09_65_13_-_RESILIENT_BASE_AND_ACCESSORIES.pdf

PDF 36 KB Posted

Attached to
Construct New Medical Reference Laboratory Federal contract opportunity
Solicitation number
IFBP04141500003
Issued by
Department of Justice Bureau of Prisons Field Acquisition Office

About this file

09 65 13

View the file

Other files for this federal contract opportunity

Other files attached to Construct New Medical Reference Laboratory, newest first.
File Type Posted
Amendment_0003.pdf PDF
Abstract.pdf PDF
DSCN2271.JPG JPG image
DSCN2269.JPG JPG image
DSCN2270.JPG JPG image
23_09_23_direct_digital_control_for_hvac.pdf PDF
Responses_to_questions.pdf PDF
Drawings.pdf PDF
03_30_00_Cast-In-Place_Concrete.pdf PDF
22_11_23_domestic_water_pumps.pdf PDF
00_0830_Disclaimers.pdf PDF
Tax_exempt_information.pdf PDF
0002_8-17.pdf PDF
Pre-bid_meeting_minutes.pdf PDF
0001_8-11.pdf PDF
Project_Specifications_Volume_1.pdf PDF
IFBP04141500003.pdf PDF
SPG_4B2J_Lab_Const_Dwgs.pdf PDF
Wage_Determination_1.PDF PDF
Project_Specifications_Volume_3.pdf PDF
SF24-06302016.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEDICAL REFERENCE LAB PROJ. NO. 04001400001

USMCFP SPRINGFIELD, SPRINGFIELD, MO AMENDMENT 8/27/2015

FINAL CONSTRUCTION DOCUMENTS

PROPERTY OF THE UNITED STATES GOVERNMENT

SENSITIVE BUT UNCLASSIFIED

Properly destroy documents/media when no longer needed.

RESILIENT BASE AND ACCESSORIES 096513 - 1

SECTION 096513 - RESILIENT BASE AND ACCESSORIES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Resilient base.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Samples for Verification: For each type of product indicated and for each color, texture, and pattern required in manufacturer's standard-size Samples, but not less than 12 inches (300 mm) long.

1.4 MAINTENANCE MATERIAL SUBMITTALS

A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.

1. Furnish not less than 10 linear feet (3 linear m) for every 500 linear feet (150 linear m) or fraction thereof, of each type, color, pattern, and size of resilient product installed.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Store resilient products and installation materials in dry spaces protected from the weather, with ambient temperatures maintained within range recommended by manufacturer, but not less than 50 deg F (10 deg C) or more than 90 deg F (32 deg C).

USMCFP SPRINGFIELD, SPRINGFIELD, MO AMENDMENT 8/27/2015

RESILIENT BASE AND ACCESSORIES 096513 - 2

1.6 FIELD CONDITIONS

A. Maintain ambient temperatures within range recommended by manufacturer, but not less than 70 deg F (21 deg C) or more than 95 deg F (35 deg C), in spaces to receive resilient products during the following time periods:

1. 48 hours before installation.

2. During installation.

3. 48 hours after installation.

B. After installation and until Substantial Completion, maintain ambient temperatures within range recommended by manufacturer, but not less than 55 deg F (13 deg C) or more than 95 deg F (35 deg C).

C. Install resilient products after other finishing operations, including painting, have been completed.

PART 2 - PRODUCTS

2.1 THERMOPLASTIC RUBBER BASE - RB-1

A. Basis of Design: Subject to compliance with requirements, provide the following: Johnsonite;

A Tarkett Company, DC–63 or an approved equal by one of the following manufacturers:

1. AB; American Biltrite.

2. Allstate Rubber Corp.

3. Armstrong World Industries, Inc.

4. Burke Mercer Flooring Products, Division of Burke Industries Inc.

5. Mondo Rubber International, Inc.

6. Nora Systems, Inc.

7. Roppe Corporation, USA.

8. VPI, LLC, Floor Products Division.

B. Product Standard: ASTM F 1861, Type TP (rubber, thermoplastic).

1. Group: I (solid, homogeneous)

2. Style: Cove

C. Thickness: 0.125 inch (3.2 mm)

D. Height: As indicated on Drawings

E. Lengths: Coils in manufacturer's standard length

F. Outside Corners: Preformed http://www.specagent.com/LookUp/?uid=123456853207&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456853206&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456853208&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456853209&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456853212&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456853213&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456853214&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456853215&mf=04&src=wd

USMCFP SPRINGFIELD, SPRINGFIELD, MO AMENDMENT 8/27/2015

RESILIENT BASE AND ACCESSORIES 096513 - 3

G. Inside Corners: Preformed

H. Colors: As indicated on drawings

2.2 INSTALLATION MATERIALS

A. Adhesives: Water-resistant type recommended by resilient-product manufacturer for resilient products and substrate conditions indicated.

1. Adhesives shall have a VOC content of 50 g/L or less.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, with Installer present, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work.

1. Verify that finishes of substrates comply with tolerances and other requirements specified in other Sections and that substrates are free of cracks, ridges, depressions, scale, and foreign deposits that might interfere with adhesion of resilient products.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

1. Installation of resilient products indicates acceptance of surfaces and conditions.

3.2 PREPARATION

A. Prepare substrates according to manufacturer's written instructions to ensure adhesion of resilient products.

B. Fill cracks, holes, and depressions in substrates with trowelable leveling and patching compound; remove bumps and ridges to produce a uniform and smooth substrate.

C. Do not install resilient products until they are the same temperature as the space where they are to be installed.

1. At least 48 hours in advance of installation, move resilient products and installation materials into spaces where they will be installed.

D. Immediately before installation, sweep and vacuum clean substrates to be covered by resilient products.

USMCFP SPRINGFIELD, SPRINGFIELD, MO AMENDMENT 8/27/2015

RESILIENT BASE AND ACCESSORIES 096513 - 4

3.3 RESILIENT BASE INSTALLATION

A. Comply with manufacturer's written instructions for installing resilient base.

B. Apply resilient base to walls, columns, pilasters, casework and cabinets in toe spaces, and other permanent fixtures in rooms and areas where base is required.

C. Install resilient base in lengths as long as practical without gaps at seams and with tops of adjacent pieces aligned.

D. Tightly adhere resilient base to substrate throughout length of each piece, with base in continuous contact with horizontal and vertical substrates.

E. Do not stretch resilient base during installation.

F. On masonry surfaces or other similar irregular substrates, fill voids along top edge of resilient base with manufacturer's recommended adhesive filler material.

G. Preformed Corners: Install preformed corners before installing straight pieces.

3.4 CLEANING AND PROTECTION

A. Comply with manufacturer's written instructions for cleaning and protecting resilient products.

B. Perform the following operations immediately after completing resilient-product installation:

1. Remove adhesive and other blemishes from exposed surfaces.

2. Sweep and vacuum horizontal surfaces thoroughly.

3. Damp-mop horizontal surfaces to remove marks and soil.

C. Protect resilient products from mars, marks, indentations, and other damage from construction operations and placement of equipment and fixtures during remainder of construction period.

D. Cover resilient products subject to wear and foot traffic until Substantial Completion.

END OF SECTION 096513

PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Resilient base.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Samples for Verification: For each type of product indicated and for each color, texture, and pattern required in manufacturer's standard-size Samples, but not less than 33T12 inches33T43T (300 mm)43T long.
1.4 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Furnish not less than 33T10 linear feet33T43T (3 linear m)43T for every 33T500 linear feet33T43T (150 linear m)43T or fraction thereof, of each type, color, pattern, and size of resilient product installed.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Store resilient products and installation materials in dry spaces protected from the weather, with ambient temperatures maintained within range recommended by manufacturer, but not less than 33T50 deg F33T43T (10 deg C)43T or more than 33T90 deg F3...
1.6 FIELD CONDITIONS
A. Maintain ambient temperatures within range recommended by manufacturer, but not less than 33T70 deg F33T43T (21 deg C)43T or more than 33T95 deg F33T43T (35 deg C)43T, in spaces to receive resilient products during the following time periods:
1. 48 hours before installation.
2. During installation.
3. 48 hours after installation.
B. After installation and until Substantial Completion, maintain ambient temperatures within range recommended by manufacturer, but not less than 33T55 deg F33T43T (13 deg C)43T or more than 33T95 deg F33T43T (35 deg C)43T.
C. Install resilient products after other finishing operations, including painting, have been completed.
PART 2 - PRODUCTS
2.1 THERMOPLASTIC RUBBER BASE - RB-1
A. 41TUBasis of DesignU41T: Subject to compliance with requirements, provide the following: 41TJohnsonite; A Tarkett Company41T, DC–63 or an approved equal by one of the following manufacturers:
1. 41TUAB; American BiltriteU41T.
2. 41TUAllstate Rubber CorpU41T.
3. 41TUArmstrong World Industries, IncU41T.
4. 41TUBurke Mercer Flooring Products, Division of Burke Industries IncU41T.
5. 41TUMondo Rubber International, IncU41T.
6. 41TUNora Systems, IncU41T.
7. 41TURoppe Corporation, USAU41T.
8. 41TUVPI, LLC, Floor Products DivisionU41T.
B. Product Standard: ASTM F 1861, Type TP (rubber, thermoplastic).
1. Group: I (solid, homogeneous)
2. Style: Cove
C. Thickness: 33T0.125 inch33T43T (3.2 mm)
D. Height: As indicated on Drawings
E. Lengths: Coils in manufacturer's standard length
F. Outside Corners: Preformed
G. Inside Corners: Preformed
H. Colors: As indicated on drawings
2.2 INSTALLATION MATERIALS
A. Adhesives: Water-resistant type recommended by resilient-product manufacturer for resilient products and substrate conditions indicated.
1. Adhesives shall have a VOC content of 50 g/L or less.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, with Installer present, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work.
1. Verify that finishes of substrates comply with tolerances and other requirements specified in other Sections and that substrates are free of cracks, ridges, depressions, scale, and foreign deposits that might interfere with adhesion of resilient pr...
B. Proceed with installation only after unsatisfactory conditions have been corrected.
1. Installation of resilient products indicates acceptance of surfaces and conditions.
3.2 PREPARATION
A. Prepare substrates according to manufacturer's written instructions to ensure adhesion of resilient products.
B. Fill cracks, holes, and depressions in substrates with trowelable leveling and patching compound; remove bumps and ridges to produce a uniform and smooth substrate.
C. Do not install resilient products until they are the same temperature as the space where they are to be installed.
1. At least 48 hours in advance of installation, move resilient products and installation materials into spaces where they will be installed.

D. Immediately before installation, sweep and vacuum clean substrates to be covered by resilient products.

3.3 RESILIENT BASE INSTALLATION
A. Comply with manufacturer's written instructions for installing resilient base.
B. Apply resilient base to walls, columns, pilasters, casework and cabinets in toe spaces, and other permanent fixtures in rooms and areas where base is required.
C. Install resilient base in lengths as long as practical without gaps at seams and with tops of adjacent pieces aligned.
D. Tightly adhere resilient base to substrate throughout length of each piece, with base in continuous contact with horizontal and vertical substrates.
E. Do not stretch resilient base during installation.
F. On masonry surfaces or other similar irregular substrates, fill voids along top edge of resilient base with manufacturer's recommended adhesive filler material.
G. Preformed Corners: Install preformed corners before installing straight pieces.
3.4 CLEANING AND PROTECTION
A. Comply with manufacturer's written instructions for cleaning and protecting resilient products.
B. Perform the following operations immediately after completing resilient-product installation:
1. Remove adhesive and other blemishes from exposed surfaces.
2. Sweep and vacuum horizontal surfaces thoroughly.
3. Damp-mop horizontal surfaces to remove marks and soil.
C. Protect resilient products from mars, marks, indentations, and other damage from construction operations and placement of equipment and fixtures during remainder of construction period.
D. Cover resilient products subject to wear and foot traffic until Substantial Completion.