II.S-1. SPMYM4-26-Q-3576.docx

DOCX document 42 KB Posted

Attached to
FILE CABINET
Solicitation number
SPMYM4-26-Q-3576
Issued by

About this file

This is a Request for Quotation (RFQ) issued by Defense Logistics Agency (DLA) Maritime for the procurement of a Type 1, 2-drawer file cabinet meeting military specifications. The solicitation number is SPMYM4-26-Q-3576, with quotes due by July 23, 2026, at 12:00 PM HST. The requirement is for one unit (1 EA) to be delivered to Pearl Harbor Naval Shipyard, with a Government Required Delivery Date of August 15, 2026. The file cabinet must comply with MIL-PRF-32038A (as of May 14, 2009 with a valid Notice dated February 27, 2025) and feature 18-gauge stainless steel construction measuring 18.500 inches wide by 27.625 inches high by 28 inches deep, with a 2-inch CRES sub-base. Additional specifications include a combination stack lock (Sargent & Greenleaf or MAS-Hamilton, with KABA-MAS X-10 preferred), Accuride or Jonathan drawer suspension with quick-release and lock-out features, 2-point drawer latching, vendor-supplied CRES trim around drawer faces, and finish per FED-STD-595 color 22563. First Article Inspection is required, and fire performance must meet MIL-STD-1623E.

The RFQ is unrestricted and applies to NAICS code 332510. Quotes must include delivered prices (FOB Destination), country of origin, and estimated calendar days to delivery. Payment terms are Net 30 after material inspection and acceptance, with WAWF (Wide Area Workflow) designated as the payment method. Final inspection occurs at destination with QA-4 material having a 7-day inspection timeline and QA-2/QA-3 having 30-day inspection periods. Vendors must be registered and active in SAM, provide a specification sheet and traceability documentation with their quote, and complete all required representations. The Government intends to make a single award and will evaluate quotations based on technical acceptability, price, and delivery, with award made without discussions to the lowest-priced technically acceptable offer. Buy American Act compliance applies to this procurement.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION SPMYM4-26-Q-3576

** THIS IS NOT AN ORDER **

PLEASE PROVIDE DELIVERED PRICES (FOB DESTINATION)

REFERENCE: SPMYM4-26-Q-3576

SET ASIDE: UNRESTRICTED

NAICS: 332510

QUOTE DUE: 07/23/2026; 12:00 PM HST

CONTACT

DLA MARITIME – PEARL HARBOR

CONTRACT SPECIALIST: Tehani Diaz Zelaya-Rios Desk Phone: 808-473-8000 x5198 Email Quotes to: Tehani.E.DiazZelayaRios.civ@us.navy.mil

VENDOR INFORMATION

Vendor Name:

CAGE Code:

Phone:

Email:

Quoted Valid for ___ Days

*** PLEASE FILL OUT THIS FORM COMPLETELY***

** In accordance with FAR 52.204-7(b)(1), an Offeror is required to be registered in SAM when submitting an offer or quotation, and must be listed as active, to prevent unduly delaying award. Information, instructions, forms, etc. for the System for Award Management (SAM) are available at https://www.sam.gov/portal/public/SAM/ **

Attention: Provisions below MUST be filled in to be considered for award.

SHIPPING INFORMATION

PLACE OF MFG/COUNTRY OF ORIGIN: _____________

ESTIMATED DELIVERY TO PEARL HARBOR__________ Calendar Days ARO

FOB TERMS: DESTINATION

SHIP TO:

DoDAAC: N32253 Country Code: USA

PEARL HARBOR NAVAL SHIPYARD IMF

667 SAFEGUARD STREET, BLDG 167-1 RECV 808-

473-8000X4961

PEARL HARBOR, HI 96860-5033

UNITED STATES

Government Representative, DLA Distribution Email: distrcustomerservice@dla.mil

IMPORTANT NOTE: The below Required Delivery Date (RDD) shall be met or exceeded in order to ensure your offer is considered responsive. If no offers are received which meet or exceed the Government’s RDD, award may proceed to the LPTA offeror, and may be made based on soonest delivery.

GOVERNMENT RDD: 15 AUGUST 2026

PAYMENT INFORMATION

PAYMENT TERMS______%______DAYS DISCOUNT TERMS __________________

Preferred Method payment: Wide Area Workflow (WAWF) Payment terms are always Net 30 AFTER the material has passed inspection and has been accepted.

REQUEST AND RECEIVING REPORTS is applicable to this solicitation. Please note that the WAWF (Wide Area Work Flow) will be used as the method of payment for supplies and/or services procured under this solicitation.

Information regarding WAWF is available on the internet at https://wawf.eb.mil.

YOUR COMPANY INFORMATION

YOUR BUSINESS SIZE: ___ Large (LG), ___ Small (SB), ___ Small-Disadvantaged Business (SDB), ___ Veteran-Owned Small Business (VOSB), ___ Women-Owned Small Business (WOSB), ___ Economically Disadvantaged Women-Owned Small Business (EDWOSB), ___ Service Disabled Veteran Owned Small Business (SDOVSB), ___ (HUBZONE), ___ (8a).

QUOTING AS MANUFACTURER? Yes ___ No ___

Name of Quoted Manufacturer ___________________

QUOTING AS: ___ AUTHORIZED DISTRIBUTOR or ___ THIRD PARTY DEALER

IS YOUR COMPANY’S PRICING INDEPENDENT FROM THE MANUFACTURER? Yes ___ No ___

SAM CAGE CODE: ________________

Representations must be filled in below, and provided with the submission of the quote.

Offers received without completed representaions may not be considered for award.

PRINTED NAME_______________________________SIGNATURE_____________________________

DATE______________

MATERIAL INFORMATION

Shipping to be included in the Unit Price

ITEM DESCRIPTION QTY U/I UNIT PRICE TOTAL PRICE

0001 FILE CABINET 1 EA __________ ___________

SUBMIT SPEC SHEET AND TRACABILITY WITH QUOTE

FILE CABINET, TYPE 1, 2-DRAWER, 18GA (0.478) STL, 18.500 W X 27.625 H X 28.000 D WITH A 2.0 H CRES SUB-BASE.

MEET REQUIREMENTS IAW MIL-PRF-32038.

FINISH TO BE IAW FED-STD-595, COLOR 22563, OVER APPLICABLE PRETREATMENT & PRIMER.

HARDWARE TO HAVE US-26D SATIN FINISH.

REQUIREMENTS:

A) SHIPBOARD FURNITURE, FIXTURES, FITTING, AND ACCESSORIES; PERFORMANCE SPEC FOR MIL-PRF-32038A DTD14MAY2009 W/ VALID NOT-1 DTD 27FEB2025.

B) FILE CABINET, TYPE 1, 2-DRAWER, 18GA (0.478) STL, 18.500 W X 27.625 H X 28.000 D C) 2-DRAWER, DRAWER SUSPENSION ACCURIDE OR JONATHAN W/QUICK RELEASE AND LOCK OUT FEATURES, 2-PT LATCHING AND VENDOR SUPPLIED CRES TRIM (20 GA) AROUND PERIMETER OF EACH DRAWER FACE TO SUIT 0.050 THK PLASTIC LAMINATE BY SHIPYARD.

D) N/A

E) FIRST ARTICLE INSPECTION REQUIRED IAW PARA 3.1 & 4.2

F) 2.0 H CRES

G) IAW FED-STD-595, 22563

H) COMBINATION STACK LOCK, SARGENT & GREENLEAF OR MAS-HAMILTON

I) N/A

J) COMMERCIAL PACKAGING IAW ASTM D3951-18 (R2023)

K) THRU L) N/A

ADDITIONAL REQUIREMENTS:

1) 2-DRAWER UNIT W/COMBINATION STACK LOCK (SARGENT & GREENLEAD OR MAS-HAMILTON)

2) THE LOCK SHALL BE KABA-MAS X-10. LOCK MAY BE SUBSTITUTED WITH OTHER APPROVED LOCKS LISTED IN QPL-FF-L-2740-10.

3) DRAWER SUSPENSION SHALL BE ACCURIDE OR JONATHAN, W/QUICK

RELEASE & LOCK OUT FEATURES.

4) DRAWERS TO HAVE 2-PT LATCHING & VENDOR SUPPLIED CRES TRIM (20

GA) AROUND PERIMETER OF EACH DRAWER FACE TO SUIT 0.050 THK PLASTIC LAMINATE BY THE SHIPYARD.

5) Fire performance requirements and approved specifications for interior finish material and furnishings (Naval Shipboard Use), MIL-STD 1623E (SH) W/CHG-1 DTD 19 APR 2010 applies to this procurement.

ADDT’L MATERIAL INFORMATION

Is there a minimum order quantity? SPECIFY: __________ Are there any quantity breaks? RANGE AND PRICING: _______________

Does the item offered contain hazardous materials? No ___ Yes ___ (MSDS Required)

EVALUATION CRITERIA

☒ If checked, the Government anticipates making a single award (all or none), If this box is not checked, requirement will be evaluated for split award.

