
CONTRACTOR CERTIFICATIONS
U.S. Department of the Interior - National Park Service Texas Parks and Wildlife Department - Local Park Grant Program (Federal LWCF Assistance)
CERTIFICATION OF BIDDER REGARDING CIVIL RIGHTS LAWS AND REGULATIONS
INSTRUCTIONS
CERTIFICATION OF BIDDER REGARDING Executive Order 11246 and Federal Laws Requiring Federal Contractor to adopt and abide by equal employment opportunity and affirmative action in their hiring, firing, and promotion practices. This includes practices related to race, color, gender, religion, national origin, disability, and veterans’ rights.
NAME AND ADDRESS OF BIDDER (include ZIP Code)
CERTIFICATION BY BIDDER
Bidder has participated in a previous contract or subcontract subject to Civil Rights Laws and Regulations.
� Yes � No
The undersigned hereby certifies that:
� The Provision of Local Training, Employment, and Business Opportunities clause (Section 3 provision) is included in the Contract. A written Section 3 plan (Local Opportunity Plan) was prepared and submitted as part of the bid proceedings (if bid equals or exceeds $100,000).
� The Equal Opportunity clause is included in the Contract (if bid equals or exceeds $10,000).
Have you ever been or are you being considered for sanction due to violation of Executive Order 11246, as amended?
� Yes � No
NAME AND TITLE OF SIGNER (Please type)
SIGNATURE DATE
CHILD SUPPORT OBLIGATION CERTIFICATION
Under Section 231.006 of the Family Code, the vendor or applicant certifies that the individual or business entity named in this contract, bid or application is not ineligible to receive the specified grant, loan, or payment and acknowledges that this contract may be terminated and payment may be withheld if this certification is inaccurate. A bid or an application for a contract, grant, or loan paid from state funds must include the name and social security number of the individual or sole proprietor and each partner, shareholder, or owner with an ownership interest of at least 25 percent of the business entity submitting the bid or application.
Signature
Printed Name
Title
Date
Certification of No Energy Company Boycott
In accordance with Chapter 2274, Texas Government Code, a Texas governmental entity may not enter into an agreement with a company for the provision of goods or services unless the agreement contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the agreement. Chapter 2274 does not apply to (1) a company that is a sole proprietorship; (2) a company that has fewer than ten (10) full-time employees; (3) an agreement that has a value of less than One Hundred Thousand Dollars ($100,000) or (4) an agreement entered into or in connection with or relating to the issuance, sale, or delivery of notes under Subchapter H, Chapter 404, or the administration of matters related to the notes, including the investment of note proceeds, is exempt as is determined by the Texas Comptroller. Unless the company is not subject to Chapter 2274 for the reasons stated herein, the signatory executing this agreement on behalf of __________________________________ verifies by their signature on this Agreement that the company does not boycott energy companies and will not boycott energy companies during the term of this Agreement.
Signature
Printed Name
Title
Certification of Non-Discrimination Against Firearm Entity or Firearm Trade Association
In accordance with Chapter 2274, Texas Government Code, a Texas governmental entity may not enter into an agreement with a company for the provision of goods or services unless the agreement contains a written verification from the company that it: (1) does not have a written or unwritten internal practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association based solely on its status as a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association based solely on its status as a firearm entity or firearm trade association during the term of this Agreement. Chapter 2274 does not apply to (1) a company that has fewer than ten (10) full-time employees; or (2) an agreement that has a value of less than One Hundred Thousand Dollars ($100,000). Unless the company is not subject to Chapter 2274 for the reasons stated herein, the signatory executing this agreement on behalf of __________________________________________ verifies by their signature on this Agreement that the company does not have a written or unwritten internal practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association based solely on its status as a firearm entity or firearm trade association; and will not discriminate against a firearm entity or firearm trade association based solely on its status as a firearm entity or firearm trade association during the term of this Agreement.
Signature
Printed Name
Title
SB 252
CHAPTER 2252 CERTIFICATION
I, ______________________________________________, the undersigned representative of ________________________________________________(Company or business name) being an adult over the age of eighteen (18) years of age, pursuant to Texas Government Code, Chapter 2252, Section 2252.152 and Section 2252.153, certify that the company named above is not listed on the website of the Comptroller of the State of Texas concerning the listing of companies that are identified under Section 806.051, Section 807.051 or Section 2253.153. I further certify that should the above-named company enter into a contract that is on said listing of companies on the website of the Comptroller of the State of Texas which do business with Iran, Sudan or any Foreign Terrorist Organization, I will immediately notify the Contracting Entity.
Name of Company Representative (Print)
Signature of Company Representative
House Bill 89 Verification Form Prohibition on Contracts with Companies Boycotting Israel
The 85th Texas Legislature approved new legislation, effective September 1, 2017, which amends Texas Local Government Code Section 1. Subtitle F, Title 10, Government Code by adding Chapter 2270 which states that a governmental entity may not enter into a contract with a company for goods or services unless the contract contains a written verification from the company that it:
1) does not boycott Israel; and
2) will not boycott Israel during the term of the contract
Pursuant to Section 2270.001, Texas Government Code:
1. “Boycott Israel” means refusing to deal with, terminating business activities with, or otherwise taking any action that is intended to penalize, inflict economic harm on, or limit commercial relations specifically with Israel, or with a person or entity doing business in Israel or in an Israeli-controlled territory, but does not include an action made for ordinary business purposes;
and
2. “Company” means a for-profit sole proprietorship, organization, association, corporation, partnership, joint venture, limited partnership, limited liability partnership, or any limited liability company, including a wholly owned subsidiary, majority-owned subsidiary, parent company or affiliate of those entities or business associations that exist to make a profit.
I, (authorized official) _________________________ , do hereby verify the truthfulness of the contents of the statements submitted on this certification under the provisions of Subtitle F, Title 10, Government Code Chapter 2270 and that the company named below:
1) does not boycott Israel currently; and
2) will not boycott Israel during the term of the contract; and
3) is not currently listed on the State of Texas Comptroller’s Companies that Boycott Israel
List located at https://comptroller.texas.gov/purchasing/publications/divestment.php
Company Name
Signature of Authorized Official
Title of Authorized Official Date https://comptroller.texas.gov/purchasing/publications/divestment.php
Certification Regarding Lobbying
The undersigned certifies, to the best of his or her knowledge and belief, that:
(a) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
(b) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying,” in accordance with its instructions.
(c) The undersigned shall require that the language paragraph 1 and 2 of this anti-lobbying certification be included in the award documents for all subawards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all subrecipients shall certify and disclose accordingly.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by 31, U.S.C. § 1352 (as amended by the Lobbying Disclosure Act of 1995).
The Contractor, ___________________, certifies or affirms the truthfulness and accuracy of each statement of its certification and disclosure, if any. In addition, the Contractor understands and agrees that the provisions of 31 U.S.C. § 3801 et seq., apply to this certification and disclosure, if any.
Signature of Contractor’s Authorized Official
Printed Name and Title of Contractor’s Authorized Official
NONCOLLUSION AFFIDAVIT OF PRIME BIDDER
State of Texas )
County of )
, being first duly sworn, deposes and says that:
(1) He/She is of , the Bidder that has submitted the attached Bid;
(2) He/She is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid;
(3) Such Bid is genuine and is not a collusive or sham Bid;
(4) Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, has in any way colluded, conspired, connived or agreed, directly or indirectly with another Bidder, firm or person to submit a collusive or sham Bid in connection with the Contract for which the attached Bid has been submitted or to refrain from bidding in connection with such Contract, or has in any manner, directly or indirectly, sought by agreement or collusion or communication or conference with any other Bidder, firm or person to fix the price or prices in the attached Bid or of any other Bidder, or to fix an overhead, profit or cost element of the Bid price or the Bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance or unlawful agreement any advantage against the (Local Public Agency) or any person interested in the proposed Contract; and
(5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the Bidder or any of its agents, representatives, owners, employees, or parties in interest, including this affiant.
(Signed)
Title
Subscribed and sworn to me this day of .
By:
Notary Public
My commission expires
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information it desires.
