This is a Request for Proposals (RFP) issued by King County, Washington for a Job Order Contract (JOC) 2027 – Parks (RFP No. KC001707). The contract encompasses selective demolition, repair, remodeling, restoration, critical areas restoration, and new construction of public buildings, facilities, industrial infrastructure, utilities, parking lots, walkways, landscape features, parks, recreation and aquatic facilities, and civil site improvements. Proposals are due by September 8, 2026 at 1:30 p.m. and must be uploaded to the E-Procurement Supplier Portal. No pre-proposal conference will be held; however, interviews with highest-ranked contractors are anticipated on October 5, 2026. The County will issue a Notice of Intent to Award by October 15, 2026, with estimated contract execution on November 23, 2026. The contract term is one year with options to extend for two additional one-year periods, for a maximum of three years. King County reserves the right to award a maximum of one contract under this solicitation.

Pricing will be established through coefficients applied to RS Means Unit Price Book line items, with separate coefficients for standard working hours (7:00 a.m. to 5:00 p.m., Monday through Friday), non-standard working hours, and non-pre-priced items. The County guarantees a minimum work order volume of $100,000, with individual work orders not exceeding $500,000 and a maximum annual contract value of $6 million, not to exceed $18 million over three years. A 15% minimum Small Contractor and Supplier (SCS) Utilization Requirement applies. At least 90% of work must be subcontracted to entities other than the contractor. Contractors must provide a performance and payment bond equal to $6 million for the first year and $6 million for each extension year. Prevailing wage rates as established by Washington State Department of Labor and Industries apply to all work subject to Chapter 39.12 RCW. The selected contractor must comply with King County Ordinance 19925 regarding responsible contractor criteria, green building and sustainable development requirements, and apprenticeship utilization requirements under Chapter 39.10.450 RCW for work orders exceeding $350,000 with over 600 single trade hours.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposals

King County Job Order Contract (JOC) 2027 - Parks

RFP No. KC001707

August 2026

Table of Contents

TABLE OF CONTENTS

I. PROPOSAL INVITATION

II. PROPOSAL REQUIREMENTS

III. GENERAL INFORMATION

IV. JOC CONTRACT OVERVIEW

V. PROPOSAL SUBMITTAL INSTRUCTIONS

VI. SELECTION PROCESS

VII. AWARD PROCESS

VIII. CONTRACT TERMS AND CONDITIONS

IX. PROTESTS AND APPEALS

ATTACHMENT 1 – EVALUATION CRITERIA

ATTACHMENT 2 – WAGE RATES

ATTACHMENT 3 – FORMS

KC001707 Page 1 of 13 JOC RFP Rev Date 7/6/2026

REQUEST FOR PROPOSALS

KING COUNTY JOB ORDER CONTRACT (JOC) 2027 - PARKS

RFP NO. KC001707

I. PROPOSAL INVITATION

A. King County requests proposals from firms interested in providing job order contract services.

Proposal Due Date:

Time:

September 8, 2026 1:30 p.m. (no later than)

Proposal Submittal: Upload Proposal to E-Procurement Supplier Portal Pre-Proposal Conference: A Pre-Proposal Conference will not be held for this RFP.

Interviews, if applicable: October 5, 2026

Primary Contract Specialist: Leeann Snyder, lsnyder@kingcounty.gov, 206-263-3517

Backup Contract Specialist: Lea McCormick, lmccormick@kingcounty.gov, 206-263-9396 First Ad Date: August 20, 2026

Max # of Contracts May Be Awarded: 1

Period of Performance: One year with option to extend up to two additional one-year periods. Maximum three years.

SCS Utilization Requirement 15% minimum requirement https://fa-epvh-saasfaprod1.fa.ocs.oraclecloud.com/supplierPortal/faces/FndOverview?fndGlobalItemNodeId=itemNode_supplier_portal_supplier_portal

KC001707 Page 2 of 13 JOC RFP

This information is available in alternate formats for individuals with disabilities upon advance request by calling 206-263-9400, TTY relay: 711.

B. In order to participate in a solicitation, all interested firms must register in the E- Procurement Supplier Portal. Registered firms can view solicitation documents at:

https://kingcounty.gov/procurement/supplierportal.

C. King County’s current advertised contracting opportunities can be viewed on the Solicitation Abstracts page at: https://kingcounty.gov/procurement/solicitations.

II. PROPOSAL REQUIREMENTS

A. Proposal Submittal. Contractors shall submit the Proposal to King County per the process, time, and date set forth above. Late Proposals will not be accepted or considered.

1. King County reserves the right to reject any and all Proposals at any time. The

County may cancel this procurement at any time, even after the issuance of the Notice of Intent to Award.

2. King County reserves the right to reject any Contractor found to be debarred by a local, state, or federal agency.

3. All costs incurred in the preparation of a Proposal and participation in this RFP and negotiation process shall be borne by the proposing firms.

B. Clarifications and Addenda. The Contract Specialist is the County’s single point of contact regarding this solicitation. Submit all inquiries in writing via email to the Contract Specialist and the Backup Contract Specialist at least six business days before the Proposal Due Date. No verbal answers by any County personnel or its agents will be binding on the County. Clarifications by the County will be in the form of a written Clarification. Clarifications will be transmitted via E-Procurement Messages to registered suppliers. Changes to the RFP will be in the form of written Addenda. Addenda will be posted to the E-Procurement Supplier Portal at:

https://kingcounty.gov/procurement/supplierportal and the Solicitation Abstracts page at:

https://kingcounty.gov/procurement/solicitations.

C. Notifications. Contractors must notify the Contract Specialist of any changes to their Proposal throughout the period it is under consideration, until the contract is executed.

D. Pre-proposal Conference. A pre-proposal conference will not be held for this RFP.

E. Ex Parte Communications. Contractors are expected to conduct themselves with professional integrity and to refrain from lobbying activities. During the procurement process, commencing with the issuance of the RFP and continuing until the award of a Contract for the project (or cancellation of the procurement) no employee, member, agent, vendor, advisor, or consultant of any Contractor shall have ex parte communications, directly or indirectly, regarding this procurement with any representative or elected official of the County involved in this procurement, except for communications permitted by this RFP. Any verified allegation that a Contractor or team member has engaged in such prohibited communications or attempted to unduly influence the selection process may cause the County to disqualify a Contractor or a member of a Contractor’s team from participating in this process, all at the sole discretion of the County.

https://kingcounty.gov/procurement/supplierportal https://kingcounty.gov/procurement/solicitations https://kingcounty.gov/procurement/supplierportal https://kingcounty.gov/procurement/solicitations

KC001707 Page 3 of 13 JOC RFP

F. Commitment of Firms and Key Personnel. The County expects all firms and Key Personnel proposed will be available to provide services for this Contract. When a member of the Contractor’s team is no longer participating in the Proposal, a Contractor must notify the Contract Specialist in writing and provide a detailed explanation and proposed remedy for the lack of availability. The County shall thereafter make a determination as to whether that Contractor may continue to compete in the selection process. Any substitution request considered by the County may require a rescoring and/or re-ranking of the Proposal. The County will only consider substitutions based on circumstances beyond the Contractor’s control.

G. Public Disclosure of Proposals. This procurement is subject to the Public Records Act, Chapter 42.56 RCW.

1. Any and all submittals required by this solicitation shall be considered public documents and will be available for inspection and copying by the public in accordance with the Public Records Act Chapter 42.56 RCW (the Act). If the Contractor considers any portion of their submittal to the County, whether in electronic or hard copy form, to be protected under law, the Contractor shall clearly identify each such portion with words such as “CONFIDENTIAL,” “PROPRIETARY,” or “TRADE SECRET” (collectively, “DESIGNATED MATERIAL”). If any materials are marked “CONFIDENTIAL,” “PROPRIETARY,” or “TRADE SECRET”, Contractors have ten (10) calendar days from the receipt of Notice of Intent to Award/Non-Award to obtain a court order enjoining release in accordance with Chapter 42.56.540 RCW to protect its interests. If a Contractor does not take such action within said period, the County will post the materials to https://kingcounty.gov/en/dept/executive-services/about-king-county/business-operations/finance-business-operations/procurement-payables/solicitation-resources after contract execution. The County shall not be liable to the Contractor for releasing records, including DESIGNATED MATERIAL. The Contractor is advised that pricing extended to the County and overly broad designations of confidentiality, for example, covering information publicly available on the Contractor’s website, are not considered to be a DESIGNATED MATERIAL. By submitting any submittal required by this solicitation, the Contractor assents to this procedure and shall have no claim against the County.

III. GENERAL INFORMATION

A. In accordance with Chapter 39.10 RCW, King County is issuing the Request for

Proposal (RFP) to select a Job Order Contract (JOC) Contractor. Specific project requirements will be identified in individual work orders issued by the County.

B. The work under this JOC includes but is not limited to selective demolition, repair, remodeling, restoration, critical areas restoration (river) and new construction of public buildings/facilities, industrial facilities and their associated infrastructure, utilities, parking lots, walkways, landscape features, parks, recreation and aquatic facilities, and other civil site improvements.

C. The Contractor tasks also include but are not limited to the following: coordination with the County regarding job and design requirements, preparation, or coordination with the County regarding design and specification information; project management, estimating, scheduling, and schedule coordination with the County and other involved or affected parties; material acquisition; staffing or subcontracting, supervising and managing construction tasks including safety management; job status reporting to the County;

https://apps.leg.wa.gov/rcw/default.aspx?cite=42.56 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fapps.leg.wa.gov%2Frcw%2Fdefault.aspx%3Fcite%3D42.56&data=05%7C02%7Crsparano%40kingcounty.gov%7Ca1b60d3e635c4261001608dc2e4bebe3%7Cbae5059a76f049d7999672dfe95d69c7%7C0%7C0%7C638436150809025510%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=BwetGgW8tct9yssPyiF0hAnS029VqdaIYuTG2zRDqyM%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fapp.leg.wa.gov%2Frcw%2Fdefault.aspx%3Fcite%3D42.56.540&data=05%7C02%7Crsparano%40kingcounty.gov%7Ca1b60d3e635c4261001608dc2e4bebe3%7Cbae5059a76f049d7999672dfe95d69c7%7C0%7C0%7C638436150809039113%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=VEHXnavXLhGmvThfU7b3Xs6sic0E03TYQC14xgYwdjk%3D&reserved=0 https://kingcounty.gov/en/dept/executive-services/about-king-county/business-operations/finance-business-operations/procurement-payables/solicitation-resources https://kingcounty.gov/en/dept/executive-services/about-king-county/business-operations/finance-business-operations/procurement-payables/solicitation-resources https://kingcounty.gov/en/dept/executive-services/about-king-county/business-operations/finance-business-operations/procurement-payables/solicitation-resources https://apps.leg.wa.gov/rcw/default.aspx?cite=39.10

KC001707 Page 4 of 13 JOC RFP record keeping, quality control and coordination of inspections, and other administrative and performance requirements identified in the RFP and Contract.

D. The JOC alternative public works procedure combines the commitment, expertise, and skills of the County and the Contractor to achieve completion of the project in the best interest of the public. The JOC can provide an effective means of reducing total lead-time and cost for public works projects.

E. The Unit Price Book (UPB) to be used for establishing job order pricing is the current edition of RS Means, all volumes. The volumes should be used in the following order of precedence: (1) Facilities Construction Costs Book, (2) Mechanical Costs Book, (3) Electrical Cost Book, and (4) if the item is not located within these volumes the parties are to use Building Construction Costs Book.

F. King County guarantees a minimum volume of work orders for the JOC awarded under this solicitation will be $100,000.

G. Each individual work order issued for a particular project shall not exceed $500,000, excluding Washington state sales and use tax.

H. All work orders issued for the same project shall be treated as a single work order for purposes of the $500,000 limit on work orders.

I. The maximum total dollar amount that the County may award under this JOC shall not exceed $6 million per year, up to a maximum of $18 million over three years. Any unused capacity from the previous year may be carried over for one year and added to the following year's limit. The maximum annual volume including unused capacity shall not exceed the limit of two years.

J. The coefficients identified in the Contractor’s proposal shall be fixed for the duration of the contract, including any extensions to the term of the contract by the County. No annual adjustments to the coefficients will be made for the full duration of the contract.

K. Prior to the execution of the JOC, the selected Contractor will be required to provide a performance and payment bond in the amount of $6 million to faithfully perform all work for the first year of the contract. If the County elects to extend the contract for an additional year, the Contractor will be required to provide a new bond in the amount of $6 million per year to faithfully perform all work associated with the second and third years of the JOC. The renewal bonds shall be executed by the Contractor prior to any yearly extension of the JOC. All costs associated with securing performance and payment bonds for the duration of the contract, including any extensions, shall be incorporated into the coefficients as identified in Contractor’s proposal.

L. Each work order issued shall be treated as a separate contract for the purposes of Chapters 39.08, 39.12, 39.76, and 60.28 RCW.

M. Any work order over $350,000 and including over 600 single trade hours shall utilize a state registered apprenticeship program for that single trade in accordance with Chapter

39.10.450 RCW.

N. Any new stand-alone permanent structure constructed under a work order shall not exceed 3,000 gross square feet.

O. The County assumes no responsibility for any conclusions or interpretations made by the Contractor based on information made available by the County.

https://app.leg.wa.gov/rcw/default.aspx?cite=39.08 https://app.leg.wa.gov/rcw/default.aspx?cite=39.12 https://app.leg.wa.gov/rcw/default.aspx?cite=39.76 https://app.leg.wa.gov/rcw/default.aspx?cite=60.28 https://app.leg.wa.gov/rcw/default.aspx?cite=39.10.450

KC001707 Page 5 of 13 JOC RFP

P. Anticipated Procurement Schedule

Activity Date

Highest Ranked Firms Submit Coefficient Pricing (at interview) October 8, 2026

Selection of Top Ranked Firm/Notice of Intent to Award October 15, 2026

Estimated Contract Execution November 23, 2026

IV. JOC CONTRACT OVERVIEW

A. Work under this Contract will be based on individually negotiated work orders. The

Contractor should be capable of adjusting disciplines and expertise as necessary to meet the needs of specific work orders. Each work order will provide a specific scope, budget, and schedule for the services required. The County does not guarantee that all disciplines or services will be used, or that the Contractor will receive a specific volume of work, a specific total contract amount, or a specific work order price.

1. The County will review all individual work orders issued under this Contract with an estimated value equal to or greater than $150,000 to establish a specific level of participation by Certified Small Contractor and Supplier (SCS) Firms, as applicable.

2. The Contractor will be expected to respond to urgent, short notice requests for services. The Contractor shall be capable of working on several work orders simultaneously.

3. The County will not compensate the Contractor for work associated with negotiation of the scope, schedule, and budget of individual work orders.

B. Sustainable Design. In 2022, the County passed the Green Building and Sustainable Development Ordinance #19402 (King County Code 18.17). The Green Building Ordinance commits us to achieve high performance sustainability and carbon neutral development, by integrating the latest green building and sustainable development practices into King County capital projects:

1. All eligible new construction projects are required to achieve LEED Platinum certification.

2. All eligible major renovation and remodel projects are required to achieve LEED Gold certification.

3. All capital projects that are not eligible or are limited in their ability to achieve LEED certification (e.g., infrastructure projects) must incorporate cost-effective green building and sustainable development practices using the King County Sustainability Infrastructure Scorecard or other approved alternative green building rating system and achieve a Platinum rating level. King County’s Sustainable Infrastructure Scorecard

4. All capital projects shall divert at least 80% construction and demolition materials and achieve zero waste of resources by 2030 at project completion.

5. All capital projects will utilize King County’s Equity and Social Justice credits for capital projects regardless of green building rating system used.

https://aqua.kingcounty.gov/council/clerk/code/21_Title_18.htm#_Toc32491847 https://kingcounty.gov/en/dept/dnrp/buildings-property/green-sustainable-building/green-building/green-building-ordinance-resources#toc-Sustainable-Infrastructure-Scorecard https://kingcounty.gov/en/dept/dnrp/buildings-property/green-sustainable-building/green-building/green-building-ordinance-resources#toc-Sustainable-Infrastructure-Scorecard https://kingcounty.gov/en/dept/dnrp/buildings-property/green-sustainable-building/green-building/green-building-ordinance-resources#toc-ESJ-credits

KC001707 Page 6 of 13 JOC RFP

C. At least 90% of the Work contained in the JOC must be subcontracted to entities other than the Contractor.

D. The Contractor must distribute subcontracts as equitably as possible among qualified and available subcontractors, including Certified Small Contractors and Suppliers and Certified Business to the extent permitted by law as demonstrative on the Contractor’s submittal(s) for a Work Order, and shall limit subcontractor bonding requirements to the greatest extent possible. The Contractor shall use all reasonable efforts to solicit and award Work Orders to qualified subcontractors through an open, equitable and competitive process. King County reserves the right to identify, within the specifications of a Work Order, minimum subcontractor qualification requirements to perform the Work.

The County will review the Contractor’s submittal(s) for a Work Order and may require the Contractor to select an alternative subcontractor to perform the work, if the original subcontractor is not qualified or acceptable to the County. County verification of subcontractor qualifications will occur prior to the execution of a Work Order. Prior to commencing any work on an individual Work Order, the Contractor shall provide a cost proposal to perform the work. The cost proposal shall be provided to King County with 14 business days of the individual Work Order request for proposal or a request to negotiate. After reviewing the cost proposal, the County may reject the cost proposal if the prices to perform the work are not reasonable. The County may either negotiate an adjusted scope and/or seek revision to the quantities or line items to obtain a reasonable cost proposal or not use the JOC and pursue the work through alternate means.

E. The Contractor and its subcontractors shall pay prevailing wages for all work that would otherwise be subject to the requirements of Chapter 39.12 RCW. Prevailing wages for all work performed pursuant to each Work Order must be at rates not less than those shown in the prevailing wage schedule established by the State Department of Labor and Industries and attached to each Work Order.

F. The Contractor shall publish notification of intent to perform public works projects at the beginning of each contract year in a legal newspaper for general circulation in King County. The Contractor shall provide the County proof of such published notification upon request.

G. All specifications, drawings and/or product and procedures developed by the Contractor must be in compliance with the Contract Documents, and all current national, state and local codes, industry standards and applicable County requirements and regulations governing the work under the contract based on this RFP. Specifications governing the work will include the various King County departmental design guidelines and conform to standard CSI format or WSDOT specification.

H. Responsible Contractor. As a condition of award for contracts valued at $100,000 or more, the Contractor agrees that it shall comply with the criteria in King County Ordinance 19925. King County Procurement & Payables may waive specific criteria, such as community workforce agreements or employee health insurance, if deemed inapplicable based on procurement type or business size. Failure to comply with the criteria specified in the ordinance and to which the Contractor is attesting on the form will constitute a material breach, and the County may terminate the contract, in whole or in part, for default.

V. PROPOSAL SUBMITTAL INSTRUCTIONS

A. Proposal Submittal.

https://cdn.kingcounty.gov/-/media/king-county/depts/executive-services/finance-business-operations/procurement-payables/documents/contractor-responsibility-quick-guide.pdf https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fkingcounty.legistar.com%2FView.ashx%3FM%3DF%26ID%3D14218499%26GUID%3DC6C95015-3659-4197-90CE-D845BB2F4F21&data=05%7C02%7Crsparano%40kingcounty.gov%7C267dcc136a5e4a91957108de0210211f%7Cbae5059a76f049d7999672dfe95d69c7%7C0%7C0%7C638950465468511176%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=PqBKYwaT8o31ha%2BrAmcqSWzlQ30wzJJrKSaSBgMWOuI%3D&reserved=0

KC001707 Page 7 of 13 JOC RFP

1. The Contractor shall upload their Proposal to the E-Procurement Supplier Portal. The file shall be in PDF format.

2. The Contractor shall upload their Price Proposal to the E-Procurement Supplier Portal separate from the Proposal response. The file shall be in PDF format.

3. Contractors are responsible for ensuring receipt of the Proposals by the deadline in the Proposal Invitation. Proposals received after the deadline will not be considered.

4. Failure to complete and submit all RFP requirements, including the forms, may result in a Proposal being declared non-responsive. No other entries, modifications, or qualifications to the Proposal shall be made.

5. Proposals submitted in accordance with this RFP are subject to RCW 39.10.470.

6. The County reserves the right to reject any and all Proposals at any time for any reason, even after issuance of Notice of Intent to Award.

7. All costs incurred in the preparation of a Proposal and participation in this RFP and negotiation process shall be borne by the proposing firms.

B. Proposal Format.

1. The Proposal shall comply with the following format requirements:

a. Proposals should be concise, legible, and provide all the information requested.

b. Page size of the Proposal shall be 8½” x 11”. A page is defined as one single-side of a document that has written text or graphics.

1) No written text or graphics shall be incorporated on dividers used to organize the Proposal.

2) Indexes or tables of content shall be included in the page limit.

2. Proposal shall be limited to a maximum of 15 pages. All pages that exceed the specified page limit will be removed prior to evaluation.

a. The following pages are excluded from the page limit specified above:

• Cover of the Proposal

• Transmittal Letter

• Resumes

• Attachment 3, Forms

3. The Contractor shall use the “Proposal Cover Sheet” provided with the solicitation in E-Procurement.

4. Each resume shall not exceed two pages. All pages of a resume that exceed the specified page limit will be removed prior to evaluation.

5. Digital files shall be formatted in searchable .pdf format.

6. The County may waive minor informalities and irregularities in the format of a

Proposal.

C. Proposal Contents

1. Proposal Transmittal Letter. The Proposal Transmittal Letter is not evaluated and not included in the page limit. It should contain the following information:

a. RFP title and number;

https://app.leg.wa.gov/rcw/default.aspx?cite=39.10.470

KC001707 Page 8 of 13 JOC RFP

b. Contractor’s name, mailing address, contact person, email address, and telephone numbers;

c. Contractor’s Washington State Department of Labor & Industries Unified Business Identifier (UBI) number; and

d. Contractor’s Unique Entity Identifier (UEI) number issued by SAM.gov.

2. Response to Evaluation Criteria. Address the evaluation criteria and provide all information identified in Attachment 1, Evaluation Criteria.

3. Attachment 3 Forms. Complete and return the forms identified in Attachment 3 required to be submitted with the Proposal.

a. Form A – Statement of Qualifications Certification

b. Form B – Commitment to Meet SCS Utilization Requirement

c. Form C – Commitment Letter from Surety

1) Each firm providing a proposal shall submit a Commitment Letter from Surety stating it will provide an executed Performance and Payment Bond worth 100% of the maximum contract value of $6 million for the first year of the contract. List the bonding company name and contact information.

d. Form D – Responsibility Detail Form

e. Form E – Responsibility Attestation

4. Forms and Documents to be Submitted after Shortlisting

a. Form F – Price Coefficient Bid Form

1) The Price Coefficient shall be submitted according to the schedule and instructions described herein and shall be completed on Form F – Price Coefficient Bid Form.

D. Unit Price Book

1. The RS Means “Assemblies Costs” volume can be used in lieu of using groups of individual listings in other volumes only if agreed to in advance by the County.

2. The Unit Price Book (UPB) governing this solicitation and the contract shall be the then current edition of the RS Means Facilities Construction Cost Data book at the time of issuance of each Work Order. The unit price for each item to be used from the UPB is the “Bare Cost Total” column.

3. Use of Unit Price Book: The unit price for each item to be used from the UPB is the “Bare Costs Total” column. UPB Division 1, Items in 01-11, 01-21-16, and 01-31 shall not be included on a Priced Item List in a Work Order Proposal. These items shall be included in the Contractor’s coefficient.

4. For each Work Order, the value of the applicable line items and their quantities will be multiplied by the City Cost Index and the designated coefficient as bid and totaled to determine the lump sum costs of Work Orders. This formula (price = bare cost unit price as identified in the applicable UPB x quantity x city cost index x designated coefficient as bid) shall determine the total amount to be paid to the Contractor for self-performed items or Subcontractor-performed items.

https://sam.gov/content/home

KC001707 Page 9 of 13 JOC RFP

5. When subsequent issues of UPB volumes are issued and available, those volumes shall be used by the Parties in pricing unit price items. The contracted Coefficients will not be changed due to newly issued or adjusted UPB volumes.

6. Non-priced items (specific line items not found in the UPB) shall be negotiated using labor rates and materials local to the Project. County may request up to 3 bids from sources acceptable to County; coefficients will be negotiated to reflect reasonable markups and incidental expenses attendant to the type, number, and value of each item. If no agreement can be reached, the bid coefficients will apply. Like items in RS Means may be substituted for a non-priced item if agreed to in advance by County and Contractor. No more than 20% of the dollar value of a Work Order may consist of items of work not contained in the UPB.

E. Preparation of Price Coefficient

1. The initial JOC term is one year, with the County’s option of extending the contract for two (2) additional one-year periods. The coefficients identified in the Contractor’s proposal to the RFP shall be fixed for the duration of the contract, including any extensions to the term of the contract by the County. No annual adjustments to the coefficients will be made for the full duration of the contract.

2. Upon notification by the County, the highest ranked Contractors shall submit sealed bids (See Attachment 3 - Form F) in the form of coefficients to be applied to pre-priced items and tasks contained in the then current edition of RS Mean – Facilities Construction Cost Data Book at the time of bid and based on the documents contained within the RFP. The coefficients shall compensate the Contractor for all non-craft labor, field office expense, supervision, field engineering, as built drawings, home office costs, bonds, insurance, taxes, and all expenses, overhead and profit as defined in the contract’s General Conditions, and which are necessary to complete the work in accordance with the contract.

3. Each identified firm shall submit three (3) coefficients: the Standard Coefficient for Work that is conducted during normal working hours (7:00AM to 5:00PM, Monday through Friday) and the Non-Standard Coefficient is for Work that occurs during other than normal working hours (5:00PM to 7:00AM, Monday through Friday, and weekends and holidays), and the Non-Pre-Priced Item (NPPI) coefficient for items not listed in the R.S. Means Price books. For the purposes of evaluation, the County anticipates that 70% of the Work will occur during normal working hours and 20% will occur during non-standard hours and 10% of the work will be NPPI. This distribution is presented for informational use only and is not a commitment of work.

4. These coefficients will be used to multiply the price for each priced item obtained from the specified RS Means Unit Price Book “Bare Costs” column. Only one coefficient may be used as the multiplier on any line item.

a. Non-Pre-Priced Items: When an item of work is requested by the County, but not contained in the RS Means manuals, the NPPI coefficient will be used as the multiplier. The “Bare Cost” for the item will be determined as the lowest of three separate quotations obtained by the contractor from the marketplace for the work item. The City Cost Index (CCI) shall not be applied to the NPPI.

b. City Cost Index: A CCI from the Unit Price book will also multiply the price for each priced item. All Contractor price coefficients submitted in response to this RFP shall exclude the CCI.

KC001707 Page 10 of 13 JOC RFP

5. The applicable coefficient, when multiplied by the “Bare Cost” unit price from the Unit Price Book “Bare Costs” column, multiplied by the quantity, multiplied by the CCI, will represent the total compensation to the Contractor for that item.

6. The JOC Coefficient includes the following Contractor’s expenses, overhead and profit including all expenses of the Contractor for participation and support of the construction of the project. The fee will include, but not be limited to:

a. Contract Manager, Superintendent/Foreman, Project Manager, Project

Executive, Home and Field Office Staff and Contractor costs and benefits to include costs by the Contractor’s firm for taxes, all B&O taxes for the cost of the work, contributions, assessments, and benefits required by law or collective bargaining agreements. For personnel not covered by such agreements, customary benefits such as sick leave, medical and health benefits, holidays, vacations, and pensions, are considered to be provided within wages and salaries paid.

b. All travel expenses, including parking fees, hotel, airfares, car rentals and fuel for travel, and job site trucks.

c. Solicitation of Subcontractors. The Contractor’s firm shall manage the printing and distribution of bid packages.

d. All reproduction, phone, communication, internet access, and facsimile, postage, and so forth.

e. All home and field office support of the Contractor’s firm for this project including direct costs, indirect costs, company overhead, and so forth.

f. Legal Expenses incurred in the administration of the contract and subcontracts.

g. Partnering process between the County and Contractor that is required throughout the project.

h. Bonds and Insurance:

1) Performance & Payment Bond(s);

2) Liability Insurance, and;

3) Builders Risk Insurance.

i. Survey, Building Lines, Testing Quality Control:

1) Survey. When applicable to a specific Work Order, a site survey and topographical map will be provided by the County; the Contractor will establish a site benchmark, site corners, the location of on-site improvements, and off-site access and utilities. The Contractor shall establish survey markers, site controls, and building lines on the site, from the general survey, as required for a specific Work Order, and;

2) Testing. County shall pay for separate quality assurance testing. Such testing will be coordinated by the Contractor.

7. Composite Coefficient Weighting Formula

a. For the purpose of the RFP evaluation process only, a composite coefficient will be calculated from the coefficients bid for the Standard working hours, Non- Standard working hours and Non-Pre-Priced items and rounded to the hundredth

KC001707 Page 11 of 13 JOC RFP decimal place (e.g., 1.01). Scoring of this composite coefficient shall be as follows:

b. Multiply [Column 1] X [Column 2] to equal [Column 3]

Std/Non-Std

Std/Non-Std/NPPI Multiplier

Bid Coefficient

Calculated Adjusted

Coef Standard .70 a .70a

Non-Standard .20 b .20b Non-Pre-Priced Items .10 c .10c

Total 1.00 .70a +.20b +.10c

Example of Scoring Calculation

Firm 1:

Written Proposal Points (100 possible) = 90 Interview Points (100 possible) = 95 Subtotal Points = 185 Adjusted Points (Subtotal/Composite Coef. from Col. 3: 185/1.01 = 183.168 Firm 2:

Written Proposal Points (100 possible) = 88 Interview Points (100 possible) = 93 Subtotal Points = 181 Adjusted Points (Subtotal/Composite Coefficient from Col 3: 181/0.925) = 195.676

In this example, Firm 2 would be the highest ranked JOC firm since it has the higher adjusted point total.

Std/Non-Std

Std/Non-Std/NPPI Multiplier

Bid Coefficient

Calculated Adjusted

Coef Standard .70 0.90 0.630 Non-standard .20 1.25 0.250 Non pre priced items .10 1.30 0.130 Total 1.00 1.01

Std/Non-Std

Std/Non-Std/NPPI Multiplier

Bid

Coefficient

Calculated

Adjusted Coef Standard .70 0.80 0.560 Non-standard .20 1.20 0.240 Non-Pre-Priced Items .10 1.25 0.125

Total 1.00 0.925

KC001707 Page 12 of 13 JOC RFP

VI. SELECTION PROCESS

A. All responsive Proposals will be evaluated by an Evaluation Panel in accordance with the criteria and points specified in Attachment 1, Evaluation Criteria.

B. At the County’s option, interviews may be held with the highest-ranked Contractors.

1. Interviews will have a maximum of 100 points.

2. The County may choose to use different criteria for the interview.

3. Failure of a Contractor or any proposed team member to participate in the interview process may result in the Contractor’s disqualification from further consideration.

4. If interviews are conducted, combined Proposal and interview scores will be included in the final ranking.

C. The highest ranked Contractors shall also submit sealed Price Coefficient Bid Form

(Attachment 3 - Form F) at the time interviews are conducted.

D. The Contractor with the highest scoring proposal resulting from the Selection

Committee’s evaluation of the written proposal, the interview, and the factored price coefficient may, at King County’s option, be selected as the highest-ranked Contractor.

E. Contractors may request a debrief from the Contract Specialist identified in the advertisement no later than twenty business days after King County issues the Notice of Intent to Award/Notification of Non-Award. The purpose of a debrief is to provide constructive feedback to teams on their Proposal so they can submit more competitive proposals in the future. Debriefs shall be limited to the debriefed Contractor’s overall ranking, scores, Evaluation Panel comments, and general information regarding the selection process. Debriefs shall not include a point-by-point comparison of the debriefed Contractor’s submittal with other Proposals.

VII. AWARD PROCESS

A. Within five (5) days of Notice of Intent to Award the Contractor shall submit all forms listed in Attachment 3, Section III.

B. If the Contractor experiences circumstances beyond their control that prevents return of the Contract Documents within five (5) days after receiving the Intent to Award, the County may grant up to a maximum of five (5) additional days for return of the forms listed in Attachment 3, Section III provided the County deems the circumstances warrant

it. Under no circumstances will the Contractor have more than 10 days to return the properly executed Agreement and Performance and Payment Bond.

C. If the apparent successful Contractor fails to execute all contractual documents or provide the documentation as required by the solicitation within the time specified, the County may terminate the award of the contract and award to the next highest ranked Contractor.

D. The County presumes that any person signing the contract on behalf of the Contractor is authorized to bind the Contractor.

E. Performance and Payment Bond

1. Prior to contract execution, the Contractor shall execute and deliver to the County a performance and payment bond for 100% of the not to exceed total contract amount of $6,000,000, on a form acceptable to the County, with an approved surety company, and in compliance with Chapter 39.08 RCW, to cover all performance and

KC001707 Page 13 of 13 JOC RFP payment obligations for the initial duration of this Contract. If the County elects to extend the contract for a second year or a final third year, the Contractor shall provide a new performance and payment bond, or riders to the original bond, on a form provided by or acceptable to the County, in the amount of $6,000,000, to cover all performance and payment obligations for each additional year of the contract.

2. Attachment 3 – Form G is a Performance and Payment Bond. Prior to contract execution, the Contractor will be required to submit a fully executed bond. The Commitment Letter from Surety to be provided by the proposing firms shall be based upon this information.

VIII. CONTRACT TERMS AND CONDITIONS

A. The County’s Contract for this work, including insurance requirements (Section 3) and

Non-discrimination and Equal Employment Opportunity requirements, is posted online with the RFP.

1. The Contractor acknowledges and agrees that it has carefully read the Contract terms and agrees to be bound by them.

2. If the Contractor is unable to meet the insurance requirements in Section 3, the

County reserves the option to terminate negotiations and proceed with the next-highest ranked Contractor.

3. The County will not negotiate changes to the Contract.

IX. PROTESTS AND APPEALS

A. The County’s process for receiving protests is available at:

http://www.kingcounty.gov/depts/finance-business-operations/procurement/for-business/do-business/protest.aspx http://www.kingcounty.gov/depts/finance-business-operations/procurement/for-business/do-business/protest.aspx http://www.kingcounty.gov/depts/finance-business-operations/procurement/for-business/do-business/protest.aspx

KC001707 Page 1 of 3 Attachment 1 Rev Date 7/19/2023 Evaluation Criteria

ATTACHMENT 1 – EVALUATION CRITERIA

A. Acceptance of Contract Pass/Fail B. Key Personnel 30 Points C. Contractor’s Past Performance on Similar Projects 20 Points D. Contractor’s Project Management, Estimating and

Scheduling Experience 40 Points

E. SCS Participation 10 Points Total 100

A. Acceptance of Contract

1. By submitting a Proposal, Proposers acknowledge that the terms and conditions of these documents are acceptable. The County makes no commitment to modify any of the terms of the contract during negotiation.

2. Submittal Information

a. Provide acceptance of the terms and conditions as published.

B. Key Personnel

1. Provide resumes for the following Key Personnel assigned to this Contract:

a. Contract Manager. Person responsible for the overall management of the contract; ensures the timeliness, quality and cost of all work performed under this Contract; and the primary point of contact within the team.

b. Project (Work Order) Manager (provide two personnel). Person responsible for preparing work orders, negotiating scope and cost with the County, selecting subcontractors, managing and maintaining budget and schedule to complete executed work orders.

c. On-Site Superintendent/Foreman (provide two personnel). Person responsible for managing the day-to-day activities on individual work orders, including performance of subcontractors, to ensure work is performed in compliance with specifications, standards and all requirements of the work order.

2. Submittal Information

a. Provide an organizational chart listing Key Personnel and other significant personnel, including their roles and responsibilities to be assigned to this Contract.

b. Provide resumes for Key Personnel

1) Within each resume, describe each Key Personnel’s relevant experience on commercial, industrial, and civil construction projects. If your identified Key Personnel has previous JOC or similar (work order, Indefinite Delivery Indefinite Quantity {IDIQ}, etc.) contracting experience, please describe.

2) Individual resumes shall not exceed 2 pages. Additional pages shall be removed. Resumes shall be submitted for Key Personnel only; additional resumes shall be removed.

KC001707 Page 2 of 3 Attachment 1

C. Contractor’s Past Performance on Similar Projects

1. Provide five (5) project examples demonstrating experience with the anticipated work under this contract including but not limited to: selective demolition, repair, remodeling, restoration, critical areas restoration (river) and new construction of public buildings/facilities, industrial facilities and their associated infrastructure, utilities, parking lots, walkways, landscape features, parks, recreation and aquatic facilities and other civil site improvements. If your firm has previous JOC or similar (work order, IDIQ, etc.) contracting experience, please describe.

2. For each project example:

a. Provide a description of the project;

b. Describe your firm’s role (prime or sub) and scope of your firm's work on the project;

c. If your firm was the prime contractor on a project, provide names and contact information for major subcontractors, if applicable;

d. Identify city/state location;

e. Identify contact person, contact information;

f. Provide construction cost (bid award amount and final amount);

g. Provide contract schedules (initial duration, final duration days).

h. Describe how this example demonstrates your firm’s ability to successfully manage this JOC for King County.

3. Describe your firm’s experience performing public works projects which required working concurrently with multiple jurisdictions having regulatory authority, multiple stakeholders, and design professionals; working in occupied or operational facilities;

and managing subcontractors.

4. Describe your firm’s experience with JOC or similar (work order, IDIQ, etc.)

contracting methods with projects located in Washington state. Describe how lessons learned from previous JOC or similar (work order, IDIQ, etc.) contracts have affected the methods used to manage such projects.

D. Contractor’s Project Management, Estimating, and Scheduling Experience

1. Ability to Manage Schedule Requirements:

a. Provide a narrative describing your firm’s ability to meet individual project timelines and schedules on multiple concurrent projects. Describe your firm’s approach to managing workload peaks and valleys without compromising schedule commitments to the County. Describe tools and techniques used to bring non-confirming projects back into conformance with schedule requirements.

If your firm has previous scheduling experience on JOC or similar (work order, IDIQ, etc.) contracts, please describe within your narrative.

2. Ability to Manage Budget Requirements and Limitations:

a. Provide a narrative describing your firm’s ability to meet budgets on individual projects. Describe your firm’s tools and techniques used to effectively manage the project budget. Describe tools and techniques used to bring non-conforming budgets into conformance with project requirements. If your firm has previous

KC001707 Page 3 of 3 Attachment 1 experience managing budgets on JOC or similar (work order, IDIQ, etc.)

contracts, please describe within your narrative.

3. Project Management Ability:

a. Provide a narrative describing your firm’s ability to perform project management.

Describe your firm’s management tools used to develop, manage, and monitor individual projects. Describe the tools and techniques used to manage subcontractors including, but not limited to:

1) Your firm’s plan for identifying qualified subcontractors;

2) Your firm’s methods to ensure competitive and equitable subcontractor participation;

3) Your firm’s method of preparing and distributing bid packages and subcontractor award process;

4) How your firm proposes to provide performance guarantees for the subcontractors;

5) Your firm’s plan bringing non-conforming subcontractors back into conformance with project requirements; and

6) If your firm has previous project management experience on JOC or similar

(work order, IDIQ, etc.) contracts, please describe within your narrative.

4. Construction Estimating Ability:

a. Provide a narrative describing your firm’s cost estimating procedures for this JOC. Describe the methodology used to develop individual work order estimates, including any software tools used to prepare estimates. Describe tools and techniques used to manage estimates to bring non-conforming estimates back into conformance with project requirements. If your firm has previous estimating experience on JOC or similar (work order, IDIQ, etc.) contracts, please describe within your narrative.

5. Approach to Safety:

a. Indicate your Labor and Industries safety experience modification rating number for the past five (5) years.

E. Small Contractor and Supplier (SCS) Participation

1. Achievement of the SCS Utilization Requirement revolves around the development and implementation of an effective Subcontracting and Outreach/Participation Plan and a proactive approach to maximizing opportunities for certified SCS firms. SCS firms must be certified by King County prior to their performance of work on the contract.

2. A 15% minimum SCS Utilization Requirement has been established for this JOC.

3. Proposers committing to less than 15% will not be awarded any points for the SCS

Utilization Requirement criterion.

4. Submittal Information:

a. The Proposer shall indicate its commitment to meet the Small Contractors and Suppliers (SCS) Utilization Requirement by fully completing Form B of this RFP.

KC001707 Page 1 of 1 Attachment 2 Rev Date 8/5/2026 Wage Rates

ATTACHMENT 2 - WAGE RATES

WASHINGTON STATE PREVAILING WAGE RATES FOR PUBLIC WORKS CONTRACTS

Listed below are the current state prevailing wage determinations from the Washington State Department of Labor and Industries (L&I) that will be utilized for this solicitation.

The Contractor, any subcontractor, or other person doing any work under the Contract shall comply with the requirements of RCW 39.12 and shall pay each employee an amount not less than the Prevailing Rate of Wage, as specified by the Industrial Statistician of the Washington State Department of Labor and Industries (L&I). If employing labor in a class not shown, the Contractor shall request a determination of the correct wage rate for the class and locality from the Industrial Statistician. The Contractor shall provide a copy of these determinations to King County. The Contractor shall file the Statement(s) of Intent to Pay Prevailing Wages form with L&I and pay all required filing fees following the issuance of each Work Order under the Job Order Contract.

To find the applicable wage rates for this solicitation:

1. Access the Washington State Labor and Industries (L&I) Website at:

https://secure.lni.wa.gov/wagelookup/

2. The appropriate prevailing wage rates shall be the wages that are in effect on the date when the individual Work Order is issued.

3. The Work of this Contract shall take place in King County.

Off-site work will use the rates for the county where that off-site work is performed.

4. Any questions regarding the state prevailing wage determinations should be addressed to:

Industrial Statistician Department of Labor and Industries Prevailing Wage Office PO Box 44540 Olympia, Washington, 98504-4540 Phone: 360-902-5335 https://secure.lni.wa.gov/wagelookup/RatesPublication.aspx https://app.leg.wa.gov/rcw/default.aspx?cite=39.12 https://secure.lni.wa.gov/wagelookup/ https://secure.lni.wa.gov/wagelookup/RatesPublication.aspx https://secure.lni.wa.gov/wagelookup/RatesPublication.aspx

KC001707 Page 1 of 1 Attachment 3 Rev Date 7/19/2023 Forms

ATTACHMENT 3 - FORMS

The following documents are incorporated as part of the Proposal and, upon execution, the Agreement between the County and the Contractor. This checklist is provided only as a convenience for Contractors. Contractors are advised to carefully read all portions of the RFP and Contract Documents and to comply with all requirements therein.

Forms listed as “King County Website” in the document location column are available for download here: https://kingcounty.gov/en/dept/executive-services/about-king-county/business-operations/finance-business-operations/procurement-payables/forms

I. FORMS AND DOCUMENTS TO BE SUBMITTED WITH PROPOSAL

Contractors shall submit the following documents as one package, separate from the Proposal response. Proposals received without the documents listed below shall be deemed non-responsive and not considered for award.

Forms/Documents Electronic Copy

Document Location

1 Form A - Statement of Qualifications 1 Attached

2 Form B – Commitment to Meet SCS Utilization Requirement 1 Attached

3 Form C – Commitment Letter from Surety 1 Attached

4 Form D – Responsibility Detail Form 1 Attached

5 Form E – Responsibility Attestation 1 Attached

II. FORMS AND DOCUMENTS TO BE SUBMITTED AFTER SHORTLISTING

Contractors shall submit the following documents by the date/time of their interview.

Forms/Documents Electronic Copy

Document Location

1 Form F – Price Coefficient Bid Form 1 Attached

III. FORMS AND DOCUMENTS TO BE SUBMITTED AFTER NOTICE OF INTENT TO AWARD

Contractors shall submit the following documents within five (5) days after receipt of the Notice of Intent to Award. A contract will not be executed with the selected Contractor prior to receipt.

Forms/Documents Electronic Copy

Document Location

1 Form G - Performance and Payment Bond 1 NA

2 Certificate of Insurance and Additional Insured Endorsements 1 NA

3 Retained Percentage Option 1 King County Website…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .