This is an Invitation for Bid (IFB) #37-25-055 issued by the Charter County of Wayne, Michigan, for the Grosse Ile Pool House Renovations project. The county is seeking bids for a comprehensive renovation of the Water's Edge Community Pool House located at 9339 Bellevue Road in Grosse Ile Township. The project involves full demolition of the existing interior (excluding the pump room), complete interior build-out, incidental structural repairs, site work, handicap accessibility upgrades, and interior/exterior finishing. The mandatory pre-bid meeting is scheduled for June 30, 2025, at 10:00 a.m., with bid responses due on July 18, 2025, at 1:00 p.m. The contract term is proposed for one year from the award date, with substantial completion expected within six months of the Notice to Proceed.

The project is funded through the U.S. Department of Housing and Urban Development (HUD) under the Community Development Block Grant (CDBG) Program. The bid includes a 5% bid guarantee bond requirement and performance and payment bonds will be required at 100% of the contract value. Wayne County offers potential equalization credits for County-Based Enterprises (up to 7%), Targeted Growth Community Enterprises (2%), and additional certifications like Small Business Enterprise, Expanding Business Enterprise, Joint Venture, Mentor Venture, and Veteran Enterprise (each at 2%). The project involves renovating a seasonal, unconditioned structure with two pools, and bidders must demonstrate minimum qualifications including a Michigan construction license, experience in plumbing, electrical, metal roofing, and ADA improvements.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THE CHARTER COUNTY OF WAYNE, MICHIGAN

INVITATION FOR BID

FOR

GROSSE ILE POOL HOUSE RENOVATIONS

CONTROL NO. 37-25-055

IFB TIMETABLE

ACTION DATE TIME

IFB Issue Date 06/13/2025

Pre-Bid Conference* 06/30/2025 10:00 a.m. LOCAL TIME Location provided below

Bidder’s Questions Due 07/07/2025 4:00 p.m. LOCAL TIME Responses to Bidder’s Questions** 07/10/2025

Bid Responses Due 07/18/2025 1:00 p.m. LOCAL TIME Virtual Bid Opening (See Pg. 2 for link) 07/18/2025 1:15 p.m. LOCAL TIME

Notice to Award** TBD Contract Start Date** TBD

* If Necessary ** Estimated Dates

Procurement Contact: Erika Hunter, Strategic Sourcing Analyst

(313) 224-2310 ehunter@waynecountymi.gov

Pre-bid Meeting Location: 10:00 a.m. LOCAL TIME, Monday, June 30, 2025 (Mandatory) Grosse Ile Township’s Water’s Edge Community Pool House 9339 Bellevue Road Grosse Ile Township, MI 48138

Description: The County of Wayne is requesting bids for the renovation of the Grosse Ile Township’s Water’s Edge Community Pool House located at 9339 Bellevue Road, Grosse Ile Township, MI 48138.

mailto:ehunter@waynecountymi.gov

IFB# 37-25-055

A copy of this bid may be obtained from the BidNet Direct website (formerly MITN.info) at https://www.bidnetdirect.com, until the deadline date and time noted above.

VIRTUAL BID OPENING LINK:

JOIN ZOOM MEETING

HTTPS://WAYNECOUNTY.ZOOM.US/J/83012586645?PWD=TY4O8WZY0H4AYONAFR6NOAUILBQ91V.1

MEETING ID: 830 1258 6645

PASSCODE: 392479

ONE TAP MOBILE

+13126266799,,83012586645#,,,,*392479# US (CHICAGO)

+16465588656,,83012586645#,,,,*392479# US (NEW YORK)

DIAL BY YOUR LOCATION

• +1 312 626 6799 US (CHICAGO)

• +1 646 558 8656 US (NEW YORK)

• +1 646 931 3860 US

• +1 301 715 8592 US (WASHINGTON DC)

• +1 305 224 1968 US

• +1 309 205 3325 US

• +1 253 215 8782 US (TACOMA)

• +1 346 248 7799 US (HOUSTON)

• +1 360 209 5623 US

• +1 386 347 5053 US

• +1 507 473 4847 US

• +1 564 217 2000 US

• +1 669 444 9171 US

• +1 689 278 1000 US

• +1 719 359 4580 US

• +1 720 707 2699 US (DENVER)

• +1 253 205 0468 US

MEETING ID: 830 1258 6645

PASSCODE: 392479

FIND YOUR LOCAL NUMBER: HTTPS://WAYNECOUNTY.ZOOM.US/U/KCLQBTZXDW

JOIN BY SIP

• 83012586645@ZOOMCRC.COM

https://www.bidnetdirect.com/ https://waynecounty.zoom.us/j/83012586645?pwd=TY4o8WZy0H4AyonaFR6noauilbq91v.1 https://waynecounty.zoom.us/u/kclqBTZxdw mailto:83012586645@zoomcrc.com

Contents

PART 1 – INVITATION FOR BID (IFB)

SECTION 1.0 – INTRODUCTION & INSTRUCTIONS:

1.1 Introduction/Background

1.2 Objective

1.3 Overview of Solicitation (IFB) Document

1.4 Contact with Wayne County Personnel

1.5 Wayne County Rights & Responsibilities

1.6 Subcontractors

1.7 Disqualification of Bidders

1.8 Freedom of Information Act (FOIA)

1.9 Disclosure of Contents

1.10 County-Based Enterprise (and other) Advantage Programs

1.11 Final Agreement Award Determination

1.12 Conflict of Interest

1.13 Gratuities

1.14 Compliance with Laws

1.15 Cooperative Contract (Optional)

1.16 Bid Guarantee

1.17 Performance and Payment Bonds

1.18 Pre-Bid Meeting and Site Visit

1.19 Definitions (Optional)

SECTION 2.0 – MINIMUM QUALIFICATIONS

2.1 Adherence to Minimum Qualifications (Pass/Fail)

SECTION 3.0 – SPECIFICATIONS AND SCOPE OF WORK

3.1 Objectives and Purpose:

3.2 Specifications:

3.3 Contract Term

3.4 Additional Specifications:

SECTION 4.0 – BIDDING, EVALUATION, SELECTION & AWARD PROCESS

4.1 Wayne County Responsibility

4.2 Truth and Accuracy of Representations

4.3 Bidder Q&A

4.4 Preparation of the Bid

4.5 Bid Submission Requirements

4.6 Duplicate Bids

4.7 Withdrawal

4.8 Evaluation Process

4.9 Optional Tools to Enhance Evaluation Process

4.10 Wayne County Option to Reject Bids

PART 2 – SUPPLIER SUBMITTAL REQUIREMENTS

SECTION 5.0 – REQUIRED DOCUMENTATION AND FORMS

5.1 REFERENCES THAT DEMONSTRATE MINIMUM QUALIFICATIONS

5.2 BID FORM

5.3 PRICING SHEET AND OTHER PRICING REQUIREMENTS

5.4 BID GUARANTEE/BID BOND

5.5 RESPONSE TO SPECIFICATIONS/SCOPE OF WORK REQUIREMENTS FORM

5.6 TERMS AND CONDITIONS FORM

5.7 CONSTRUCTION BIDDER QUESTIONNAIRE

5.8 CONTRACTOR ESTIMATED WORK FORCE BREAKDOWN FORM

5.8.1 CONTRACTOR’S ADDITIONAL INFORMATION

5.9 DEBARMENT FORM

APPENDICES

Appendix A – Price Sheet Appendix B – Sample Agreement/Contract Appendix C – Examples of Surety Forms (Performance and Payment Bonds) Appendix D – Construction Documents (Requirements, Specifications, Plans, Drawings) Appendix E – Davis Bacon Act Information Appendix F – Davis Bacon Wage Rates Determination Appendix G – Section 3 FAQs and Information Appendix H – Federal Labor Standards (HUD Form 4010) Information Appendix I – DBE Participation Form

PART 1 – INVITATION FOR BID (IFB)

SECTION 1.0 – INTRODUCTION & INSTRUCTIONS:

1.1 Introduction/Background

INTRODUCTION: Through this Invitation for Bid (IFB), the Charter County of Wayne (County) hereby invites businesses who meet the qualifications and specifications set forth herein to submit bids for the purpose of renovating the Water’s Edge Community Pool House located in Grosse Ile, Michigan. Renovations will include the demolition of the existing interior of the pool house (exception: existing pump room not included); complete interior build-out; incidental structural repairs; incidental site work; full handicap accessibility upgrades, and interior/exterior finishing.

GENERAL WAYNE COUNTY INFORMATION: Situated in the heart of the Great Lakes region along the beautiful Detroit River, Wayne County is the 19th most populous county in the United States. With 43 distinct communities including the automotive capital of the world - Detroit, Wayne County is rich in history, culture, arts, and world-class amenities. We take pride in being one of the most diverse counties in the United States;

a place where different cultures come together to offer a truly cosmopolitan experience.

Wayne County offers a first-class business environment, a top-rated international airport, diverse residential areas, expansive parks, and a multitude of recreational and cultural activities. We are home to several major universities including Wayne State, the University of Michigan-Dearborn, and the University of Detroit-Mercy.

We have several award-winning secondary and primary schools, as well as numerous community colleges and vocational schools. We are also home to the Detroit Symphony Orchestra, Michigan Opera Theater, Detroit Institute of Arts, the Henry Ford, and dozens of theaters, art galleries and concert halls. With hundreds of musical and cultural events every year, Wayne County is Michigan's cultural epicenter.

SPECIFIC BACKGROUND INFORMATION: The Charter County of Wayne (County) administers federal funds provided by the U.S. Department of Housing and Urban Development (HUD) under the Community Development Block Grant (CDBG) Program. Each year, funds are awarded to multiple municipalities for the purpose of improving and developing surrounding communities.

Grosse Ile Township is located in the southeast portion of Wayne County in Michigan. The township is composed of twelve (12) islands, of which Grosse Ile is the largest. Grosse Ile’s Community Recreation Department oversees the operations of the Water’s Edge Recreation Complex that includes the marina, pool, golf course and driving range.

The Water's Edge Community Pool Complex has two (2) pools. The Lap Pool has five (5) lanes and varies in depth from three (3’) feet to five-feet and five inches (5’5”). The Leisure Pool is approximately seven-hundred

(700) square feet and is two-to-three (2-3’) feet deep. Both pools are heated.

1.2 Objective

The general objectives of this solicitation are the following:

• competitively award a contract

• ensure there is a fair process at every step of the procurement process

• to fulfill the purchase request in a timely manner

• ensure that taxpayers dollars are spent wisely

1.3 Overview of Solicitation (IFB) Document

The solicitation is composed of the following 2 parts:

PART 1: INVITATION FOR BID

Section 1.0: INTRODUCTION/OVERVIEW: Specifies the information regarding the requirements of the solicitation process.

Section 2.0: MINIMUM QUALIFICATIONS: Specifies the requirements a bidder must meet in order to be considered for evaluation.

Section 3.0: SPECIFICATIONS AND SCOPE OF WORK: Sets forth a description of the required Grosse

Ile Township Water’s Edge Community Pool House renovation.

Section 4.0: BIDDING, EVALUATION, SELECTION & AWARD PROCESS: Includes information on how bids will be evaluated, selected and awarded.

PART 2: SUPPLIER SUBMITTAL REQUIREMENTS (CHECKLIST)

Section 5.0: REQUIRED DOCUMENTATION AND FORMS: Bidder will submit the required documentation and complete the requisite forms that will be utilized in determining whether the Bidder is a responsive and responsible bidder that has the capacity and capability to deliver and provide products under this agreement.

1.4 Contact with Wayne County Personnel

In order to create a more competitive and unbiased procurement process, the County has designated a single point of contact for the duration of this solicitation. From the issue date of this IFB, until a successful bidder is selected, all requests for clarification or additional information regarding this IFB, or contact with County personnel concerning this IFB or the evaluation process must be solely to the contact person listed on the cover page of this IFB.

If it is discovered that a bidder contacted and received information regarding this Solicitation from any Wayne County personnel other than the person specified above, the Wayne County Procurement Director, at his / her sole discretion may disqualify its bid from further consideration. Only those communications made by the Procurement Department contact in writing will be binding with respect to this IFB.

If it is later discovered that a violation in regards to this section has occurred, the County may reject any bid or terminate any contract awarded pursuant to this IFB.

1.5 Wayne County Rights & Responsibilities

Wayne County has the right to amend this IFB by one or more written addenda. Wayne County is responsible only for that which is expressly stated in the solicitation document and any authorized written addenda.

Should any such addenda require additional information not previously requested, Bidder’s failure to address the requirements of such addenda may result in the Bid not being considered, as determined in the sole discretion of Wayne County. Wayne County is not responsible for and shall not be bound by any representations otherwise made by any individual acting or purporting to act on its behalf, other than the Procurement Director, Procurement Director’s designee, and/or stated contact for the solicitation.

It is the Bidder’s responsibility to periodically check the source of the IFB until the posted bid deadline to obtain any issued addenda. However, Wayne County will make reasonable efforts to inform all bidders of any clarifications, modifications, or amendments.

When, either before or after receipt of bids, Wayne County changes its requirements or terms and conditions, the Procurement Director, or their designee, shall amend the solicitation.

The Procurement Director will have the discretion to extend the IFB deadline date if he/she determines that it is in the best interest of the County. Furthermore, the Procurement Director may also cancel the original solicitation and issue a new solicitation if it is in the best interest of the County or if the amendment is so substantial in nature as to exceed what prospective offerors reasonably could have anticipated, so that additional sources likely would have submitted offers had the substance of the amendment been known to them.

1.6 Subcontractors

In an effort to promote supplier diversity, Wayne County encourages bidders to identify and include qualified disadvantaged businesses as subcontractors when proposing to provide products and services to the County.

If the Bidder’s team is composed of a Prime Contractor with subcontractors, the subcontractors must remain exclusive to the Prime described in the bid until the end of the specific bid period and may not partner with more than one prime for the purposes of the responsive bid. The total exclusive time will be 120 days from the bid due date.

Subcontractors (or their assignments), as it pertains to the specifications/scope of work may not be changed without prior written approval by the County. The Contract will not be assignable to any other business entity without the County’s approval. Bidders are encouraged to consider a joint venture.

1.7 Disqualification of Bidders

Any one or more of the following causes may be considered sufficient for the disqualification of a bidder and the rejection of the bid:

a. Evidence of collusion among bidders

b. Lack of competency as revealed by either financial, experience, or equipment statements

c. Lack of responsibility as shown by past work

d. Uncompleted work under other contracts which, in the judgment of the County, might hinder or prevent the prompt completion of additional work if awarded

e. Being in arrears on existing contracts, in litigation with the County, or having defaulted on previous contracts

1.8 Freedom of Information Act (FOIA)

Bid responses, resultant contract(s) and all information submitted to Wayne County by Bidders and Contractors is subject to the Michigan Freedom of Information Act (FOIA), 1976 PA 442, MCL 15.231, et seq.

1.9 Disclosure of Contents

All information provided in the bid shall be held in confidence and shall not be revealed or discussed with competitors, until after award of the contract except as provided by law or court decision. All material submitted with the bid becomes the property of the County and may be returned only at the County’s option.

Bidders must make no other distribution of their bids other than authorized by this IFB. A bidder who shares cost information contained in its bid with other County personnel or competing bidder personnel shall be subject to disqualification.

1.10 County-Based Enterprise (and other) Advantage Programs

Wayne County administers a procurement program that gives pricing advantages (equalization credits) to businesses located within Wayne County and to businesses located within the 10 Targeted Growth Communities within Wayne County (Detroit, Ecorse, Hamtramck, Highland Park, Inkster, Melvindale, River Rouge, Romulus, Sumpter Township, and Taylor). The County shall apply equalization credits up to 7% to the price for bids submitted by certified County Based Enterprises (CBE) and 2% for Targeted Growth Community Enterprise (TGCE).

County Based Enterprise / Targeted Growth Community Enterprise Equalization Allowance Table

Contract Amount Equalization Percentage

Up to $50,000 (CBE) 7%

$50,000 to $200,000 (CBE) 5%

$200,000.01 and over (CBE) 2%

Targeted Growth Community Enterprise (TGCE) 2%

This program also includes five additional certifications that provide businesses with equalization credits. The five additional certifications are: Small Business Enterprise (SBE), Expanding Business Enterprise (EBE), Joint Venture (JV), Mentor Venture (MV) and Veteran Enterprise (VE). These equalization credits for qualifying certified suppliers have maximum allowable credits that cannot exceed 10% of the price. All suppliers, who wish to receive credits for their bids, must be certified by the Human Relations Division at the time of Bid and must submit a copy of their current certification in the bid.

Certification Eligible for Equalization Credits

Equalization Percentage

Small Business Enterprise (SBE) 2%

Expanding Business Enterprise (EBE) 2%

Joint Venture (JV) 2%

Mentor Venture (MV) 2%

Veteran Enterprise (VE) 2%

Equalization Allowance table for SBE, EBE, JV, MV, VE

If you have questions regarding certification or to apply for certification please visit Human Relations website at https://www.waynecounty.com/departments/corpcounsel/certification-program.aspx or call the office (313) 224-5021.

Most federal and state funded projects will not include the application of geographic advantages such as the CBE and TGCE in accordance with funding requirements as well as other advantage categories; in these cases, equalization credits will not apply.

1.11 Final Agreement Award Determination

The County reserves the right to withdraw the IFB, to award to one bidder, to any combination of bidders, by item, group of items, or total bid. The County may waive informalities. The bidder to whom the award is made will be notified at the earliest possible date. Tentative acceptance of the bid, intent to recommend award of a contract and actual award of the contract will be provided by written notice sent to the bidder at the address designated in the bid. If, for any reason, a contract is not executed with the selected bidder within a reasonable amount of time, as determined by Wayne County, after notice of recommended award, then the County may recommend the next most responsive and responsible bidder. Award of this bid is contingent upon the availability of funds for this project, within the sole discretion of the County. Acceptance of the bidder’s bid does not constitute a binding contract.

There is no contract until the agreement is approved by the Wayne County Commission (if such approval is required by the Procurement Ordinance) and executed by the County Executive.

The County is not liable for performance costs until the successful bidder has been given a fully executed contract. Failure to accept the terms and conditions of the County’s Standard Contract may deem the bidder non-responsive.

https://www.waynecounty.com/departments/corpcounsel/certification-program.aspx

1.12 Conflict of Interest

No Wayne County employee or agent whose position in Wayne County enables him/her to influence the selection of a supplier for this IFB, or any competing IFB, nor any spouse of economic dependent of such employees, shall be employed in any capacity by a bidder or have any other direct or indirect financial interest in the selection of a supplier.

1.13 Gratuities

It is prohibited for any Wayne County officer, employee or agent to accept a gratuity for themselves or for a relative, except as permitted by the County’s Procurement Ordinance.

A bidder shall not offer or give either directly or through an intermediary, consideration, in any form, to a Wayne County officer, employee or agent for the purpose of securing favorable treatment with respect to the award of the Contract.

1.14 Compliance with Laws

The Bidder must comply with all federal, state, and local laws and policies including, but not limited to:

A. The provisions of the Wayne County Procurement Ordinance governing “Ethics in Public Contracting”, as applicable to contractors, being Article 12 of Chapter 120, and Contractor agrees to provide all required disclosures;

B. The Michigan Civil Rights Act;

C. The Persons With Disabilities Act;

D. The Age Discrimination Act;

E. Section 504 of the Rehabilitation Act;

F. The Slavery Era Disclosure Ordinance;

G. The Fair Employment Practices of the Equal Contracting Opportunities Ordinances.

H. Davis Bacon Act

1.15 Cooperative Contract (Optional)

NOT APPLICABLE

1.16 Bid Guarantee

A bid guarantee, in the form of a bid bond in the amount of 5% of the total price of the bid, must be submitted with the bid. A bid guarantee is as a guarantee that the bidder will enter into a contract for the work of the bid is accepted.

1.17 Performance and Payment Bonds

Performance and Payment Bonds in the amount of 100% of the contract value, will be required of the awarded supplier.

1.18 Pre-Bid Meeting and Site Visit

Bidders must attend and sign in at all mandatory pre-bid meetings and site visits. (See cover page for location.)

1.19 Definitions (Optional)

HUD: U.S. Department of Housing and Urban Development

CDBG: Community Development Block Grant

SECTION 2.0 – MINIMUM QUALIFICATIONS

2.1 Adherence to Minimum Qualifications (Pass/Fail)

Interested and qualified bidders that can demonstrate their ability to successfully provide the services/products outlined in the Scope of Work/Specifications section of this IFB are invited to submit bid(s), provided they meet the following minimum qualifications:

a) The Bidder must have a State of Michigan endorsed Construction/Contractor’s License or Builder’s

License; and

b) The Bidder or its subcontractor or its key personnel must have at least five (5) years’ experience repairing or providing plumbing and electrical work; and

c) The Bidder or its subcontractor or its key personnel must have at least five (5) years’ experience installing metal roofs; and e) The Bidder or its subcontractor or its key personnel must have worked on at least three (3) comparable projects that included ADA improvements within the past ten (10) years.

Failure of the Bidder to meet all of the minimum qualifications will eliminate its bid from any further consideration.

SECTION 3.0 – SPECIFICATIONS AND SCOPE OF WORK

3.1 Objectives and Purpose

Project: Water’s Edge Community Pool / Pool House Location: 9339 Bellevue Rd, Grosse Ile Township, MI 48138 Project Type: Commercial / renovation, build-out Building Square Footage: 1,323 Square Feet / 1,118 Square Feet work area (not including the pump room) Date of original Construction: Unknown Existing drawings: No existing building drawings have been provided Environmental testing: No testing has been completed Proposed renovations timeline: Fall 2024 – Spring 2025 Notice of understanding: This structure is an unconditioned, seasonal structure.

When not in use (pools closed), it is winterized and closed-up for the season

Administrative / Site visit (mandatory and subsequent)

All General Contractors (GC) shall visit the project site with their trades at the time of the mandatory walk-through. No additional costs will be approved for conditions that could have been visually observed at the time of the mandatory walk-through.

Administrative / Voluntary Alternates

Although base pricing shall include the scope of work and systems illustrated in the pricing documents (drawings/narrative), Voluntary Alternates are encouraged but not required. Voluntary Alternates must be listed on the attached forms herein and will be evaluated as options by the County. Voluntary alternates shall not be used in calculating the base bid price.

Administrative / Mandatory Alternates

Mandatory alternates noted herein must be submitted as a part of the pricing. Mandatory alternates must be listed on the forms herein and will be evaluated by the County. . Mandatory alternates shall not be used in calculating the base bid price.

Allowances

Provide the following allowances as part of the Base Price. Allowances will be adjusted once final pricing can be determined:

Door hardware (for swing doors) $5,000.00

Contingencies

Contingencies shall be noted on the forms herein.

Design contingencies shall be governed by the Agreement between the Architect and the Owner. The construction contingency shall be in place to address unforeseen conditions. No portion of the construction contingency shall be used without prior approval. Work on unforeseen conditions shall not commence without prior review and approval by the Architect. Impacts to timeline and cost shall be submitted for evaluation and to give the Owner an opportunity to mitigate the expenses. The Owner has the right to approve, deny or approve with conditions any proposed use of the construction contingency.

The construction contingency is not to be used for Owner changes.

Warranties

Unless stated otherwise in this document, the General Contractor, shall warrant the work for a period of one

(1) year from the date of the occupancy permit. Addressing of issues that arise during the warranty period shall include all material and labor to resolve the issues that may arise. The General Contractor shall be the Owner’s point of contact for any warranty claims, whether the issue is related to a product, self-perform scope, or the work of their subcontractor(s).

The Owner shall not be required to contact manufacturers or trades directly for resolution, coordination or execution.

An extended warranty is required for the flooring system—see requirements under “flooring” herein.

Insurance

The insurance required to be in place as a part of the execution of this project shall be agreeable to both parties for governance, coverage amounts and terms. The General Contractor shall submit a Certificate of Insurance along with the Pricing Form. Additional names insured shall include: Grosse Ile Township, Charles E. Raines Company and VanderKlok Architects LLC.

Owner/GC contract

See Exhibit B – Sample Contract, included with this solicitation. The Architect’s services during construction are delineated in the Agreement between the Owner and the Architect. The GC/Owner Agreement cannot unilaterally increase or decrease the Architect’s scope of services.

All drawings will be available in PDF format for pricing. The General Contractor and their subcontractors may print hardcopies from the PDF documents. It is the responsibility of the General Contractor to ensure that their office and the office of their subcontractors have the current documents.

Administrative / Davis-Bacon

The Davis-Bacon Act applies to contractors and subcontractors performing work on this project.

Pricing, General

The pricing submitted for the base price, voluntary alternates, mandatory alternates and change orders shall include all hard and soft costs required to complete the work: labor, materials, equipment, general conditions, disposal fees, materials, taxes, equipment rental fees, licensing fees, insurances, overhead, profit, percentage multipliers, etc.

3.2 Specifications

Demolition

1. Preparation and care during the execution of the demolition scope.

a. This structure has a lot of deferred maintenance and was originally constructed using base acceptable building methods. The contractor shall review the existing conditions and take all necessary precautions in protecting all elements that are to remain. The building shows signs of differential settlement (ladder cracking in the CMU, etc)—bracing of the perimeter walls may be necessary to execute the scope of work while preserving the integrity of the existing structure (e.g.— if the GC elects to use a skid steer/hydraulic breaker to remove the slab, the vibrations produced may have negative consequences on the walls).

2. Interior

a. With the exception of the pump room, the full interior of the existing structure will be removed— concrete slab, plumbing fixtures, interior walls, existing ceiling finish, power, lighting, water distribution, sanitary, and incidental installations: abandoned ductwork, towel hooks, signage, etc.

3. Envelope

a. The perimeter, CMU walls will remain.

b. The existing, wood framed roof will remain.

c. The windows, existing concrete sills and any wood bucks/shims shall be removed in preparation for new windows.

d. All doors and frames are being removed (except the pump room door/frame)

e. Remove existing wood siding at the north and south sides of the central entry canopy—DO NOT

REMOVE SIDING AT THE NORTH AND SOUTH GABLES OF THE BUILDING.

4. Site

a. There are incidental elements that need to be removed in order to perform the improvement work:

select concrete slabs, portions of slabs, and portions of existing walks. Some are saw cuts; others are panel/slab removals.

5. Salvage

a. See demolition notes for required walk through with Owner to identify any items to be salvaged

(e.g.—existing refrigerator).

i. Salvaged items that are not to be reinstalled shall become the property of the Owner and removed from the work area after GC removal; salvaged items to be reinstalled shall be stored and protected by the GC for future reinstallation.

b. The Owner will remove any incidental effects related to the operation of the concessions/office area (e.g.—snacks, computers, paperwork, etc)

6. Preparation of elements that are to remain

a. Means and methods are the responsibility of the GC; trade scope assignments are the responsibility of the GC. Regardless of the means/methods/responsibility, the perimeter CMU walls and wood framed roof structure must be cleaned and prepped. The CMU walls will be primed/painted; the wood roof structure will be sprayed primer/paint. Methods of prep shall be coordinated with the finishing trades (e.g.—compressed air, power washing, sand blasting, etc).

Concrete

1. IMPORTANT NOTICE

a. The floor finish for this building is a seamless 3/16” decorative chip flooring system featuring a highly moisture tolerant self-priming and self-leveling body coat topped with a double broadcast of decorative Macro or Micro vinyl chip aggregate and finished with an Accelera fast-curing topcoat for a chemical and abrasion resistant, high-gloss finish. For a successful installation, the subbase slab, vapor barrier and slab preparation must be properly completed or the system will fail. The GC must coordinate a meeting between the concrete trade, floor finisher and local product rep to ensure that all parties are in concurrence with the process and understand the requirements. Failure to coordinate may result in premature failure of the system and extensive removal/replacement of the system.

2. The GC shall be responsible for assigning responsibilities for each trade. Do not assume that one trade will be doing a portion of the work related to your specialty (e.g.—although removal of slabs are discussed in demo, the GC may elect to have the concrete trade responsible for all or some of the scope; saw cutting of CMU for new door openings).

3. Interior slab in the locker rooms and office/concessions being removed in its entirety. See Demolition.

4. Select exterior slabs are being removed (see demolition).

5. Structural foundations

a. There are (02) belled, post footings required as a part of this scope. The westerly overhang of the building includes (02) wood posts. These posts are currently sitting on the slab and can be moved with little effort. It is believed that the posts may have been added for shoring at some point in the life of the building and are not original to the building. It is likely that the roof was originally designed as being self-supporting. But, since the posts have been added, and the building is aging and showing signs of differential settlement, the scope of this project will include establishing permanent footings and posts.

b. GC shall provide shoring, as required, prior to any modifications to the canopy being made.

6. Flatwork, interior

a. Handicap requirements

i. This project is very tight in accommodating the various Federal law and State Code handicap clearances. Minor field adjustments of roughs, drains and slopes may seem incidental but could prove detrimental to providing proper handicap dimension in the finished product. Coordinate with the PC to ensure proper placements.

b. Structural slabs

i. There aren’t any interior footings as a part of this project. The proposed CMU walls will sit directly on the slab. The slab is 5” in lieu of the ‘normal’ 4” interior slab and contains wire mesh. It is critical that the soil beneath the slabs be properly compacted and tested (including backfill over plumbing excavations) prior to the slabs being poured.

ii. No CMU walls shall be placed on the slab for 10 calendar days.

c. Slabs, general

i. Prior to any interior slabs being installed, density testing must be completed in accordance with the plans.

ii. Due to the proposed finish of the slab, it is critical that the proper subbase and vapor barrier be installed. Improper (or missing vapor barrier) will have a detrimental impact on the performance of the floor finish (blistering and delamination).

iii. The top of the slab must be finished in accordance with the flooring supplier’s requirements for adhesion.

iv. Expansion joint material shall be used where the slab abuts the exterior, perimeter walls.

v. Slabs shall be sloped, as indicated on the drawings

vi. Slabs shall be recessed 1 ½” in nonhandicap showers; DO NOT RECESS THE SLAB IN

THE HANDICAP SHOWERS (slope to drain only).

1. The slab is the ‘floor pan’ for the showers—no fiberglass pans will be installed over the slab.

vii. Provide control joints where required and where noted on plans.

d. Slabs at exterior door openings

i. Where new door openings are being created, the interior and exterior slabs shall ‘merge’ through the door openings and abut one another at an expansion joint under the threshold of the new door/frames. Existing masonry at the new doorways must be removed to 8” below FF and the slabs thickened to 8” through the width of the doorway.

7. Flatwork, exterior

a. All exterior slabs shall meet the specifications in the drawings.

b. Slabs shall pitch away from the structure ¼” / FT minimum. Slabs at doorways shall not exceed ¼”

/ FT as they are considered ‘landings’ and exceeding ¼” / FT would exceed handicap requirements.

c. Where noted, rigid insulation shall be placed under the slabs to help in controlling heaving.

d. Expansion joint material shall be used where slabs abut CMU walls and structural post footings.

e. Control joints shall be placed where required to minimize cracking.

f. New slabs shall be doweled into existing slabs, when abutting.

Masonry

1. The GC shall be responsible for assigning responsibilities for each trade. Do not assume that one trade will be doing a portion of the work related to your specialty (e.g.—saw cutting of new door openings)

2. The existing exterior masonry walls need attention. Differential settlement has caused ladder / stair step cracking in many areas of the wall system. It is believed that the differential settlement has been exasperated by storm water runoff from the roof (gutters/downspouts are being added as a part of this project to help move the storm water away from the building)

3. Understanding the condition of the existing, exterior masonry, it is understood that the finish of the exterior masonry will not be in ‘like new’ condition and most of the areas of concern will still show imperfections after addressing them.

a. The ladder/stair step cracking appears to have been filled (multiple times) over the years. These joints need to be cleaned and tuck-pointed, inside and out.

b. Where interior abutting walls have been removed, the face shells may need to be patched/repaired.

c. Where accessories have been removed, the face shells may need to be patched/repaired— examples: where the exterior shower has been removed; where towel hooks have been removed, etc.

d. Existing doors and windows are being removed. Door openings are shifting from their current positions to accommodate the new plan layout and handicap accessible widths.

i. Existing openings will need to be infilled, including infilling the wood infills around the existing, easterly door and adjacent window.

e. There are several locations where polyurethane spray foam was used for various CMU penetrations.

Remove foam and mortar around penetrations for proper sealing.

4. Where precast concrete lintels are noted, properly sized, galvanized steel lintels may be substituted (one/4” of wythe).

5. A coordinated effort will be required between the masons and the plumbers—there are water lines and sanitary lines concealed within the CMU walls.

Wood framing

1. The GC shall be responsible for assigning responsibilities for each trade. Do not assume that one trade will be doing a portion of the work related to your specialty (e.g.—repairs to the entry overhang).

2. All wood in contact with concrete or masonry shall be treated.

3. Front canopy/overhang

a. Due to improper installation, storm water has entered the north and south faces of the front entry canopy. Water has collected behind the decorative friezes and rotted the framing members. A small access hole was cut at the north end of the canopy soffit but a full investigation could not be completed due to limited ability to observe existing conditions. The drawings indicate removal/replacement of the end wall members at both the north and south ends and specify framing members to be assumed during pricing.

b. It is assumed that we will be adding 7/16” osb sheathing over the existing sheathing boards; installing Tyvek Commercial Wrap and new vinyl siding. A new fibercement fascia will need to be installed over the existing and a new drip edge flashing installed to account for the deeper fascia elements.

A sidewall flashing will be required where the lower slope abuts the vertical face of the gable end.

c. The decorative friezes at the bottom of the entry canopy element shall be removed and replaced. At the end walls, a transition flashing must be installed between the bottom of the vinyl siding at the top of the new frieze. The upper, vertical leg of the flashing shall be ‘shingled’ under the Tyvek wrap.

4. Front posts

a. The westerly overhang of the building includes (02) wood posts. These posts are currently sitting on the slab and can be moved with little effort. It is believed that the posts may have been added for shoring at some point in the life of the building and are not original to the building. It is likely that the roof was originally designed as being self-supporting. But, since the posts have been added, and the building is aging and showing signs of differential settlement, the scope of this project will include establishing permanent footings and new posts.

5. Existing roof structure

a. The existing roof structure includes a ridge, roof rafters and ceiling joists. Where the front entry canopy exists, a stub wall was constructed over the CMU to support the projection and slope of the extended roof rafters. It is proposed as a part of this renovation project to leave this framing exposed (spray coated in white epoxy paint so that the material is ‘sealed’ per the Michigan Pool Code). The wood is old and is expected to show signs of its age, including the possibility of some splits. The aged and rough character of the framing is desired and the scope of the project is not to make the roof framing/roof sheathing ‘perfect’. Any splits shall be repaired/reinforced but the overall existing conditions shall be left as-is.

6. Provide blocking at the roof framing as illustrated in the window section.

7. Windows

a. Provide treated window bucks as illustrated in the window section

8. MEP coordinations

a. Coordinate with EC the installation of wood mounting backers for the inverted lighting system.

b. Coordinate with the MC the removal, framing and blocking required for the installation of the exhaust systems.

9. Although these systems are showing age and wear, they are proposed to remain

a. Frieze at CMU/overhang juncture

b. Soffit at entry canopy

c. Soffit at overhangs

Roofing

1. It shall be expected, as a part of executing the scope of work described herein and in the drawings, that some incidental roofing work will need to be completed to properly complete the work.

a. Flashing tie-in where the sides of the entry canopy abut the lower roof slopes

b. Drip edge and flashing tie-in where the side of the entry canopy receives new rake trim

c. Incidental penetrations (i.e.—plumbing vents, if applicable)

Doors and Frames

1. See schedule and specifications on sheet A-1

2. Hardware, pending – include allowance of $5,000.00 for all swing door hardware. The allowance will be adjusted (increased or decreased) once the hardware package is complete.

Coil doors

1. See schedule and specifications on A-1

Operable windows

1. See schedule and specifications on A-1

Finishes and equipment, Interior

1. Flooring

a. IMPORTANT NOTICE

i. The floor finish for this building is a seamless 3/16” decorative chip flooring system featuring a highly moisture tolerant self-priming and self-leveling body coat topped with a double broadcast of decorative Macro or Micro vinyl chip aggregate and finished with an Accelera fast-curing topcoat for a chemical and abrasion resistant, high-gloss finish. For a successful installation, the subbase slab, vapor barrier and slab preparation must be properly completed or the system will fail. The GC must coordinate a meeting between the concrete trade, floor finisher and local product rep to ensure that all parties are in concurrence with the process and understand the requirements. Failure to coordinate may result in premature failure of the system and extensive removal/replacement of the system.

b. A 6” preformed base is required in all areas except the shower ‘compartments’. See finish plan. The base shall be an acceptable substrate approved by the floor finish manufacturer and the wall properly prepared for adhesion of the system.

c. Any expansion joints between the concrete floor and wall systems shall be properly treated to not interfere with the floor finish or base.

d. Any saw cut expansion joints in the slab shall be filled and prepped in accordance with the manufacturer’s requirements.

e. The floor/base finisher shall be responsible for:

i. Attending the pre-construction meeting related to the preparation and application of the system (see above)

ii. Preparing a mock-up that can be tested for the slip resistance coefficient

iii. Observing the conditions of the slab subbase and vapor barrier. The vapor barrier shall be approved prior to the slab being poured.

iv. Observing the conditions of the concrete slab after pour and cure.

v. Providing moisture testing prior to application and shall not commence application unless the moisture levels are within the acceptable levels required by the product manufacturers.

vi. Providing temporary protective covering of the finished work until substantial completion of the project is complete and the building is turned over to the Owner for use.

f. Warranty

i. In addition to the manufacturer’s product warranties, the applicator shall provide a two-year warranty for materials and labor to address any premature failures of the system due to improper preparation, application and/or finishing—including, but no limited to, moisture migration, slab preparation, adhesion, bubbling, blistering, etc. The warranty shall commence on the date of substantial completion of the project.

2. Wall finishes

a. See drawings for prep, prime and finish of the walls

b. All paint shall be moisture and mildew resistant

3. Open structure finish

a. The existing, open structure is proposed to be finished with semi-gloss white epoxy

4. Sealants

a. Provide sealant between all dissimilar materials

5. Partitions

a. Solid HDPE

b. Format

i. Floor anchored; overhead braced toilet and shower partitions

ii. Wall anchored urinal partitions

c. Stainless stirrups

d. Stainless brackets

e. Stainless hardware

f. Stainless support rail, anti-grip

g. No sight privacy strips on toilet partitions

h. Sizes

i. Toilet

1. 64” door and panels

ii. Urinals

1. 51” panels

iii. Showers

1. 72” panels

6. Stainless steel countertops

a. 16 gauge

b. 304 18/8

c. #4 brushed

d. Treated poplar plywood backer (two layers ¾”)

7. Lockers

a. U-line, or approved equal

i. H-5987, all weather lockers

b. Double stacks

c. 12”x18”x72”

d. High density polyethylene

8. Accessories

a. See cut sheets for Base Price accessories

9. Code-required signage

a. Tactile/braille signage shall be provided and installed at the following locations

i. “EXIT” – inside latch jamb at doors 101, 102 and 104

ii. “MENS LOCKER ROOM” – outside latch jamb at door 104. Include international symbol of accessibility and male pictograph

iii. “WOMENS LOCKER ROOM” – outside latch jamb at door 102. Include international symbol of accessibility and female pictograph

iv. “CONCESSIONS” – mount on door 103 (no room adjacent to latch jamb)

v. “PUMP ROOM” – outside latch jamb of existing pump room exterior door

vi. “UTILITY” – jamb latch of janitor’s closet

Plumbing

1. See cut sheets for Base Price fixtures proposed

2. The GC shall be responsible for assigning responsibilities for each trade. Do not assume that one trade will be doing a portion of the work related to your specialty (e.g.—water heater removal, fixture removal, etc).

3. Receive and review all documents related to the full scope of the building renovation—do not limit your review to the sheets specific to your trade.

4. A coordinated effort will be required between the plumbers and the masons—there are water lines and sanitary lines concealed within the CMU walls.

5. This structure is an unconditioned, seasonal structure. When not in use (pools closed), it is winterized and closed up for the season. There is no temporary heat. Provide necessary provisions to allow for proper winterization in the off season.

6. Handicap requirements

a. This project is very tight in accommodating the various Federal law and State Code handicap clearances. Minor field adjustments of slab roughs may seem incidental but could prove detrimental to providing proper handicap dimension in the finished product. Coordinate with the concrete trade to ensure proper placements. Communicate with the Architect’s office if there are any concerns.

7. The system designed is based on copper. PEX may be used but the piping will need to be upsized from what is indicated on the drawings to account for fitting pressure loss.

8. The water fixture units calculate to needing a 1 ½” water service. The existing water service is a nominal 1 ½”service (comes up into the pump room to the north).

9. PVC is an acceptable product for sanitary piping and venting in this building.

10. Provide access panels to all concealed valves, if applicable

11. Provide vented access panels for all AIVs (see detail, sheet P-1).

12. The condition, flow, depth and location of the existing sanitary lateral is unknown. The point-of-exit illustrated on the drawings is the assumption based on existing conditions. If, during demolition and rough, conditions differ from what was assumed, contact the Architect’s office.

13. All floor drains (not including shower drains) shall have SureSeal Waterless Inline Drain Trap Seals.

14. The swimsuit dryers note that a floor drain is needed to ‘drain’ the incidental water from the system but the manufacturer documents don’t specify the type of drain. For the sake of the base bid, assume that it is a funnel drain and that the manufacturer’s drain will be via a flexible hose and air gap to the funnel.

15. Fixtures

a. Fixtures noted are for the Base Pricing. If the PC prefers a different manufacturer, please submit voluntary alternates during bidding.

b. Flush valve toilets will not be acceptable due to the existing water service not be large enough to support the demand—flush tanks must be used.

c. The flush lever on the toilet tanks must be on the ‘wide side’ of the handicap toilet compartments (not on the ‘wall side’ of the compartment).

Electrical

1. See cut sheets for base price light fixtures proposed

2. The GC shall be responsible for assigning responsibilities for each trade.

3. Receive and review all documents related to the full scope of the building renovation—do not limit your review to the sheets specific to your trade.

4. A coordinated effort will be required between the EC and the masons—there are power feeds and boxes in the masonry—do not run conduits on the face of the masonry and do no surface mount recepts of boxes on the face of masonry.

5. This structure is an unconditioned, seasonal structure. When not in use (pools closed), it is winterized and closed up for the season. There is no temporary heat.

6. The work area is not considered a corrosive environment, but the pump room is. The shower/locker room/concessions-office area is a damp environment.

a. Properly rated equipment and wiring methods must be used in the pump room to avoid premature oxidation and failure.

b. Properly rated equipment and wiring methods must be used in the shower/locker room/concessions-office area to avoid premature oxidation and failure.

7. Use approved wiring methods as permitted in the NEC. This structure is a type V, combustible, unfire-rated structure. NM cable may be used where permitted by the NEC and concealed from sight. Exposed wire feeds may be galv rigid conduit, PVC conduit or FMC appropriate for exposed installation, finishing (epoxy paint) and exposure to moisture and humidity.

8. Exposed wiring installations shall be parallel and perpendicular to the building structure.

9. Coordinate installation of wood backers for ceiling uplighting with the architectural trade.

10. The occupant sensors shall be design/build. Provide and install all necessary systems and interconnections for activation of the lighting in accordance with the design intent of the drawings and the requirements of Ashrae 90.1.

11. Fixtures

a. Fixtures noted are for the Base Pricing. If the EC has a preference for a different manufacturer, please submit voluntary alternates during pricing

b. All interior light fixtures in the locker room areas shall be damp location listed

c. Devices shall be dark brown with stainless trim plates.

d. Emergency lighting is required due to the toilet rooms exceeding 300SF; exit lighting is not required

Mechanical

1. See cut sheets for Base Price equipment proposed

2. The GC shall be responsible for assigning responsibilities for each trade.

3. Receive and review all documents related to the full scope of the building renovation—do not limit your review to the sheets specific to your trade.

4. This structure is an unconditioned, seasonal structure. When not in use (pools closed), it is winterized and closed for the season. There is no temporary heat.

5. The work area is not considered a corrosive environment, but the pump room is. The shower/locker room/concessions-office area is a damp environment.

a. Appropriate materials must be used to avoid premature oxidation and failure

6. The exhaust fans are designed for intermittent use. They operate only when the space that they serve is occupied.

a. The occupant sensors shall be design/build. Provide and install all necessary systems and interconnections for activation of the exhaust fans in accordance with the design intent of the drawings and the requirements of the MMC.

3.3 Contract Term

The term of the resultant contract shall be for a period of one (1) year from the date of award, with Substantial Completion within six (6) months of receipt of the Notice to Proceed; and a one, six (6) additional MONTHS’ extension options, which may be exercised at the discretion of Wayne County.

3.4 Additional Specifications

3.4.1 Service Work Schedules

When the Contractor is onsite at…