Date: ________________________________
Bidder (Legal Name of Firm):
Date Organized:
Address :
Date Incorporated
Federal ID Number: ____________________________
Number of Years in contracting business under present name
List all other names under which your business has operated in the last 10 years:
Work Presently Under Contract:
Contract Amount $ Completion Date
Type of work performed by your company:
Total Staff employed by Firm (Break down by Managers and Trades on separate sheet):
Have you ever failed to complete any work awarded to you?� Yes � No (If yes, please attach summary of details on a separate sheet. Include brief explanation of cause and resolution)
Have you ever defaulted on a contract?� Yes � No (If yes, please attach summary of details on a separate sheet.)
Has your organization had any disbarments or suspensions that have been imposed in the past five years or that was still in effect during the five year period or is still in effect? � Yes � No
(If yes, list and explain; such list must include disbarments and suspensions of officers, principals, partners, members, and employees of your organization.)
List the projects most recently completed by your firm (include project of similar importance):
Project Amount $ Mo/Yr Completed
Major equipment available for this contract:
Are you in compliance with all applicable EEO requirements? � Yes � No (If no, please attach summary of details on a separate sheet.))
Bank References
Address: __________________________________ Contact Name: _______________
City & State: _____________________Zip: ____________________Phone Number:
Credit available: $
Has the firm or predecessor firm been involved in a bankruptcy or reorganization? � Yes � No (If yes, please attach summary of details on a separate sheet.)
List on a sheet attached hereto all judgements, claims, arbitration proceedings, or suits pending or outstanding against bidder over the last five (5) years with amount of claim and brief description.
List on a sheet attached hereto all lawsuits or requested arbitration with regard to construction contracts which bidder has initiated within the last five (5) years and brief explanation of claim and outcome.
Attach resume(s) for the principal member(s) of your organization, including the officers as well as the proposed superintendent for the project.
Signed this ______ day of _______________________, 20____.
Signature
Printed Name and Title
Company Name
Notary Statement:
______________________________, being duly sworn, says that he/she is the _________Position/Title____________of________________________ (Firm Name), and hereby swears that the answers to the foregoing questions and all statements therein contained are true and correct. He/she hereby authorizes and requests any person, firm, or corporation to furnish any information requested City/County of _____________________ in verification of the recitals comprising this Statement of Bidder's Qualifications.
Subscribed and sworn before me this _________day of __________, 20____.
Notary Public
Signature
Printed Name
My Commission Expires: _______________, The penalty for making false statements is prescribed in the U. S. Criminal Code, 18 U.S.C. 1001.
BID BOND
KNOW ALL MEN BY THESE PRESENTS, that we the undersigned, as PRINCIPAL, and , as SURETY are held and firmly bound unto (City/County) hereinafter called the "Local Public Agency”, in the penal sum of Dollars, ($ ), lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the Principal has submitted the Accompanying Bid, dated , for
NOW, THEREFORE, the Principal shall not withdraw said Bid within the period specified therein after the opening of the same, or, if no period be specified, within thirty (30) days after the said opening, and shall within the period specified therefor, or if no period be specified, within ten (10) days after the prescribed forms are presented to him for signature, enter into a written contract with the Local Public Agency in accordance with the Bid as accepted, and give bond with good and sufficient surety or sureties, as may be required, for the faithful performance and proper fulfillment of such contract; or in the event of the withdrawal of said Bid within the period specified, or the failure to enter into such Contract and give such bond within the time specified, if the Principal shall pay the Local Public Agency the difference between the amount specified in said Bid and the amount for which the local Public Agency may procure the required work or supplies or both, if the latter be in excess of the former, then the above obligation shall be void and of no effect, otherwise to remain in full force and virtue.
IN WITNESS THEREOF, the above parties have executed this instrument this day of , the name and corporate seal of each corporate party being hereto affixed and these present signed by its undersigned representative, pursuant to authority of its governing body.
