13-AF_Form_66.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Renovate Rooms in Bldg 2007 Federal contract opportunity
- Solicitation number
- KELL15-0026_Bldg2007
About this file
Attachment 2 - Schedule of Materials
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers.docx | DOCX document | |
| 3-SOW-KELL150026-updated20150908.docx | DOCX document | |
| JEWC_Visitor_Parking_20141203_(2).pptx | PPTX presentation | |
| 3-SOW-KELL150026-updated20150716.docx | DOCX document | |
| RFP.pdf | ||
| DOC.PDF | ||
| Wage_Determination.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF FORM 66
| PROJECT NUMBER: | PROJECT TITLE: | SOLICITATION/CONTRACT NUMBER: | ||||||
| SCHEDULE OF MATERIAL SUBMITTALS | RENV Room 119 C, D, E | |||||||
| KELL150026 | Buliding 2007 | |||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||
| NUMBER OF COPIES REQUIRED | REQUIRED SUBMISSION | |||||||
| DATE | DATE RECEIVED IN | |||||||
| CONTRACTING | DATE TO CIVIL | |||||||
| ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | CONTRACTOR | |||||
| RESUBMITTAL | FINAL APPROVAL | |||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, |
CONTRACT REFERENCE, TYPE OF
| SUBMITTAL | CERTIFICATION OF | ||||
| COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S | |
| RECOMMENDATIONS | MANUFACTURER'S | ||||
| WARRANTY | CATALOG DATA | OPERATING | |||
| INSTRUCTIONS | DOCUMENT | DATE |
CONTRACTOR
| NOTIFIED | REMARKS | ||
| APPROVED | DIS- |
APPROVED
| 1 | Design Submittals - Hard Copies 65% | 3 | 3 | |||||||
| 2 | Design Submittals -CD/DVD 65%, CAD & PDF | 2 | 2 | |||||||
| 3 | Design Submittals - Hard Copies 95% | 2 | 3 | 2 | 3 | 3 | ||||
| 4 | Design Submittals -CD/DVD 95%, CAD & PDF | 2 | 2 | |||||||
| 5 | Design Submittals - Hard Copies 100% | 2 | 3 | 2 | 3 | 3 | ||||
| 6 | Design Submittals -CD/DVD 100%, CAD & PDF | 2 | 2 | |||||||
| 7 | Design Timeline/Schedule | 3 | ||||||||
| 8 | Construction Timeline/Schedule | 3 | ||||||||
| 9 | Hazardous Materials Report | 3 | 3 | 3 | ||||||
| 10 | Work Plan | 3 | 3 | |||||||
| 11 | Safety Plan | 3 | 3 | |||||||
| 12 | Quality Control Plan | 3 | 3 | |||||||
| 13 | SWPPP | 3 | 3 | |||||||
| 14 | Demolition Plan | 3 | 3 | |||||||
| 15 | License/Permits | 3 | 3 | |||||||
| 16 | Waste Manifests | 3 | 3 | |||||||
| 17 | Asbestos/Lead Based Paint Abatement Plan, if required | 3 | 3 | 3 | ||||||
| 18 | Division 2 Existing Conditions | 3 | 3 | 3 | 3 | 3 | 3 | 3 | ||
| 19 | Division 3 Concrete | 3 | 3 | 3 | 3 | 3 | 3 | 3 | ||
| 20 | Division 4 Masonry | 3 | 3 | 3 | 3 | 3 | 3 | 3 | ||
| 21 | Division 5 Metals | 3 | 3 | 3 | 3 | 3 | 3 | 3 | ||
| 22 | Division 6 Wood, Plastics, Composites | 3 | 3 | 3 | 3 | 3 | 3 | 3 | ||
| 23 | Division 7 Thermal and Moisture Protection | 3 | 3 | 3 | 3 | 3 | 3 | 3 | ||
| 24 | Division 8 Openings | 3 | 3 | 3 | 3 | 3 | 3 | 3 | ||
| 25 | Division 9 Finishes | 3 | 3 | 3 | 3 | 3 | 3 | 3 | ||
| 26 | Division 10 Specialties | 3 | 3 | 3 | 3 | 3 | 3 | 3 | ||
| 27 | Division 11 Equipment | |||||||||
| 28 | Division 12 Furnishings | |||||||||
| 29 | Division 13 Special Construction | |||||||||
| 30 | Division 14 Conveying Equipment | 3 | 3 | 3 | 3 | 3 | 3 | 3 | ||
| 31 | Division 21 Fire Supression | 3 | 3 | 3 | 3 | 3 | 3 | 3 | ||
| 32 | Division 22 Plumbing | |||||||||
| 33 | Division 23 HVAC | 3 | 3 | 3 | 3 | 3 | 3 | 3 | ||
| 34 | Division 25 Integrated Automation | |||||||||
| 35 | Division 26 Electrical | 3 | 3 | 3 | 3 | 3 | 3 | 3 | ||
| 36 | Division 27 Communications | 3 | 3 | 3 | 3 | 3 | 3 | 3 | ||
| 37 | Division 28 Electronic Safety and Security | 3 | 3 | 3 | 3 | 3 | 3 | 3 | ||
| 38 | Division 32 Exterior Improvements | |||||||||
| 39 | Division 33 Utilities | 3 | 3 | 3 | 3 | 3 | 3 | 3 | ||
| 40 | Division 34 Transportation | |||||||||
| 41 | Division 40 Process Integration | |||||||||
| 42 | Division 41 Material Processing and Handling Eqpt | |||||||||
| 43 | Division 42 Process Heating, Cooling, and Drying Egpt | |||||||||
| 44 | Division 43 Process Gas & Liquid Handling, Purification & Storage Eqpt | |||||||||
| 45 | Division 44 Pollution Control Equipment | |||||||||
| 46 | Division 48 Electric Power Generation | |||||||||
| 47 | Testing Reports | 3 | 3 | |||||||
| 48 | DD 1354 | 3 | 3 | |||||||
| 49 | Warranty Letters | 3 | 3 | |||||||
| 50 | Operation and Maintenance Data | 3 | 3 | 3 | 3 | 3 | ||||
| 51 | As-Built Drawings, Hard copy & electronic | 3 | 3 | 3 | ||||||
| 52 | ||||||||||
| 53 | ||||||||||
| 54 | ||||||||||
| 55 | ||||||||||
| 56 | ||||||||||
| 57 | ||||||||||
| 58 | ||||||||||
| 59 | ||||||||||
| 60 | ||||||||||
| 61 | ||||||||||
| 62 | ||||||||||
| 63 | ||||||||||
| 64 | ||||||||||
| 65 | ||||||||||
| 66 | ||||||||||
| 67 | ||||||||||
| 68 | ||||||||||
| 69 | ||||||||||
| 70 | ||||||||||
| 71 | ||||||||||
| 72 | ||||||||||
| 73 | ||||||||||
| 74 | ||||||||||
| 75 | ||||||||||
| 76 | ||||||||||
| 77 |
&"Arial,Bold"&8Not All Inclusive &"Arial,Regular" 01305-&P
File details come from the government source that posted it. Updated .