Source selection criteria:

1. TECHNICALLY ACCEPTABLE

1. PRICE

1. DELIVERY

Quotations submitted by each vendor will be evaluated in accordance with the specifications provided in the solicitation, and determined to be either acceptable or unacceptable. Technical submissions that do not meet the minimum requirements will be rated as "Unacceptable" and will no longer be considered for further competition or award. The Government intends to make an award without discussions.

☒ If checked, SPRS evaluation procedures apply to determine vendor responsibility.

Other than Certified Cost and Pricing Data may be requested to support fair and reasonable price determination.

INSPECTION

Inspection Location: ☒ Final Inspection at Destination Inspection Terms: QA1 ☐ , QA2 ☐ , QA3 ☐ , QA4 ☒ Inspection Time: QA-4 material has a 7-day inspection time and QA-2 and QA-3 have a 30-day inspection time.

BUY AMERICAN

DFARS Buy American Act - Balance of Payments applies if >$15,000.00.

DFARS Buy American Act - Free Trade Agreements may apply if > $25,000.00.

ATTACHMENTS:

CLAUSES AND PROVISIONS

FAR CLAUSES AND PROVISIONS

52.204-7System for Award Maintenance
52.204-9Personal Identity Verification of Contractor Personnel
52.204-13SAM Maintenance
52.204-19Incorporation by Reference of Representations and Certifications
52.211-14Notice of Priority Rating
52.211-15Defense Priority And Allocation Requirements
52.211-17Delivery of Excess Quantities
52.212-1Instructions to Offerors - Commercial Products and Commercial Services
52.212-3Offeror Reps and Certs - Commercial Products and Commercial Services
52.212-4Contract Terms and Conditions – Commercial Items
52.223-22Sustainable Products and Services (DEVIATION 2025-O0004) in lieu of clause at FAR 52.223-23.
52.225-25Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relation to Iran-Reps and Certs
52.232-39Unenforceability of Unauthorized Obligations
52.233-2Service of Protest
52.242-13Bankruptcy
52.242-15Stop Work Order
52.243-1Changes Fixed Price
52.246-1Contractor Inspection Requirements
52.247-34F.O.B-Destination
52.252-1Solicitation Provisions Incorporated by Reference
52.252-2Clauses Incorporated by Reference
52.253-1Computer Generated Forms
52.203-19Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
52.204-23Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities
52.204-25Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
52.209-10Prohibition on Contracting with Inverted Domestic Corporations
52.232-40Providing Accelerated Payments to Small Business Subcontractors
52.233-3Protest After Award
52.233-4Applicable Law for Breach of Contract Claim
52.203-15Whistleblower Protections when using recovery act funds
52.204-27Prohibition on a ByteDance Covered Application
52.204-30FASCSA Federal Acquisition Supply Chain Security Act Orders-Prohibition
52.222-50Combating Trafficking in PersonsBoth Prime and Sub
52.223-11Ozone Depleting Substances
52.225-13Restriction on Certain Foreign Purchases

DFARS CLAUSES AND PROVISIONS

252.203-7000 Requirements Relating to Compensation of Former DoD Officials, 252.203-7002, Requirement to Inform Employees of Whistleblower Rights 252.203-7005 Representation Relating to Compensation of Former DoD Officials 252.204-7003. Control of Government Personnel Work Product 252.204-7004 Antiterrorism Awareness Training for Contractors.

252.204-7008 Compliance With Safeguarding Covered Defense Information Controls 252.204-7009 Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting (May 2024) (Deviation 2024-O0013) 252.204-7015, Disclosure of Information to Litigation Support Contractors 252-204-7017, Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services-Representation 252.204-7018, Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.

252.204-7024 Notice on the Use of the Supplier Performance Risk System 252.209-7999, Representation by Corporations regarding an Unpaid Delinquent Tax Liability 252.213-7000 Notice to Prospective Suppliers on Use of Supplier Performance Risk System in Past Performance Evaluations.

252.223-7006, Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous Materials.

252.223-7008 Prohibition of Hexavalent Chromium 252.225-7048, Export Controlled Items 252.225-7059 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region - Representation 252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region 252.231-7000, Supplemental Cost Principles.

252.232-7003, Electronic Submission of Payment Requests 252.232-7006, Wide Area Workflow Payment Instructions 252.232-7010, Levies on Contract Payments 252.243-7001, Pricing of Contract Modifications 252.243-7002, Requests for Equitable Adjustment 252.244-7000, Subcontracts for Commercial Items 252.247-7023, Transportation of Supplies By Sea Note: Vendor shall list the country of origin for each line item.