(SEAL)
Attest: By:
Affix Corporate
Seal
Affix
Countersigned
By
* Attorney-in-Fact, State of Texas
CERTIFICATE AS TO CORPORATE PRINCIPAL
I, , certify that I am the Secretary of the Corporation named as Principal in the bid bond; that , who signed the said bond on behalf of the Principal was then of said corporation; that I know his/her signature, and his/her signature thereto is genuine; and that said bond was duly signed, sealed, and attested to, on behalf of said corporation by authority of its governing body.
Title:
* Power-of-attorney for person signing for Surety Company must be attached to bond.
PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS that:
(Name of Contractor or Company)
(Address) a , hereinafter called Principal, (Corporation / Partnership) and (Name of Surety Company) hereinafter called Surety, are held and firmly bound unto
(Name of Recipient)
(Recipient's Address) hereinafter called OWNER, in the penal sum of $
Dollars, $ in lawful money of the United States, for this payment of which sum well and truly to be made, we bind ourselves, successors, and assigns, jointly and severally, firmly by these presents.
THE CONFIDENTIALITY OF THIS OBLIGATION is such that whereas, the Principal entered into a certain contract with the OWNER, dated the day of , a copy of which is hereto attached and made a part hereof for the construction of:
(Project Name)
NOW, THEREFORE, if the Principal shall promptly make payment to all persons, firms, SUB- CONTRACTORS, and corporations furnishing materials for or performing labor in the prosecution of the WORK provided for in such contract, and any authorized extension or modification thereof, including all amounts due for materials, lubricants, oil, gasoline, coal and coke, repairs on machinery, equipment and tools, consumed or used in connection with the construction of such WORK, and all insurance premiums on said WORK, and for all labor, performed in such WORK whether by SUB-CONTRACTOR or otherwise, then this obligation shall be void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety, for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to WORK to be performed thereunder or the SPECIFICATIONS accompanying the same shall in any way affect its obligation on this BOND, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the WORK or to the SPECIFICATIONS.
PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
IN WITNESS WHEREOF, this instrument is executed in ______________ counter-parts, each on of (Number) which shall be deemed an original, this the day of .
ATTEST:
(Principal)
By (s) (Principal Secretary)
(Witness as to Principal) (Address)
ATTEST:
(Surety)
(Witness as to Surety (Attorney in Fact)
(Address) (Address)
NOTE: Date of BOND must not be prior to date of Contract. If CONTRACTOR is Partnership, all partners should execute BOND.
PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS that:
(Name of Contractor or Company) a hereinafter called Principal, and
(Name of Surety Company) hereinafter called Surety, are held and firmly bound unto
(Name of Grant Recipient)
(Grant Recipient's Address) hereinafter called OWNER, in the penal sum of $
Dollars ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made we bind ourselves, successors, and assigns, jointly and severally, firmly in these presents.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a certain contract with the OWNER dated the day of , a copy of which is hereto attached and made a part hereof for the construction of:
NOW THEREFORE, if the Principal shall well, truly and faithfully perform its duties in all the undertakings, covenants, terms, conditions, and agreements of said contract during the original term thereof, and any extensions thereof which may be granted by the OWNER, with or without notice to the Surety and during the one year guaranty period, and if he shall satisfy all claims and demands incurred under such contract, and shall fully indemnify and save harmless the OWNER from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER all outlay and expense which the OWNER may incur in making good any default, then this obligation shall be void, otherwise to remain in full force and effect.
PROVIDED FURTHER, that the said Surety, for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to WORK to be performed thereunder or the SPECIFICATIONS accompanying the same shall in any way affect its obligation on this BOND, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the WORK or to the SPECIFICATIONS.
PROVIDED, FURTHER, that no final settlement between the OWNER and the Principal shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
IN WITNESS WHEREOF, this instrument is executed in counterparts, each one of which shall be deemed an original, this the day of .
(Principal)
By (s) (Principal Secretary)
(Witness as to Principal) (Address)
(Surety)
(Witness as to Surety) (Attorney in Fact)
(Address) (Address)
NOTE: Date of BOND must not be prior to date of Contract. If PRINCIPAL/CONTRACTOR is Partnership, all partners should execute BOND.
