Statement_of_Work.pdf
PDF 158 KB Posted
- Solicitation number
- IFBP04011500001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Astract.pdf | ||
| Amendment_0003.pdf | ||
| Clarifications_1.pdf | ||
| A0002.pdf | ||
| Pre_bid_meeting_minutes.pdf | ||
| Amendment_0001.pdf | ||
| 3_SF24-06302016.pdf | ||
| 2_Construction_Wage_Rates.pdf | ||
| 1_Statement_of_Work.pdf | ||
| IFBP04011500001.pdf | ||
| 1_Statement_of_Work.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
METROPOLITAN CORRECTIONAL CENTER
71 WEST VAN BUREN
CHICAGO, ILLINOIS
STATEMENT OF WORK
INSTALL ON-DEMAND DOMESTIC HOT WATER SYSTEM
PROJECT 4A9R
SUMMARY OF WORK:
MCC Chicago is a 26 story high rise structure located at 71 W. Van Buren Chicago, IL. Adjacent to the high rise is an 8 story parking structure. Inside the parking structure is the power plant where all the domestic hot water is generated. The scope of this project is to completely replace the domestic hot water system and update the BAS to efficiently operate and log the new hot water system. Provide a turn-key installation of a packaged Instantaneous Double Walled Water Heater Assembly with all the valves, fittings, pipes, insulation, electrical, and BAS updates to function. All work and installations will be made in accordance with federal, state and local building codes and shall include all needed permits.
PART 1 SCOPE OF WORK
Asbestos abatement - Remove the insulation from heat exchangers that may contain ACM according to the MCC Asbestos report dated January 2 1996. Which states only the 140 converter tested positive for ACM (20-25%amosite)
2 – 9’’ diameter by 8’ long heat exchangers (225 square feet each)
1 – 11’’ by 8’ long heat exchanger (250 square feet)
1 – 11’’ by 2’ long heat exchanger (40 square feet)
Demolition – remove all insulation, tanks, pipework, valves, traps, and heat exchangers w/ racks involved in current domestic hot water system.
Tanks – Remove two hot water storage tanks.
-13’ long by 5’ in diameter
-18’ long by 5’ in diameter
Converters –remove 6 domestic hot water converters
-Two 8’ long by 9’’ diameter
-One 8’ long by 11’’ diameter
-One 2’ long by 11’’ diameter
-Two small Leslie package heaters 2’ tall by 2’ wide
Pipe – Remove all current pipework involved with domestic hot water system
-250 linear feet of 4’’ Galvanized
-400 linear feet of 2’’ copper
-200 linear feet of 2 1/2’’ Black pipe (steam line)
-50 linear feet of 5’’ Black pipe (steam line)
-200 linear feet of 2’’ Black pipe (Condensate line)
Installation of Hot Water System – Furnish and provide turn-key installation of a packaged Instantaneous Double Walled Water Heater Assembly with all the valves, fittings, pipes, insulation, electrical, and BAS updates to function. It will provide sufficient hot water to accommodate a dual temp domestic hot water system at 250 GPM. One side at 180 degrees (which will be referred to as the 180 system) and the other at 140 degrees (which will be referred to as the 140 system). The 180 system demand is 90 GPM and the 140 system demand is 160 GPM. The Heater will produce 180 degree water and split to feed both systems. The 140 system will go through a redundant Digital Recirculation Valve(DRV) which will blend the water down to 140 Degrees.
Steam Line – There are 2 steam lines involved in this project. A 4’’ steam line that supplied steam to the Leslie heaters and a 5’’ steam line that provided steam to the Hot water converters.
– Reconfigure the old 4’’ Leslie steam line after the lines feeding the Leslie heaters have been removed.
This also feeds a pre heat coil for AHU S-6, so it has to have a proper drip leg and condensate line ran to the condensate system
– Reconfigure the old 5’’ converter steam line after the lines feeding the converters have been removed to feed the new Instantaneous Double Walled Water Heater Assembly with proper drip leg and condensate line ran to the condensate system.
Condensate Lines and traps – Install manufacturer recommended (new heater) traps with properly sized condensate lines.
-from 4’’ steam line, install proper drip leg, traps, and condensate line tied into condensate system
-from new water heater, install proper drip leg, traps, and condensate line tied into condensate system
Water Lines – Run all cold, supply, and return lines to the new Water Heater
-Run a new 4’’ copper line off the current house pumps in the boiler level up 2 floors to the Converter level to feed the DRV
Reconfigure the 140 system and 180 system Supply and Return (4 – 4’’ galvanized lines) to meet the requirements of the new Water Heater. Install a Di-Electric flange on all 4 lines with 4 new flanged Stainless Steel ball valves to isolate the building. Install 4’’ copper with 4’’ grooved copper fittings to the water heater and/or DRV. On the new 4’’ supply and return copper lines, install a four 4’’x4’’x 2’’ T with 2’’ threaded shutoff valve to drain the building
Insulation – Insulate all lines involved with the project
-Steam lines; insulate the new and reconfigured 4’’ steam line. Insulate the new and reconfigured 5’’ steam lines involved with the project
-Condensate lines; insulate all new and reconfigured condensate lines involved in the project
-water lines; insulate all new and reconfigured cold, supply, and return lines involved in the project.
-Valves; insulate all new and reconfigured steam, condensate, and water valves involved in the project.
BAS – Update the Building Automation System to a Bacnet compatible system to allow compatibility with the Brainscan or equivalent so the new water heater can be accurately logged and be the most energy efficient. Tridium or equivalent
- Furnish and install (2) Web based network controllers for the domestic hot water system.
- Furnish and install (1) new ddc controller and boiler control panel for the DHW system.
- Upgrade the existing (9) AHU ddc controllers to bacnet ms/tp for the DHW system.
- Upgrade the existing (1) Chiller ddc controller to bacnet ms/tp for the DHW system.
- Upgrade the existing (2) Converter ddc controller to bacnet ms/tp for the DHW system.
- Upgrade the existing (8) misc ddc controller to bacnet ms/tp for the DHW system.
- Control and monitor new DWH heaters that will be provided by others.
- Re-utilize the existing relays, sensors, actuators, and EPT's.
- Program, configure, and install the ddc control programs.
- Provide control conduit and wiring.
- Customer shall provide network data jack and IP address for remote access and alarm notification.
- Furnish and install the required control transformers.
- Write, test, and install the control programs.
- Provide system graphics
- Map the points to the new front end workstation
- Provide (3) paper sets and (1) electronic copy of the engineered as-built control drawings.
PART 2 EQUIPMENT
The instantaneous water heater assembly with integral programmable digital recirculation valve (DRV) shall be mounted on an angle iron frame. The assembly shall be pre-piped with performance matched components and pressure tested before delivery. Substitute assemblies which require field assembly other than basic water, and steam service shall be unacceptable.
The instantaneous water heater shall be of the horizontal shell and tube design providing easy access to the individual tubes without moving the heater from its installed position. No overhead clearance shall be required for servicing. The tubes shall be double wall with a U-bend. Helical tubes shall be unacceptable. Only the necessary steam, water and condensate connections to the instantaneous water heater shall be pre-plumbed. Copper lined storage tanks shall not be used. Temperature controller (DRV) shall be controlled digitally via integrated circuit board technology designed to deliver blended water economically at a safe, accurate temperature for sanitary use in re-circulated hot water systems. No minimum system draw-off required. The Redundant DRV shall have a 2 line, 16 character display of delivered temperature with the option of °F or °C. Display also shows the error codes and alarm conditions. The temperature controller shall be compliant with ASSE Standard 1017, CSA B125 & CE and so certified and identified.
Materials of construction and items included shall be:
1. Shells of carbon steel with 4” 150# ANSI steam inlet and 2” NPT condensate exit ports
2. Tubes of 5/8” copper inner, ¾” ID grooved copper outer expanded into steel (steam side) and brass (water side) tube sheets
3. 3” NPT water connections
4. Stand of 2” Carbon Steel Angle
5. Water pipe of Type L copper
6. Armstrong Steam Trap model 20JD8 or equivalent
7. Armstrong Thermostatic Air Vent or equivalent
8. One 12V Digital Recirculating Valve (DRV)
9. One UL Listed Power supply’s rated at 100-240V (12V AC output)
10. All required valve fittings and isolation valves, pressure gauges, inlet combination ball valve strainers, inlet/return check valves, inlet, system blend and return line thermometers
11. All Stainless Steel Construction (DRV only)
-Armstrong Digital-Flo™ Model D8120 DW Instantaneous Water Heater Assembly or equivalent
-redundant control valves Armstrong DRV40 (The Brain) or equivalent
-Armstrong Brainscan (BacNet compatible) or equivalent
-Anvil International Gruvlok® - CTS Copper System for all copper connections or equivalent
-Apollo Valves stainless steel 4’’ flanged ball valve part #87A-20A-01 for 180 /140 supply and return system isolation valves or equivalent
- The Tridium Niagara Framework or equivalent
The Niagara Framework® is a software platform that integrates diverse systems and devices regardless of manufacturer, or communication protocol into a unified platform that can be easily managed and controlled in real time over the Internet using a standard web browser. NiagaraAX resolves the challenges associated with open systems, integration and interoperability by integrating diverse systems and devices - regardless of manufacturer, or communication protocol - into a unified platform that is easily managed and controlled over the Internet. A scalable solution, NiagaraAX increases the functionality and value of “smart devices and systems” by connecting real time operational data to the people and systems that manage business enterprises.
NiagaraAX creates a common environment that connects to almost any embedded device imaginable. It models the data and behavior of the devices into normalized software components, providing a seamless, uniform view of device data to the enterprise via a wide variety of IP-based protocols, XML-based connectivity options, and open API’s. By transforming the data from diverse external systems into normalized components, NiagaraAX creates an architecture that provides substantial benefits over gateway-based integration.
Today, there are over 245,000 instances of the Niagara Framework deployed worldwide.
1.04 SYSTEM DESCRIPTION
A. The intent of this project is to retrofit existing obsolete supervisory controllers at the project site with an open web-based Building Automation System (BAS). Tridium was chosen as the building block for the new BAS for this project and shall be comprised of the following:
1. NiagaraAX JACE – The web-based JACE shall act as the building supervisory controller.
2. NiagaraAX Supervisor - The Supervisor serves real-time graphical information to standard web-browser clients and also provides server-level functions such as: centralized data logging, archiving, alarming, trending, master scheduling and system-wide database management. In addition, the Supervisor provides a comprehensive, graphical engineering toolset for application development.
B. Tridium NiagaraAX Compatibility Statement (NiCS): The BAS system provided must utilize an open access product licensing procedure. The Tridium AX system provided for this project shall be capable of connection and management by any other
Niagara based tools or systems without the need to modify the license. The means that the end user (owner) does not have to authorize changes to the Tridium AX license for another systems integrator to gain access to the system. The end user does need to have the necessary administrative user names and passwords which shall be provided to the owner upon completion of the project. The following is an explanation of the NiCS licensing
1. BrandID: Every licensed station and tool has a Brand Identifier (BrandID). This field holds a text descriptor that the OEM chooses as the identifier for its product line. Each station or tool can have only one BrandID entry. The license shall be set as follows: BrandID = Any Brand
2. Station Compatibility In: This field is a list of brands that this local station will allow NiagaraAX data to come in from. Simply stated from the point of view of a JACE, “this is the list of brands that I can accept data from”. The license shall be set as follows: Station Compatibility In = All
3. Station Compatibility Out: This field is a list of brands that this local station will allow NiagaraAX data to be shared with. Simply stated, “this is the list of brands that I can share data with”. The license shall be set as follows: Station
Compatibility Out = All
4. Tool Compatibility In: This field is a list of brands that this station will allow to be connected to it for engineering of its application. Simply stated, “this is the list of brands that can engineer me”. The license shall be set as follows: Tool
Compatibility In = All
5. Tool Compatibility Out: This field is a list of brands that this tool is allowed to connect to and engineer. Simply stated, “this is the list of brands that I can engineer”. The license shall be set as follows: Tool Compatibility Out = All
C. Automatic temperature controls, field monitoring, and control system using field programmable microprocessor based units with communication to Building
Automation and Control System.
D. Base system on distributed system of fully intelligent, stand-alone controllers, operating in a multi-tasking, multi-user environment on token passing network, with central and remote hardware, software, and interconnecting wire and conduit.
E. Provide computer software and hardware, operator input/output devices, control units, local area networks (LAN), sensors, control devices, actuators.
F. Provide controls for terminal units, radiation, reheat coils, unit heaters, fan coils, air handling units, chillers, pumps, unit ventilators, etc. when directly connected to control units.
G. Provide installation and calibration, supervision, adjust
AS Built drawings for all completed work must be submitted in hardcopy and PDF format.
PART 3 SITE INFORMATION
SITE LOCATION - The Metropolitan Correctional Center’s physical location is 71 West Van Buren Street, Chicago, Illinois, 60605.
The parking structures physical address is 450 S. Federal Street, Chicago, Illinois, 60605
SITE ACCESS - There is no unimpeded, free access to secure areas of the Metropolitan Correctional Center. Therefore, contract work crews will be assigned an Officer escort for purposes of providing mobility, ensuring that security procedures are fully observed. When entering or exiting secure areas of the institution, contract workers must be accompanied by their escort officer, and processed according To established entry and exit procedures. (Note: The escort Officer has no authority to modify clarify or interpret any part of this contract.)
VEHICLE PARKING - On-premises parking for contractor vehicles is not available.
PART 4 SPECIAL CONDITIONS
BUILDING ADMITTANCE REQUIREMENTS - Contractor and all contract workers shall complete and sign an Application for Employment (Form SF-171), an Authorization for Release of Information (OPM-329A), a Name Check Request (Form DOJ-99), and a Fingerprint Check Request (FD-258). Admittance to the interior of the building is contingent upon receipt of acceptable
Background reports from the Federal Bureau of Investigation (FBI), National Crime Information Center (NCIC), and local law enforcement.
TOOL CONTROL - Contractor owned tools and or equipment shall be stringently controlled. At the beginning of each shift, a Tool/Equipment Inventory Form, supplied by MCC, will be completed and certified by the escorting officer in a designated staging location (usually the front lobby or rear vehicle entrance) prior to entering the building. Once tools have entered the building, they shall remain under continuous, close supervision. At the end of the shift, all tools and equipment will be returned to the staging location and re-inventoried. When an exact accounting of tools has been confirmed by the escorting officer, tools shall be removed from the premises.
CONSTRUCTION & CLEANING DEBRIS - Contractor shall remove from the premises, all debris and refuse created as a result of the door replacement.
PART 5 SCHEDULING & GENERAL INFORMATION
Work Scheduling - Work schedule will be determined on award of bid
PART 6 INSTRUCTIONS TO BIDDERS
Contractors are encouraged to visit the work site prior to bidding to familiarize themselves with the site conditions and job requirements.
File details come from the government source that posted it. Updated .