J.2 Summary of Work 01010_02.pdf
PDF 133 KB Posted
- Attached to
- CLRD Fort Collins Admin Storage Building Federal contract opportunity
- Solicitation number
- 1282AT20R0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 0. 1282AT20R0003-0002 TermsB-M.pdf | ||
| QA-1282AT20R0003_07302020FE.pdf | ||
| 1282AT20R0003-0002_ SF1442.pdf | ||
| 1282AT20R0003-0002_SF30.pdf | ||
| 1282AT20R0003_0001_ SF1442.pdf | ||
| 1282AT20R0003_0001_SF30.pdf | ||
| Pre-BidMtgMins-1282AT20R0003FE.pdf | ||
| 0. 1282AT20R0003, SF1442andTermsB-M.pdf | ||
| J.1 SOI, 1282AT20R0003 (Fill-In).xlsx | XLSX spreadsheet | |
| J.4 WD CO20200024 v2, 01242020.pdf | ||
| J.9 SAMProofofRegistration.docx | DOCX document | |
| J.6 Fire Plan, 08202018.pdf | ||
| J.3 Work Restrictions 01140_02.pdf | ||
| J.8 FS 6300-11_SubkApp.doc | DOC document | |
| J.5 WD CO20200002 v1, 01312020.pdf | ||
| J.7 1282AT20R0003_TechProposalForm.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01010 - 1
SUMMARY OF WORK
SECTION 01010
SUMMARY OF WORK
PART 1 - GENERAL
1.1 SUMMARY
A. Work for this project consists of the labor and materials to construct one 23’6” X 60’ wood framed storage building onto an existing concrete slab foundation.
1.2 LOCATION
A. This project is located in Fort Collins, Colorado.
Fort Collins Administrative Site 300 Hemlock St.
Fort Collins, CO 80524
4.1 USE OF PREMISES
A. General: Contractor shall have full use of premises for construction operations, including use of Project site, during construction period. Contractor's use of premises is limited only by the Government's right to perform work or to retain other contractors on portions of Project. The use of Forest Service restroom facilities will not be allowed. The contractor will be required to provide restroom facilities for it’s employees.
B. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public and employees. Confine storage of materials to areas as approved by the
CO.
C. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public and Forest Service Employess during all construction operations. Contractor shall minimize disturbance of all undisturbed areas.
D. Preservation of Natural Features: Confines all operations to work limits of the project.
Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
1. Provide temporary barriers to protect existing trees and plants and root zones.
2. Do not remove, injure, or destroy trees or other plants without prior approval.
Consult with CO and remove agreed-on roots and branches that interfere with construction.
3. Do not fasten ropes, cables, or guys to existing trees.
4. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.
01010 - 2
SUMMARY OF WORK
E. Existing Utilities: Notify CO and utility companies of proposed locations and times for excavation.
1. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.
2. Interruption of Existing Utility Service: Notify CO, 48 hours in advance of any interruption of existing utilities.
4.2 MEALS AND LODGING
A. Meals and lodging are commercially available in the City of Fort Collins.
4.3 CONSTRUCTION SEQUENCE
A. There is no specified construction sequence or season for this project.
B. Depending on conditions, normal fire restrictions may apply to activities associated with this project.
4.4 FIELD VERIFICATION
A. Field verify all new and existing dimensions affecting the work of this contract before ordering products.
4.5 PERMITS
A. Special permits for permits required by County, State, or Federal laws or regulations shall be obtained by the Contractor.
END OF SECTION 01100
| 1. |
| 1.1 summary |
| A. Work for this project consists of the labor and materials to construct one 23’6” X 60’ wood framed storage building onto an existing concrete slab foundation. |
| 1.2 location |
| A. This project is located in Fort Collins, Colorado. |
| 2. |
| 3. |
| 4. |
| Fort Collins Administrative Site |
| 300 Hemlock St. |
| Fort Collins, CO 80524 |
| 4.1 USE OF PREMISES |
| A. General: Contractor shall have full use of premises for construction operations, including use of Project site, during construction period. Contractor's use of premises is limited only by the Government's right to perform work or to retain other ... |
| B. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public and employees. Confine storage of materials to areas as approved by the CO. |
| C. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public and Forest Service Employess during all construction operations. Contractor shall minimize disturbance of all undisturbed areas. |
| D. Preservation of Natural Features: Confines all operations to work limits of the project. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government. |
| 1. Provide temporary barriers to protect existing trees and plants and root zones. |
| 2. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with CO and remove agreed-on roots and branches that interfere with construction. |
| 3. Do not fasten ropes, cables, or guys to existing trees. |
| 4. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage. |
| E. Existing Utilities: Notify CO and utility companies of proposed locations and times for excavation. |
| 1. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government. |
| 2. Interruption of Existing Utility Service: Notify CO, 48 hours in advance of any interruption of existing utilities. |
| 4.2 MEALS AND LODGING |
| A. Meals and lodging are commercially available in the City of Fort Collins. |
| 4.3 construction sequence |
| A. There is no specified construction sequence or season for this project. |
| B. Depending on conditions, normal fire restrictions may apply to activities associated with this project. |
| 4.4 Field verification |
| A. Field verify all new and existing dimensions affecting the work of this contract before ordering products. |
| 4.5 permits |
| A. Special permits for permits required by County, State, or Federal laws or regulations shall be obtained by the Contractor. |