DLAD CLAUSES AND PROVISIONS (See Attachment for Full Text) 5452.233-9001, Disputes: Agreement to Use Alternative Disputes Resolution

DLA PROCUREMENT NOTES (See Attachment for Full Text) C01 Superseded Part Numbered Items (SEP 2016) C02 Manufacturing Phase-Out or Discontinuation of Production, Diminishing Sources, and Obsolete Materials or Components (DEC 2016) C03 Contractor Retention of Supply Chain Traceability Documentation (MAR 2023) C08 Tailored Logistics Support Purchasing Reviews C14 Repackaging or Relabeling to Correct Deficiencies (AUG 2017) E08 First Article Testing Requirement (APRIL 2025) H10 Exception to the Requirement for (DCAA) DLA Controlling Authority Approval L04 Offers for Part Numbered Items (SEP 2016) L06 Agency Protests (DEC 2016) L08 Use of Supplier Performance Risk System (SPRS) in Past Performance Evaluations L22 Restriction of Alternate Offers for Source Controlled Items L31 Additive Manufacturing (JUN 2018) M05 Evaluation Factor for Unused Former Government Surplus Property (SEP 2016) M06 Evaluation of Offers for Part Numbered Items (SEP 2016)

LOCAL CLAUSES (See Attachment for Full Text):

YM4 E7F754 CERTIFICATIONS REQUIRED WITH DELIVERY OF MATERIAL

YM4 C7F758 MERCURY EXCLUSION CLAUSE FOR MERCURY FREE PROCUREMENT

YM4 E7F751 SOURCE INSPECTION BY THE DEFENSE CONTRACT MANAGEMENT AGENCY (DCMA) IS

YM4 L001 EUROPEAN UNION RESTRICTIONS REGARDING NONMANUFACTURED WOOD PACKAGING AND PALLETS

YM4 L003 UNIT PRICES

YM4 L331 REVIEW OF AGENCY PROTESTS

E08 First Article Testing Requirements (MAR 2025)

(1) If there is not a separate contract line item number (CLIN) for FAT, the offeror shall include all costs and risk associated with completion of the FAT requirement in the production CLIN price.

(2) If there is a separate FAT CLIN, the offeror shall include all costs and risk associated with completion of the FAT requirement in the FAT CLIN price. The unit of issue for the FAT CLIN, EACH, is equal to one First Article Test (1EA=1FAT). To receive payment for any costs associated with FAT, the offeror shall propose costs associated with FAT on a separate CLIN. The offeror shall base the production CLIN price solely on all costs associated with completion of the production units and shall exclude all FAT-related costs.

(3) The contracting officer will use the total award price in selecting the best value offer from among all eligible offerors. However, for an offeror to be eligible for award, the contracting officer must determine that the FAT CLIN price (unless FAT is waived) and the production CLIN price are fair and reasonable; and, if set-aside under FAR Part 19, a fair market price. The offeror shall not propose a FAT CLIN price that is materially unbalanced in relation to the production CLIN price. In the event an offeror receives a waiver of the FAT requirement, the contracting officer will deduct the FAT CLIN price for the waived source in determining the total award price.

(4)(a) Notwithstanding the conditions for waiving first article, the contracting officer may order an additional first article sample, or portion thereof, in writing if there is a--

(i) Major change to the technical data;

(ii) Lapse in production for a period in excess of 90 days; or

(iii) Change in the place of performance (manufacturing facility), manufacturing process, material used,drawing, specification or source of supply.

(b) When conditions in paragraphs (4)(a)(i), (ii), or (iii) occur, the contractor shall notify the contracting officer; who will determine whether to order an additional first article sample or portion thereof and provide instructions concerning the submission, inspection, and notification of results. The contractor shall bear the costs of the additional first article testing resulting from any of the causes in paragraphs (4)(a)(i)-(iii) instituted by the contractor and not due to changes directed by the Government.

(5) Waivers. The offeror may submit a request for FAT waiver to the contracting officer, who may waive the FAT requirement when all of the following criteria apply:

(a) The offeror requesting waiver has successfully manufactured, delivered and the government accepted the item or a similar item. The offeror shall provide the following information and be prepared to provide documentary evidence upon the contracting officer's request:

(i) Contract number(s), date(s), and issuing Government agency or agencies.

(ii) Description of item previously furnished, identified by part number, type, model number and/or other identifying information. If the item previously furnished is similar but not identical to the item being acquired under the current buy, the offeror shall explain why manufacture of the item previously furnished is sufficient to demonstrate its ability to manufacture the item being acquired under the current buy without need for a first article test.

(iii) Engineering control document/change number of item previously furnished.

(b) There have been no changes to manufacturing processes, tooling, or place of performance. (c) There have been no changes to manufacturing data (e.g., drawing revisions that change materials, dimensions, processes, inspection or testing requirements; or subcontractors used to manufacture the items successfully in the past).

(d) The offeror shall supply an item of the same design and manufactured by the same method at the same facilities as the item or similar item previously furnished and accepted under subparagraph (5)(a).

(6) Contractor-Performed FAT.

(a) The contractor shall test the quantities as outlined in paragraph (a) of FAR clause 52.209- 3 as specified in the contract. The contractor shall submit reports in accordance with paragraph (b) of FAR clause 52.209-3, as supplemented in this procurement note.

(b) For test report preparation and delivery of contractor FAT, the contractor shall-- (i) Use the data item description DI-NDTI-80809B report format.

(ii) Mark the test report with the following: "First article test report - Contract number: [insert contract number] and lot/item number: [insert lot/item number].

(iii) Sign the FAT Report, accompanied by the system of record receiving report (i.e., WAWF or] DD Form 250) and contractor confirmation that the same process and facilities used to manufacture the first article units will be used to manufacture the production units, to the contracting officer at the applicable address shown below:

Textile (C&T), Medical Materiel, or Subsistence, submit the report to the procuring activity in Block 6 of the DD Form 1155, Block 7 of Standard Form (SF) 33, Block 5 of SF 26, or Block 9 of SF 1449 award. (B) For awards issued by DLA Land (SPE7L), submit the report to the following address: DLA Land - FLSEB, ATTN: FAT Monitor, P. O. Box 3990, Columbus, OH 43218-3990, or email to: Land.FAT.Monitor@dla.mil.

(C) For awards issued by DLA Maritime (SPE7M), submit the report to the following address: DLA Maritime - FMSE, ATTN: FAT Monitor, P. O. Box 3990, Columbus, OH 43218-3990, or email to: maritime.fat.monitor@dla.mil.

(D) For awards issued by DLA Troop Support Construction and Equipment (SPE8E), email the report to Construction and Equipment FAT Monitor at trpsptcandefatmonitor@dla.ml. If report file exceeds email limitations, submit to the following address: DLA Troop Support, Attention: First Article Testing Monitor, Building 3, 700 Robbins Avenue, Philadelphia, Pennsylvania 19111.

(7) The contractor shall--

(a) Provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3;

(b) Maintain and make available all records evidencing those details at the Government's request. (c) At least fourteen (14) calendar days (or as otherwise specified in the contract) prior to shipment to the Government, provide written notice to the contracting officer and to the cognizant DCMA Functional Specialist when full administration or Quality Support administration is delegated to DCMA. (8) Government-performed FAT. The contractor shall--

(a) For delivery of separately priced Government first article samples for Government performed FAT ship the units and system of record receiving report (i.e., WAWF or DD Form 250) to the test facility specified in paragraph (a) of FAR clause 52.209-4.

(b) For delivery of Government first article samples that are not separately priced, ship the units with a commercial shipping document to the test facility.

(c) Prepare the shipping container(s) by marking the external packages in bold letters, "First Article Exhibits - Do Not Post to Stock," adjacent to the MIL-STD-129 (latest revision) identification markings. (d) Use a hard copy of the system of record receiving report (i.e., WAWF DD Form 250), or commercial shipping document as a packing list, in accordance with DFARS Appendix F.

(e) Mark the exterior of the shipping container in accordance with MIL-STD-129 (latest revision), paragraph 5.11.

(f) In the interior package, include hard copies of the contract, test reports, material certifications/process operation sheets, drawings used to manufacture the units, and a pre-paid return label or shipping account for payment.

(g)Send units by traceable means (e.g., certified or registered mail, United Parcel Service, Federal Express).

(h)Send an email with subject titled "Notification of Test Exhibits [insert Government Lab DODAAC]" to the corresponding address in (i) or (ii) below and to the contracting officer specified in the contract. In the email, provide the shipment date, contract/purchase order number, National Stock Number, means of transportation, tracking number, and summary of container contents. Attach a copy of the system of record receiving report (i.e., WAWF or DD Form 250) documenting the Government has performed the contract quality assurance within the system or record.

(i) DLA Land & Maritime - DSCCProdVerif@dla.mil

(ii) DLA Aviation - DSCR.Test&EvaluationOffice@dla.mil

(9) At its discretion, the Government may return FAT units to the contractor at no cost to the Government. The contractor shall submit the return address and pre-paid return label or shipping account for payment.

(10) If the Government disapproves or conditionally approves Government-performed FAT units, the Government will take action in accordance with FAR 52.209-4.

File details come from the government source that posted it. Updated .