J-2 Cass_House-SOW.pdf
PDF 20 MB Posted
- Attached to
- Cass Job Corps Center Housing Repairs
- Solicitation number
- 1282A720Q0123
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_1282A720Q0123.pdf | ||
| J-3 CAS-CDHouse-SectionB.docx | DOCX document | |
| J-4 Wage Determiantion.pdf | ||
| Sol_1282A720Q0123.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
CASS JOB CORPS CIVILIAN CONSERVATION CENTER
CENTER DIRECTOR’S HOUSE
EXTERIOR IMPROVEMENTS
CASS JOB CORPS CCC
OZARK, AR
SPECIFICATION INDEX
01 01 50 – GENERAL REQUIREMENTS
02 00 00- EXISTING CONDITIONS
03 10 00- CONCRETE FORMWORK
03 20 00- CONCRETE REINFORCEMENT
03 30 00- CAST IN PLACE CONCRETE
07 62 00- SHEET METAL FLASHING TRIM
31 05 16 - AGGREGATES FOR EARTHWORK
31 05 19 - GEOTEXTILES FOR EARTHWORK
31 22 00 - GRADING
31 23 33 – TRENCHING AND BACKFILLING
32 91 00 – PLANTING PREPARATION
32 92 00 – TURF AND GRASSES
33 05 33.36 – CORRUGATED NON-PERFORATED HDPE DRAINAGE PIPE
CENTER DIRECTOR’S HOUSE 010150 – 1
CASS JOB CORPS CCC GENERAL REQUIREMENTS
SECTION 010150
GENERAL REQUIREMENTS
PART 1 SUMMARY OF WORK
1.1 DESCRIPTION
A. Work for this project requires the Contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses for the work summarized as follows:
1. Clean all debris off the existing roof and out of the existing gutters.
2. Remove and replace all damaged gutter and down spout on the house.
3. Install a new down spout approximately twenty feet from the south east corner of the house (far back side near the basement entrance).
4. Fill all opening around penetration in the basement with non-shrink grout.
5. Remove the ramp and storage building from the slab on the south side of the house.
Terminating the existing electrical at the slab with a new junction box.
6. Trim all trees and bushes around the foundation and apply herbicide to cut stumps.
7. Clean out concrete drain and flush out all the storm water drain piping.
8. Attach the down spout on the south side of the front porch to a drain pipe the discharges to the south approximately 50’ south of the house.
9. Excavate the two drain pipes on the south side of the house and reinstall existing pipe or new pipe minimum 4” below grade
10. Remove and replace the concrete at the basement entry and south side of the front porch.
11. Clean out concrete drain and flush out all the storm water drain piping.
12. Regrade the area around the house with minimum 2% slope away from the house.
13. Regrade the front yard with a swale to divert storm water to the south of the house.
14. Provide a swale from the basement entry slab to the southeast at 2% slope till daylights.
1.2 LOCATION
A. This project is located at the Cass Job Corp Center located approximately 18 miles North of Ozark, Arkansas on State Highway 23. The address is 21424 North Highway 23, Ozark, AR 72949. The center hosts approximately 224 students, 164 men and 60 women.
1.3 PROJECT SCHEDULING
A. Work shall be performed on regular work days (Monday through Friday) and during regular business houses (7:30 am – 5:00 pm), excluding official Federal Government
Holidays. Contractor shall provide a project work schedule and notify the Government a minimum 5 days prior to starting work.
1.4 MEALS AND LODGING
A. Meals and lodging are commercially available in the Cities of Ozark and Clarkesville within 35 miles of the construction site. Meals or lodging will not be available at Job
Corps facilities.
CENTER DIRECTOR’S HOUSE 010150 – 2
1.5 POINT OF CONTACT
A. Center Point of Contact: Mike Elder, carl.m.edler@usda.gov, 479-667-0343
479-209-4660 Mobile
B. Occupant: Kenith Delesline, kenith.delesline@usda.gov, 479-667-0922
479-209-4178 Mobile
1.6 USE OF PREMISES
A. Use of Site: Confine constructions operations to immediate area of work. Do not disturb portions of Project site beyond areas in which the Work is indicated.
B. Government will occupy site and buildings during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate
Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Coordination with the occupant will be required for entry and site work.
C. Keep driveways, parking areas, loading areas and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times.
Do not use these areas for parking or storage of materials. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from
Government and authorities having jurisdiction
1. Schedule deliveries to minimize use of driveways and entrances.
2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
1.7 WORK RESTRICTION
A. Smoking is not permitted within the buildings or within 25 feet (8 m) of entrances, operable windows, or outdoor air intakes.
1.8 SCHEDULE OF ITEMS
A. The project Schedule of Items includes several sections to organize the work into Base
Items and Optional Items.
1. Provide pricing for all items listed in the Schedule of Items
2. Contract award will be made for all Base Items.
1.9 FIELD VERIFICATION
A. Field verify all new and existing dimensions affecting the work of this contract before ordering products
PART 2 SUMITTAL PROCEDURES
2.1 DEFINITIONS
A. Action Submittals: Written and graphic information that requires Government approval.
B. Informational Submittals: Written information that does not require Government approval. Submittals may be rejected for not complying with requirements.
2.2 PROCEDURES
A. Contractor Responsibilities
1. Review each submittal and check for compliance with the Contract Documents.
2. Highlight, encircle, or otherwise identify deviations from the Contract
Documents on submittals.
3. Include the following information on label or cover sheet for processing and recording action taken:
mailto:carl.m.edler@usda.gov mailto:kenith.delesline@usda.gov
CENTER DIRECTOR’S HOUSE 010150 – 3
a. Project name.
b. Date.
c. Name and address of Contractor.
d. Name of manufacturer.
e. Unique identifier, including revision number.
f. Number and title of appropriate Specification Section.
g. Drawing number and detail references, as appropriate.
h. Date of Contractor’s approval.
i. Statement certifying that submittal has been reviewed, checked, and approved by the Contractor for compliance with the Contract Documents.
4. The Government will not review submittals that do not bear Contractor's approval and will return them without action.
5. Unless additional copies are required for final submittal, and unless the CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.
6. Only final submittals with mark indicating action taken by Government are to be used for construction.
7. Submittals not required by the Contract Documents will not be reviewed and may be discarded.
B. Processing Time: Time for review shall commence on CO's receipt of submittal.
1. Initial Review: Government will review initial submittal within 10 working days. Additional time may be needed if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.
2. Resubmittals: If resubmittal is necessary, it will be processed in same timeframe as initial submittal.
2.3 ACTION SUBMITTALS
A. Prepare and submit Action Submittals required in the Technical Specifications in this contract, if applicable, and as indicated at the end of this subsection.
1. Submit two copies of each submittal, unless otherwise indicated. CO will return one copy. Mark up and retain one returned copy as a Project Record Document.
Electronic submission of PDFs is an acceptable alternative to paper submission.
B. Collect information into a single submittal for each element of construction and type of product or equipment.
1. Mark each copy of each submittal to show which products and options are applicable.
2. Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
c. Manufacturer's installation instructions.
d. Manufacturer's catalog cuts.
e. Wiring diagrams showing factory-installed wiring.
f. Compliance with recognized trade association standards.
g. Compliance with recognized testing agency standards.
C. Required Action Submittals
1. Product Data: refer to technical specifications
2.4 INFORMATIONAL SUBMITTALS
A. Prepare and submit Informational Submittals required in the Technical Specifications in this contract, if applicable, and as indicated at the end of this subsection.
CENTER DIRECTOR’S HOUSE 010150 – 4
1. Submit one copy of each submittal, unless otherwise indicated. CO will not return copy. Electronic submission of PDFs is an acceptable alternative to paper submission.
2. Provide a statement that includes signature of entity responsible for preparing certification.
B. Required Informational Submittals:
1. Construction Schedule
2. Sample Manufacturer Roofing Warranty
PART 3 – TEMPORARY FACILITIES AND CONTROLS
3.1 USE OF UTILITIES
A. Utilities: Use of Government existing facilities will be permitted without metering and without payment of use charges, as long as facilities are cleaned and maintained in an acceptable condition. At Substantial Completion, restore these facilities to condition existing before initial use. The following are available for use by the contractor: water, and electrical power services. The following are not available: telephone service.
3.2 SANITARY FACILITIES
A. Sanitary facilities are not available for use by the Contractor.
3.3 STAGING AREAS
A. Coordinate on-site staging and storage requirements with the Center Point of Contact or the Contracting Officer Representative (COR).
3.4 CONSTRUCTION WASTE DISPOSAL FACILITIES
A. Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste.
3.5 SAFETY AND ENVIRONMENTAL PROTECTION
A. Environmental Protection: Contractor shall provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
B. Barricades, Warning Signs, and Lights: Comply with the national or state Manual on
Uniform Traffic Control Devices (MUTCD) for erecting structurally adequate barricades, paint with appropriate colors, graphics, and warning signs/lights to inform personnel and public of possible hazard.
C. Fire Protection.
1. Store combustible materials in containers in fire-safe locations.
2. Maintain unobstructed access to fire extinguishers, fire hydrants, fire-protection facilities, stairways, and other access routes for firefighting. Prohibit smoking in hazardous fire-exposure areas.
3. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition.
CENTER DIRECTOR’S HOUSE 010150 – 5
PART 4 – ACCIDENT PREVENTION
4.1 DESCRIPTION
A. This section consists of establishing an effective accident prevention plan and providing a safe environment for personnel and visitors.
4.2 SUBMITTALS
A. Accident Prevention Plan: Before on-site work begins, submit a company approved accident prevention plan. This plan will be posted in the contract file. Design the plan to address Federal, State, and Local Occupational Safety and Health requirements that apply to this project. A Notice to Proceed will not be issued until the plan is received. As a minimum the plan shall include:
1. Name, position title and contact information of company executive responsible for approving the Accident Prevention Plan.
2. Name and contact information of supervisor responsible to carry out the plan.
3. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to ensure property protection and safety of the public, government personnel, and the Contractor's employees. Identify the work included under each phase by reference to specification section or division numbers.
4. Contingency plans for emergency situations such as medical, fire, hazard material spills and other contract assessed hazard prevention and abatement requirement needs that apply to this project.
B. Certificates: Provide certificates from a mechanic that all mechanical equipment has been inspected and meets OSHA requirements.
