This document is a justification and approval for a sole source acquisition of a Caterpillar D7 bulldozer from Caterpillar, Inc. by the Bureau of Land Management's West Desert District/Fillmore Field Office. The dozer is required to install water systems for recreation and range programs in difficult terrain at a depth of 40 inches below frost level. Only the Caterpillar D7 meets the agency's needs due to its horsepower, weight, and drawbar pulling force of 118,000 pounds. Additionally, Caterpillar field technicians are located within a one hour drive of 90% of project sites to provide necessary maintenance and repairs. The estimated value of the requirement is $679,800 to be delivered within 12 months of order receipt. The justification cites FAR 13.5 for restricting competition as the Caterpillar D7 is the only product that can meet the agency's needs. Market research found no other dozers with sufficient drawbar pull capability or comparable field service support. The solicitation will be publicized on SAM.gov as an unrestricted requirement under NAICS 333120 to allow for maximum small business participation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
BUREAU OF LAND MANAGEMENT
Utah State Office
440 West 200 South, Suite 500
Salt Lake City, UT 84101-1345
INTERIOR REGION 7 • UPPER COLORADO BASIN
COLORADO, NEW MEXICO, UTAH, WYOMING
JUSTIFICATION AND APPROVAL
SIMPLIFIED PROCEDURES FOR CERTAIN COMMERCIAL PRODUCTS AND
SERVICES IN ACCORDANCE WITH FAR 13.5
This document sets forth the justification and approval as required by FAR 13.5.
1. Identification of the Agency and the Contracting Activity.
The Department of the Interior, Bureau of Land Management (BLM) West Desert
District/Fillmore Field Office requests the BLM, Utah State Office to contract on a limited or sole source basis.
2. Nature and/or description of the action being approved.
This requirement is to obtain one (1) Caterpillar D7 dozer on a brand name basis. The dozer is an item peculiar to one manufacturer, Caterpillar, Inc. located at 14009 N Old Galena RD
Chillicothe, Illinois 61523-9554, United States. No other supplies will satisfy the agency’s requirements.
3. A description of the Supplies or Services required meeting the Agency’s needs, including the estimated value.
The estimated value of this requirement is $679,800. Delivery is FOB Destination, 12 months after receipt of order (ARO).
4. An identification of the statutory authority permitting other than full and open competition.
FAR 13.5 Simplified Procedures for Certain Commercial Items. The statutory authority for applying the Simplified Procedures for Commercial Items of FAR 13.5 is 41 U.S.C. § 1901 and is implemented by FAR 13.106-1(b)(2) for restricting competition on this procurement.
Competition is restricted on this procurement for the reason below: only one responsible source and no other supplies or services will satisfy agency requirements.
5. A demonstration that the proposed contractor’s unique qualifications or the nature of the acquisition requires use of the authority cited.
The West Desert District covers 7.7 million acres in Utah. The land throughout the area is made of hard and rocky soil. The Fillmore Field Office is responsible for installing water systems for recreation and range programs. These systems are installed at a frost depth of 40 inches.
The unique characteristics of the Caterpillar D7 dozer are 1) its significant horsepower, weight and drawbar pulling force to lay water system pipes in tough terrain; and 2) its readily available field service technicians in proximity to the West Desert to perform routine maintenance or repairs and avoid loss of productivity.
Additional details:
Caterpillar is the only manufacturer producing a dozer built with a “high” track design. This design moves the final drives vertically just under the cab and provides the following benefit:
more track in contact with the ground that provides for the large difference in draw bar pull.
Other manufacturers are not producing a dozer meeting draw bar pull capability.
Caterpillar has field service technicians in proximity to the Fillmore Field Office to conduct on-site or field service calls. Technicians are 30 minutes from the office or within 1-hour drive to 90% of all project sites. Service from other manufacturers is a minimum 2-hour, one-way drive to Salt Lake City or St. George, Utah. Caterpillar’s availability and proximity of field service technicians reduce administrative time and avoids excess cost in transporting another manufacturer’s equipment two plus hours for service or repair.
5. A description of efforts made to ensure that offers are solicited from as many potential sources as practicable, including whether a notice was or will be publicized as required by FAR Subpart 5.2 and, if not, which exception under FAR 5.202 applies.
