IFB_Forms_ATT_B_Bid_Schedule-Marana.xlsx
XLSX spreadsheet 84 KB Posted
- Attached to
- Master Agreement AZ|CTR079528
- Contract number
- CTR079528
- Issued by
- Arizona
About this file
This document is a Bid Schedule (Attachment B) for the Arizona Department of Administration General Services Division, specifically for the ADVS-Marana-Veterans Memorial Cemetery Expansion project (Solicitation No. BPM006983). The bid is submitted by Paradigm CCW JV LLC, a construction firm based in Phoenix, Arizona, with an AZ Contractor's License No. #328071 (KB-1 license type), represented by Brandon Curtis, Construction Manager.
The bid covers a comprehensive set of construction services for the veterans memorial cemetery expansion, with a base bid subtotal of $568,600.00, which increases to $618,068.20 after applying an 8.7% tax rate. The bid includes line items for various construction activities such as general requirements, temporary construction, demolition, surveying, concrete work, site signage, earth moving, landscaping, permits, erosion control, and facility modifications. The bid is valid for 90 calendar days, and the bidder is required to provide a bid security of $56,860.00. The project involves reconfiguring existing structures, installing site furnishings, and preparing the cemetery expansion area with various specialized construction tasks.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Solicitation No. BPM006983 Project Name: ADVS-Marana-Veterans Memorial Cemetery Expansion Agency Project No. PCS-25-062 Arizona Department of Administration General Services Division 1400 W Washington St., Ste. B200 Phoenix, AZ 85007
ATTACHMENT B BID SCHEDULE
| Location | BASE BID | ||||
| ITEM NO. | DESCRIPTION | Estimated Quantity | Unit of Measure | Unit Price | Price Extension |
| BASE BID | |||||
| 1 | General Requirements | 1 | LS | $97,050.00 | $97,050.00 |
| 2 | Temporary Construction | 1 | LS | $17,270.00 | $17,270.00 |
| 2 | Exsiting conditions Demolition | 1 | LS | $111,210.00 | $111,210.00 |
| 3 | Surveying | 1 | LS | $18,700.00 | $18,700.00 |
| 4 | Concrete | 1 | LS | $8,000.00 | $8,000.00 |
| 5 | Construction Signage | 1 | LS | $7,800.00 | $7,800.00 |
| 7 | Site Signage (way finding, trash/flower recipticals/ section identifers) | 1 | LS | $31,660.00 | $31,660.00 |
| 8 | Earth Moving | 1 | LS | $132,760.00 | $132,760.00 |
| 9 | Site Funishings | 1 | LS | $0.00 | $0.00 |
| 10 | Landscape | 1 | LS | $101,150.00 | $101,150.00 |
| 11 | Permits | 1 | LS | $3,500.00 | $3,500.00 |
| 12 | SWPPP/ Erosion Control | 1 | LS | $29,550.00 | $29,550.00 |
| 13 | Construction Water | 1 | LS | $0.00 | $0.00 |
| 14 | Reconfigure emblems, paint and patch comittal shelter | 1 | LS | $5,900.00 | $5,900.00 |
| 16 | Reconfigure emblems, paint and patch assembly area | 1 | LS | $4,050.00 | $4,050.00 |
| 17 | In ground cremains ( design, fabrication and delivery to the site) | 1 | LS | $0.00 | $0.00 |
| 18 | In ground cremains ( installation costs) | 1 | LS | $0.00 | $0.00 |
Subtotal BASE BID SUBTOTAL $568,600.00
TAX Your Tax Rate (Enter Rate Here)--------------------------------------------------------------> 8.7000% $49,468.20
GRAND TOTAL GRAND TOTAL (TO INCLUDE TAX) $618,068.20
Unit prices for shall include all labor, materials, water disposal, bailing, shoring, removal, disposal, overhead, profit, insurance, and all other related costs and work to complete the ADVS-Marana-Veterans Memorial Cemetery Expansion.
Bidder understands that the Owner reserves the right to reject any or all Bids, or portions thereof, and to waive any informalities in the bidding.
The Bidder agrees that this Bid shall be good and may not be withdrawn for a period of ninety (90) calendar days after the scheduled closing time for receiving Bids.
Upon receipt of written notice of the acceptance of this Bid, Bidder shall execute AND Agreement within 10 days and deliver a Performance Bond, Payment Bond, and Certificates of Insurance.
| Bid Security the sum of |
| $ 56,860.00 |
| is to become the property of the Owner in the event the Contract and Bond(s) are not executed and provided within the time above set forth, as liquidated damages for the delay and additional expense to the Owner caused thereby. **Please submit a copy of the Bid Security with your submission in APP with an original to follow via mail within seven (7) days of the Bid Due Date** |
| RESPECTFULLY SUBMITTED BY: | |
| BY: | Brandon Curtis |
| TITLE: | Construction Manager |
| FIRM: | Paradigm CCW JV LLC |
| ADDRESS | 5110 N 40th st. Ste 254 |
| CITY, STATE, ZIP | Phoenix, AZ 85018 |
| PHONE: | 602.315.4389 |
| FAX: | |
| Seal - if Bid by a corporation | |
| AZ Contractor's License No: | #328071 |
| License Type: | KB-1 |