C. Submit a copy of test reports, as required by OSHA, for personnel working with hazardous materials.
D. Submit a brief report of safety meetings and of inspections.
E. Upon request, submit proof of employees' qualifications to perform assigned duties in a safe manner.
4.3 QUALITY ASSURANCE
A. Clauses entitled "Accident Prevention" and "Permits and Responsibilities" of the General
Provisions: In case of conflicts between Federal, state, and local safety and health requirements, the most stringent shall apply. Equipment or tools not meeting OSHA requirements will not be allowed on the project sites. Failure to comply with the requirements of this section and related sections may result in suspension of work.
B. Qualifications of Employees: Ensure employees are physically qualified to perform assigned duties in a safe manner.
4.4 ACCIDENT REPORTING
A. Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, property damage by accident in excess of
$100, and fires. Within 7 calendar days of a reportable accident, fill out and forward to the CO a CA-1 form, which may be obtained from CO.
B. All Other Accidents: Report all other accidents to the CO as soon as possible and assist the CO and other officials as required in the investigation of the accident.
4.5 FIRST AID FACILITIES
CENTER DIRECTOR’S HOUSE 010150 – 6
A. Provide adequate facilities for the number of employees and the type of construction at the site.
4.6 PERSONNEL PROTECTIVE EQUIPMENT
A. Meet requirements of NIOSH and MSHA, where applicable, as well as ANSI.
4.7 EMERGENCY INSTRUCTIONS
A. Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
4.8 PROTECTIVE EQUIPMENT
A. Inspect personal protective equipment daily and maintain in a serviceable condition.
Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual.
B. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.
4.9 SAFETY MEETINGS
A. As a minimum, conduct weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite.
4.10 HARD HATS AND PROTECTIVE EQUIPMENT AREAS
A. The CO will designate a hard hat area. Post the hard hat area in a manner satisfactory to the CO.
B. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary protective equipment at all times. As a minimum, provide two hard hats for use by visitors. Change liners before reissuing hats.
4.11 TRAINING
A. First Aid: Provide adequate training to ensure prompt and efficient first aid.
B. Hazardous Material: Train and instruct each employee exposed to hazardous material in safe and approved methods of handling and storage. Hazardous materials are defined as explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury.
PART 5 – EXECUTION REQUIREMENTS
5.1 EXAMINATION
A. Existing Conditions: Before beginning work, investigate and verify the existence and location of mechanical and electrical systems and other construction affecting the Work.
B. Acceptance of Conditions: Examine areas, and conditions, with Installer. Record observations.
1. Examine roughing-in for electrical systems to verify actual locations of connections before equipment and fixture installation.
CENTER DIRECTOR’S HOUSE 010150 – 7
2. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions.
5.2 PREPARATION
A. Field Measurements: Take field measurements as required to fit the Work properly.
B. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to CO.
Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents.
5.3 INSTALLATION
A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.
1. Make vertical work plumb and make horizontal work level.
B. Comply with manufacturer's written instructions and recommendations for installing products.
C. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous.
5.4 PROGRESS CLEANING
A. General: Clean Project site and work areas daily, including common areas. Dispose of materials lawfully.
1. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris.
2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F (27 deg C).
3. Containerize hazardous and unsanitary waste materials separately from other waste. Mark containers appropriately and dispose of legally, according to regulations.
B. Site: Maintain Project site free of waste materials and debris.
C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work.
D. Waste Disposal: Burying or burning waste materials on-site will not be permitted.
Washing waste materials down sewers or into waterways will not be permitted.
5.5 PROTECTION OF INSTALLED CONSTRUCTION
A. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Substantial Completion.
5.6 CORRECTION OF THE WORK
A. Repair or remove and replace defective construction. Restore damaged substrates and finishes.
1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.
CENTER DIRECTOR’S HOUSE 010150 – 8
PART 6 – CLOSEOUT PROCEDURES
6.1 SUBSTANTIAL COMPLETION
A. Definition of Substantial Completion: The Date certified by the CO when construction is sufficiently complete, in accordance with the Contract Documents, so the Government can occupy or utilize the Work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents.
B. Preliminary Procedures: Before requesting inspection for determining date of Substantial
Completion, complete the following. List items below that are incomplete in request.
1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.
2. Advise the CO of pending insurance changeover requirements.
3. Submit specific warranties, workmanship bonds, final certifications, and similar documents.
4. Obtain and submit releases permitting Government unrestricted use of the Work and access to services and utilities.
5. Deliver tools, spare parts, extra materials, and similar items to location designated by Government. Label with manufacturer's name and model number where applicable.
6. Complete startup testing of systems.
7. Submit changeover information related to Government occupancy, use, operation, and maintenance.
8. Complete final cleaning requirements, including touchup painting.
9. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.
C. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by CO, that must be completed or corrected before certificate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
2. Results of completed inspection will form the basis of requirements for Final
Completion.
6.2 FINAL COMPLETION
A. Preliminary Procedures: Before requesting final inspection for determining date of Final
Completion, complete the following:
1. Submit certified copy of CO’s Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by CO. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.
2. Submit evidence of final, continuing insurance coverage complying with insurance requirements.
3. Instruct Government personnel in operation, adjustment, and maintenance of products, equipment, and systems.
B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled
CENTER DIRECTOR’S HOUSE 010150 – 9
requirements. CO will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
6.3 LIST OF INCOMPLETE ITEMS (PUNCH LIST)
A. Preparation: Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.
6.4 FINAL CLEANING
A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.
B. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.
C. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:
1. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.
2. Remove tools, construction equipment, machinery, and surplus material from
Project site.
3. Touch up and otherwise repair and restore marred, exposed finishes and surfaces. Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.
D. Remove waste materials from Project site and dispose of lawfully.
END OF SECTION 010150
CENTER DIRECTOR’S HOUSE 020000 – 1
CASS JOB CORPS CCC EXISTING CONDITIONS
DIVISION 02 00 00 EXISTING CONDITIONS
SECTION 02 41 13
SELECTIVE SITE DEMOLITION
PART 1- GENERAL
1.1 SUMMARY
A. SECTION INCLUDES:
1. Demolition of storage building.
B. WORK INCLUDED: All work necessary to remove and dispose of the specified items, as listed in PART 3 of this Section.
C. PROPER DISPOSAL in this contract means that the material being removed or otherwise dealt with is handled in accordance with all county, state, federal laws and these specifications. All removed items, debris, slash, etc. shall be disposed of off of
Government property unless specifically noted elsewhere.
D. The Forest Service reserves the right to remove any material from the project site until the Notice to Proceed is issued.
PART 2 – PRODUCTS – NOT USED
PART 3 - EXECUTION
3.1 INSTALLATION
A. SAFETY:
1. Contractor shall follow all OSHA required safety procedures while performing decommissioning work, including use of PPE.
B. MISCELLANEOUS IMPROVEMENTS: The following improvements are present at the site and shall be removed from Government property and properly disposed of as designated. This may not be a complete list. The Contractor is responsible for removing all listed existing improvements from the project area. The storage building and ramp on the south side of the house. The two concrete slabs shown in the attached photos (one at the basement entry and one section of the slab on the south side of the front porch.
CENTER DIRECTOR’S HOUSE 030000 – 1
CASS JOB CORPS CCC CONCRETE
DIVISION 03 00 00 CONCRETE
SECTION 03 10 00
CONCRETE FORMWORK
PART 1 GENERAL
1.1 SUMMARY
A. This section covers all formwork and related accessories. The slabs at the basement entry and front of the house. The slabs shall be the same size as the existing slabs and 6 inches thick.
PART 2 PRODUCTS
2.1 FORMING MATERIALS
A. Forms shall be wood, plywood, hard board, or metal and shall be approved be COR.
B. Form oil shall be non-staining type.
PART 3 EXECUTION
3.1 INSTALLATION
A. Forms shall be built tight, in proper alignment, and adequate to resist the stresses of concrete placement without deformation.
B. Forms shall be constructed to produce the required concrete surface.
C. COR must approve concrete form work prior to all concrete placement, at least 24 hour notice is required for approval.
SECTION 03 20 00
CONCRETE REINFORCEMENT
PART 1 GENERAL
1.1 SUMMARY
A. This section covers all concrete reinforcement and its accessories. The slabs at the basement entry and front of the house shall have #4 reinforcement bar at 12 inches on center each direction or welded wire fabric (WWF) 6X6 W5.4/W5.4.
B. The latest editions of the following specifications and codes shall govern:
1. ACI 301, Specifications for Structural Concrete for Buildings
2. ASTM A615
3. ASTM A185
PART 2 PRODUCTS
2.1 REINFORCEMENT MATERIALS
CENTER DIRECTOR’S HOUSE 030000 – 2
A. Reinforcing Steel. Straight bars of all diameters and bent bars with a diameter less than 1
½ inches shall be deformed billet steel bars. All bars shall be Grade 60.
B. Welded Wire Fabric (WWF) Plain welded wire reinforcement must conform to ASTM
A1064/A1064M, with welded intersections spaced no greater than 6 inches apart in direction of principal reinforcement.
PART 3 EXECUTION
3.1 INSTALLATION
A. Reinforcement mesh shall conform to the sizes and spacing as shown.
B. Field bending and cutting will be permitted if performed in accordance with above listed code.
C. Reinforcement shall be free from dirt, oil, paint, grease, mill scale, and loose or thick rust when concrete is placed.
D. Woven wire mesh shall be hooked and/or supported during the placement of concrete slabs to insure proper embedment as detailed.
E. Anchorage and accessories shall be accurately placed as shown and held rigidly in position during placing of concrete.
F. Depth of cover, radius of bends, and deformations shall be in accordance with ACI 318.
SECTION 03 30 00
CAST IN PLACE CONCRETE
PART 1 GENERAL
1.1 SUMMARY
A. This section covers cast in place concrete, including curing and finishing of concrete.
The concrete for this project includes the slabs at the basement entry and front of the house and the nonshrink grout to fill the holes in the walls in the basement.
B. The latest editions of the following specifications and recommended practices shall govern:
1. ACI 301 Specifications for Structural Concrete for Buildings
2. ACI 306 Recommended Practice for Winter Concrete
3. ACI 305 Recommended Practice for Hot Weather Concrete
4. ASTM C1107/C1107M Standard Specification for Packaged Dry, Hydraulic-
Cement Grout (Nonshrink)
PART 2 PRODUCTS
2.1 CONCRETE MATERIALS
A. Aggregate shall conform to the requirements of Federal Specification SS A 281, Classes
1 and 2, and shall be well graded from fine to coarse within designated limits.
CENTER DIRECTOR’S HOUSE 030000 – 3
B. Portland, Cement, shall comply with ASTM C150, Type 1. Supplier shall provide mill certification of compliance with specification.
C. Water shall be clean, fresh, and free from injurious amounts of minerals or foreign substances.
D. 4 mil thickness polyethylene sheeting shall be placed under all concrete placed on grade.
E. Concrete Mix Design
1. All concrete shall have a minimum "compressive strength" of 3000 psi at 28 days.
2. Concrete shall be air entrained and shall contain not less than 4% and not more than 8% entrained air determined by test procedure ASTM C 138.
3. The design of the concrete mixture shall be the responsibility of the contractor and must be approved by the COR prior to pour.
F. Additives, air entrainment agents shall comply with ASTM C 260.
G. Liquid curing membrane shall be Type 1 D or Type 2.
H. Nonshrink grout in accordance with ASTM C1107/C1107M
PART 3 EXECUTION
3.1 INSTALLATION
A. "Ready Mixed Concrete" may be employed if the time interval between mixing at the plant and discharge into the form does not exceed 1 1/2 hours.
B. All concrete shall be placed within 1 1/2 hours from the time of mixing.
1. No concrete shall be placed after it has started its initial set.
2. No concrete with a temperature above 90F shall be placed.
C. Concrete shall be placed in such a manner as to avoid segregation of the mixture.
1. Concrete shall be spread in horizontal layers when practicable.
2. No concrete shall be freely dropped more than 5'.
3. Depositing a large quantity of concrete and flowing or working it along the forms will not be permitted.
D. Mechanical vibrators shall be used for consolidation of concrete.
1. Concrete shall be consolidated within 15 minutes after placement.
2. If consolidation of concrete with mechanical vibrators is impractical, hand tamping, rodding, and spading will be permitted.
3. A minimum of two vibrators, in working order, shall be on the job during concrete placement.
E. Concrete shall be placed and protected as specified for temperature conditions.
F. Concrete plant standards and truck mixer and agitator standards shall be as recommended by the National Ready Mix Association.
G. Finishing
1. All finishes shall be made without use of cement or other dusting materials.
2. Concrete shall be struck to proper grade and surface finished with float trowels.
3. All exterior concrete where a person can walk shall have a heavy broom finish perpendicular to the traffic pattern.
4. At all exposed formed surfaces, removed all ties, fill all form tie holes and imperfections; i.e., "honeycombing", with dry cement mortar, remove all lines, and then "sack" or finish to match adjacent surfaces.
CENTER DIRECTOR’S HOUSE 030000 – 4
H. Concrete shall be protected against rapid drying and kept moist for seven days by covering with curing paper with edges sealed, burlap, canvas, Type 1 D or Type 2 liquid membrane curing compounds, or by sprinkling.
I. Testing
1. Concrete shall have a minimum 28 day breaking strength of 3000 psi when tested in accordance with ASTM C 39.
2. Slump shall not exceed 4 inches for concrete.
J. Grout shall be packed into the cracks, opening, and voids around the penetration in the basement walls. The finish surface of the grout shall have a smooth finish on the inside and outside of the wall.
CENTER DIRECTOR’S HOUSE 076200-1
CASS JOB CORPS CCC SHEET METAL FLASHING AND TRIM
SECTION 076200
SHEET METAL FLASHING AND TRIM
PART 1 – GENERAL
1.1 SUMMARY
A. This Section includes the following sheet metal flashing and trim:
1. Gutter and downspouts.
1.2 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and
Supplementary Conditions and Division 1 Specification Sections, apply to this
Section.
1.3 DESIGN CONDITIONS
A. General: Install sheet metal flashing and trim to withstand wind loads, structural movement, thermally induced movement, and exposure to weather without failing, rattling, leaking, and fastener disengagement.
B. Thermal Movements: Provide sheet metal flashing and trim that allow for thermal movements resulting from the following maximum change (range) in ambient and surface temperatures by preventing buckling, opening of joints, hole elongation, overstressing of components, failure of joint sealants, failure of connections, and other detrimental effects. Provide clips that resist rotation and avoid shear stress as a result of sheet metal and trim thermal movements. Base engineering calculation on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss.
1. Temperature Change (Range): 120 deg F (67 deg C), ambient: 180 deg F
(100 deg C), material surfaces.
1.4 SUBMITTALS
A. Product Data: For each type of product indicated. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes.
B. Shop Drawings: Show layouts of sheet metal flashing and trim, including plans and elevations. Distinguish between shop and field-assembled work. Include the following.
1. Identify material, thickness, weight, and finish for each item and location in
Project.
CENTER DIRECTOR’S HOUSE 076200-2
2. Details for forming sheet metal flashing and trim, including profiles, shapes, seams, and dimensions.
3. Details for fastening, joining, supporting, and anchoring sheet metal flashing and trim, including fasteners, clips, cleats, and attachments to adjoining work.
4. Details of expansion-joint covers, including showing direction of expansion and contraction.
C. Samples for Selection: For each type of sheet metal flashing and trim indicated with factory-applied color finishes.
1.5 QUALITY ASSURANCE
A. Sheet Metal Flashing and Trim Standard: Comply with SMACNA's "architectural
Sheet Metal Manual." Conform to dimensions and profiles shown unless more stringent requirements are indicated.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Deliver sheet metal flashing materials and fabrications undamaged. Protect sheet metal flashing and trim materials and fabrications during transportation and handling.
B. Unload, store, and install sheet metal flashing materials and fabrications in a manner to prevent bending, warping, twisting, and surface damage.
C. Stack materials on platforms or pallets, covered with suitable weather-tight and ventilation covering. Do not store sheet metal flashing and trim materials in contract with other materials that might cause staining, denting, or other surface damage.
1.7 COORDINATION
A. Coordinate installation of sheet metal flashing and trim with interfacing and adjoining construction to provide a leak-proof, secure, and non-corrosive installation.
PART 2 – PRODUCTS
2.1 SHEET METALS
A. Pre-painted, Metallic-Coated Steel Sheets: Steel sheet metallic coated by the hot-dip process and pre-painted by the coil-process to comply with ASTM A 755/A
755M.
1. Zinc-Coated (Galvanized) Steel Sheet: ASTM A 653/A 653M, G90 (Z275) coating designation; structural quality.
2. Exposed Finished: Apply the following coil coating:
CENTER DIRECTOR’S HOUSE 076200-3
a. Fluoropolymer 3-Coat System: Manufacturer's standard 3-coat, thermocured system consisting of specially formulated inhibitive primer, fluoropolymer color coat, and clear fluoropolymer topcoat, with both color coat and clear topcoat containing not less than 70 percent polyvinylidene fluoride resin by weight, with a minimum total dry film thickness of 1.5 mill (0.038 mm); complying with physical properties and coating performance requirements of AAMA 2605, except as modified below:
b. Color: As selected by CO from manufacturer's full range.
B. Zinc-Coated (Galvanized) Steel Sheet: ASTM A 653/A 653M, G90 (Z275) coating designation; structural quality.
2.2 GUTTER ANS DOWNSPOUTS
A. When fabricated of aluminum, fabricate the following items with Alclad 3003, Alclad 3004, or Alclad 3005, clad on both sides unless otherwise indicated.
B. Gutters: Manufactured in uniform section lengths, with matching corner units, ends, outlet tubes, and other accessories. Elevate back edge at least 1 inch (25 mm) above front edge. Furnish expansion joints and expansion-joint covers. Gutters each side.
1. Gutter Style: Match existing Gutter
2. Depth/width ratio: 0.75
3. Aluminum: 0.032 inch
4. Gutter Supports: Manufacturer's standard supports with finish matching the gutters.
5. Manufacturer: RainTrade Corporation or approved equal.
C. Downspouts: Corrugated rectangular with mitered elbows. Furnish wall brackets of same material and finish as downspouts, with anchors. Downspout at each building corner.
1. Formed Aluminum: 0.032 inch.
2. Aluminum downspout straps 0.040 inch; 2 inches wide
3. Manufacturer: RainTrade Corporation or approved equal.
D. Provide exposed exterior sheet metal and aluminum with a baked on, factory applied color coating of polyvinylidene fluoride (PVF2) or approved equal fluorocarbon coating. Dry film thickness of coatings must be 0.8 to 1.3 mils. Color to be selected from manufacturer's standard range of color choices. Field applications of color coatings are prohibited and will be rejected.
2.3 MISCELLANEOUS MATERIALS
A. General: Provide materials and types of fasteners, solder, welding rods, protective coatings, separators, sealants, and other miscellaneous items as required for complete sheet metal flashing and trim installation.
CENTER DIRECTOR’S HOUSE 076200-4
B. Fasteners: Wood screws, annular threaded nails, self-tapping screws, self-locking rivets and bolts, and other suitable fasteners designed to withstand design loads.
1. Blind Fasteners: High-strength aluminum or stainless-steel rivets.
2. Spikes and Ferrules: Same material as gutter; with spike with ferrule matching internal gutter width.
C. Sealing Tape: Pressure-sensitive, 100 percent solids, polyisobutylene compound sealing tape with release-paper backing. Provide permanently elastic, non-sag, non-toxic, non-staining tape.
D. Butyl Sealant: ASTM C 1311, single-component, solvent-release butyl rubber sealant, polyisobutylene plasticized, heavy bodied for hooked-type expansion joints with limited movement.
E. Epoxy Seam Sealer: Two-part, non-corrosive, aluminum seam-cementing compound, recommended by aluminum manufacturer for exterior nonmoving joints, including riveted joints.
F. Bituminous Coating: Cold-applied asphalt mastic, SSPC-paint 12, compounded for
15-mil (0.4 mm) dry film thickness per coat. Provide inert-type non-corrosive compound free of asbestos fibers, sulfur components, and other deleterious impurities.
G. Asphalt Roofing Cement: ASTM D 4586, asbestos free, of consistency required for application.
2.4 FINISHES
A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal
Products" for recommendations for applying and designating finishes.
B. Protect mechanical and painted finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping.
C. Appearance of Finished Work: Variations in appearance of abutting or adjacent pieces are acceptable if they are within one-half of the range of approved Samples.
Noticeable variations in the same piece are not acceptable. Variations in appearance of other components are acceptable if they are within the range of approved
Samples and are assembled or installed to minimize contrast.
PART 3. – EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, to verify actual locations, dimensions and other conditions affecting performance of work
CENTER DIRECTOR’S HOUSE 076200-5
1. Verify that substrate is sound, dry, smooth, clean, sloped for drainage, and securely anchored.
2. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 INSTALLATION, GENERAL
A. General: Anchor sheet metal flashing and trim and other components of the Work securely in place, with provisions for thermal and structural movement. Use fasteners, solder, welding rods, protective coating, separators, sealants, and other miscellaneous items as required to complete sheet metal flashing and trim system.
1. Torch cutting of sheet metal flashing and trim is not permitted.
B. Metal Protection: Where dissimilar metals will contact each other or corrosive substrates, protect against galvanic action by painting contact surfaces with bituminous coating or by other permanent separation as recommended by fabricator or manufacturers of dissimilar metals.
1. Underlayment: Where installing metal flashing directly on cementitious or wood substrates, install a course of self adhered rubber membrane.
2. Bed flanges in thick coat of asphalt roofing cement where required for waterproof performance.
3. Paint surfaces in contact with mortar, concrete, or other masonry materials with alkali-resistant coatings such as heavy-bodied bituminous paint.
C. Install exposed sheet metal, flashing, and trim without excessive oil canning, buckling, and tool marks.
D. Install sheet metal flashing and trim true to line and levels indicated. Provide uniform, neat seams with minimum exposure of solder, welds, and sealant.
E. Install sheet metal flashing and trim to fit substrates and to result in watertight performance. Verify shapes and dimensions of surfaces to be covered before fabricating sheet metal.
1. Space cleats not more than 12 inches (300 mm) apart. Anchor each cleat with two fasteners. Bend tabs over fasteners.
F. Expansion Provisions: Provide for thermal expansion of exposed flashing and trim.
Space movement joints at a maximum of 20 feet with no joints allowed within 24 inches of corner or intersection. Joints shall be placed evenly. Where lapped or bayonet-type expansion provisions cannot be used or would not be sufficiently watertight, form expansion joints of intermeshing hooked flanges, not less than 1 inch (25 m m ) deep, filled with elastomeric sealant concealed within joints.
G. Fasteners: Use fasteners of sizes that will penetrate substrate not less than 1-1/4 inches (32 mm) for nails and not less than 3/4 inch (19 mm) for wood screws.
CENTER DIRECTOR’S HOUSE 076200-6
1. Galvanized or Prepainted, Metallic-Coated Steel: Use stainless-steel fasteners.
H. Seal joints with elastomeric sealant as required for watertight construction.
1. Where sealant-filled joints are used, embed hooked flanges of joint members not less than 1 inch (25 m m ) into sealant. Form joints to completely conceal sealant. When ambient temperature at time of installation is moderate, between 40 and 70 deg F (4 and 21 deg C), set joint members for 50 percent movement either way. Adjust setting proportionately for installation at higher ambient temperatures. Do not install sealant-type joints at temperatures below
40 deg F (4 deg C).
2. Prepare joints and apply sealants.
3.3 GUTTERS
A. The hung type of shape indicated and supported on underside by brackets that permit free thermal movement of the gutter. Provide gutters in sizes indicated complete with mitered corners, end caps, outlets, brackets, and other accessories necessary for installation. Bead with hemmed edge or reinforce the outer edge of gutter with a stiffening bar not less than 3/4 by 3/16 inch of material compatible with gutter. Fabricate gutters in sections not less than 8 feet. Lap the sections a minimum of one inch in the direction of flow or provide with concealed splice plate
6 inches minimum. Join aluminum gutters with riveted sealed joints. Provide expansion-type slip joints midway between outlets. Install gutters below slope line of the roof so that snow and ice can slide clear. Support gutters on adjustable hangers spaced not more than 30 inches on center or by cleats spaced not less than
36 inches apart. Adjust gutters to slope uniformly to outlets, with high points occurring midway between outlets. Fabricate hangers and fastenings from compatible metals.
3.4 DOWNSPOUTS
A. Space supports for downspouts according to the manufacturer's recommendation for the substrate. Provide complete including elbows and offsets. Provide downspouts in approximately 10 foot lengths. Provide end joints to telescope not less than 1/2 inch and lock longitudinal joints. Keep downspouts not less than one inch away from walls. Fasten to the walls at top, bottom, and at an intermediate point not to exceed 5 feet on center with leader straps or concealed rack-and-pin type fasteners. Form straps and fasteners of metal compatible with the downspouts.
3.5 CLEANING AND PROTECTION
A. Clean exposed metal surfaces of substances that interfere with uniform oxidation and weathering.
B. Clean and neutralize flux materials. Clean off excess solder and sealants.
CENTER DIRECTOR’S HOUSE 076200-7
C. Remove temporary protective coverings and strippable films as sheet metal flashing and trim are installed. On completion of installation, clean finished surfaces, including removing unused fasteners, metal filings, pop rivet stems, and pieces of flashing. Maintain in a clean condition during construction.
D. Replace sheet metal flashing and trim that have been damaged or that have deteriorated beyond successful repair by finish touchup or similar minor repair procedures.
END OF SECTION 076200
CENTER DIRECTOR’S HOUSE 310000 – 1
CASS JOB CORPS CCC EARTHWORK
DIVISION 31 00 00 EARTHWORK
SECTION 31 05 16
AGGREGATES FOR EARTHWORK
PART 1 - GENERAL
1.1 SUMMARY
A. This section covers supply of all aggregates for this project.
B. The latest editions of the following specifications and codes shall govern:
1. ASTM D448 03 Standard Classification for Sizes of Aggregate for Road and
Bridge Construction.
2. ASTM C33 Standard Specifications for Concrete Aggregates
PART 2 – PRODUCT
2.1 AGGREGATE MATERIALS
A. The aggregate for the subgrade material under the slab and bedding material for the drainage piping shall be an ASTM #4 or #5 stone.
PART 3 EXECUTION
3.1 INSTALLATION
A. Aggregate shall be placed at the locations indicated on the drawings. Thickness of aggregate shall be as indicated on the drawings or in this specification. The drains shall be 4 inches deep until daylighting on the steeper slope on the south side of the property.
The stone shall be completely encapsulated by geotextile.
SECTION 31 05 19
GEOTEXTILES FOR EARTHWORK
PART 1 - GENERAL
1.1 SUMMARY
A. This section covers supply of all geotextiles for this project.
B. The latest editions of the following specifications and codes shall govern:
1. ASTM D4632 Grab Breaking Load and Elongation of Geotextiles.
2. ASTM D4491 Standard Test Method for Water Permeability of Geotextiles.
3. ASTM D5261 Standard Test Method for Measuring Mass per Unit Area of
Geotextiles.
4. ASTM D4751 Standard Test Method for Determining Apparent Size of
Geotextiles.
CENTER DIRECTOR’S HOUSE 310000 – 2
PART 2 – PRODUCT
2.1 FORMING MATERIALS
A. The geotextile shall be a nonwoven geotextile that meets or exceeds the criteria listed:
Weight 5.0 oz/sy.
Tensile Strength 150 lbs
Water Flow Rate 100g/min/sf
Apparent Open Size 70 US Sieve
PART 3 EXECUTION
3.1 INSTALLATION
A. Geotextile shall be placed on all sides of the aggregate around the subgrade material for the slabs. The geotextile shall be placed on top of the pipe embedment material across the whole width of the trench. If any laps are made perpendicular to the drain pipe they shall be a minimum 24 inches in length.
SECTION 31 22 00
GRADING
PART 1 - GENERAL
1.1 SUMMARY
A. Scope of Work shall include completing grading on the southeast, south, and southwest sides of the house; re-grading the area north of the house on the east side of the driveway; and covering the sanitary sewer piping at the northeast side of the house. The areas around the house shall slope away from the building with a minimum slope of 2 percent of fall perpendicular to the house for a minimum of 10 feet in length. The area beyond the 10 feet shall be graded to blend into the existing grade and sloped for drainage with the slope no greater than 3 to 1.
B. The latest editions of the following specifications and codes shall govern:
1. ASTM D2487 Standard Practice for Classification of Soils for Engineering
Purposes (Unified Soil Classification System).
2. ASTM D2488 Standard Practice for Description and Identifications of Soils
(Visual-Manual Procedure)
3. ASTM D698 Standard Test Method for Laboratory Compaction Characteristics of
Soil Using Standard Effort
4. ASTM D6938 Standard Test Method for In-Place Density and Water Content of
Soil by Nuclear Method (Shallow Depth)
PART 2 – PRODUCT
2.1 MATERIALS
A. Existing onsite materials.
CENTER DIRECTOR’S HOUSE 310000 – 3
PART 3 EXECUTION
3.1 INSTALLATION
A. All excavations, sheeting, shoring, and temporary excavation support shall be performed in accordance with OSHA 29 CFR Part 1926 Subpart P, "Excavations.".
B. Embedment and backfill shall not be placed during freezing weather unless acceptable to the COR.
C. Earth material shall not be placed on frozen surfaces, and frozen materials, snow, or ice shall not be placed in any embedment fill or backfill material.
D. Grade or elevation shall be fixed and determined by means of batter boards and offset stakes, laser equipment, or surveying instruments, unless otherwise accepted.
E. The top portion of backfill beneath established lawn areas shall be finished with at least
6 inches of topsoil similar to the topsoil in adjoining lawn areas. Compacted backfill material shall be job excavated material. The method of compaction and the equipment used shall be appropriate for the material being compacted.
F. Surplus earth and materials for the work shall be spread on the south side of the site in a manner and location designated by the COR. Surplus material shall be free from brush, trees, debris, or other organic or deleterious materials. Offsite disposal may be used, if allowed by the COR. Disposal shall be in accordance with all federal, state, and local requirements.
SECTION 31 23 33
TRENCHING AND BACKFILL
PART 1 - GENERAL
1.1 SUMMARY
A. Scope of Work shall include completing trenching and shall include other services as specified under these specifications.
B. The latest editions of the following specifications and codes shall govern:
1. ASTM D448 03 Standard Classification for Sizes of Aggregate for Road and
Bridge Construction.
2. ASTM C33 Standard Specifications for Concrete Aggregates
3. ASTM D698 Standard Test Method for Laboratory Compaction Characteristics of
Soil Using Standard Effort
PART 2 – PRODUCT
2.1 MATERIALS
A. Aggregates (section 31 05 16) and existing onsite materials.
PART 3 EXECUTION
CENTER DIRECTOR’S HOUSE 310000 – 4
3.1 INSTALLATION
A. All…