This requirement will be publicized on SAM.gov in accordance with FAR 5.2 under NAICS
333120 Construction Machinery Manufacturing. This requirement is not covered by a Small
Business Administration (SBA) Non-Manufacturer Waiver, and therefore, the requirement will be advertised as an unrestricted. This approach will allow for maximum competition among small and other than small businesses. Small businesses and authorized resellers have been identified.
6. A determination By the Contracting Officer that the anticipated cost to the
Government will be fair and reasonable.
The Contracting Officer anticipates that price will be determined fair and reasonable based on competition. It is expected that at least two quotes will be received in response to the solicitation. Previous market research shows that there are at least two small businesses that are interested in this requirement. Prior to award, price analysis of the proposed price will be performed and documented to sufficient determine that the cost to the Government will be fair and reasonable.
7. A description of the Market Research conducted (see FAR Part 10) and the results or a statement of the reason Market Research was not conducted.
Market research was conducted to assess a wide range of comparable dozers. Research revealed the John Deere 950K dozer as the closest in horsepower and weight. The primary reasons this machine cannot meet the Field Office’s needs is due to 1) lack of drawbar pull, and 2) lack of readily available field service technicians to perform maintenance or repairs when needed. The Field Office operations staff utilize the rear tool 80% of the time which makes it the primary requirement for needing the Caterpillar D7 dozer. The specifications for the drawbar pull of the D7 dozer shows that forward gear 1 (2.2 mph) of the D7 provides
118,000-foot-pounds of drawbar pull. The specification for a John Deere 950K shows that it provides only 35,000-foot-pounds of drawbar pull on each side for a maximum amount of
70,000-foot-pounds. The additional 48,000-foot pounds of drawbar pull is very significant, and anything less than 115,000-foot-pounds would not allow the Field Office to install water lines for the Recreation and Range departments at the required depth of 40 inches to be below frost depth. Another advantage that the D7 provides is that the layout of the cab allows for the operator to view previous track marks. This is important because it allows the operator to keep the dozer in the correct path when laying the pipe. The layout of the cab in the 950K prevents the operator to view the prior tracks, which can reduce the efficiency of the operation due to having to backtrack to keep the dozer on the right path.
9. Any other facts supporting the use of Other Than Full and Open Competition
The Fillmore Field Office is unique in the fact that it is responsible for maintaining large water infrastructure systems in various recreation areas and range improvement projects. A large percentage of the water systems are used through the winter months which requires the water pipeline to be installed at a depth of 40 inches minimum (which is frost depth). The office engineering staff have experience using other brands of equipment to assess its capability of meeting the office’s needs. Based on the research, experience of staff and reasons mentioned above, no other manufacturer’s product can meet the office’s needs.
Anticipated mission impact of non-approval: The immediate impact is the inability to rip the pipelines in at a depth that will guard against frozen water lines through the winter months.
BLM provides water service to a wide range permit holders who are the end users of BLM’s water systems. These users rely on water sources for their livestock through the winter expect this service to reliably continue well into the future.
10. A listing of the sources, if any, that expressed in writing, an interest in the acquisition:
- Wheeler CAT located at 1345 S. State St. Salina, Utah 84654-1699
- Federal Contracts Corp located at 12918 N. Nebraska Ave. Tampa, Florida 33612-4446
11. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the Supplies or Services required.
As stated above, the barriers to competition have been eliminated to fullest extent possible.
The Caterpillar D7 dozer is the only dozer that meets the specifications. Due to the fact that bulldozers are not listed on the SBA Non-Manufacture List, this requirement cannot be solicited as anything other than “unrestricted” under NAICS 333120. Competition will be achieved by allowing both Small Businesses and Other Than Small Businesses to quote on this requirement. The government will consider any alternate offers, and those offers will be technically evaluated for acceptability.
12. Program Office Certification.
I certify that the facts and representations under my cognizance, which are included in this justification, and which form a basis for this justification, are complete and accurate.
//Signature on File// Date
West Desert District Office
13. Contracting Officer’s Certification.
The ordering activity Contracting Officer’s certification that the justification is accurate and complete to the best of the Contracting Officer’s knowledge and belief and evidence that the supporting data that form a basis for the justification have been certified as complete and accurate by technical/program personnel.
I certify that the justification is accurate and complete to the best of my knowledge and belief: