JHS-CTE Storage.pdf
PDF 512 KB Posted
- Attached to
- Demolition Modular Buildings & Warehouse
- Solicitation number
- WCSD6-25-796-0416
- Issued by
- Weld County, Colorado
About this file
This document is a site plan and demolition project diagram for Jefferson High School/CTE Center located at 235 14th Avenue in Greeley, Colorado 80631. The site plan details specific demolition and site modification requirements, including the removal and replacement of existing chain link fencing, demolition of a wood/metal storage building, and preservation of the existing concrete slab. The project involves strategic fence installation along the north end of the property, with specifications to provide barbed wire and supports matching the adjacent fence configuration.
The site plan indicates multiple structures on the property, including an existing building and a new building, with specific demolition instructions focused on the wood/metal storage building. The diagram provides precise measurements and locations for fence removal, replacement, and installation, emphasizing property boundary management and site security. The demolition appears to be part of a broader facilities management or redevelopment project for the Jefferson High School/CTE Center, with careful attention to maintaining site infrastructure while removing unnecessary structures.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2025 Demo Projects_front.docx | DOCX document | |
| Jefferson Site Plan 2014.02.07.pdf | ||
| Franklin Demo.png | PNG image | |
| CTE_JHS Demo.png | PNG image | |
| Franklin Modular DEMOLITION.pdf | ||
| Jeff Jr HS Demo.png | PNG image | |
| D6 2025 Misc Demolition Projects - Specifications (1).docx | DOCX document | |
| Maplewood Modular Demolition.pdf | ||
| Maplewood Demo.png | PNG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
jkirtley Rectangle jkirtley Rectangle jkirtley Callout DEMOLISH WOOD/METAL STORAGE BUILDING, INCLUDING ANCHOR BOLTS AND OTHER ABOVE-SLAB PROTUSIONS, CONCRETE SLAB TO REMAIN jkirtley Arrow jkirtley Line jkirtley Line jkirtley Line jkirtley Callout INSTALL 6' GALVANIZED CHAIN LINK FENCE. WHERE FENCE CLOSES OFF NEIGHBORING PROPERTY ON NORTH END, PROVIDE BARB WIRE AND SUPPORTS TO MATCH EXISTING ADJACENT FENCES jkirtley Callout REMOVE EXISITNG CHAIN LINK FENCE AND REPLACE WITH NEW 6' GALVANIZED CHAIN LINK FENCE jkirtley Text Box
JEFFERSON HS / CTE CENTER
STORAGE BUILDINGS DEMOLITION
235 14TH AVENUE, GREELEY CO 80631
File details come from the government source that posted it. Updated .