JOFOC_19UK5618D0011.pdf

PDF 231 KB Posted

Attached to
Hotel Contract for VIP Visit
Solicitation number
Not on record
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Reference DOSAR 606.303-2

JUSTIFICATION AND APPROVAL

FOR OTHER THAN FULL AND OPEN COMPETITION, PRICE

JUSTIFICATION (JOFOC)

ACQUISITION OF HOTEL ACCOMMODATIONS IN SUPPORT OF SENIOR

HIGH LEVEL USG VIP VISIT

1. I recommend that the Department of State use other than full and open competition for the acquisition of hotel rooms for this VIP visit.

The estimated cost is £866,425.00 GBP/ $1,212,995.00USD (ROE $1.40)

2. Nature and/or description of the action being approved.

Senior High Level USG Principal traveling with a delegation inclusive of support elements in: Security, Communications, Logistics and Operations.

3. A description of the supplies or services required to meet the agency’s needs.

Accommodation reserved at the JW Marriot Grosvenor House Hotel on Park Lane for an estimated 1,700 room nights. A mix of standard room rates and suite room rates ranging from £395.00 GBP and £900.00 GBP per room night inclusive of all taxes. Rooms to be provided between the 27th June and 16th July 2018 inclusive in support of a senior VIP visit to London

JW Marriot, Grosvenor House Hotel

86-90 Park Lane

London

W1K 7TN

4. An identification of the statutory authority permitting other than full and open competition.

[ X ] 41 U.S.C. 253 (c) (2), FAR 6.302-2; Unusual and Compelling Urgency;

(Based on the available time and urgency of the requirement as detailed below)

Security concerns prohibit sufficient advanced notification of VIP travel to allow for sufficient time to conduct full and open competition. The Department of State can only communicate with the staff at Posts abroad when authorization is given due to security concerns. They have an extremely short turnaround time when authorization has been granted for negotiations to commence and site selections to be finalized with both the local vendors and Posts before the actual Senior High

Level USG VIP visit occurs. Security and logistical teams make determinations during the site survey as to which hotels are most suitable for the Senior High

Level USG VIP and his traveling staff to remain overnight. Consideration of the

Senior High Level USG Principal and the location are taken into consideration as a determining factor.

The types of events, meetings, locations and availability of venues to support the

Senior High Level USG VIP and the delegation are often times designated by the host countries.

Unique requirements for communications support are under severe time limitations and always a determining factor in the selection process as its capacity to be augmented to the unique requirements necessary to support certain Senior

High Level USG Principals.

Many of the arrangements for hotel and transportation are often not confirmed until just before the actual visit. In addition to supporting a large delegation within a short time frame, last minute and frequent changes of itineraries for supporting personnel often result in significant changes in how Posts work with the vendors.

With the exception of a few trips, contracts are not permitted to be signed until the

Department of State (Post) has written confirmation from all supporting agencies, which enables collection of funds from said agencies in the event of cancellation.

This results in an unusual and compelling urgency in accordance with 41 U.S.C.

253 (c) (2), FAR 6.302-2.

These unique Senior High Level USG VIP travel requirements result in only a single or a very limited number of responsible sources with no other supplies or services capable of satisfying agency requirement in accordance with 41 U.S.C.

253 (c ) (2), Far 6.302-2.

The Hilton on Park Lane will also be used for the requirements of this visit.

5. A demonstration that the proposed contractor’s unique qualifications or the nature of the acquisition requires use of the authority cited.

Security and logistics are the Department of State’s primary considerations when procuring hotel rooms. The Department of State must be able to provide a safe and secure environment for VIP visitors. Frequently VIP visits are not announced or confirmed in sufficient time to conduct a competition, creating an urgent and compelling need. At other times, the security requirements and/or requirements of the host country government limit the acquisition to one or a small number of predetermined hotels.

[ X ] The VIP visit information was not available in sufficient time thereby creating an urgent and compelling need.

[ ] The host country government requires the use of this/these hotel(s).

[ X ] The proposed contractor has the following unique qualifications which meet the Department of State’s security and logistical requirements.

[ ] Set-back (hotel is safe distance from the street)

[ X ] Location (able to secure building, travel route; distance to and from event)

[ X ] Size and number of rooms (able to house everyone in one hotel)

[ ] Conference facilities (adequate space for meetings, press conferences)

[ X ] Communications (able to install equipment/lines, command center)

[ X ] Accommodating to security needs

6. A description of efforts made to ensure that offers are solicited from as many potential sources as is practicable.

Due to urgency and exception in FAR 25.401(a)(5) this solicitation cannot be posted but the JOFOC will be published in FedBizOpps.

The following other hotels were reviewed but were not adequate because of the following:

The Intercontinental Hotel

One Hamilton Place

Park Lane

London, W1J 7QY

Had availability, but the pricing at £470.00 GBP for a standard room and £1,950.00 GBP for a suite was more expensive.

The London Hilton Park Lane

Park Lane

London, W1K 1BE

Had limited availability, so will be used for additional requirements in conjunction with the Grosvenor House. The room pricing for a standard room is £399.00 GBP, so is offering a room rate comparable with the JW Marriot, Grosvenor House.

Hyatt Regency London The Churchill

30 Portman Square

London, W1H 7BH

Had insufficient availability on the dates required. The room rates were £330.00 for a standard room and £650.00 for a suite.

7. A determination by the Contracting Officer that the anticipated cost to the

Government will be fair and reasonable.

Of the hotels surveyed, only one hotel, Hyatt Regency London The Churchill had cheaper rooms available for the required dates, however they were unable to accommodate the requirements. Of the hotels which had availability, The Intercontinental was £75.00 more expensive for a standard room and £1,050.00 more expensive than the highest price suite available at the JW Marriot, Grosvenor House. The other hotel, which will also be used had a standard room rate of £399.00, which compares well to the £395.00 offered by the

JW Marriot, Grosvenor House. It is therefore determined that the price is fair and reasonable.

8. Any other facts supporting the use of other than full and open competition.

None

9. A listing of sources, if any, that expressed, in writing, an interest in the acquisition.

10. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or services required.

CERTIFICATIONS

I certify that the information in this justification is accurate and contains complete data necessary to support the recommendation for other than full and open competition to the best of my knowledge and belief.

Date: 15th June 2018 Phong C. Ngo

Acting Director PTS

I certify that this justification is accurate and complete to the best of my knowledge and belief. Based on my assessment, I conclude that other than full and open competition is justified and the proposed price is fair and reasonable.

Date:15th June 2018 Mark G. Jasonides

Contracting Officer

(If over $500,000 add)

As the Competition Advocate at post, I approve this justification:

Date:15th June 2018 Thomas C. Reed

Senior General Services Officer

File details come from the government source that posted it.