J3 WERC Specs.pdf

PDF 81 KB Posted

Attached to
State, Private and Tribal Forestry WERC Roofing Repairs
Solicitation number
12445523Q0098
Issued by

View the file

Other files

File Type Posted
J5 WERC Vicinity Map.pdf PDF
J4 WERC Area Map.pdf PDF
J1 DBA Wage Determination WV20230028 Mercer County dated 05262023.pdf PDF
Sol_12445523Q0098.pdf PDF
J2 WERC SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

011000 - SUMMARY

011000 - WERC Roof Repairs PAGE 1 OF 3

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Project information.

2. Work covered by Contract Documents.

3. Contractor's use of site and premises.

4. Coordination with occupants.

5. Work restrictions.

6. Specification and Drawing conventions.

1.2 PROJECT INFORMATION

A. Project Identification: Wood Education and Resource Center (WERC) Roofing Repairs

1. Project Location: 301 Hardwood Lane Princeton, West Virginia 24740

B. Owner: USDA Forest Service

1.3 WORK COVERED BY CONTRACT DOCUMENTS

A. The Work of Project is defined by the Contract Documents and consists of the following:

1. Reference SOW for breakdown of work items.

a. Labor and materials shall be warrantied for a minimum of 365 days from the time of final inspection by COR.

B. Type of Contract:

1. Project will be constructed under a single prime contract.

1.4 CONTRACTOR'S USE OF SITE AND PREMISES

A. Restricted Use of Site: Contractor’s use of Project site for construction operations shall be limited to the areas necessary to complete work. Should a staging area be needed, coordinate with COR.

B. Limits on Use of Site: Limit use of Project site to Work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Limits on Use of Site: Confine construction operations to area required for access to roof or to perform roofing repairs as denoted in the project documents.

011000 - WERC Roof Repairs PAGE 2 OF 3

2. Driveways, Walkways, and Entrances: Keep driveways, loading areas, and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or for storage of materials.

C. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations.

1.5 COORDINATION WITH OCCUPANTS

A. Full Owner Occupancy: Owner will occupy site and existing building(s) during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations. Maintain existing exits unless otherwise indicated.

1.6 WORK RESTRICTIONS

A. Comply with restrictions on construction operations.

1. Comply with limitations on use of public streets, work on public streets, rights of way, and other requirements of authorities having jurisdiction.

B. On-Site Work Hours: Work at the facility shall take place between the hours of 8:00AM and

5:00PM on weekdays (excluding Federal Holidays). Work may take place outside of this window with permission from the COR and/or facility manager.

C. Noise, Vibration, Dust, and Odors: Coordinate operations that may result in high levels of noise and vibration, dust, odors, or other disruption to Owner occupancy with Owner.

1. Notify COR not less than two days in advance of proposed disruptive operations.

2. Obtain COR’s written permission before proceeding with disruptive operations.

D. Smoking and Controlled Substance Restrictions: Use of tobacco products, alcoholic beverages, and other controlled substances on Project site is not permitted.

1.7 SPECIFICATION AND DRAWING CONVENTIONS

A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.

These conventions are as follows:

1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

2. Text Color: Text used in the Specifications, including units of measure, manufacturer and product names, and other text may appear in multiple colors or underlined as part of a hyperlink; no emphasis is implied by text with these characteristics.

011000 - WERC Roof Repairs PAGE 3 OF 3

3. Hypertext: Text used in the Specifications may contain hyperlinks. Hyperlinks may allow for access to linked information that is not residing in the Specifications. Unless otherwise indicated, linked information is not part of the Contract Documents.

4. Specification requirements are to be performed by Contractor unless specifically stated otherwise.

PART 2 - PRODUCTS

2.1 Colors for all materials utilized shall match the color of existing material to be replaced (Grey).

2.2 Sealant products to be as follows:

A. Sealant on Metal roofing fasteners and pipe penetrations on the metal roof shall be Titebond

Weathermaster Metal Roofing Sealant, or approved equivalent.

B. Sealants at the Office building coping cap, pipe penetrations, and scupper faceplates shall be

Henry 900 Construction and Flashing Sealant or approved equivalent.

C. Sealant at the Office building pitch pockets shall be Pro-Grade® 928 Pitch Pocket & Self-

Leveling Roof Sealer or approved equivalent. Product shall be grey if possible, otherwise black.

PART 3 - EXECUTION

3.1 Work for the project shall be executed as described in the statement of work.

END OF SECTION 011000