GENERAL CONDITIONS - PART I
FOR CONSTRUCTION
1. Contract and Contract Documents
(a) The project to be constructed pursuant to this contract will be financed with assistance from the United
Sates Department of the Interior and the Texas Parks and Wildlife Department (LOCAL PARKS GRANT) and is subject to all applicable Federal and State laws and regulations.
(b) The Plans, Specifications and Addenda shall form part of this contract and the provisions thereof shall be binding upon the parties as if they were herein fully set forth.
2. Definitions
Whenever used in any of the Contract Documents, the following meanings shall be given to the terms here in defined:
(a) The term "Contract" means the Contract executed between the (Name of City/County), hereinafter called the “City/County” and (Name of Construction Co.), hereinafter called “Contractor”, of which these GENERAL CONDITIONS, form a part.
(b) The term "Project Area" means the area within the specified Contract limits of the Improvements contemplated to be constructed in whole or in part under this contract.
(c) The term "Engineer" means (name of engineering firm) , Engineer in charge, serving the City/County with architectural or engineering services, his successor, or any other person or persons, employed by the City/County for the purpose of directing or having in charge the work embraced in this Contract.
(d) The term "Contract Documents" means and shall include the following: Executed Contract, Addenda
(if any), Invitation for Bids, Instructions to Bidders, Signed Copy of Bid, General Conditions, Special Conditions, Technical Specifications, and Drawings (as listed in the Schedule of Drawings).
3. Supervision by Contractor
(a) Except where the Contractor is an individual and personally supervises the work, the Contractor shall provide a competent superintendent, satisfactory to the Engineer, on the work at all times during working hours with full authority to act as Contractor’s agent. The Contractor shall also provide adequate staff for the proper coordination and expediting of his work.
(b) The Contractor shall be responsible for all work executed under the Contract. Contractor shall verify all figures and elevations before proceeding with the work and will be held responsible for any error resulting from his failure to do so.
4. Subcontracts
(a) The Contractor shall not execute an agreement with any subcontractor or permit any subcontractor to perform any work included in this contract until Contractor has verified the subcontractor is eligible to participate in federally funded contracts.
(b) No proposed subcontractor shall be disapproved by the City/County except for cause.
(c) The Contractor shall be as fully responsible to the City/County for the acts and omissions of his subcontractors, and of persons either directly or indirectly employed by them.
(d) Nothing contained in the Contract shall create any contractual relation between any subcontractor and the City/County.
5. Fitting and Coordination of Work
The Contractor shall be responsible for the proper fitting of all work and for the coordination of the operations of all trades, subcontractors, or material suppliers engaged upon this Contract.
6. Payments to Contractor
(a) Partial Payments
1) The Contractor shall prepare the requisition for partial payment as of the last day of the month and submit it, with the required number of copies, to the Engineer for approval. The amount of the payment due the Contractor shall be determined by adding to the total value of work completed to date, the value of materials properly stored on the site and deducting (1) ten percent (10%) of the total amount, to be retained until final payment, and (2) the amount of all previous payments. The total value of work completed to date shall be based on the estimated quantities of work completed and on the unit prices contained in the agreement. The value of materials properly stored on the site shall be based upon the estimated quantities of such materials and the invoice prices. Copies of all invoices shall be available for inspection of the Engineer.
2) Monthly or partial payments made by the City/County to the Contractor are advanced for the purpose of assisting the contractor to expedite the work of construction. The Contractor shall be responsible for the care and protection of all materials and work upon which payments have been made until final acceptance of such work and materials by the City/County. Such payments shall not constitute a waiver of the right of the City/County to require the fulfillment of all terms of the Contract and the delivery of all improvements embraced in this Contract complete and satisfactory to the City/County in all details.
(b) Final Payment
1) After final inspection and the acceptance by the City/County of all work under the Contract, the
Contractor shall prepare the requisition for final payment which shall be based upon the careful inspection of each item of work at the applicable unit prices stipulated in the Contract. The total amount of the final payment due the Contractor under this Contract shall be the amount computed as described above less all previous payments.
2) Before paying the final estimate, City/County shall require the Contractor to furnish releases or receipts from all subcontractors having performed any work and all persons having supplied materials, equipment (installed on the Project) and services to the Contractor. The City/County may make payment in part or in full to the Contractor without requiring the furnishing of such releases or receipts and any payments made shall in no way impair the obligations of any surety or sureties furnished under this Contract.
3) Any amount due the City/County under Liquidated Damages shall be deducted from the final payment due the contractor.
(c) Payments Subject to Submission of Certificates
Each payment to the Contractor by the City/County shall be made subject to submission by the Contractor of all written certifications required of it and its subcontractors.
(d) Withholding Payments
The City/County may withhold any payment due the Contractor as deemed necessary to protect the City/County, and if so elects, may also withhold any amounts due from the Contractor to any subcontractors or material dealers, for work performed or material furnished by them. The foregoing provisions shall be construed solely for the benefit of the City/County and will not require the City/County to determine or adjust any claims or disputes between the Contractor and its subcontractors or material dealers, or to withhold any moneys for their protection unless the City/County elects to do
so. The failure or refusal of the City/County to withhold any moneys from the Contractor shall in no way impair the obligations of any surety or sureties under any bond or bonds furnished under this Contract.
7. Changes in the Work
(a) The City/County may make changes in the scope of work required to be performed by the Contractor under the Contract without relieving or releasing the Contractor from any obligations under the Contract or any guarantee given pursuant to the Contract provisions, and without affecting the validity of the guaranty bonds, and without relieving or releasing the surety or sureties of said bonds. All such work shall be executed under the terms of the original Contract unless it is expressly provided otherwise.
Additionally, all such change orders must be approved by LOCAL PARKS GRANT prior to execution of same.
(b) Except for the purpose of affording protection against any emergency endangering health, life, limb or property, the Contractor shall make no change in the materials used or in the specified manner of constructing and/or installing the improvements or supply additional labor, services or materials beyond that actually required for the execution of the Contract, unless in pursuance of a written order from the City/County authorizing the Contractor to proceed with the change. No claim for an adjustment of the Contract Price will be valid unless so ordered.
(c) If applicable unit prices are contained in the Contract, the City/County may order the Contractor to proceed with desired unit prices specified in the Contract; provided that in case of a unit price contract the net value of all changes does not increase the original total amount of the agreement by more than twenty-five percent (25%) or decrease the original the total amount by eighteen percent (18%).
(d) Each change order shall include in its final form:
1) A detailed description of the change in the work.
2) The Contractor's proposal (if any) or a confirmed copy thereof.
3) A definite statement as to the resulting change in the contract price and/or time.
4) The statement that all work involved in the change shall be performed in accordance with contract requirements except as modified by the change order.
5) The procedures as outlined in this Section for a unit price contract also apply in any lump sum contract.
8. Claims for Extra Cost
(a) If the Contractor claims that any instructions by Drawings or otherwise involve extra cost or extension of time, he shall, within ten days after the receipt of such instructions, and in any event before proceeding to execute the work, submit his protest thereto in writing to the City/County, stating clearly and in detail the basis of his objections. No such claim will be considered unless so made.
(b) Claims for additional compensation for extra work, due to alleged errors in ground elevations, contour lines, or bench marks, will not be recognized unless accompanied by certified survey data, made prior to the time the original ground was disturbed, clearly showing that errors exist which resulted, or would result, in handling more material, or performing more work, than would be reasonably estimated from the Drawings and maps issued.
(c) Any discrepancies which may be discovered between actual conditions and those represented by the
Drawings and maps shall be reported at once to the City/County and work shall not proceed except at the Contractor's risk, until written instructions have been received from the City/County.
(d) If, on the basis of the available evidence, the City/County determines that an adjustment of the Contract
Price and/or time is justifiable, a change order shall be executed.
9. Termination, Delays, and Liquidated Damages
(a) Right of the City/County to Terminate Contract for Convenience
City/County may at any time and for any reason terminate Contractor’s services and work at City/County's convenience upon providing written notice to the Contractor specifying the extent of termination and the effective date. Upon receipt of such notice, Contractor shall, unless the notice directs otherwise, immediately discontinue the work and placing of orders for materials, facilities and supplies in connection with the performance of this…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .