ATTACHMENT.CSI SPECS.doc
DOC document 758 KB Posted
- Attached to
- HWY 179 PULLOUTS
- Solicitation number
- IFB-AG-94TZ-S-10-0029
About this file
ATTACHMENT CSI SPECS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation.pdf | ||
| ATTACHMENT.SUPPLEMENTAL SPECS TO FP03.doc | DOC document | |
| ATTACHMENTS.FIRE PLAN AND WAGE DECISION.pdf | ||
| ATTACHMENT.DRAWINGS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HWY 179 Pullouts
ATTACHMENT 1
CSI SPECIFICATION INDEX
FOR
SR-179 SCENIC PULLOUTS
DIVISION 1 - GENERAL REQUIREMENTS
01000 - Project Coordination
01010 - Summary of Work
01020 – Temporary Soil Erosion and Water Pollution Control
01030 – Noxious Weed Control
01101 - Abbreviations
01102 - Definitions
01103 – Measurement and Payment
01300 - Submittals
01410 - Quality Control and Quantity Measurement
01620 – Storage and Protection
01710 - Cleaning
01730 – Operations and Maintenance Data
DIVISION 2 - SITE WORK
02072 – Obliteration of Abandoned Trails 02223 – Excavation and Backfill for Utilities
02224 – Excavation, Embankment and Backfill
02512 - Concrete Sidewalks/Slabs 02620 – Subdrainage 02795 – Porous Pavement
02841 – Signs
02901 – Barrier Rock
02951 – Seeding and Mulching
DIVISION 3 - CONCRETE
03100 - Concrete Formwork
03201 - Concrete Reinforcement
03251 - Expansion and Contraction Joints
03301 - Cast-in-Place Concrete
03345 – Concrete Finishing
03360 – Integrally Colored Concrete Finishes
DIVISION 4 – MASONRY
04100 - Masonry Mortar
04150 – Masonry Accessories
04220 – Reinforced Concrete Masonry Units 04850 – Rock Assemblies
DIVISION 5 - METALS
05720 – Handrails
DIVISION 6 – WOOD
06100 – Carpentry
DIVISION 7 – THERMAL & MOISTURE PROTECTION
07410 – Preformed Metal Roofing
07900 – Caulking and Sealants
DIVISION 9 - FINISHING
09900 – Painting and Graffiti Protection
END OF SPECIFICATION INDEX
DIVISION 1 GENERAL
PROJECT COORDINATION - 01000
PART 1 - GENERAL
1.1 - Description This work shall consist of coordination with government agencies and the general public.
1.2 - Related Sections 01010 - Summary of Work
01030 – Noxious Weed Control
PART 2 - PRODUCTS
None
PART 3 - EXECUTION
3.1 - Government Agencies All permits necessary for construction and occupancy of the project shall be obtained by the contractor.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement Work under this section will not be measured for payment, but is included in all other items in the contract.
4.2 - Payment Separate payment will not be made.
END OF SPECIFICATION 01000
DIVISION 1 GENERAL
SUMMARY OF WORK - 01010
PART 1 - GENERAL
1.1 - Location The project is located at three SR-179 Scenic Pullouts: Bell Rock Pathways, Courthouse Butte, and Little Horse Trailhead, 35 miles south of Flagstaff, 5 miles south of Sedona, 9 miles north of the junction of 179 and I-17. Driving time from Sedona, Arizona is approximately 10 minutes. Driving time from Flagstaff, Arizona is approximately 50 minutes. These locations are all highly visited recreational sites especially through the summer season.
1.2 - Site Work and Utilities General:
All work shall be completed in accordance with project specifications and construction drawings. The work includes all labor, material, and equipment necessary to perform all the operations for the work specified.
Site work:
The project consists of constructing accessible concrete sidewalks, masonry seatwalls with stone veneer, masonry retaining walls, fabrication and installation of metal handrails, striping of parking stalls, construction of concrete aprons/pads, removing and relocating existing wooden fence posts, constructing drainage ditches, installing new concrete scuppers, constructing french drains, removing and disposing existing landscape/retaining materials, including railroad ties, removing existing stairway and constructing new concrete stairways.
Additive Item 1:
This contract may include the construction of concrete sidewalk and striping application for an accessible parking stall at the Little Horse Trailhead. This work shall include all labor, material, and equipment necessary to completely construct the sidewalk and provide new striping.
Additive Item 2:
This contract may include the construction of new kiosk at the Courthouse Butte Trailhead. This work shall include all labor, material, and equipment necessary to completely construct a new wood-framed, corrugated self weathering steel roof, with rock veneer base, and concrete slab.
1.3 - Timing of Work The site shall be closed to the public during construction. No motorized activities may occur before 6:00 a.m. or after 8 p.m. seven days per week.
The Red Rock Ranger District will make notification to the public regarding no public use of the toilet during the contract. This will include the toilets at the Bell Rock and Courthouse Butte Trailheads. The toilet at the Little Horse Trailhead will be made available during the contract. If Optional Item 1 is included in this contract, then temporary access to the toilet for the public shall be provided, AS SHOWN ON THE DRAWINGS.
1.4 - Government-Furnished Facilities
1. The site is available to the Contractor for staging and storage during construction. Any damage resulting from the Contractor's use of the site will be repaired or replaced at the Contractor’s expense at the direction of the Engineer.
2. Sanitary facilities for construction workers shall be the public facilities at these sites.
3. All temporary services and use areas shall be completely removed and the areas restored upon completion of use.
4. Electricity is not available at the project site.
5. Water for construction purposes is not available at the site. Pumping, hauling and placing water shall be the Contractor's responsibility. The Contractor shall submit a water source for the Engineer’s approval. Water supply shall be incidental to other payments. Water is available from Red Rock Ranger District Administrative Site approximately 2-6 miles one way. Contactor shall coordinate with the District staff for this water source.
6. Potable water is not available on the project site.
7. Transportation to and from the work site for the Contractor's personnel and materials will be provided at the Contractor's expense.
1.5 - Material Sources All materials shall be obtained from a commercial source unless noted otherwise.
1.6 - Subsurface Soils and Investigations No auger boring tests were made in the area. Under supervision of the Engineer, the Contractor shall undertake any site investigations necessary to ascertain subsurface conditions.
1.7 - Precautionary Measures
Protection of Work:
The Contractor shall take precautions to protect all work during the construction period and shall provide and maintain adequate protection during severe weather conditions to prevent damage to the work, materials and equipment.
Safety:
The Contractor is responsible for safeguarding employees, public, existing facilities, and forest resources from his operations. All operations shall be in compliance with the requirements and restrictions of OSHA, the Arizona Occupational Safety and Health Code, and the Workman’s Compensation Board. The Contractor shall erect signs and chain-link fencing barricades as necessary to make unguarded operations safe. Signs and barricades shall be maintained at night and on weekends. Precautions such as lowering tractor blades and safely storing materials shall be practiced to prevent injury to others in the area.
Security:
No security shall be provided by the Government. The Contractor shall take all precautions deemed necessary to secure the worksite, improvements and equipment. This may include security fencing and/or a night watchman with mobile communication.
END OF SPECIFICATION 01010
DIVISION 1 GENERAL
TEMPORARY SOIL EROSION AND WATER POLLUTION CONTROL - 01020
PART 1 - GENERAL
1.1 - Description This work consists of temporary measures as specified herein or directed by the Engineer to control soil erosion and water pollution, through the use of berms, dikes, dams, sediment basins, silt fences, brush barriers, fiber mats, netting, mulches, grasses, slope drains, and other devices or methods.
The control provisions shall be coordinated with the permanent erosion control features in the contract to ensure economical, effective, and continuous protection throughout the construction period.
1.2 - Related Work Specified Elsewhere 02224 – Excavation, Embankment, and Backfill
1.3 – Submittals
Erosion Control Plan
PART 2 - PRODUCTS
NONE
PART 3 - EXECUTION
3.1 - Plan and Construction The Contractor shall submit an Erosion Control Plan to the Engineer for approval prior to the beginning of any ground disturbing activities. The plan shall specify both temporary and permanent measures for erosion control, at specific locations, during specified stages of work. All permanent erosion control features shall be incorporated into the project at the earliest practicable time to minimize the need for temporary erosion control. Permanent erosion control features are SHOWN ON THE DRAWINGS. Clearing and grubbing shall be scheduled and performed so that grading operations and permanent erosion control measures can follow without interference.
The plan shall include drawings identifying the locations of erosion control measures as well as a narrative discussion. The plan should also identify the individual responsible for insuring the erosion control measures are implemented.
Elements that shall be considered in an Erosion Control Plan are:
1. Minimize the amount of clearing and grubbing and limit exposure of erodible area. The Arizona Water Quality Control Council for Construction and Related Activities in Water recommends limiting exposure of erodible surface to 750,000 square feet at any one time.
2. Measures to minimize off-site runoff onto cleared areas. These could include berms, diversions or drains to convey off-site runoff around or through cleared areas.
3. Measures to prevent sediments from disturbed areas from reaching stream channels or water bodies. These could include hay or straw bale checks to act as erosion filters and barriers at the toe of fills and as erosion checks in ditches, pipe outlets, and drainage channels. Rock check dams may be used to trap sediments in ditches or drainages. Sediment basins may be constructed to capture on-site runoff to settle sediments before water is discharged to natural channels or water bodies.
4. Wash water from aggregate washing or other operations containing mud or silt shall be treated by filtration or retention in a settling pond, or ponds, adequate to prevent muddy water from entering stream channels or water bodies. The location of aggregate washing operations and filtration or retention facilities shall be identified on drawings submitted with the Erosion Control Plan.
5. Oily or greasy substances originating from the contractors operations shall be removed from the National Forest lands and disposed in an approved site. Portland cement, fresh portland cement concrete, and wash water from concreting operations shall not be disposed of except at sites approved by the Engineer.
6. Excavation and/or fill material shall not be placed in drainage channels at any time. Existing channel flows shall not be restricted at any time during construction except by structures specifically intended to trap or filter sediments or other pollutants. Material derived from roadway work shall not be deposited in stream channels. The Contractor shall not operate equipment in live streams except as approved by the Engineer. Construction equipment shall cross drainage channels only at crossings designated by the Engineer.
7. The Contractor shall operate and maintain all temporary pollution and erosion control features in a functional condition during the life of the contract. When depth of materials retained in these facilities reaches three-fourths capacity, the facilities shall be cleaned and restored to their original condition. Material cleaned from these facilities shall be disposed of at a site approved by the Engineer or incorporated into the work where feasible.
8. Removal and disposal of all temporary erosion control devices shall be specified in the Erosion Control Plan.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement There will be no separate measurement of this item.
4.2 - Payment This work is incidental to other items in the contract and direct separate payment will not be made.
END OF SPECIFICATION 01020
DIVISION 1 – GENERAL
NOXIOUS WEED CONTROL – 01030
PART 1 - GENERAL
1.1 - Description This work consists of incorporating weed prevention and control within the project site. The Contractor shall prevent new weed infestations and the spread of existing weed infestations within the project site as specified herein.
1.2 - Related Work Specified Elsewhere 02072 – Obliteration of Abandoned Trails
PART 2 - PRODUCTS
None.
PART 3 - EXECUTION
3.1 - Equipment The Contractor shall ensure all equipment brought onto the forest is thoroughly washed/cleaned in order to remove all soil, vegetative matter, and other debris prior to entering the forest. Particular attention shall be given to the under carriage and any other surface where soil containing weed seed and propagules may exist. All equipment shall be inspected by the Forest Service. Only construction and maintenance equipment, and the equipment necessary to transport said equipment, cleaned and inspected by the Forest Service, shall be allowed to operate within the project area. All subsequent move-ins of equipment to the project area shall be treated in the same manner as the initial move-in.
The Contractor shall employ cleaning methods, approved by the Forest Service, to ensure that construction and maintenance equipment is free of noxious weeds. Equipment shall be considered free of soil, seed, and other such debris when a visual inspection does not disclose such material. Equipment or component disassembly, or the need for specialized tools, are not required.
Unless otherwise agreed, the Contractor shall give the Forest Service at least 24 hour notice when equipment is ready for inspection. Notification will include an agreed upon location where the equipment will be available for inspection by the Forest Service. Inspection will be required after every cleaning.
3.2 – General Project Work
The Contractor shall minimize soil surface disturbance wherever possible.
All fill and surfacing material sources shall be approved by the Engineer prior to being transported to the project site. All sources shall be free of hazardous, invasive, and noxious plant species contamination.
New infestations of noxious weeds of concern to Forest Service and identified by either Contractor or Forest Service, on the project site or on haul routes the Contractor plans to use, shall be promptly reported to the other party. Contractor and Forest Service shall agree on treatment methods to reduce or prevent the spread of hazardous, invasive, and noxious plant species when new infestations are found. A current list of hazardous, invasive, and noxious plant species is available at each Forest Service office. A copy of this list as well as the Forest Service’s Best Management Practices will be submitted to the contractor.
A Noxious Weed Summary (“standards and guides”) will be submitted to the Contractor by the Government providing information about hazardous, invasive, and noxious plant species that may be encountered at the project sites or haul roads.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement There will be no separate measurement of this item.
4.2 - Payment This work is incidental to other items in the contract and direct separate payment will not be made.
END OF SPECIFICATION 01030
DIVISION 1 GENERAL
ABBREVIATIONS - 01101
Organizations & Standards Whenever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows. Reference to a specific standard of specification shall mean the latest edition or amendment in effect on date of invitation to bid.
AASHTO--American Association of State Highway and Transportation Officials
ACI--American Concrete Institute
AISC--American Institute of Steel Construction
AISI--American Iron and Steel Institute
ANSI--American National Standards Institute
APA--American Plywood Association
ASTM--American Society for Testing and Material
AWPA--American Wood Preservers Association
AWPB--American Wood Preservers Bureau
AWS--American Welding Society
AWWA--American Water Works Association
CFR--Code of Federal Regulations
CRSI--Concrete Reinforcing Steel Institute
CS--Commercial Standard issued by U.S. Department of Commerce
EPA--Environmental Protection Agency
FAR--Federal Acquisition Regulation
FED SPEC. or FS-- Federal Specifications
FSS--Federal Specifications and Standards
GSA--General Services Administration
MUTCD--Manual on Uniform Traffic Control Devices
NEMA--National Electrical Manufacturers Association
NESC--National Electrical Safety Code
NFPA--(Fire)--National Fire Protection Association
NFPA--(Forest)--National Forest Products Association
NWMA--National Woodwork Manufacturers Association
OSHA--Occupational Safety and Health Administration
PCA--Portland Cement Association
PCI--Prestressed Concrete Institute
PS--Product Standard issued by the U.S. Department of Commerce
SF--Standard Form
SSPC--Steel Structures Painting Council
UL--Underwriter's Laboratories, Inc.
WWPA--Western Wood Products Association
ABBREVIATIONS
Aluminum
AL.
Asphalt
ASP.
Barbed Wire
B.W.
Bituminous Coated Corrugated Steel Pipe . . . . B.C.C.S.P. OR B.C.C.S. PIPE
Bituminous Surface Treatment
BST
Cement
CEMT.
Cement Treated
CEMT.-T.
Cement Treated Base
CTB
Clearing & Grubbing
CLEAR & GRUB
Compaction
CMPCT.
Concrete
CONC.
Corrugated Metal Pipe
CMP
Corrugated Steel Pipe
C.S.P.
Corrugated Steel Pipe Arch
C.S.P. ARCH
Cubic Yard
C.Y.
Cubic Yard Mile
C.Y.MI.
Diameter
DIA.
Each
EA.
Emulsified
EMLSFD.
Erosion and Pollution Control
E&P CONTROL
Fabricated
FABR.
Finish Floor Elevation
F.F.E.
Foundation
FOUND.
Furnished
FURN.
Gallon
GAL.
Grade
GR.
Height
HT.
High Strength
H. STRENGTH
Horizontal
HOR.
Hour
HR.
Linear Foot
L.F.
Liquid
LIQ.
Loading
LD.
Lump Sum
L.S.
Material
MAT'L
Maximum
MAX.
Method
M.
Mile
MI.
Minimum
MIN.
One Thousand Feet Board Measure . . . . . . . . MFBM
One Thousand Gallons
M.GALS.
One Thousand Gallons Mile
M.GALS.MI.
One Thousand Square Feet M.S.F.
Polyvinylchloride
PVC
Pounds
LBS.
Reflectorized
REFLECT.
Section
SEC.
Square Foot
S.F.
Square Yard
S.Y.
Station
STA.
Station Yard
STA. YD.
Strand
S.
Structural
STRUCT.
Structural Steel
S. STEEL
Stump
STMP
Target Value
TV
Thickness
TH.
Ton Mile
T.M.
Tops and Limbs
T&L
Utilization of Timber
UOT
Vertical
VERT.
Welded Wire Fabric W.W.F.
White
WH.
Width
W.
With
W/
Without
W/O
Woven wire
W.W.
Yellow
YE.
END OF SPECIFICATION 01101
DIVISION 1 – GENERAL
DEFINITIONS - 01102
Wherever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:
Adjustment in Contract Price. "Adjustment in contract price" shall mean "equitable adjustment" as used in the Federal Acquisition Regulations.
Arch Pipe. A culvert section, usually formed of bolted structural plates, that is an arc of a circle (usually one-half or less); that is, a bottomless culvert.
Base Course. The layer or layers of specified or selected material of designed thickness placed on a subbase or subgrade to support a surface course.
Berm. Curb or dike constructed to control runoff water or traffic flow.
Change. "Change" means "Change Order" as used in the Federal Acquisition Regulations.
Clearing Limits. The limits of clearing as designated on the ground or on the drawings.
Conduit. A natural or artificial channel for carrying fluids, as water pipes, canals, and aqueducts.
Construction Slash. All vegetative material not meeting utilization standards, such as tops and limbs, timber, brush, and grubbed stumps associated with construction or reconstruction of a facility.
Contractor. The individual, partnership, joint venture, or corporation undertaking the execution of the work under the terms of the contract and acting directly or through their agent, employees, or subcontractors.
Contracting Officer (CO). The person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings.
Contractor Officer Representative (COR). The person designated by the CO in writing as the on site contract administrator whose duties and responsibilities are defined in a letter of designation (form FS-6300-6, or equivalent).
Culvert. A conduit or passageway under a road, trail, or other obstruction. A culvert differs from a bridge in that it is usually constructed entirely below the elevation of the traveled way.
Defect. A failure to meet a requirement with respect to a single quality characteristic.
Drawings. The documents, including plan and profile sheets, cross sections, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials showing details for construction of a facility.
Embankment. A structure of soil, aggregate, or rock material placed on the prepared ground surface and constructed to subgrade.
Engineer. The Contracting Officer's Representative (COR) responsible for onsite administration of the contract.
Equipment. All machinery and equipment, together with the necessary supplies for upkeep and maintenance, as well as tools and apparatus necessary for the proper construction and acceptable completion of the work.
Excess Excavation. Material from the excavation in excess of that needed for construction of designed roadways and facilities.
Forest Service. The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
Gauge. The term "gauge" when used in connection with the measurement of plates will mean the U.S. Standard Gauge, except when reference is made to the measurement of metal sheets used in the manufacture of corrugated metal, pipe, metal plate culverts and arches, and metal cribbing, then the term means the "gauge" or "thickness" specified in AASHTO M 36, M 167, M 196, and M 219, as applicable. When the term "gauge" refers to the measurement of wire, it will mean the wire gauge specified in AASHTO M 32.
Government Land. National Forest System lands, and other lands controlled or administered by the Forest Service or by other Federal agencies.
Inspector. The Government-authorized representative designated in writing by the CO or COR responsible for detailed inspection.
Job-Mix Formula. The percentage of each material in a mixture intended for a particular use.
Laboratory. A testing laboratory of the Government or any other testing laboratory approved by the Contracting Officer.
Materials. Any substance specified for use in the construction of the project and its appurtenances.
Maximum Density. The highest density that can be obtained under stated conditions.
Measurement. Determining and expressing the quantities of work or materials.
Neat Line. A line defining the proposed or specified limits of an excavation or structure.
Nominal Dimensions or Weights. The numerical values shown on the drawings or in the specifications as measurements of material to be used in the construction.
Nominal Maximum Particle Size. The largest sieve size listed in the applicable specification upon which any material is permitted to be retained.
Overbreak. Material beyond the neat line of an excavation that is removed in the process of excavation, usually by blasting.
Pavement Structure. Subbase, base, or surface course, or combination thereof, placed on a subgrade to support the traffic load and distribute it to the roadbed.
Pipe. A culvert that is circular (round) in cross-section.
Pipe-Arch. A pipe that has been factory-deformed from a circular shape such that the width (or span) is larger than the vertical dimension (or rise).
Profile Grade. The trace of a vertical plane, as shown on the drawings, intersecting the top surface at the centerline of the proposed facility construction.
Random Sampling. Sampling at times or locations determined in advance by the use of a table of random numbers.
Reasonably Close Conformity. Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is compliance with reasonable and customary manufacturing and construction tolerances.
Roadway. The portion of the road within the limits of excavation and embankment, including slope rounding.
Schedule of Items. A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Second Samples. A sample taken when the initial sample indicates that the material is defective.
Sidewalk. The portion of the roadway constructed primarily for pedestrian use.
Specifications. A description of the technical requirements for a material, product, or service that includes criteria for determination whether these requirements are met.
Standard Specifications. Specifications approved for general application and repetitive use.
Subbase. The layers of specified or selected material of designed thickness placed on a subgrade to support a base course.
Subgrade. The layers of roadbed that bring it up to the top surface, upon which subbase, base, or surface course is constructed. For roads without base course or surface course, that portion of roadbed prepared as the finished wearing surface.
Target Value. The percentage of each material in a mixture intended for a particular use from which allowable variations are measured.
Unit of Measurement. The unit and fractions of units shown in the Schedule of Items.
Unsuitable Material. The material excavated during roadway construction that is not usable in embankment and must be disposed of or that can be used only in certain locations or for limited purposes.
END OF SPECIFICATION 01102
DIVISION 1 - GENERAL
MEASUREMENT AND PAYMENT - 01103
PART 1 - GENERAL
1.1 – Requirements:
Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered incidental to and included in the payment of the pay items in the SCHEDULE OF ITEMS.
1.2 – Measurement Terms and Definitions:
Unless otherwise specified, the following terms are defined as follows:
Each. One entire unit. The quantity is the actual number of units completed and accepted.
Linear foot. As applicable, measure the work along its length from end-to-end; parallel to the base or foundation; along the top; along the front face; or along the invert. Do not measure overlaps.
Lump sum. Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item. The quantity is designated as "1." Estimated quantities of lump sum work shown in the contract are approximate.
Square yard. 9 square feet. Longitudinal and transverse measurements for area computations will be made horizontally. No deductions from the area computation will be made for individual fixtures having area of 9 square feet or less.
Payment will be by units defined and determined according to U.S. Standard measure.
END OF SPECIFICATION 01103
DIVISION 1 GENERAL
SUBMITTALS - 01300
PART 1 - GENERAL
1.1 - Requirements It will be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work which involves the item. Contractor shall allow ten (10) days for processing of submittals by the Government.
Submittals may also be referred to as SHOP DRAWINGS.
1.2 - Manufacturer's Literature and Shop Drawings Submit two (2) copies to the Engineer for approval on the items required herein.
Submittal specifications are to be submitted in the following format:
A. The specifications and salient qualities of the item specified in the contract.
B. The specifications and salient qualities of the submittal item.
C. A listing of the differences and a comparison between the two, including but not limited to the structural qualities, operational qualities, any modifications necessary to accomplish installation of unit, and guarantee and warranty.
D. A cost comparison between the specified and submitted item(s) with the cost reduction benefit to the government or adequate justification for a cost increase to the government.
E. Shop drawings of submitted item(s) including wiring or layout diagrams.
If there are any modifications necessary to facilitate installation, a set of drawings showing installation of specified item and a set showing how the submittal item will be installed shall be submitted to the C.O.R.
If the specified item is to be accessible, the submittal item needs to meet current Americans with Disabilities Act Accessibility Guidelines (ADAAG) or Forest Service Accessibility Guidelines and show to be installed for accessibility on submitted drawings, not just state it is available as accessible.
Submittals will be waived if Contractor furnishes exact item used for design when manufacturer's model, size, etc. are shown in the contract.
Submittals are required per the following sections:
1. 301 – Crushed Aggregate Certificate-of-Compliance of Crushed Aggregate
Certificate-of- Compliance of Aggregate
2. 602 – Precast Trench Drain
Product Data
3. 1020 – Erosion Control Plan
Temporary Erosion Control Plan for construction activities
4. 01410 – Quality Control and Quantity Measurement
Contractor's Representative Designation
Project Schedule
Quality Control Plan
As-Built Drawings
Certificates-of-Compliance
Quantity Measurements
Test Results
Bill-of-Ladings
5. 02304 – Select Material
Certificates-of-Compliance of Select Material
6. 03301 - Cast-in-Place Concrete
Mix Design
Admixtures
Delivery Tickets
7. 04100 - Masonry Mortar
Manufacturer’s Prepare Dry Color Sample
8. 04220 – Reinforced Concrete Masonry Units
Samples of Proposed Concrete Masonry Units
Certificate-of-Compliance of Masonry Units
9. 04850 Rock Assemblies 2 typical size stones from selected source to show range of color, texture and hardness.
10. 05500 - Metal Fabrications
Shop Drawings
11. 07410 - Preformed Metal Roofing
Manufacturer’s Specifications and Installation Recommendations
Product Samples
Shop drawings
Warranties
12. 09900 - Painting and Graffiti Protection
8” X 8” Top Coat Finish Samples
Product Data
Other required submittals include all those as specified in the referenced Forest Service Specifications for this project.
END OF SPECIFICATION 01300
DIVISION 1 - GENERAL
QUALITY CONTROL AND QUANTITY MEASUREMENT - 01410
PART 1 - GENERAL
1.1 - Description This work shall consist of providing quality control in conformance with the Inspection of Construction provisions of this contract to ensure compliance with the drawings, specifications, and provisions of the contract, and measuring the quantities of completed work in conformance with the provisions of the applicable specification. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of this specification.
1.2 - Related Work Specified Elsewhere General Provisions FAR 52.236-5, Material and Workmanship
General Provisions FAR 52.236-6, Superintendence by the Contractor
General Provisions FAR 52.246-12, Inspection of Construction
1.3 - Submittals Submittals under this section shall be furnished to the Engineer. Submittals include, but are not limited to the following:
Contractor's Representative Designation
Project Schedule
Quality Control Plan
As-Built Drawings
Certificates-of-Compliance
Quantity Measurements
Test Results
Bill-of-Ladings
PART 2 - PRODUCTS
None
PART 3 - EXECUTION
3.1 - Contractor's Representative Submit a letter to the Contracting Officer stating the name of the on-the-job superintendent or representative for the Contractor and the duties and authorities of the representative during work under this contract.
3.2 - Project Schedule Submit a project schedule stating information such as proposed dates of completion of various elements of construction.
3.3 - Quality Control Plan The Quality Control Plan shall consist of the following:
(1) Authorities and responsibilities of inspection and testing personnel.
(2) Experience and qualifications of inspection and testing personnel to be assigned and name and location of any (for hire) testing facility to be used.
The Contractor's proposed quality control plan for all items requiring quality control shall be submitted to the Engineer for review prior to the Contractor commencing work. Within 10 days of receipt of the plan, the Engineer shall notify the Contractor whether the plan adequately covers quality control requirements. Construction work shall not be performed prior to Contractor's receipt of written approval of the proposed plan. The Contractor shall submit to the Engineer, in writing, any proposed changes in the approved quality control plan. Proposed changes shall not be put into effect until approved in writing by the Engineer.
All work shall comply with local applicable codes and codes referenced in individual sections of the technical specifications.
3.4 - Sampling, Testing, Inspection, and Measurement of Quantities The Contractor shall provide and maintain appropriate measuring and testing devices, equipment, and supplies to accomplish the required measurement, testing, and inspection in a timely manner. Tests, measurements, and certifications shall be made as required by the drawings and specifications. The Contractor shall take samples and perform inspections and tests necessary to achieve the quality of construction required by the contract and make required measurements of work under this contract performed onsite or offsite. Sampling and testing frequency for specific items shall be specified in the related section.
The Contractor shall maintain current records of all inspections and tests performed. The following information will be acceptable to the Government:
PROJECT NAME:________________________CONTRACT No.__________________
Pay Item No.
Test Date Location Standard Results Test By
(Initials)
The Contractor shall engage inspection and testing agencies which are prequalified as complying with the recommendations of "Independent Laboratory Qualification" by the American Council of Independent Laboratories, and which specialize in the types of inspections and tests to be performed.
The Contractor shall protect construction exposed by or for quality control service activities and protect repaired construction. Upon completion of inspection and testing repair damaged construction and restore substrates and finishes to eliminate deficiencies. The Contractor is responsible for repair and protection of inspected work, whether inspection is performed by the Contractor or by the Government.
The Contractor shall certify in writing that all inspections and tests were performed in accordance with specifications.
3.5 - As-Built Drawings The Contractor shall maintain a set of the contract drawings depicting as-built conditions. These drawings shall be maintained in a current condition and shall be available for review. All variations from contract drawings shall be indicated in red on the drawings. Upon completion of the contract work, as built drawings shall be submitted to the Contracting Officer (CO) or Contracting Officer Representative (COR).
3.6 - Certificates and Measurements Certification:
The Contractor shall furnish certificates executed by the manufacturer, supplier, or vendor, stipulating that all offsite produced materials incorporated into the work meet the applicable requirements SHOWN ON THE DRAWINGS or stated in the specifications. Incidental purchases needed to remedy minor shortages of material shall be certified by the Contractor. Earth, aggregate, and concrete material shall be certified and accurately completed indicating weights, volumes, and batch times where appropriate.
Measurements:
The Contractor shall make all measurements for computation of quantities for all work items except those specified for payment by Designed Quantity (DQ). The Contractor shall compute the quantities for periodic progress payments; the Engineer will compute the quantities for the final payment based on measurements taken by the Contractor. All Contractor measurements are subject to verification. The Contractor shall submit all field notes, calculation sheets, and other data used to determine quantities. The Contractor shall certify in writing as to the accuracy of the measurements and computations submitted.
The following format or one containing the following information will be acceptable to the Government:
PROJECT NAME:_______________________CONTRACT No.__________________
Quantity or
Pay Item
Date
Measurement
Test By
(Initials)
3.7 - Aggregate Materials When the material sources are not designated as Government-furnished or the Contractor elects not to use designated sources, the Contractor shall be responsible for furnishing materials that produce an end product equivalent in performance to that originally designated and that meets contract specifications.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement There will be no separate measurement for this section.
4.2 - Payment This work is incidental to other items in the contract and direct separate item payment will not be made.
END OF SPECIFICATION 01410
DIVISION 1 – GENERAL
STORAGE AND PROTECTION – 01620
PART 1 - GENERAL
1.1 - Description This section of work covers storage and protection procedures for the products scheduled for use.
1.2 - Related Work Specified Elsewhere 01300 - Submittals
PART 2 - PRODUCTS
None
PART 3 - EXECUTION
3.1 – Manufacturer’s Recommendations Except as otherwise approved by the Engineer, determine and comply with manufacturer’s instructions on product handling, storage and protection.
3.2 - Packing Deliver products to the job site in the manufacturer’s original container, with the labels intact and legible.
1. Maintain packaged materials with seals unbroken and labels intact until time of use.
2. Promptly remove damaged material and unsuitable items from the job site, and promptly replace with material meeting the specified requirements at no additional cost to the Forest Service.
The Engineer may reject as non-complying such material and products that do not bear identification satisfactory to the Forest Service as to the manufacturer, grade, quality and other pertinent information.
All product literature, warranties and operating instructions must be intact and placed in a binder and transmitted to the Forest Service.
3.3 – Protection Protect finished surfaces, including jambs and soffits of openings used as passageways, through which equipment and materials are handled.
Provide protection for finished floor surfaces in traffic areas prior to allowing equipment and materials to be moved over such surfaces.
Maintain finished surfaces clean, unmarred and suitably protected until accepted by the Forest Service.
3.4 – Repairs and Replacements
In event of damage, promptly make replacements and repairs to the approval of the Forest Service and at no additional cost to the Forest Service.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement There will be no separate measurement for this section.
4.2 - Payment This work is incidental to other items in the contract and direct separate item payment will not be made.
END OF SPECIFICATION 01620
DIVISION 1 – GENERAL
CLEANING – 01710
PART 1 - GENERAL
1.1 - Description Throughout the construction period, maintain the construction site and facilities in an orderly and clean manner as described in this Section.
PART 2 - PRODUCTS
2.1 – Cleaning Materials and Equipment Provide required personnel, equipment and materials as needed to maintain the specified standard.
2.2 – Compatibility Use only the cleaning materials and equipment, which are compatible with the surface being cleaned, as recommended by the manufacturer of the cleaning material.
PART 3 - EXECUTION
3.1 – Progress Cleaning Retain stored items in an orderly arrangement allowing maximum access, not impeding traffic or drainage, and providing required protection of materials.
Do not allow accumulation of scrap, debris, waste material and other items not required for construction of this work.
At least twice each month, and more often if necessary, completely remove all scrap, debris and waste material from the job site.
Provide adequate storage for all items awaiting removal from the job site, observing requirements for fire protection and protection of the ecology.
3.2 – Site
Daily, and more often if necessary, inspect the site and pick up all scrap, debris and waste material. Remove such items to the place designated for their storage.
Maintain the site in a neat and orderly condition at all times.
Clean mud and debris from roadways or highways adjacent to the project site daily.
3.3 – Structure
At least weekly inspect the structures and pick up all scrap, debris and waste material and remove them to the place designated for their storage.
“Clean” for the purpose of this paragraph shall be interpreted a meaning free from material capable of being removed by reasonable effort with a handheld broom.
3.4 – Final Cleaning
Prior to completion of the work, remove from the job site all tools, surplus materials, equipment, scrap, debris and waste.
Structures:
1.
Exterior:
a.
Visually inspect exterior surfaces and remove all traces of soil, waste materials, smudges and other foreign matter.
b.
Remove all traces of splashed materials from adjacent surfaces.
c.
In the event of stubborn stains not removable with water, the Forest Service may require light sandblasting or other cleaning at no additional cost to the Forest Service.
2.
Interior:
a.
Visually inspect interior surfaces and remove all traces of soil, waste materials, smudges and other foreign matter.
b.
Remove all traces of splashed material from adjacent surfaces.
c.
Remove paint drippings, spots, stains and dirt from finished surfaces.
Final cleaning of the project site shall be approved by the Forest Service prior to final acceptance of the work.
END OF SECTION 01710
DIVISION 2 - SITE WORK
OBLITERATION OF ABANDONED TRAILS - 02072
PART 1 - GENERAL
1.1 - Description This section specifies work required for the obliteration of trails.
1.2 - Related Work Specified Elsewhere 01030 – Noxious Weed Control
02224 - Excavation, Embankment and Backfill
PART 2 - PRODUCTS
None.
PART 3 - EXECUTION
3.1 - Performance Trails shall be obliterated where SHOWN ON THE DRAWINGS. The natural drainage pattern shall be restored or maintained or both. The trail pathway shall be ripped, plowed or scarified to a depth of six (6) inches to promote the establishment of vegetation, and the slopes shall be rounded to approximate the original contour. All existing surfacing material shall be removed and incorporated into the subgrade of trails designated to remain open.
Where SHOWN ON THE DRAWINGS or as directed by the Engineer, excess or unsuitable material from new construction shall be used in obliterating the abandoned trail.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement This work will not be measured for separate payment.
4.2 - Payment This work is incidental to other items in this contract and direct separate payment will not be made.
END OF SPECIFICATION 02072
DIVISION 2 - SITE WORK
EXCAVATION AND BACKFILL FOR UTILITIES - 02223
PART 1 - GENERAL
1.1 - Description This section covers excavation; furnishing, hauling, placing select backfill materials and bedding material; watering; compaction; disposal of excess or unsuitable material; and grading for utilities.
1.2 - Related Work Specified Elsewhere 201 – Clearing & Grubbing
01030 – Noxious Weed Control
02620 – Subdrainage
04850 – Rock Assemblies
1.3 - Class of Material Material to be excavated for installation of utilities is unclassified. Contractor is advised to classify the material to their satisfaction.
1.4 - Approvals Required Excavation Notify Engineer when excavation is completed. Do not place pipe, bedding, or backfill until the excavation is approved by the Engineer.
Backfill Do not place backfill until installation of pipe has been approved by the Engineer.
1.5 - Backfill Time Limit Backfill and restore surface materials of subdrainage line trenches located in existing roadways or parking areas within seven days after approval to place backfill by the Engineer.
PART 2 - PRODUCTS
2.1 - Backfill Materials Backfill shall contain no frozen or organic material.
(a) Select Excavated Material Excavated material containing no rocks larger than 6 inches in largest dimension.
(b) Bedding/Shading Material Fine sand or soil with a maximum P.I. of 10, 100% passing the 3/8" sieve, without sharp chips or points.
(c) Conduit Backfill Material free of sharp edges and rocks greater than 4" inches diameter.
(d) Water shall be reasonably clean and free of injurious substances.
PART 3 - EXECUTION
3.1 - Excavation Excavation shall not begin until any clearing or grubbing work has been completed. Operations shall be in compliance with the requirements and restrictions of OSHA, the Arizona Occupational Safety and Health Code, and the Workman's Compensation Board.
All trenches shall be excavated in reasonably close conformity with the lines and grades AS SHOWN ON THE DRAWINGS. Any shifting or change from the alignment and grade shown on the drawings must receive prior approval by the Engineer in writing.
Lay utilities in continuous open trench. Short tunnel sections or boring may be used in special locations with the approval to the Engineer.
Trim roots flush with trench wall.
3.2 - Over excavation Restore to grade any over excavation by backfilling with bedding material.
3.3 - Wet Excavation If water is encountered during trench excavation, provide adequate pumping equipment and piping to keep trench free from water and dispose of the water without damage to adjacent property. Separate payment will not be made for pumping of water from trenches or for excavation of material rendered unsuitable as a result of water encountered.
3.4 – Back Sloping, Sheeting and Shoring Back sloping of trench walls shall be allowed only upon prior written approval of the Engineer.
Remove all shoring and sheeting when construction is completed. Withdraw shoring in such a manner as to prevent trench wall from caving in while backfilling.
3.5 - Excavated Material Pile excavated material at the side of the trench where it will provide the best protection for the work. Leave adequate space between the toe of the spoil pile and edge of trench, to prevent material from falling into the trench.
3.6 - Backfill Before compacting backfill other than rock or sand, prepare material to a water content that will permit proper compaction by either aerating the material if it is too wet, or spraying the material with water if it is too dry. Thoroughly mix each lift before compaction to assure uniform distribution of water content. Do not compact material above pipe until there are 6” of cover over the pipe. Compact each lift to the required density.
(a) Bedding and Shading Place in lifts 6 inches or less and compact with a minimum of 3 passes over the entire lift surface. Compact around pipe barrel and bells by hand tamping.
(b) Select Excavated Material and Conduit Backfill Distribute large rocks so they are individually surrounded by fine materials and not directly against any conduit or pipe materials. Place 12-inch lifts or less and compact to at least 90% of the maximum dry density as determined by AASHTO T-99.
(c) Backfill and Compaction in Roadways Place 6-inch lifts and compact to at least 95% of maximum dry density as determined by AASHTO T-99.
(d) Surface Restoration Mound final compacted lift above grade, except in roadways and drain field trenches, where the final surface shall be even with the surrounding roadway.
(e) Final Finish After the drainpipe installation and backfill have been completed, finish all disturbed areas, to a smooth, uniform grade and texture, well blended to the original contours, showing minimum evidence of construction activity.
3.7 - Disposal of Excess Excavation and Unsuitable Material All suitable excavated materials shall be used as backfill.
All excavated materials not required or unsuitable for backfill shall be utilized on the site, by either being broken for incorporation into suitable backfill, utilized on site as barrier rocks if approved by the Engineer. Rocks may be broken by mechanical means. The Contractor shall be responsible for all costs involving reducing rock size.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement The work specified herein will not be measured for payment.
4.2 - Payment The work is incidental to other items in this contract and direct separate item payment will not be made.
END OF SPECIFICATION 02223
DIVISION 2 - SITE WORK
EXCAVATION, EMBANKMENT AND BACKFILL – 02224
PART 1 - GENERAL
1.1 - Description This section specifies excavation, embankment and backfill, hauling and placing of backfill and embankment material; watering; compaction; disposal of excess or unsuitable excavated material; final grading for toilet building, concrete aprons, concrete sidewalks, and access; retaining/seating walls, concrete scuppers, and relocation and placement of existing and generated barrier rocks.
1.2 - Material Classification Material to be excavated is unclassified. Contractor is advised to classify the material to their satisfaction.
1.3 - Related Work Specified Elsewhere 201 – Clearing and Grubbing 204 – Excavation and Embankment 01030 – Noxious Weed Control 02223 – Excavation and Backfill for Utilities 02901 – Barrier Rocks 04850 – Rock Assemblies
PART 2 - PRODUCTS
2.1 - Backfill Material Backfill material shall be readily compactable excavated material free of frozen or organic material, highly plastic clay or other objectionable material and shall contain no rocks larger than 6 inches in diameter.
2.2 - Water Water shall be reasonably clean and free of injurious substances.
PART 3 - EXECUTION
3.1 - Excavation All suitable excavated materials shall be used in construction of embankments, slopes, and backfill.
No excavated material shall be placed in lakes, live streams, or washes.
Rocks too large to be incorporated into embankments shall be broken for incorporation into the embankment or relocated to locations approved by the Engineer for use as barrier rocks.
3.2 - Backfill General backfill shall be placed in horizontal layers not exceeding 12 inches (loose…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .